AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 16 of 35  ELOG logo
Entry  Fri May 6 09:31:41 2022, TD NH, Friday 6 May 33x

10:30 DAQ appears to have stopped
Entry  Wed May 4 16:50:04 2022, NH, AIDA 4th May Screenshot_20220504_174929.pngScreenshot_20220504_175201.png
bPlas has been mostly cabled in now

Reseat LAN cable (AIDA Switch -> AIDA-3) and reachieve 1 gbit/s speed as needed.
Entry  Mon May 2 13:08:49 2022, NH, AIDA Updates 2 May elog_temps1.pngalpha_1d.png
The snout endcap has been sealed with new copper tape over the red tape

Observe significant drop in leakage current on DSSD #2 down to 7 uA (about 0.5 uA above DSSD #1) as it looked when the black cloth was on
    Reply  Tue May 3 14:15:17 2022, NH, AIDA Updates 2 May 

PAUSE/RESUME stats are dominated by 2x FEE64s - aida07 and aida16
Entry  Mon May 2 09:52:20 2022, OH, Shifter checklist 2022 
Every 30 minutes:

- Reload statistics (Web browser tab screen 1, workspace 3)
Entry  Thu Apr 28 18:45:09 2022, NH, Alpha Background Run  AnyDeskMSI_2022-04-28_19-47-33.pngAnyDeskMSI_2022-04-28_19-47-56.pngAnyDeskMSI_2022-04-28_19-48-13.png
Runs are in /TapeData/BGAPR22 located on 8TB disk "SecondDrive" (N.B. 2A experiment is using ThirdDrive)

Old runs and test files were removed from disk. Left is an unknown S481 folder (fibre implant test?) and Patrick
Entry  Wed Apr 27 15:47:46 2022, NH, HA, SA, CJ, AIDA 27 Apr 22 7x
Remount snout in S4 (photos to come) 
Alignment with DEGAS OK but a bit short...  DEGAS platform will be brought 31 mm closer to AIDA by rail adjustment
Entry  Fri Apr 8 08:59:42 2022, OH, NH, Friday 8th April 11x
09:59 Noticed that the right hand ribbon cable for aida07 was offset vertically by 1. i.e. Only 1 of the 2 rows of pins in. Unbiassed detectors and reconnected.
      Rebiassed detectors - leakage current on DSSD2 increased to 9.96uA - Attachment 1
Entry  Thu Apr 7 12:42:14 2022, OH, NH, TD, Thursday 7 April 8x

Re-assembled triple snout re-installed on the AIDA stand - DSSSD ribbon cables and grounds re-connected.
FEE64 adaptor PCB LKs per https://elog.ph.ed.ac.uk/DESPEC/409
Entry  Wed Apr 6 10:09:21 2022, OH, NH, TD, Wednesday 6 April 6x
DSSSD bias OFF. DAQ STOPped

Attachment 6 FEE64 temps OK
Entry  Tue Apr 5 12:46:52 2022, TD, MSL type BB18(DS)-1000 triple - cable lengths 

OH/NH disassembling current AIDA triple snout and DSSSD stack.
Entry  Tue Apr 5 08:52:16 2022, TD, Tuesday 5 April 6x
DSSSD bias OFF. DAQ STOPped

Attachment 1 FEE64 temps OK
Entry  Mon Apr 4 09:19:49 2022, TD, Monday 4 April 12x
AIDA adaptor PCB config - all LKs removed *except*

aida04 & aida08 LK1
Entry  Sun Apr 3 10:56:11 2022, TD, Sunday 3 April 35x

all system wide checks OK *except* aida10 failed ADC calibration
Entry  Sat Apr 2 10:42:49 2022, TD, Saturday 2 April 21x
11.10 Found aida08 not running - merger/TapeServer stalled

Restart required power cycle of all FEE64s
Entry  Wed Mar 9 10:15:56 2022, NH TD, Wednesday 9 March - noise tests contd. 38x
11.15 - S4 is currently closed no access

If access possible (should be) plan is
Entry  Tue Mar 8 10:26:56 2022, TD NH, Tuesday 8 March 2022 40x

11.25 System wide checks OK except aida06 clock fail status 6 - attachments 1-13
Entry  Mon Mar 7 12:20:26 2022, NH, TD, AIDA Grounding Checks Mon 7 Mar 14x
Remove all DSSD ribbon cable braid ground from FEE64s to check n+n ground loops

Removing all on n+n side only and test resistance to ground: 4, 6 and 8 show continuity to ground, 2 shows no connection (braid ring terminal to copper
Entry  Sat Mar 5 10:43:45 2022, OH, NH, Grounding and noise tests 4th-5th March Summary 13x
Tests performed


After leaving overnight noticed the pulser was not fully inserted into aida09

Little change in rates
observed in 9 but otherwise nothing else


Connected bias of aida02 (n+n ground) to aida06 (n+n ground) and likewise 4-8

No
change observed in rates


Also tested covering the snout in light tight material

No Changes


Unplugged
Entry  Fri Mar 4 08:40:36 2022, OH, NH, AIDA Noise and grounding tests 3rd March - Results 9x
Grounding implemented


Each FEE given direct connection to heavy duty earth bar via adaptor board lemo ground
Earth bars
are then connected to platform ground on AIDA frame
Photo of grounding - attachment 1
Improvements not as large as expected from
previous experience though

Particularly in the n+n side where widths still appear awful


While implementing the
Entry  Thu Mar 3 08:45:03 2022, OH, NH, AIDA Noise and grounding tests 3rd March 8x
Pulser spectra


Changes to the nn pulser circuit yesterday have improved the peak widths on the p+n side
p+n peak widths
averact around 100 channels
n+n around 1000 at 0xa threshold
n+n 1.8.L spectra - attachment 1
p+n 1.8.L spectra attachment
2


p+n peak widths




ELOG V3.1.3-7933898