AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 7 of 11  ELOG logo
Entry  Sun Nov 12 18:32:52 2017, MB DK , run 112 
Header: 4.4 MeV/u CH2_16 sample
Ender: 
====================================================
Entry  Thu Oct 4 13:07:33 2018, KG, Schematics for gas-cell tests in_atmosphere.pngFeedthrough.png
in_atmosphere.png : schematic for testing gas-cell in atmosphere

Feedthrough.png : feed through schematic for testing vacuum chamber and gas cell
Entry  Thu Oct 25 13:25:16 2018, KG, Current gas cell status 
(Wrapped up)

    Cell b : 15um Al exit, 12.5um Al entrance.  L/R ~0.4Torr/hr overnight (in vacuum)
Entry  Thu Nov 9 01:24:01 2017, Daid. Mirco, Run 54 
Header: Continue with 5.0 MeV/u and CH2
Ender: Checked control room, about 2:40.  Target current is 2 A (low...should be 430 A).  No beam seen at our FC, although MIDAS seemed to have events.
NB: You can monitor the target current on any network computer via: https://op-webtools.web.cern.ch/Vistar/vistars.php?usr=GPS 
Entry  Thu Nov 9 03:32:55 2017, Daid. Mirco, Run 55 gps-r55.jpgpsb-run55.jpg
Header: Continue 5.0 MeV/u with CH2 after target re-heating
Ender: End
====================================================
Entry  Thu Nov 9 05:35:44 2017, Daid. Mirco, Run 56 

Header: 5.0 MeV/u CH2, Laser 2 is turned off on purpose to check background.
Ender: Could not see many real events beside pulser and current was very low
Entry  Thu Nov 9 06:02:41 2017, Daid. Mirco, Run 57 
Header: Continue with 5.0 MeV/u and CH2.  Laser back on.
Ender: 
====================================================
Entry  Sat Nov 11 00:01:41 2017, Daid. Mirco, Trigger and scalars for 4.0 MeV/u 
Tom et al. tuned the trigger this evening, before we began the runs.  (Run 82, or Run 83??)

===TRIGGER===
Entry  Wed Nov 8 23:14:38 2017, Daid, Ruchi, Mirco, Run 53 
Header: Restart 5.0 MeV/u w/ CH2 after PS comes back (3 rings until the morning)
Ender: End
====================================================
Entry  Wed Nov 8 20:40:33 2017, Daid, Ruchi, Run 49 
Header: First test with RIB.  Irises closed.
End: End
Entry  Wed Nov 8 20:46:23 2017, Daid, Ruchi, Run 50 
Header: First run with irises open.  30 min run.
Ender: Call from PS-Booster.  Stop run.
Entry  Wed Nov 8 23:06:48 2017, Daid, Ruchi, Run 52 (junk) 
(Junk -- see comments)
====================================================
Run number : 52
Entry  Thu Nov 9 06:30:35 2017, Daid, Mirco, Spectra (Shift 1) 12x
Screen shots for accumulated data before the target went down.  Should be (at least) runs 53 & 54 inclusive, possibly back to the start of RI beam on CH2
target.
Entry  Wed Nov 8 22:08:55 2017, Daid, Run 51 
Header: Restart 5.0 MeV/u CH2 with 3 PS rings.
Ender: Stop run.  We want good data with a smaller file size for fast analysis, as well as to get on a 2 hour schedule.
====================================================
Entry  Wed Nov 8 23:46:32 2017, Daid, Charge State Distributions  charge-state-distribution-3.6.jpgcharge-state-distribution-4.0.jpgcharge-state-distribution-4.4.jpgcharge-state-distribution-4.7.jpgcharge-state-distribution-5.0.jpg
Faraday cup readout at the end of our chamber should change based on whether or not the target is in and also the 59Cu beam energy.

The effect could be as much as 10 to 20%.  At some point, we should check the Faraday cup reading with the CH2 target and with the empty target.
Entry  Sat Nov 11 17:45:10 2017, DK, TD, ASM, RG, MD, Run 97 
Header: CH2 target in, Laser #2 off, 4.0 MeV/u
Ender: Stopped run to modify DAQ trigger 
====================================================
Entry  Fri Jan 27 11:02:03 2017, DK, PB, Notes from visit to CERN 
Here I am simply digitizing my notes from our visit to CERN 17~18 January 2017.  They may not be perfectly linear or organized, but may be searchable.

==ISOLDE Hall Info==
Entry  Mon Oct 8 12:05:25 2018, DK, PB, Gas cell supports gas_cell_support.PDF
These are used to connect the gas cell to the target ladder.  We only had the one, and it would be more convenient if each gas cell has its own, to avoid
swapping them back and forth.
Entry  Sun Nov 12 23:52:10 2017, DK, MD, RG, Run 115 - short 
Header: Continue 4.4 MeV / u @ CH2
Ender: Run stopped short as the IHS tripped
====================================================
Entry  Wed Nov 15 05:26:46 2017, DK, MD, CLW, Run 153 
Header: Continue with CH2 and 5.0 MeV/u
Ender: end of beam time
====================================================
ELOG V3.1.4-unknown