AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 1 of 11  ELOG logo
ID Date Author Subjectdown
  14   Fri Sep 8 19:03:23 2017 TDw26 network configuration
Network configuration files for workstation w26 (Sun Ultra 45)

serial # 0743TFC0DQ
host ID # 840e6006
MAC address 0:14:4f:e:60:6

The MIDAS DAQ configured to use ppc1 (MVME 2431 CPU) connected
to w26 via port 1 (/dev/bge1)
Attachment 1: hosts
#
# Internet host table
#
#
# Merged entries from ipnodes into hosts on <Wednesday April  2 18:57:41 BST 2008>
# Backup files saved in /etc/inet/ directory: hosts.premerge, ipnodes.premerge
#
127.0.0.1	localhost	
129.215.73.26	w26	loghost	egmsg
192.168.1.25    w26daq
192.168.1.1     ppc0            # TUDA Motorola MVME 2431 CPU
192.168.1.2     ppc1            #
192.168.1.3     ppc2            #
192.168.1.4     ppc3
192.168.1.5     ppc4
192.168.1.6     ppc5
192.168.1.7     ppc6
Attachment 2: ethers
08:00:3e:2b:59:76       ppc0    # TRIUMF, TUDA
00:01:af:0b:11:22       ppc1    # HIE-ISOLDE, CERN
00:01:af:0b:10:7a       ppc2    # u/s
00:01:af:09:86:88       ppc3    # GELINA, JRC IRMM 
00:01:af:08:2c:38       ppc4
00:01:af:09:df:db       ppc5    # Edinburgh
00:01:af:09:86:83       ppc6    # u/s
Attachment 3: netmasks
#
# The netmasks file associates Internet Protocol (IP) address
# masks with IP network numbers.
# 
# 	network-number	netmask
#
# The term network-number refers to a number obtained from the Internet Network
# Information Center.
#
# Both the network-number and the netmasks are specified in
# "decimal dot" notation, e.g:
#
# 		128.32.0.0 255.255.255.0
#
129.215.72.0	255.255.252.0
192.168.1.0     255.255.255.0
Attachment 4: nsswitch.conf
#
# Copyright 2006 Sun Microsystems, Inc.  All rights reserved.
# Use is subject to license terms.
#
# ident	"@(#)nsswitch.files	1.14	06/05/03 SMI"

#
# /etc/nsswitch.files:
#
# An example file that could be copied over to /etc/nsswitch.conf; it
# does not use any naming service.
#
# "hosts:" and "services:" in this file are used only if the
# /etc/netconfig file has a "-" for nametoaddr_libs of "inet" transports.

passwd:     files
group:      files
hosts:      files
ipnodes:    files
networks:   files
protocols:  files
rpc:        files
ethers:     files
netmasks:   files
bootparams: files
publickey:  files
# At present there isn't a 'files' backend for netgroup;  the system will 
#   figure it out pretty quickly, and won't use netgroups at all.
netgroup:   files
automount:  files
aliases:    files
services:   files
printers:	user files

auth_attr:  files
prof_attr:  files
project:    files

tnrhtp:     files
tnrhdb:     files
Attachment 5: hostname.bge0
w26
Attachment 6: hostname6.bge0

Attachment 7: hostname.bge1
w26daq
Attachment 8: hostname6.bge1

Attachment 9: defaultrouter
129.215.75.254
Attachment 10: dfstab
#	Place share(1M) commands here for automatic execution
#	on entering init state 3.
#
#	Issue the command '/etc/init.d/nfs.server start' to run the NFS
#	daemon processes and the share commands, after adding the very
#	first entry to this file.
#
#	share [-F fstype] [ -o options] [-d "<text>"] <pathname> [resource]
#	.e.g,
#	share  -F nfs  -o rw=engineering  -d "home dirs"  /export/home2

share -F nfs -o rw=np-suns /scratch
share -F nfs -o rw=ppc1,root=ppc1 /MIDAS
Attachment 11: hosts.allow
rpcbind: 192.168.1.0/255.255.255.0
in.tftpd: 192.168.1.0/255.255.255.0
rpcbind: 129.215.72.0/255.255.252.0 
rpcbind: 255.255.255.255 0.0.0.0
sshd: .gsi.de .ed.ac.uk .dl.ac.uk .cern.ch @np-suns
Attachment 12: hosts.deny
ALL: ALL: spawn (/usr/sfw/sbin/safe_finger -l @%h | /bin/mailx -s %d-%h td) &: DENY
  97   Sat Nov 11 05:49:00 2017 AM & MDrun 88
Header: 3.99 MeV/u and CH2_30+25.
Ender: 
====================================================
Run number			: 88
Date				: 11/11/17
Start time			: 06:49:09
Stop time			: 07:34:34
Trigger rate (MIDAS)	        : 0
Blocks written		        : 1
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated                      : 0 (or near as damn it)
1- Gated                        : 0
2- dE                           : 138k
3- E                            : 56
4- HI                           : 15
5- Pulser                       : 2
6- Clock			: 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u)		: 3.99 MeV/u
Beam intensity (epA)	        : ~ 0.1 pA (yes!)
Target				: CH2_30+25  (Pos#6; 490-520 ug/cm2)
Ladder position	(mm)	        : 67.26
HI Degrader foil (um)		: 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		: -40
del_E leakage (uA)		: 0.65
E voltage (V)			: -350
E leakage (uA)		: 2.11
E_hi voltage (V)		: -14
E_hi leakage (uA)		: 2.42
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive)	(A)	: 1.55
PA power (Up, negative) (A)     : -0.55
PA power (Down, positive) (A)	: 0.8
PA power (Down, negative) (A)   : -0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)	(mbar)	        : 7.8 E-06
Pressure (old gauge) (mbar)          : 2.35 E-05
Pressure (SEC)	(mbar)         	: 4.3 E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)	deg	        : -10.1
Temp (chamber)	deg	        : 5.7
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Laser needs cleaning - person (Dima) on the way. Right now, very low beam current. Stopped when Dima arrived
====================================================
  79   Fri Nov 10 01:29:51 2017 ASM, MD, DKrun 75
Header: 4.7 MeV/u and C_09. PS back, but need to check how much beam actually there was before next issue
Ender: no beam at our sample; IHS cavity (part of normal conducting linac) tripped
====================================================
Run number			: 75
Date				: 10/11
Start time			: 02:20:11
Stop time			: 02:41:21
Trigger rate (MIDAS)      :  
Blocks written                : 77
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated                      :  2
1- Gated                           :  2
2- dE                                :  7
3- E                                  :  2
4- HI                                :  2
5- Pulser                          :  967
6- Clock                           :  0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy			: 4.7 MeV/u
Beam intensity		: 2.0-2.5 pA (in the beginning)
Target				: C_09 (Pos #5 - 82.44mm), chosen due to similar thickness as CH2_30+25, as used before
Ladder position		: 82.44
HI Degrader foil (um)     : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		: -32 
del_E leakage (uA)		: 0.8 
E voltage (V)			: -350 
E leakage (uA)	        : 1.75
E_hi voltage (V)		: -14 
E_hi leakage (uA)		: 0.88 
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive)	: 1.55A 
PA power (upstream, negative)   : 0.55A
PA power (downstream, positive)	: 0.8A
PA power (downstream, negative) : 0.28A 
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)		        : 6.8E-06
Pressure (old gauge)	        : 1.9E-05
Pressure (SEC)	           	: 3.8E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)		        : -10.1
Temp (chamber)		        : 5.4 (from before)
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: realised no beam on target after couple of minutes: normal conducting cavity tripped
Alex and Daid try to fix it.

====================================================
  126   Sun Nov 12 18:32:52 2017 MB DK run 112
Header: 4.4 MeV/u CH2_16 sample
Ender: 
====================================================
Run number			:   112
Date				:   12/11
Start time			:   19.32
Stop time			:   22.27
Trigger rate (MIDAS)	        :   3
Blocks written		        :   733
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated                      :   3
1- Gated                        :   3 
2- dE                           :   146000
3- E                            :   17
4- HI                           :   258
5- Pulser                       :   2
6- Clock			:   969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u)		:   4.4 MeV/u
Beam intensity (epA)	        :   0.8 
Target				:   CH2_16
Ladder position	(mm)	        :   127.95 
HI Degrader foil (um)		:   10 mu
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		:   -40
del_E leakage (uA)		:   0.76
E voltage (V)			:   -350
E leakage (uA)		        :   2.10
E_hi voltage (V)		:   -14
E_hi leakage (uA)		:   2.76
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive)	(A)	:   1.55
PA power (Up, negative) (A)     :   0.55
PA power (Down, positive) (A)	:   0.8
PA power (Down, negative) (A)   :   0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)	(mbar)	        :   6.2E-6
Pressure (old gauge) (mbar)     :   1.8E-5
Pressure (SEC)	(mbar)         	:   3.6E-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)	deg	        :   -10.0
Temp (chamber)	deg	        :    5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: data during first 5 mins of run were taken with sample at 126.95 mm rather than 127.95 mm
at 21:05, RILIS begins brief laser maintenance.  21:19 finished.
====================================================
  125   Sun Nov 12 17:44:49 2017 MB DK RGrun 111
Header:  empty target, 4.4 MeV/u
Ender: End
====================================================
Run number			:   111 
Date				:   12/11
Start time			:   18:44
Stop time			:   19:24
Trigger rate (MIDAS)	        :   2
Blocks written		        :   157
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated                      :   2
1- Gated                        :   2
2- dE                           :   138000
3- E                            :   15
4- HI                           :   12
5- Pulser                       :   1
6- Clock			:   969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u)		:   4.4 MeV/u
Beam intensity (epA)	        :   about 1
Target				:   empty 
Ladder position	(mm)	        :   52.09
HI Degrader foil (um)		:   10 mu
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		:   -40 V 
del_E leakage (uA)		:   0.77 muA
E voltage (V)			:   -350 V
E leakage (uA)		        :   2.1 muA
E_hi voltage (V)		:   -14 
E_hi leakage (uA)		:   2.76 muA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive)	(A)	:   1.55  
PA power (Up, negative) (A)     :   0.6  
PA power (Down, positive) (A)	:   0.79 
PA power (Down, negative) (A)   :   0.27 
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)	(mbar)	        :   6.2E-6
Pressure (old gauge) (mbar)     :   1.8E-5
Pressure (SEC)	(mbar)         	:   3.6E-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)	deg	        :   -10
Temp (chamber)	deg	        :    5.9
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
====================================================
  78   Thu Nov 9 23:10:38 2017 MDpreparation for Carbon C_09 (Run 75)
10/11/17: 00:03

switch target ladder to Pos #5: 82.44 mm

Carbon foil C_09 in place
(similar thickness as CH2_30+25, as used before)

Ready for beam coming back.
  108   Sat Nov 11 17:36:54 2017 ASMmore halflife stuff

Fitting those half life data more reasonably... fitted the decay curve with y=a*exp(-b*t)+c to all the data points, comes up with t1/2=(85.8+/-2.6)s

Attachment 1: Screen_Shot_2017-11-11_at_18.38.37.png
Screen_Shot_2017-11-11_at_18.38.37.png
  28   Thu Sep 28 03:38:18 2017 dkheavy ion degrader foil - updated
--original email text--
Using Claudia's code, I added a layer of Al foil before the heavy ion
silicon detector.  The attached plots correspond to the heavy ion
portion of fig 3(a) in the proposal.  Thus it only uses ground-state
transitions and doesn't account for geometry or efficiency etc.  I opt
to show only the highest and lowest beam energies for each simulation.

As I said before, something between 10 and 20 um of Al was likely to
be the correct choice, which is confirmed.  10 um is almost to thin to
guarantee the signals are below 200 MeV, while for 20 um we start
having issues of detecting the lowest energy recoils for the low
energy run.

We can discuss the selection in more detail at the next meeting, but
most probably we can just use some kitchen foil, adopting whatever its
thickness of 13 to 15 um depending what we find.

The attached file starts with no degrader, then adds 10 um Al, and 1
um Al steps up to 20 um.

--Updated 2 Oct to include 5 um ~ 10 um--

As ~185 MeV is the maximum energy, but the gain resistors may vary by up to ~10%, then the 'maximium safe energy' is about 160 MeV.  This we can get for the highest energy run 
with 15 um Al (we have it in stock); however, then the lowest energy case becomes about 30 MeV, or less than 1 MeV/u, which may be an issue for straggling etc.  So we will 
prepare two foils, as it is seen even for the low energy beam, it comes almost to 190 MeV without a degrader foil.  In fact, any foil thickness between 5 ~ 10 um may be okay 
(we have 8 um in stock).  

Using also all 5 energies (212, 236, 260, 277, 295) then we see that the two lowest energies are okay for 8 um foil, and the three highest energies are suitable for 15 um foil.

NB: 19 Oct I deleted 15 um (previously attachment 2) and now it is attachment 8.  

Note that the beam energy order (right to left, left to right) differs between the first PDF and the second two.

--4 Oct--
Existing 8um Al foils are not the right size.  Check 6 um and 10 um in detail, as we have more stock of these two.  Attached.

--12 Oct--

Attachments 5-7 show the 59Cu energy after the degrader foils for elastic (12C,12C) scattering.  Foil thicknesses are 6, 10, 15 um of Al, respectively.  Note that the angular 
range shows up to 15 degrees (larger than the case of the (p,a)).
Attachment 1: degrader.pdf
degrader.pdf degrader.pdf degrader.pdf degrader.pdf degrader.pdf degrader.pdf degrader.pdf degrader.pdf
Attachment 2: degrader08_full.pdf
degrader08_full.pdf
Attachment 3: degrader06_full.pdf
degrader06_full.pdf
Attachment 4: degrader10_full.pdf
degrader10_full.pdf
Attachment 5: degrader06_12C_full.pdf
degrader06_12C_full.pdf
Attachment 6: degrader10_12C_full.pdf
degrader10_12C_full.pdf
Attachment 7: degrader15_12C_full.pdf
degrader15_12C_full.pdf
Attachment 8: degrader15_full.pdf
degrader15_full.pdf
  33   Thu Oct 19 14:41:19 2017 daidheavy ion degrader foil - full / new
See entry https://elog.ph.ed.ac.uk/ISOLDE/28 for a full description, but editing the same elog is altering attachment numbers etc.

Here I've added 20 um foil as well as 5.3 MeV/u (~313 MeV) 59Cu beam.

The first set is 59Cu(p,alpha)56Ni showing 56Ni in the heavy ion detector, with different beam energies and Al degrader foil thicknesses.

The second set is for 59Cu(12C,12C)59Cu scattering.
Attachment 1: degrader06_full.pdf
degrader06_full.pdf
Attachment 2: degrader10_full.pdf
degrader10_full.pdf
Attachment 3: degrader15_full.pdf
degrader15_full.pdf
Attachment 4: degrader20_full.pdf
degrader20_full.pdf
Attachment 5: degrader06_12C_full.pdf
degrader06_12C_full.pdf
Attachment 6: degrader10_12C_full.pdf
degrader10_12C_full.pdf
Attachment 7: degrader15_12C_full.pdf
degrader15_12C_full.pdf
Attachment 8: degrader20_12C_full.pdf
degrader20_12C_full.pdf
  Draft   Thu Sep 28 03:34:20 2017 dkheavy ion degrader foil
--text from email--
Using Claudia's code, I added a layer of Al foil before the heavy ion
silicon detector.  The attached plots correspond to the heavy ion
portion of fig 3(a) in the proposal.  Thus it only uses ground-state
transitions and doesn't account for geometry or efficiency etc.  I opt
to show only the highest and lowest beam energies for each simulation.

As I said before, something between 10 and 20 um of Al was likely to
be the correct choice, which is confirmed.  10 um is almost to thin to
guarantee the signals are below 200 MeV, while for 20 um we start
having issues of detecting the lowest energy recoils for the low
energy run.

We can discuss the selection in more detail at the next meeting, but
most probably we can just use some kitchen foil, adopting whatever its
thickness of 13 to 15 um depending what we find.

The attached file starts with no degrader, then adds 10 um Al, and 1
um Al steps up to 20 um.
Attachment 1: degrader.pdf
degrader.pdf degrader.pdf degrader.pdf degrader.pdf degrader.pdf degrader.pdf degrader.pdf degrader.pdf
  107   Sat Nov 11 17:19:54 2017 ASM, CL, TD...halflife

Placed a hand held rad monitor near the faraday cup and took rate readings every 20 seconds, right after inserting the gate valve in front of SEC:

seconds counts/s

0    590
20    499
40    474
60    400
80    353
100    290
120    259
140    234
160    207
180    187
200    175
220    146
240    135
260    124
280    120
300    109
320    107
340    103
360    85
380    86
400    84
420    94
440    81
460    76
480    76
500    74

Then fitted this for half life.

Assuming a steady state background of 70 cps, and using the first 7 data points... the half life comes out as 82.1 +/-3.9 s.

Excellent agreement with known halflife of 59Cu.

 

Attachment 1: Screen_Shot_2017-11-11_at_18.25.54.png
Screen_Shot_2017-11-11_at_18.25.54.png
  40   Mon Nov 6 10:50:33 2017 Peter Blackfoil mount drawings
Attachment 1: SiPD_foil_mount.PDF
SiPD_foil_mount.PDF
Attachment 2: fOIL_HOLDER.PDF
fOIL_HOLDER.PDF
  19   Thu Sep 14 09:47:02 2017 dkdiscussion with beam operators
CERN side
     Faraday cup at the end of SEC, ideally with automated control to insert and remove

Edinburgh side
     Photographs of chamber, diagrams, measurement, nicely organised 
     FC output from SHV to SMA, to input to CERN preamp
     Beam viewer scintillating min beam intensity?
     Irises to protect SSDs are essential since the beams will be tuned for energy case by case and not at once.
     Collimator sizes for the target ladder?
     Window view port to confirm iris settings?
     Photodiodes should be on the opposite side of the target ladder from the collimator.  
  43   Mon Nov 6 16:12:47 2017 Peter Blackchamber drawings

work in progress. 

Attachment 1: FullAssemb2.PDF
FullAssemb2.PDF
Attachment 2: section.PDF
section.PDF
  41   Mon Nov 6 10:52:58 2017 Peter Blackalignment hardware drawings
Attachment 1: ladder_alignment_block.PDF
ladder_alignment_block.PDF
Attachment 2: S2_alignment_bar.PDF
S2_alignment_bar.PDF
Attachment 3: alignment_plug_70mm.PDF
alignment_plug_70mm.PDF
Attachment 4: alignment_plug.PDF
alignment_plug.PDF
  22   Thu Sep 14 14:07:21 2017 pbalignment

Chat with survey team

1. mauf plugs for both ends of chamber with concentric 8mmH7 holes, with nylon tipped grub screws/clamp bars

2. Manuf of target with 8mmH7 hole

3. Manuf detector with 8mmH7 hole

4. Manuf of 4x pad sliders for feet for radial alignment.

 

Report from survey team attached.

Attachment 1: 2017.11.02_HISO_XT03_EdinburghChamber.pdf
2017.11.02_HISO_XT03_EdinburghChamber.pdf 2017.11.02_HISO_XT03_EdinburghChamber.pdf 2017.11.02_HISO_XT03_EdinburghChamber.pdf 2017.11.02_HISO_XT03_EdinburghChamber.pdf 2017.11.02_HISO_XT03_EdinburghChamber.pdf
  186   Thu Aug 23 18:23:27 2018 DKWhere to find (our) stuff at ISOLDE
=Overview=

Shoes, hard hats, 'underpants', spiders, etc: Cardboard box "R", Garage entry of ISOLDE, shelf opposite turnstyle.

Electronics racks: between XT02 and XT03 beam lines.  Atop racks are power strips, box of ribbon cables

Chamber, stand: beam left of XT01.

Wooden chamber shipping box: MIA?!

5 SSDs, 3 photodiodes, (10, 15, 20 um Al degraders for photodiodes), heavy ion degrader foils of 59Cu: MINIBALL fragile cabi

All others: Building 275, in the 7 metal boxes.

=New inventory after moving chamber=

Summary:

1	A	Toolbag etc, packed aug 2018 - has Faraday cup cable in pocket
2	F	Packings only
3	O	extra ribbon cables, helmet, TV power supply (look here as last resort)
4	C	Packed Aug 2018, see below.  Small TMP, vacuum gauge readouts, etc
5	B	Large TMP, packed august 2018
6	P	vacuum tubes, chamber innards, irises, bolts and such
7	Q	tom's favorite PC and components


==Box A==

Toolbag
	has faraday cup cable, inner pocket
	SEC flange to connect our beam line !!
	bolts to fix chamber to stand, in a bag in outer pocket
	1 photodiode preamp, outer pocket.
	fan, peter's idea how to cool small TMP


==Box B==

Large TMP

Connectors and cut allen key for chamber mounting  -- daid's pocket, intending to tape to inside top of box

(nothing else, just these item)


==Box C==

Large TMP controller

Small TMP, with valve attached at exit and C clamp on top to connect to chamber.

Small TMP controller

Both digital vacuum gauge readouts

===unlabeled subbox of C (quickly sealed w/ blue tape)===

	3 power supply cables (1 w/ swiss converter)
	
	2 SHV cables (for inv. magnetron gauges)
	
	1 funky cable for other vacuum gauge
	
	1 bag of unknown origin pre-existing in box:
		1 fuse
		1 ferrite clamp
		1 bumper foot
	
===2nd unlabelled subbox===
	handed to me by someone, from near XT03.
	appears to be related w/ chamber internal video camera...LEDs, wires, RCA connectors, etc


==Box P==

(added vacuum tubes)

Attached: Notices posted with much enthusiasm.
Attachment 1: edinburgh-notices-daid.pdf
edinburgh-notices-daid.pdf edinburgh-notices-daid.pdf edinburgh-notices-daid.pdf edinburgh-notices-daid.pdf edinburgh-notices-daid.pdf edinburgh-notices-daid.pdf edinburgh-notices-daid.pdf edinburgh-notices-daid.pdf
  187   Thu Aug 23 18:57:15 2018 DKWhat daid is taking from ISOLDE to Edinburgh
1 bolt for chamber stand structure, for reference for new struts.

2 target ladders: spare 1/2 style ladder, ladder from inside chamber, including the bits to connect to actuator

2 dual photodiode frames for degraders.  (Existing at CERN are 3 more, with 10, 15, and 20 um Al foil over one side, respectively)

Acrylic window from beam upstream (front) top of chamber, where gas feedthrough is meant to go.
  3   Sun Feb 19 12:22:16 2017 td, mdVacuum and detector test
------17.2.17 ------------------------------------------------------

closing chamber 
use Leak testing pump
16.50 p = 0.6 mbar --> starting Turbo pump

18.25 Turbo @ 30kRPM, 33W
      Pressure 7.0E-04mbar, backing pressure (leak tester) 0.1mbar
      

------18.2.17 ------------------------------------------------------

12.30 Turbo @ 42kRPM, 25W
      Pressure 6.0E-05mbar, backing pressure (leak tester) 0.1mbar
      FL601 started , temperature 25.8 deg C, set point -5.0 deg C

16.10 Turbo @ 42kRPM, 18W
      Pressure 1.8E-05mbar, backing pressure (leak tester) 9.3E-2mbar
      FL601 set point -5.0 deg C, actual -1.6 deg C

19.2.17

12.20 Turbo @ 42kRPM, 15W
      Pressure 1.5E-05mbar, backing pressure (leak tester) 9.3E-2mbar
      FL601 set point -5.0 deg C, actual -2.0 deg C

------20.2.17 -------------------------------------------------------

14.30 Turbo @ 42kRPM, 14W
      Pressure 1.2E-05mbar, backing pressure (leak tester) 9.2E-2mbar
      FL601 set point -5.0 deg C, actual -2.3 deg C

21.2.17 

10.10 Turbo @ 42kRPM, 14W
      Pressure 1.1E-05mbar, backing pressure (leak tester) 9.2E-2mbar
      FL601 set point -5.0 deg C, actual -2.5 deg C

16.30 Turbo @ 42kRPM, 13W
      Pressure 1.0E-05mbar, backing pressure (leak tester) 9.2E-2mbar
      FL601 set point -5.0 deg C, actual -2.4 deg C

-----22.2.17 -------------------------------------------------------

11.00 Turbo @ 42kRPM, 13W
      Pressure 1.0E-05mbar, backing pressure (leak tester) 9.2E-2mbar
      FL601 set point -5.0 deg C, actual -2.4 deg C

11.02 +/-15V preamp power ON

11.06 Pressure 1.2E-05mbar, FL601 actual temp -1.8 deg C

11.12 Pressure 1.3E-05mbar, FL601 actual temp -1.4 deg C

14.01 Pressure 1.5E-05mbar, FL601 actual temp -1.0 deg C

14.02 +/-15V preamp power OFF

14.15 Pressure 1.1E-05mbar, FL601 actual temp -1.9 deg C

15.27 Pressure 1.0E-05mbar, FL601 actual temp -2.0 deg C

------23.2.17 -----------------------------------------------------

14.40 Pressure 8.6E-06mbar, FL601 actual temp -2.4 deg C

17.10 Pressure 8.1E-06mbar, FL601 actual temp -2.5 deg C

------24.2.17 -----------------------------------------------------

13.08 Turbo @ 42kRPM, 13W
      Pressure 7.0E-06mbar, backing pressure (leak tester) 9.1E-2mbar, leak rate 3.3E-10 mbar.l/s
      FL601 set point -5.0 deg C, actual -2.2 deg C

14.30 Pressure 6.8E-06mbar, FL601 actual temp -2.5 deg C
      +/-15V preamp power ON

14.49 Pressure 9.9E-06mbar, FL601 actual temp -1.0 deg C

17.44 Pressure 1.1E-05mbar, FL601 actual temp -1.0 deg C

19.00 Pressure 1.1E-05mbar, FL601 actual temp -1.0 deg C
      +/-15V preamp power OFF

------26.2.17 ---------------------------------------------------

11.44 Turbo @ 42kRPM, 13W
      Pressure 7.5E-06mbar, backing pressure (leak tester) 9.1E-2mbar, leak rate 1.8E-10 mbar.l/s
      FL601 set point -5.0 deg C, actual -2.0 deg C
      +/-15V preamp power ON

14.02 Pressure 1.2E-05mbar, FL601 actual temp -0.9 deg C


18.19 +/-15V preamp power OFF
      Pressure 1.2E-05mbar, FL601 actual temp -0.9 deg C

------27.2.17 ---------------------------------------------------

11.44 Turbo @ 42kRPM, 13W, 0.7A, 33 degree
      Pressure 6.8E-06mbar, backing pressure (leak tester) 9.1E-2mbar, leak rate 1.3E-10 mbar.l/s
      FL601 set point -5.0 deg C, actual -2.4 deg C

13.15 pressure 6.7E-06mbar;

Turn off Turbo pump and open chamber!
##################################################################
##################################################################


------2.3.17------------------------------------------------------

using leak testing pump as backing/pre pump (start it with open valve --otherwise there will be alarm signal of leak
rate changing dramatically)
showing some time scales for pumping (p_back is the pressure measured in backing pump and p_TC2 is the second gauge
plugged and measured inside the chamber 

16.03 p_back = 39mbar;   p_TC2 = 1.0E+03mbar
16.29 p_back = 1.3mbar;  p_TC2 = 8.4E+02mbar
16.45 p_back = 0.8mbar;  p_TC2 = 6.7E+02mbar
16.59 p_back = 0.6mbar;  p_TC2 = 4.1E+02mbar

18.26 p_back = 0.2mbar;  p_TC2 = 4.0E+00mbar
     --> starting Turbopump (accelerating up with safety check step in between)
18.30 p_back = 0.3mbar;  p_TC2 = 3.5E+00mbar
      (release more gas from the chamber into pipe by TP)
18.34 Turbo @  I=1.8A,   P=28W,         7 kRPM,   27 deg C
      p_TC2 = 1.9E+00mbar 
18.38 Turbo @  I=6.0A,   upto P=90W,   10 kRPM,   29 deg C
18.42 Turbo @  I=2.5A,   P=38W,        11 kRPM,   29 deg C
      p_TC2 =  5.5E-01mbar
18.55 Turbo @  I=1.1A,   P=17W,        15 kRPM,   31 deg C
      p_TC2 =  4.1E-02mbar
18.59 Turbo @  I=4.5A,   P=82W,        19 kRPM,   31 deg C
      p_TC2 =  2.3E-02mbar


------3.3.17-------------------------------------------------------

11.05 Turbo @ 42kRPM, 13W
      Pressure 5.5E-05mbar, FL601 ON
      FL601 set point -5.0 deg C, actual +24 deg C


      +/-15V preamp power ON

14.15 Turbo @ 42kRPM, 0.7A, 14W, 33 deg C
      Pressure 1.2E-05mbar, backing pressure (leak tester) 9.2E-2mbar, leak rate between 2E-12 and 1.4E-11 mbar.l/s
      FL601 set point -5.0 deg C, actual -1.4 deg C

14.30 Adding insulation to water pipe and try to deflect hot air from chiller away from cold pipes

14.40 - 15.40:     +/-15V preamp power ON

15.00 Turbo @ 42kRPM, 0.8A, 16W, 33 deg C
      Pressure 1.8E-05mbar
      FL601 set point -5.0 deg C, actual -0.7 deg C

15.40 Turbo @ 42kRPM, 0.8A, 17W, 33 deg C
      Pressure 2.1E-05mbar
      FL601 set point -5.0 deg C, actual -0.6 deg C

16.10 Turbo @ 42kRPM, 0.7A, 14W, 33 deg C
      Pressure 1.2E-05mbar
      FL601 set point -5.0 deg C, actual -1.6 deg C

17.30 Turbo @ 42kRPM, 0.7A, 14W, 33 deg C
      Pressure 1.1E-05mbar
      FL601 set point -5.0 deg C, actual -1.7 deg C


------06.03.17 ----------------------------------------------

power fluctuations turned off the chiller

13.42 Turbo @ 42kRPM, 1.0A, 19W, 33 deg C
      Pressure 2.2E-05mbar
      FL601 off.
      Turn on FL601, which went from -5.0 up to actual +0.1 deg C and started cooling again.

visible impact on the pressure:

13.46 Turbo @ 42kRPM, 1.0A, 18W, 33 deg C
      Pressure 1.1E-05mbar
      FL601 set point -5.0 deg C, actual -0.1 deg C

14.04 Turbo @ 42kRPM, 0.7A, 14W, 33 deg C
      Pressure 8.7E-06mbar
      FL601 set point -5.0 deg C, actual -1.6 deg C

14.26 Turbo @ 42kRPM, 0.7A, 13W, 33 deg C
      Pressure 8.2E-06mbar
      FL601 set point -5.0 deg C, actual -2.0 deg C

Adding alcohol and water to cooling reservoir up to limit (full reservior), temperature went up due to room
temperature of added liquids

14.44 temp -0.6 deg C
14.49 temp -2.7 deg C
14.52 temp -3.6 deg C
added more alcohol! (one small bottle and a bit of the rest in IPA bottle)

15.00 temp -3.8 deg C

15.01 Turbo @ 42kRPM, 0.7A, 13W, 33 deg C
      Pressure 7.9E-06mbar
      FL601 set point -5.0 deg C, actual -4.1 deg C

15.12 Turbo @ 42kRPM, 0.7A, 13W, 33 deg C
      Pressure 7.4E-06mbar
      FL601 set point -5.0 deg C, actual -5.3 deg C

15.14 set point to -10.0 deg C

15.22 Turbo @ 42kRPM, 0.7A, 13W, 33 deg C
      Pressure 7.3E-06mbar
      FL601 set point -10.0 deg C, actual -6.3 deg C

16.03 Turbo @ 42kRPM, 0.6A, 12W, 33 deg C
      Pressure 6.9E-06mbar, p_back = 9.1E-02mbar, leak rate 6.2E-11 mbar *l/s
      FL601 set point -10.0 deg C, actual -9.9 deg C

17.00 Turbo @ 42kRPM, 0.6A, 12W, 33 deg C
      Pressure 6.7E-06mbar
      FL601 set point -15.0 deg C, actual -10.3 deg C

17.38 Turbo @ 42kRPM, 0.6A, 12W, 33 deg C
      Pressure 6.7E-06mbar, p_back = 9.1E-02mbar
      FL601 set point -15.0 deg C, actual -10.2 deg C
    --> reach minimum temp due to not enough alcohol --> set point to -10.0 deg C

17.41 Turn +/-15V preamp power ON

  17.46 Turbo @ 42kRPM, 0.6A, 12W, 32 deg C
      Pressure 7.2E-06mbar, p_back = 9.1E-02mbar, leak rate 8.3E-11 mbar *l/s
      FL601 set point -10.0 deg C, actual -8.6 deg C

  18.17 Turbo @ 42kRPM, 0.7A, 14W, 32 deg C
      Pressure 1.0E-05mbar, p_back = 9.2E-02mbar, leak rate 2.3E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -8.0 deg C

  18.44 Turbo @ 42kRPM, 0.8A, 15W, 33 deg C
      Pressure 1.1E-05mbar, p_back = 9.2E-02mbar, leak rate 2.4E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -7.7 deg C

18.45 Turn +/-15V preamp power OFF

19.35 Turbo @ 42kRPM, 0.6A, 12W, 33 deg C
      Pressure 7.1E-06mbar, p_back = 9.1E-02mbar, leak rate 1.7E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -9.8 deg C

------07.03.17 ----------------------------------------------

12.13 Turbo @ 42kRPM, 0.7A, 12W, 32 deg C
      Pressure 6.5E-06mbar, p_back = 9.1E-02mbar, leak rate 1.2E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -10.0 deg C

12.15 Turn +/-15V preamp power ON

  12.31 Turbo @ 42kRPM, 0.7A, 14W, 32 deg C
      Pressure 8.6E-06mbar, p_back = 9.1E-02mbar, leak rate 1.3E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -8.6 deg C

  13.22 Turbo @ 42kRPM, 0.8A, 15W, 32 deg C
      Pressure 1.0E-05mbar, p_back = 9.2E-02mbar, leak rate 1.8E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -6.8 deg C

  13.41 Turbo @ 42kRPM, 0.8A, 15W, 32 deg C
      Pressure 1.0E-05mbar, p_back = 9.2E-02mbar, leak rate 1.9E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -6.9 deg C

  14.35 Turbo @ 42kRPM, 0.8A, 15W, 33 deg C
      Pressure 1.0E-05mbar, p_back = 9.2E-02mbar, leak rate 1.7E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -7.3 deg C

  15.24 Turbo @ 42kRPM, 0.8A, 14W, 33 deg C
      Pressure 1.0E-05mbar, p_back = 9.2E-02mbar, leak rate 1.8E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -7.3 deg C

  16.05 Turbo @ 42kRPM, 0.8A, 14W, 33 deg C
      Pressure 1.0E-05mbar, p_back = 9.2E-02mbar, leak rate 1.8E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -7.4 deg C

  17.56 Turbo @ 42kRPM, 0.8A, 14W, 33 deg C
      Pressure 1.0E-05mbar, p_back = 9.2E-02mbar, leak rate 1.7E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -7.6 deg C

18.14 Turn +/-15V preamp power OFF

18.18 Turbo @ 42kRPM, 0.7A, 14W, 33 deg C
      Pressure 9.1E-06mbar, p_back = 9.2E-02mbar, leak rate 1.6E-10 mbar *l/s 
      (decreased after a big outgasing (E-09) just shortly after turning preamp power) 
      FL601 set point -10.0 deg C, actual -7.5 deg C

------08.03.17 --------------------------------------------------------------

12.00 Turbo @ 42kRPM, 1.0A, 18W, 34 deg C
      Pressure 6.2E-06mbar, p_back = 9.1E-02mbar, leak rate 7.9E-11 mbar *l/s
      FL601 set point -10.0 deg C, actual -9.7 deg C

      Power on Turbo pump higher than usual, although pressure is at its lowest since.
      Checked cycle time = 8261 min = 137.68 hours = 5.74 days
              pump life  = 31107 h

Release a bit of coolant to check the concentration in chemistry lab:
density of mixture = 0.965 g/cm3 at temperature of 19.3 degree

concentration of alcohol: x = (density_mixture - density_water)/(density_ethanol - density_water)
                            = (0.965 - 0.998)/(0.79 - 0.998) 
                            = 0.159
around 16% alcohol --> freezing temp should be around -7 to -8 degree C 

13.46 Turbo @ 42kRPM, 1.0A, 18W, 35 deg C
      Pressure 6.1E-06mbar, p_back = 9.1E-02mbar, leak rate 8.6E-11 mbar *l/s
      FL601 set point -10.0 deg C, actual -9.2 deg C

15.30 Turbo @ 42kRPM, 0.8A, 15W, 35 deg C
      Pressure 6.1E-06mbar, p_back = 9.1E-02mbar, leak rate 9.3E-11 mbar *l/s
      FL601 set point -10.0 deg C, actual -9.6 deg C

15.37 Turn +/-15V preamp power ON

  16.38 Turbo @ 42kRPM, 0.8A, 17W, 35 deg C
      Pressure 9.4E-06mbar, p_back = 9.1E-02mbar, leak rate 1.5E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -7.0 deg C

16.39 Turn +/-15V preamp power OFF

------09.03.17 --------------------------------------------------------------

11.21 Turbo @ 42kRPM, 0.7A, 15W, 35 deg C
      Pressure 6.1E-06mbar, p_back = 9.1E-02mbar, leak rate 8.6E-11 mbar *l/s
      FL601 set point -10.0 deg C, actual -9.6 deg C (fluctuations between -10.0 and -9.3 degree C)

11.22 Turn +/-15V preamp power ON

  14.18 Turbo @ 42kRPM, 0.8A, 17W, 35 deg C
      Pressure 9.3E-06mbar, p_back = 9.1E-02mbar, leak rate 1.7E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -7.4 deg C

  14.39 Turbo @ 42kRPM, 0.9A, 17W, 35 deg C
      Pressure 9.4E-06mbar, p_back = 9.1E-02mbar, leak rate 1.6E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -7.4 deg C

14.40 Turn +/-15V preamp power OFF

14.50 Turbo @ 42kRPM, 0.8A, 16W, 35 deg C
      Pressure 7.4E-06mbar, p_back = 9.1E-02mbar, leak rate 1.2E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -8.3 deg C

15.00 Turbo @ 42kRPM, 0.8A, 16W, 35 deg C
      Pressure 6.9E-06mbar, p_back = 9.1E-02mbar, leak rate 1.3E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -9.2 deg C

17.14 Turbo @ 42kRPM, 0.8A, 15W, 35 deg C
      Pressure 6.1E-06mbar, p_back = 9.1E-02mbar, leak rate 9.9E-11 mbar *l/s
      FL601 set point -10.0 deg C, actual -10.0 deg C

17.58 Turbo @ 42kRPM, 0.8A, 15W, 34 deg C
      Pressure 6.0E-06mbar, p_back = 9.1E-02mbar, leak rate 4.2E-10 mbar *l/s (did some Helium leak checking)
      FL601 set point -10.0 deg C, actual -9.9 deg C

------10.03.17 --------------------------------------------------------------

10.55 Turbo @ 42kRPM, 0.8A, 15W, 35 deg C
      Pressure 6.0E-06mbar, p_back = 9.1E-02mbar, leak rate 1.0E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -10.2 deg C

12.01 Turbo @ 42kRPM, 0.7A, 15W, 35 deg C
      Pressure 5.9E-06mbar, p_back = 9.1E-02mbar, leak rate 1.1E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -10.0 deg C

12.07 leak rate dropped to 3.0E-12 just occasionly

13.07 Turbo @ 42kRPM, 0.7A, 15W, 34 deg C
      Pressure 5.8E-06mbar, p_back = 9.1E-02mbar, leak rate 3.5E-10 mbar *l/s (after leak check - suspious about UP
and DOWN ribbon cable flanges)
      FL601 set point -10.0 deg C, actual -10.1 deg C

13.07 Turn +/-15V preamp power ON

  14.56 Turbo @ 42kRPM, 0.8A, 17W, 34 deg C
      Pressure 9.0E-06mbar, p_back = 9.1E-02mbar, leak rate 6.3E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -7.2 deg C

14.56 Turn +/-15V preamp power OFF

17.10 Turbo @ 42kRPM, 0.8A, 15W, 34 deg C
      Pressure 5.9E-06mbar, p_back = 9.1E-02mbar, leak rate 2.9E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -10.1 deg C

17.40 Turbo @ 42kRPM, 0.8A, 15W, 34 deg C
      Pressure 5.7E-06mbar, p_back = 9.1E-02mbar, leak rate 7.4.9E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -10.2 deg C

------13/03/17 ---------------------------------------------------------------

11.40 Turbo @ 42kRPM, 0.8A, 15W, 34 deg C
      Pressure 6.3E-06mbar, p_back = 9.1E-02mbar, leak rate 9.4E-11 mbar *l/s
      FL601 set point -10.0 deg C, actual -10.1 deg C
      --> pressure went up over the weekend??????????????? (Room temperature can be the reason)

15.53 Turbo @ 42kRPM, 0.8A, 15W, 34 deg C
      Pressure 6.1E-06mbar, p_back = 9.1E-02mbar, leak rate 1.5E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -10.1 deg C



------14/03/17 ---------------------------------------------------------------

09.38 Turbo @ 42kRPM, 0.7A, 15W, 35 deg C
      Pressure 6.3E-06mbar, p_back = 9.1E-02mbar, leak rate 1.1E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -9.9 deg C

09.39 Turn +/-15V preamp power ON

  11.14 Turbo @ 42kRPM, 0.8A, 17W, 35 deg C
      Pressure 8.9E-06mbar, p_back = 9.1E-02mbar, leak rate 1.8E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -7.1 deg C

  11.30 Turbo @ 42kRPM, 0.8A, 17W, 35 deg C
      Pressure 8.7E-06mbar, p_back = 9.1E-02mbar, leak rate 1.8E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -6.8 deg C

11.30 Turn +/-15V preamp power OFF

Adding same silicone vacuum leak sealant (Aerosol) to the Upstream cable connections (suspious leak)

13.30 Turbo @ 42kRPM, 0.8A, 15W, 34 deg C
      Pressure 6.2E-06mbar, p_back = 9.1E-02mbar, leak rate 1.0E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -9.8 deg C



------15/03/17 ---------------------------------------------------------------

10.50 Turbo @ 42kRPM, 0.7A, 15W, 35 deg C
      Pressure 6.2E-06mbar, p_back = 9.1E-02mbar, leak rate 1.2E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -10.0 deg C
      Fluke Thermometer(thermocoupling to preamp board) = 0.3 deg C

13.30 Turbo @ 42kRPM, 0.8A, 15W, 35 deg C
      Pressure 5.9E-06mbar, p_back = 9.1E-02mbar, leak rate 9.9E-11 mbar *l/s
      FL601 set point -10.0 deg C, actual -10.1 deg C

 13.48 Leak test of lower 2/3 of BNC connections, when leak risen slowly from 2E-10 to 3E-09 in like 10minutes.
        At same time p(TC1) raised for some second up to 9E-06mbar, which could indicate a huge outgasing) 

 14.04 Turbo @ 42kRPM, 0.7A, 15W, 35 deg C
      Pressure 6.0E-06mbar, p_back = 9.1E-02mbar, leak rate 3.4E-09 mbar *l/s
      FL601 set point -10.0 deg C, actual -9.7 deg C

16.36 Turbo @ 42kRPM, 0.7A, 15W, 34 deg C
      Pressure 5.9E-06mbar, p_back = 9.1E-02mbar, leak rate 5.9E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -9.9 deg C



------16/03/17 ---------------------------------------------------------------

11.49 Turbo @ 42kRPM, 0.8A, 15W, 34 deg C
      Pressure 6.1E-06mbar, p_back = 9.1E-02mbar, leak rate 1.8E-10 mbar *l/s
      FL601 set point -10.0 deg C, actual -10.1 deg C

13.11 Turbo @ 42kRPM, 0.8A, 15W, 34 deg C
      Pressure 6.0E-06mbar, p_back = 9.1E-02mbar, leak rate 1.4E-08 mbar *l/s (leak test Toby - found bad o-ring
connection back side downstream end)
      FL601 set point -10.0 deg C, actual -9.7 deg C

----- Switched off TP 15.34 (peter changed Fan of TP controller, new Targetholder did not fit perfectly, so still with
old one, investigation on o-ring leak --> maybe small dust particle)
15.53 chamber close, Roughing pump with bigger pipe ON, 16.02 Turn on TP (Soft start)

16.30 Pressure 1.1E-03mbar (Turbo @ 15kRPM, 0.6A, 10W, 34 deg C)
16.55 Pressure 5.2E-04mbar (Turbo @ 27kRPM, 0.6A, 17W, 35 deg C)
17.32 Pressure 2.8E-04mbar (Turbo @ 42kRPM, 0.6A, 27W, 37 deg C)
18.21 Pressure 2.2E-04mbar (Turbo @ 42kRPM, 0.6A, 20W, 38 deg C)

18.23 pressure = 2.E-04 --> start FL601set point -10.0 deg C, actual -6.5 went up to - 1.5 deg C (start equilibrium)

18.27 Pressure 1.6E-04mbar (Turbo @ 42kRPM, 0.9A, 19W, 38 deg C)
      FL601 set point -10.0 deg C, actual -2.2 deg C

18.40 Pressure 1.3E-04mbar (Turbo @ 42kRPM, 0.9A, 19W, 39 deg C)
      FL601 set point -10.0 deg C, actual -5.5 deg C
      (temperature of TP could have indicated a leak...)


------17/03/17 Friday---------------------------------------------------------------

09.37 Pressure 1.2E-04mbar (Turbo @ 42kRPM, 0.9A, 15W, 40 deg C)
      FL601 set point -10.0 deg C, actual -9.6 deg C
LEAK? (screws on targetholder were not secured enough)

09.43 Pressure 5.4E-05mbar (Turbo @ 42kRPM, 0.6A, 13W, 40 deg C)
      FL601 set point -10.0 deg C, actual -9.6 deg C

10.40 Pressure 5.5E-05mbar (Turbo @ 42kRPM, 0.7A, 13W, 40 deg C)
      FL601 set point -10.0 deg C, actual -9.7 deg C
      Helium test: o-ring (downstream end) front top part 10^-9 to 10^-5 (big leak --> no pressure improvement)

11.06 Turn off FL601
14.35 Turn off TP
###################################################################################
OPEN CHAMBER: Removed pre amp board U1-U4.
over weekend close chamber with roughing pump (~5.0E-01mbar)

------20/03/17 Monday---------------------------------------------------------------

CHANGED/SWITCHED UP and DOWN board inside the chamber.

New UP (1-8) and new DOWN (5-8)

Distance measurements: 




------17/03/17 Friday---------------------------------------------------------------

09.37 Pressure 1.2E-04mbar (Turbo @ 42kRPM, 0.9A, 15W, 40 deg C)
      FL601 set point -10.0 deg C, actual -9.6 deg C
LEAK? (screws on targetholder were not secured enough)

09.43 Pressure 5.4E-05mbar (Turbo @ 42kRPM, 0.6A, 13W, 40 deg C)
      FL601 set point -10.0 deg C, actual -9.6 deg C

10.40 Pressure 5.5E-05mbar (Turbo @ 42kRPM, 0.7A, 13W, 40 deg C)
      FL601 set point -10.0 deg C, actual -9.7 deg C
      Helium test: o-ring (downstream end) front top part 10^-9 to 10^-5 (big leak --> no pressure improvement)

11.06 Turn off FL601
14.35 Turn off TP
###################################################################################
OPEN CHAMBER: Removed pre amp board U1-U4.
over weekend close chamber with roughing pump (~5.0E-01mbar)

------20/03/17 Monday---------------------------------------------------------------

CHANGED/SWITCHED UP and DOWN board inside the chamber.

New UP (1-8) and new DOWN (5-8)

Distance measurements: 

New UPstream: (metal frame stand off = 10mm)
   Position (to end of chamber): 738 - 40 (pos from target) - 32 (plastic standoff) + 10 = 676 (to end of board)

Orientation:

      4
       3 

 6          2
  5        1

       7
       8


New DOWNstream: (metal frame stand off = 20mm) 
   Position (to end of chamber): 738 - 400 (pos from target) - 14 (plastic standoff) + 20 = 344 (to end of board)


Orientation:

      
       

 6    
  5        

       7
       8


***note: 24/03/17: took short standoff for UPstream hold (only ~40mm to targetholder)
                   remeasured short standoffs: 12.5mm


Checked: Cooling (changed circle with one preamp board less), cabling (preamp power signal), 
position, cleaning, test preamp
CABLING changed 16-x19 to D5-8

14.30 close chamber, start roughing pump
15.24 p(TC2) = 4.4E-01 mbar  --> soft start big Turbo Pump
15.39 p = 1.6 E-03mbar (0.7A, 11W, 11kRPM, 27 deg C) 
16.11 p = 5.9 E-04mbar (0.6A, 14W, 23kRPM, 29 deg C)
16.33 p = 3.4 E-04mbar (1.3A, 38W, 34kRPM, 31 deg C)
17.41 p = 1.7 E-04mbar (0.9A, 18W, 42kRPM, 35 deg C)

Turn on FL601 cooling, set point to -5.0 deg C, actual temp starts at 22 deg C

19.12 Pressure 5.9E-05mbar (Turbo @ 42kRPM, 0.6A, 10W, 35 deg C)
      FL601 set point -5.0 deg C, actual -4.6 deg C
   --> changed set point to -10.0 deg C

------21/03/17 Tuesday---------------------------------------------------------------

10.52 p = 1.9 E-05 mbar 
     --> switch on small Turbo pump (TP2)

11.05 Pressure 1.3E-05mbar (Turbo @ 42kRPM, 0.5A, 10W, 35 deg C;  TP2 @ 75kRPM, 0.25A, 13W, 32 deg C)
      FL601 set point -10.0 deg C, actual -5.5 deg C
   --> Turn ア15V preamp power ON
Testing DAQ

11.45 Pressure 2.0E-05mbar (Turbo @ 42kRPM, 0.5A, 10W, 35 deg C;  TP2 @ 75kRPM, 0.26A, 13W, 39 deg C)
      FL601 set point -10.0 deg C, actual -3.9 deg C

12.17 Turn ア15V preamp power OFF 
      Pressure 1.9E-05mbar (Turbo @ 42kRPM, 0.5A, 10W, 35 deg C;  TP2 @ 75kRPM, 0.26A, 13W, 43 deg C)
      FL601 set point -10.0 deg C, actual -4.0 deg C

14.18 Pressure 1.2E-05mbar (Turbo @ 42kRPM, 0.5A, 10W, 35 deg C;  TP2 @ 75kRPM, 0.25A, 13W, 45 deg C)
      FL601 set point -10.0 deg C, actual -5.6 deg C

added some alcohol(mixing takes a short heat up), switch to helium leak tester (DONT MOVE WHILE IT IS ON)
added FAN for small Turbopump

15.40 Pressure 1.1E-05mbar (Turbo @ 42kRPM, 0.5A, 9W, 35 deg C;  TP2 @ 75kRPM, 0.24A, 12W, 33 deg C)
      FL601 set point -10.0 deg C, actual -6.0 deg C

17.05 Pressure 1.0E-05mbar (Turbo @ 42kRPM, 0.5A, 9W, 34 deg C;  TP2 @ 75kRPM, 0.24A, 12W, 34 deg C)
      FL601 set point -10.0 deg C, actual -7.6 deg C

17.05 Turn ア15V preamp power ON

   18.51 Pressure 1.6E-05mbar (Turbo @ 42kRPM, 0.5A, 9W, 34 deg C;  TP2 @ 75kRPM, 0.24A, 12W, 34 deg C)
      FL601 set point -10.0 deg C, actual -5.3 deg C

18.51 Turn ア15V preamp power OFF


------22/03/17 Wednesday---------------------------------------------------------------

10.55 Pressure 7.9E-06mbar (Turbo @ 42kRPM, 0.5A, 8W, 35 deg C;  TP2 @ 75kRPM, 0.22A, 11W, 33 deg C)
      p_back = 9.2E-02mbar, leak rate 10E-11 - 10E-12 mbar*l/s
      FL601 set point -10.0 deg C, actual -7.7 deg C

14.05 pressure 7.7E-06mbar

OPEN CHAMBER FOR ALIGNMENT

------23/03/17 Thursday---------------------------------------------------------------

Si-Detectors: measures- DeltaE-E (65オm - 1000オm) and Downstream E (74オm) 
HANDLE WITH CARE, NO TENSION --> THIN LAYERS. 

Voltage supply: 24V for 74オm. BIAS cable is 4th row and 2nd place

Cabled to U1-4. DONT FLAT THE CHAMBER WITH LOTS OF AIR, use valve at TP.



------24/03/17 Friday---------------------------------------------------------------

Testing Preamps (with Si-"capacitor" - no BIAS) under atmosphere with 5 deg C cooling
Normal resolution with pulser and without Si-Detector = 2-3 channel

Without BIAS:
#1 adc 0-13: FWHM ~10ch
#1 adc 14,15: Broken
#1 adc 16-31: FWHM ~7ch

#2 adc 0-6: FWHM ~27ch
#2 adc 7,8: FWHM ~5-6ch only
#2 adc 9-14: FWHM ~30ch (2peaks each; low peak coming from wrong pulser signal.)
#2 adc 13: FWHM ~90ch
#2 adc 15: FWHM ~27ch

#2 adc 16-31: 8-10ch
except from #2 adc 22,28: ~27ch

Quad BIAS Supply:
0V - 0.20オA
5V - 0.82オA
10V - 0.95オA
15V - 1.07オA
20V - 1.17オA
24V - 1.25オA

With BIAS:
#1 adc 0-31(14,15 broken): FWHM 4-6ch

#2 adc 0-15: FWHM ~ 7ch
except from #2 adc 3,4,7,8,12 with lower tail: FWHM ~7-10ch

#2 adc 16-31: FWHM ~4-6ch
except 22,38: FWHM ~10ch
except 13: FWHM ~25ch


Targetholder (alignment) marker on scale

pos-1:  34.54  (bottom on ladder)

pos-2:  94.05  (middle)

pos-3:  bottom.8 (almost maximum, top on ladder)


New run with alpha source P32 R9344 mixed (only Gold sealing --> wear Cloves)
 (Pu-239,   - 5.155MeV 
  Am-241,   - 5.486MeV
  Cm-244,   - 5.805MeV)

17.15 Close Chamber, roughing pump

17.28 p = 9.9E-01mbar   --> Start TP (big)
17.48 p = 2.0E-03mbar (TP @ 11kRPM, 0.7A, 12W, 28 deg C


------25/03/17 Saturday---------------------------------------------------------------

15.00 Pressure 4.6E-05mbar (Turbo @ 42kRPM, 0.6A, 11W, 34 deg C)
      --> start small TP2 and open valve (quick soft start in 1 minute) - TP2 @ 75kRPM, 0.24A, 12W, 26 deg C)
      start FL601 set point -10.0 deg C, actual 20.7 deg C

15.05 p = 3.8E-05 mbar
15.07 p = 3.4E-05 mbar



------27/03/17 Monday---------------------------------------------------------------

12.17 Pressure 6.2E-06mbar (Turbo @ 42kRPM, 0.8A, 14W, 36 deg C;  TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
      FL601 set point -10.0 deg C, actual -8.4 deg C

12.21 Turn ア15V preamp power ON

   14.05 Pressure 8.7E-06mbar (Turbo @ 42kRPM, 0.8A, 13W, 36 deg C;  TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
      FL601 set point -10.0 deg C, actual -5.0 deg C

   14.43 Pressure 8.7E-06mbar (Turbo @ 42kRPM, 0.8A, 13W, 36 deg C;  TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
      FL601 set point -10.0 deg C, actual -5.1 deg C

14.44 Turn ア15V preamp power OFF

16.25 Pressure 6.1E-06mbar (outgazing still ongoing, saw peak up to 2.3E-05mbar at a glimpse)
      (Turbo @ 42kRPM, 0.8A, 13W, 36 deg C;  TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
      FL601 set point -10.0 deg C, actual -7.3 deg C

------28/03/17 Tuesday---------------------------------------------------------------

13.06 Pressure 5.7E-06mbar (Turbo @ 42kRPM, 0.8A, 14W, 35 deg C;  TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
      FL601 set point -10.0 deg C, actual -9.4 deg C

13.09 Turn ア15V preamp power ON

   16.15 Pressure 7.8E-06mbar (Turbo @ 42kRPM, 0.8A, 13W, 35 deg C;  TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
      FL601 set point -10.0 deg C, actual -5.8 deg C

16.16 Turn ア15V preamp power OFF

18.36 Pressure 6.1E-06mbar (Turbo @ 42kRPM, 0.7A, 13W, 35 deg C;  TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
      FL601 set point -10.0 deg C, actual -8.5 deg C


------29/03/17 Wednesday---------------------------------------------------------------

13.15 Pressure 5.9E-06mbar (Turbo @ 42kRPM, 0.7A, 13W, 35 deg C;  TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
      FL601 set point -10.0 deg C, actual -9.5 deg C

13.25 Turn ア15V preamp power ON for alpha measurement

   14.30 Pressure 7.3E-06mbar (Turbo @ 42kRPM, 0.7A, 13W, 35 deg C;  TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
      FL601 set point -10.0 deg C, actual -7.6 deg C

   15.41 Pressure 7.9E-06mbar (Turbo @ 42kRPM, 0.7A, 13W, 35 deg C;  TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
      FL601 set point -10.0 deg C, actual -6.6 deg C

   16.31 Pressure 7.8E-06mbar (Turbo @ 42kRPM, 0.7A, 13W, 35 deg C;  TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
      FL601 set point -10.0 deg C, actual -6.4 deg C
good vacuum condition of ~8E-06mbar with preamps on
16.31 Turn ア15V preamp power OFF
   
17.46 Pressure 6.1E-06mbar (Turbo @ 42kRPM, 0.7A, 12W, 35 deg C;  TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
      FL601 set point -10.0 deg C, actual -8.7 deg C


------30/03/17 Thursday---------------------------------------------------------------

12.15 Pressure 6.3E-06mbar (Turbo @ 42kRPM, 0.7A, 13W, 35 deg C;  TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
      FL601 set point -10.0 deg C, actual -9.8 deg C
      shut off TP + TP2 --> spinning down

13.05 p = 3.1E-05mbar, turn off FL601, bringing down to atmosphere takes about 30 minutes.

###########################
13.35 OPEN CHAMBER, longer cable done for detector, Peter add block (15.8mm) the target holder (due to pos 3)
      put stand off on DOWNstream

Test #3,#4 under atmosphere WITHOUT BIAS:
#3 adc 0 lower xmean ~ 1550, FWHM ~20ch
#19 low xmean ~450, FWHM ~3ch
rest of #3: xmean 2400-2600, FWHM ~10ch

#4 xmean more or less between 2000-3000, most ~2400.
#4 adc 4: double peak, FWHM > 30ch
#4 adc 0 - 15: FWHM ~ 30ch, except of
#4 adc 7: FWHM ~8ch.

#4 adc 16-31: FWHM ~12-13ch, right tail
except #4 adc 16: FWHM ~7ch
       #4 adc 18: FWHM 15ch
       #4 adc 25: FWHM ~20ch

BIAS up to 24 V  1.38オA leak current (while ramp <3オA)
alpha source inside chamber on new middle position: 94.05 -15.8 = 78.25
chamber close after 2h 

WITH BIAS: 
#3 0-31: 4-6ch FWHM
except #3 adc 1: ~10ch FWHM
       #3 adc 19: ~3ch FWHM (lower mean)
left tail: adc 0-23      and    right tail: adc 24-31

#4 adc 0-15: broader: adc 0-4: ~7ch FWHM
                      adc 5:   ~3ch FWHM
                      adc 6,13: 11ch FWHM
                      adc 7,15: ~5,6ch FWHM
                      adc 8-12,14: ~7,8ch FWHM

#4 adc 16-31: 5-8ch FWHM  right tail 

##############################################
################################closed chamber

16.10 Roughing pump slowly pump down (open value stepwise)
16.25 p = 1.1 mbar   --> start TP
16.30 p = 1.3E-01 mbar (TP @ 7kRPM, 1.0A, 15W, 28 deg C)
17.21 p = 7.8E-04 mbar (TP @ 27kRPM, 0.6A, 17W, 31 deg C)
18.08 p = 3.3E-04 mbar (TP @ 42kRPM, 1.1A, 22W, 34 deg C)
      --> start TP2 (1min) --> TP2 @ 75kRPM, 0.26A, 13W, 26 deg C)
18.12 p = 2.7E-04 mbar
18.16 start FL601 set to -10.0 deg C, starts at ~ +4.0 deg C
18.18 p = 2.0E-04 mbar
18.54 p = 8.8E-05 mbar (TP @ 42kRPM, 0.8A, 17W, 35 deg C; TP2 @ 75kRPM, 0.25A, 13W, 32 deg C)
      FL601 set point -10.0 deg C, actual -5.5 deg C


------31/03/17 Friday---------------------------------------------------------------

10.35 p = 1.5E-05mbar
12.15 p = 1.4E-05 mbar (TP @ 42kRPM, 0.6A, 12W, 35 deg C; TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
      FL601 set point -10.0 deg C, actual -6.2 deg C
12.30 Turn ア15V preamp power ON    (for Outgazing and alpha measurement)

   13.40 p = 2.2E-05 mbar;   leak rate: 1.6E-09 mbar l /S
   14.15 p = 2.1E-05 mbar;   T = -4.5 deg C

TURN BIAS on 24V, 1.16オA
14.17 DAQ started
#3 -19: low peak 181 with Amplitude of 478 (14.33), FWHM 4-5ch --> Area ~ 5500counts
rest #3 0-31: xmean ~ 1000, FWHM 8-12 ch

#4 adc 6 and 7: no signal
 --> adc 6 could be preamp problem
 --> adc 7 could be Si-Det issue, because it was observed with #2adc7 before
#4 adc 5: low xmean = 134, FWHM 2.5ch
rest of #4 adc 0-15: (14.40) ~500-800 Amplitude, xmean ~ 1000, FWHM ~12ch
#4 adc 16-31: A~200-250, xmean ~ 950-1050; FWHM ~7-8ch


   14.45 p = 2.1E-05 mbar;   Temp = -4.8 deg C;    leak rate: 8.0E-10 mbar l /S
14.46 Turn ア15V preamp power OFF, switch off Amps and BIAS

16.10 p = 1.3E-05 mbar;   T = -6.2 deg C

18.23 p = 1.2E-05 mbar;   T = -6.2 deg C


------
------03/04/17 Monday ------------------- Peter testing ----------------

15.49 p = 7.6E-06 mbar;

------04/04/17 Tuesday -------------------

14.05 p = 7.1E-06 mbar;

TP Off

------05/04/17 Wednesday -------------------
########################################
##### chamber open, alpha source out ###

10.25 chamber close, start pumping
12.10 large TP ON

13.55 p = 9.4E-05 mbar

15.30 p = 5.7E-05 mbar

------06/04/17 Thursday -------------------

09.50 p = 1.5E-05 mbar

15.30 p = 1.0E-05 mbar


------07/04/17 Friday -------------------

09.25 p = 9.1E-06 mbar (TP @ 42kRPM, 0.5A, 9W, 35 deg C; no TP2)
      FL601 set point -10.0 deg C, actual -9.7 deg C
09.25 Turn ア15V preamp power ON

   12.02 p = 1.2E-05 mbar
         T = -6.9 deg C
   Turn ア15V preamp power OFF

12.13 p = 1.0E-05 mbar
      T = -7.5 deg C

12.54 p = 9.0E-06 mbar
      T = -8.5 deg C

15.04 p = 9.0E-06 mbar
      T = -9.1 deg C

16.47 p = 8.6E-06 mbar
      T = -9.3 deg C

##########################
ACCIDENT Registered on Sunday 09/04/17 ~10 am:
Power went down due to wiring problem
Tom C. closed valves, but chamber was probably already vented to atmosphere. 
During power shut down roughing and turbo pump slowed down and turbo probably deaccelerate against atmosphere.
Possible back flows.


------11/04/17 Tuesday -----------------
OPEN CHAMBER 16.05: readjust Downstream plate to 326mm, cause we changed to longer stand-off
Downstream --> 74オm Si-Det
Upstream   --> 500オm Si-Det

Check DAQ/FWHM of spectra without BIAS on under atmosphere and only PULSER signal:


BIAS up (500オm):
Voltage[V]  Leak current[オA]
  0             0.14
  5             0.6
 10             0.73
 20             0.93
 30             1.11
 40             1.22
 50             1.27
 60             1.32
 70             1.34
 80             1.38
 90             1.42
100             1.44
110             1.48
120             1.49
130             1.52   --> 1.44 (after 5 min)


Check DAQ/FWHM of spectra with BIAS on under atmosphere and only PULSER signal:


CLOSING CHAMBER
18.03 Start roughing pump
18.06 p = 1.0E+03 mbar
18.11 p = 2.0E+01 mbar
18.14 p = 3.8E+00 mbar
18.16 p = 1.9E+00 mbar
18.19 p = 1.1E+00 mbar  --> start TP (and close valve at TP2)
18.22 p = 5.0E-01 mbar
18.25 p = 9.0E-02 mbar (took a while for next stage of acceleration... very slow start)
18.34 p = 2.6E-03 mbar
18.40 p = 2.2E-03 mbar
18.44 p = 1.6E-03 mbar
19.02 p = 1.0E-03 mbar
19.12 p = 8.2E-04 mbar
19.18 p = 7.6E-04 mbar
19.21 p = 7.0E-04 mbar
19.30 p = 5.7E-04 mbar
20.00 p = 3.7E-04 mbar (full speed at TP @ 42 kRPM)
20.04 TURN ON TP2
20.06 p = 3.0E-04 mbar
20.10 p = 2.9E-04 mbar (TP @ 42kRPM, 0.9A, 18W, 34 deg C; TP2 @ 75kRPM, 0.28A, 15W, 28 deg C)

------12/04/17 Wednesday -----------------

9.33  p = 6.1E-05 mbar
10.27 p = 5.9E-05 mbar
      Turn on FL601 chiller set to -5.0 deg C; T_start = 18.7 deg C
10.44 p = 2.9E-05 mbar; T = 4.8 deg C 
      stop chiller to remove 500ml of Coolant and replace it with ~375ml IPA
10.54 p = 2.7E-05 mbar; T = 3.4 deg C

11.08 p = 2.1E-05 mbar; T = -5.0 deg C   (set to -10.0 deg C)
11.15 Turn ア15V preamp power ON

  11.29 p = 2.4E-05 mbar; T = -5.8 deg C
  11.50 p = 2.5E-05 mbar; T = -5.1 deg C

BIAS up for UPSTREAM (500オm - 130 V) and DOWNSTREAM (74オm - 24 V)
11.51 DAQ started for testing Si-det with triple alpha source

  12.10 p = 2.4E-05 mbar; T = -5.1 deg C
  12.17 p = 2.5E-05 mbar; T = -5.2 deg C
  13.12 p = 2.3E-05 mbar; T = -5.2 deg C
  15.08 p = 2.1E-05 mbar; T = -5.1 deg C
  15.50 p = 2.0E-05 mbar; T = -5.1 deg C

15.58 DAQ stopped; ramp down BIAS, switch off amp+preamps
      Turn ア15V preamp power OFF

16.02 p = 2.0E-05 mbar; T = -5.2 deg C
16.35 p = 1.5E-05 mbar; T = -6.0 deg C
17.04 p = 1.5E-05 mbar; T = -6.0 deg C

17.05 Turn ア15V preamp power ON
  17.19 p = 1.7E-05 mbar; T = -1.4 deg C (set to -2.0)
17.19 Turn ア15V preamp power OFF

17.40 p = 1.5E-05 mbar; T = -5.7 deg C (after set to -10.0 deg C)
18.14 p = 1.4E-05 mbar; T = -5.8 deg C

------13/04/17 Thursday -----------------

11.37 p = 1.0E-05 mbar; T = -6.2 deg C
      Turn ア15V preamp power ON
  13.21 p = 1.4E-05 mbar; T = -4.5 deg C
      Turn ア15V preamp power OFF
add ~300ml IPA, set point to +5.0 deg C

13.44 p = 1.3E-05 mbar; T = 4.1 deg C
14.33 p = 1.4E-05 mbar; T = 5.0 deg C

14.38 FL601 turn OFF, peter test cooling pipes with Helium (~4bar He --> leak rate up to 10^{-6} or 10^{-5} mbar*l/s
Test chiller in close circle: 15.05  T = -8.3 deg C

open cooling pipe --> chamber without cooling:
14.50 p = 2.0E-05 mbar
15.05 p = 2.9E-05 mbar
15.35 p = 4.0E-05 mbar (leak rate 5 * 10^{-5} mbar*l/s)

15.50 reconnect cooling to chamber
15.55 p = 1.5E-05 mbar; T = -5.8 deg C;    leak rate 2.0E-05 mbar*l/s
16.55 p = 1.7E-05 mbar; Cooling was off by Daid to test temperature influence

17.00 p = 1.1E-05 mbar; T = -5.7 deg C (chiller back on)
17.50 p = 1.0E-05 mbar; T = -6.6 deg C
18.18 p = 1.0E-05 mbar; T = -6.8 deg C

------14/04/17 Friday -----------------

11.09 p = 8.5E-06 mbar; T = -7.1 deg C
11.15 Turn ア15V preamp power ON

  12.10 p = 1.2E-05 mbar; T = -5.2 deg C    switch to Helium leak pump: rate ~ 4.3E-09 mbar*l/s

  12.29 p = 1.1E-05 mbar; T = -5.2 deg C

  Turn ア15V preamp power OFF

14.20 p = 8.5E-06 mbar; T = -7.2 deg C

14.50 Turn ア15V preamp power ON

  15.05 p = 9.4E-06 mbar;  T = -6.6 deg C;  leak rate 5*10^{-09} mbar*l/s
  15.30 p = 1.0E-05 mbar;  T = -5.7 deg C;  leak rate 6.3*10^{-09} mbar*l/s
  15.50 p = 1.1E-05 mbar;  T = -5.6 deg C;  leak rate 7*10^{-09} mbar*l/s
  16.33 p = 1.1E-05 mbar;  T = -5.5 deg C;  leak rate 7.6*10^{-09} mbar*l/s
  16   Sat Sep 9 09:39:38 2017 ClaudiaVacuum Readings at ISOLDE Hall

Thursday, 7th September:

Vaccum after pumping all night preamps off, chiller off

  • 09:37: IMG1 2.3E-5 mbar, Chamber 7.5 E-5 mbar; Julabo off;
  • 09:38: IMG1 2.1E-5 mbar; Chamber 6.6E-5 mbar; Julabo 20 Celsius
  • 09:41: IMG1 2E-5; Chamber 6.6E-5; Julabo 5 Celsius
  • 09:55: IMG1 1.3E-5; Chamber 1.3E-5
  • 10:10 IMG1 1.2E-5; Chamber 4.5E-5;

Preamp power ON, Chiller on 5 Celsius

  • 10:25 IMG1 1.3E-5; 5E-5; Thermocoupling Readout 16 Celsius
  • 11:20 IMG1 1.5E-5; 6.1E-5 Thermocoupling Readount 19.3
  • 13:08 IMG1 1.6E-5; 5.5E-5
  • 14:16 IMG1 1.4E-5; 5.1E-5
  • 15:40 IMG1 1.4E-5; 4.9E-5
  • 17:55 IMG1 1.3E-5; 4.5E-5

Preamp OFF, chiller off

8th September

  • 1.2E-5; 3.9E-5

--> Leak test with He, replace target ladder with blank and refit feedtrhrough (upstream detectors), identify some scratches

start pumping

  • 23:50 IMG1 2.2E-5; Chamber 9E-5

9th September

  • 08:17 IMG1 1.3E-5; 5.1E-5 mbar

Leak test but no leaks found anywhere now.

Chiller on 5 Celsius, preamplifiers ON

  • 10:55 IMG1 9.1E-6; 3.8E-5
  • 12:00 IMG1 8.9E-6; 4.0E-5
  • 14:50 IMG1 8.1E-6; 3.6E-5

Preamplifiers OFF

  • 15:05 IMG1 6.3E-6; 2.9E-5 (9.8 C)
  • 15:12 IMG1 6.1E-1; 2.9E-5 (9.3 C)
  • 15:25 IMG1 5.9E-6; 2.8E-5 (9.0 C)

Chiller OFF (not sure when exactly chiller was turned off)

Sunday 10/09/2017

  • 22:50 IMG1 8.8E-06; 3.4E-05

Monday 11/09/2017

  • 9:20 IMG1 8.2E-06; 2.7E-05

Leak test on Cooling loop. --> Big leak detected. Open up chamber to replace cooling.

Tuesday 12/09/2017

Several tests done for cooling, it seems that even the smallest possible cooling loop is leaky.

  • 19:00, close chamber and start pumping
  • 19:13 start both turbo pumps at 9.9E-1 mbar
  • 19:23 P=2.7E-4 mbar

Note that big Turbopump has been switched to normal start so pumping times not comparable with before. Maximum wattage of pump should be 420 W

Wednesday 13/09/2017

  • 9:15 8.5E-6 mbar; 3.1E-5mbar
  • 9:30 Cooling ON, switched to -10C
  • 10:05 4.4E-6 mbar; 1.7E-5 bar (-9.9C on chiller)
  • 10:15 preamps on, -10 C, 4.1E-6; 1.6E-5 mbar
  • 10:22 T readout 5.6 C, 4.6E-6; 1.8E-5
  • 10:26 T readount 6.2 C; 4.8E-6 mbar, 1.9E-5 mbar
  • 10:40 4.9E-6 mbar; 1.9E-5 mbar

Preamps off, cooler off

open chamber for detector installation and some checks; close chamber and pump

  • 18:55 7.2E-5; 3.3E-4 mbar
  • 20:45 4.4E-5; 1.8E-4 mbar (nopreamp, no chiller)

Thursday, 14 September 2017

  • 9:25 1.1E-5mbar; 4.3E-5 mbar

open chamber to discuss with beam operators

  • 11:05 close chamber start pumping
  • 11:20 1.2 mbar, turbo pumps on
  • 11:32 4.1E-4 mbar; 1.1E-3 mbar

 

ELOG V3.1.4-unknown