AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 14 of 35  ELOG logo
  ID Date Author Subject Text Attachments
  437   Fri May 13 02:28:36 2022 MLbeam droppedWe see less counts in AIDA implant DSSD1
(~1Hz) than at the beginning of the night
shift (~10Hz).
  
  436   Fri May 13 00:50:16 2022 ML2h-Shift ChecksAll seems ok  (apart for my virgin
network connection usually quite reliable
but not so tonight !?!).
 Stats_Screenshot_from_2022-05-13_01-45-56.pngTemp_Screenshot_from_2022-05-13_01-47-31.pngHV_LC_Screenshot_from_2022-05-13_01-48-21.png 
  435   Thu May 12 22:49:39 2022 BA, MALow RatesThe rate is very low in all aida, not sure
.
 RatesLow2022-05-12_23-48-01.png 
  434   Thu May 12 21:43:49 2022 BA, MARates 

Statistic check (screenshot attached).

Temperatures OK (screenshot attached).
 Stati2022-05-12_22-47-26.pngTemp2022-05-12_22-48-41.pngLeakageCurrent2022-05-12_22-45-44.png 
  433   Thu May 12 16:30:47 2022 NH, OH, TDNotes for mounting a second switchUpdate DHCPD as expected
Make sure new ethernet device is trusted
in firewall
  
  432   Thu May 12 10:10:51 2022 TD, OHAIDA data throughput
Attachment 1 - top aida06
 15x 
  431   Thu May 12 07:09:43 2022 TDThursday 12 May 08:00-24:00
08.10 AIDA DAQ status
    
 27x 
  430   Thu May 12 00:37:52 2022 OH, AMThursday 12 May01:37 Over the past hour the degrader settings
have been checked by impinging 209Pb onto
the detectors.
 13x 
  429   Wed May 11 19:08:41 2022 CB, PPWednesday 11th May - evening shift20:19 no beam yet.

Statistic check (screenshot attached).

Temperatures OK (screenshot attached).
 16.png22.png13.png14.png 
  428   Wed May 11 07:04:13 2022 OH, NH, TDWednesday 11th May08:00 Overnight at some point it appears that
aida14 has stopped producing any ASIC data
      It is currently sending data pause
 9x 
  427   Tue May 10 07:41:28 2022 NH TDTuesday 10 May8:15am S4 CONTROLLED ACCESS to remove beam
plug and check bPlas/AIDA response to beam
 29x 
  426   Mon May 9 08:36:23 2022 TD, NHMonday 9 May
09.32 Re-start AIDA
 31x 
  425   Sun May 8 17:43:57 2022 NHAIDA FEE64 LayoutAIDA FEE64 layout with respect to the beam.  AIDA_Adapter_Configuration(1).png 
  424   Sun May 8 15:10:45 2022 TDSunday 8 May
DSSSD bias and FEE64 power OFF during Ge
install
 6x 
  423   Sat May 7 13:27:39 2022 TDAIDA configuration
Adaptor PCB link settings
  
  422   Sat May 7 09:55:53 2022 TDSaturday 7 May
Attachments 1 & 2 per FEE64 1.8.L spectra
 15x 
  421   Fri May 6 09:31:41 2022 TD NHFriday 6 May
10:30 DAQ appears to have stopped
 33x 
  420   Wed May 4 16:50:04 2022 NHAIDA 4th MaybPlas has been mostly cabled in now

Reseat LAN cable (AIDA Switch -> AIDA-3)
 Screenshot_20220504_174929.pngScreenshot_20220504_175201.png 
  419   Tue May 3 14:15:17 2022 NHAIDA Updates 2 May
PAUSE/RESUME stats are dominated by 2x FEE64s
- aida07 and aida16
  
  418   Mon May 2 13:08:49 2022 NHAIDA Updates 2 MayThe snout endcap has been sealed with new
copper tape over the red tape
 elog_temps1.pngalpha_1d.png 
ELOG V3.1.4-unknown