ID |
Date |
Author |
Subject |
Text |
|
65
|
Thu Nov 9 10:15:38 2017 |
Sarah Lonsdale | Run 61 |
Header: 5.0 MeV/u and Carbon (C_25).
Ender:
====================================================
Run
number : 61
Date : 9 / 11
Start time : |
|
64
|
Thu Nov 9 09:49:03 2017 |
Sarah Lonsdale | Run 60 |
Header: 5.0 MeV/u and Empty Frame.
Tuned beam to lower scatter, solved dE counting
issue. Pulser scaler has been added.
Ender: |
|
62
|
Thu Nov 9 08:20:21 2017 |
Claudia | Restarting Target Current & Line Current | 0) If target or line drop, STOP THE BEAM!!
1) If you SEE target or line current
go down (top right window of monitors next |
|
61
|
Thu Nov 9 07:15:49 2017 |
MD | Tips for Babysitting ISOLDE during shifts | from ISOLDE webpage |
|
60
|
Thu Nov 9 06:30:35 2017 |
Daid, Mirco | Spectra (Shift 1) | Screen shots for accumulated data before the
target went down. Should be (at least) runs
53 & 54 inclusive, possibly back to the start |
12x |
59
|
Thu Nov 9 06:02:41 2017 |
Daid. Mirco | Run 57 | Header: Continue with 5.0 MeV/u and CH2.
Laser back on.
Ender:
|
|
58
|
Thu Nov 9 05:35:44 2017 |
Daid. Mirco | Run 56 |
Header: 5.0 MeV/u CH2, Laser 2 is turned
off on purpose to check background.
|
|
57
|
Thu Nov 9 05:33:50 2017 |
TD | Charge State Distributions | > Faraday cup readout at the end of our chamber
should change based on whether or not the
target is in and also the 59Cu
|
|
56
|
Thu Nov 9 03:32:55 2017 |
Daid. Mirco | Run 55 | Header: Continue 5.0 MeV/u with CH2 after
target re-heating
Ender: End
|
|
55
|
Thu Nov 9 01:24:01 2017 |
Daid. Mirco | Run 54 | Header: Continue with 5.0 MeV/u and CH2
Ender: Checked control room, about 2:40.
Target current is 2 A (low...should be 430 |
|
54
|
Wed Nov 8 23:46:32 2017 |
Daid | Charge State Distributions | Faraday cup readout at the end of our chamber
should change based on whether or not the
target is in and also the 59Cu beam energy.
|
|
53
|
Wed Nov 8 23:14:38 2017 |
Daid, Ruchi, Mirco | Run 53 | Header: Restart 5.0 MeV/u w/ CH2 after PS
comes back (3 rings until the morning)
Ender: End
|
|
52
|
Wed Nov 8 23:06:48 2017 |
Daid, Ruchi | Run 52 (junk) | (Junk -- see comments)
====================================================
Run number : 52
|
|
51
|
Wed Nov 8 22:21:35 2017 |
Ruchi | Beam transmission | By the end of beam tuning (around 6pm),
beam transmission between Faraday cups at
the end of SEC and at end of Edinburgh chamber: |
|
50
|
Wed Nov 8 22:08:55 2017 |
Daid | Run 51 | Header: Restart 5.0 MeV/u CH2 with 3 PS rings.
Ender: Stop run. We want good data with
a smaller file size for fast analysis, as |
|
49
|
Wed Nov 8 22:00:00 2017 |
daid | Scalars | Present scalars:
0: Ungated
1: Gated
|
|
48
|
Wed Nov 8 21:21:31 2017 |
Ruchi Garg, Daid | RunLogTemplate | Header:
Ender:
====================================================
|
|
47
|
Wed Nov 8 20:46:23 2017 |
Daid, Ruchi | Run 50 | Header: First run with irises open. 30 min
run.
Ender: Call from PS-Booster. Stop run.
|
|
46
|
Wed Nov 8 20:40:33 2017 |
Daid, Ruchi | Run 49 | Header: First test with RIB. Irises closed.
End: End
|
|
45
|
Wed Nov 8 17:12:01 2017 |
TD | MIDAS logs | Attachment 1 - snoop -d bge1 log following
MVME CPU reset
|
|