| ID |
Date |
Author |
Subject |
Text |
 |
|
745
|
Wed Nov 19 10:28:24 2025 |
JEL, JB | Analysis of AIDA from S100 experiment by JEL | Analysis done by JEL of the AIDA daq with
his own time-stitcher -- not the standard
one used by DESPEC. |
|
|
744
|
Thu Nov 13 10:14:50 2025 |
JB, MP | Noise conditions after removal of bPlast cabling | JB has removed unnecessary cables and items
from the snout and platform:
- the bPlast cables and booster |
11x |
|
743
|
Fri Nov 7 12:30:30 2025 |
JB, GB, MP | Pulser walkthrough for source tests. | 13:30 We are going to do the pulser walkthrough
for the the source tests.
|
    |
|
742
|
Fri Nov 7 10:47:29 2025 |
MP | 207Bi source test - data taking | DAQ stopped at ~17.30 due to anydesk failure
|
|
|
741
|
Thu Nov 6 12:58:09 2025 |
NH | 207Bi source test - data taking | Restart AIDA
aida06 took three attempts to boot today |
6x |
|
740
|
Wed Nov 5 13:23:38 2025 |
JB, MP | 207Bi source test - FWHM tests | 14:10 started up the DAQ. HV and TEMPS OK.
Peak threshold with 1V pulser measured at |
8x |
|
739
|
Tue Nov 4 17:29:28 2025 |
MP | Bi207 source data, 700keV | Anydesk has crashed. I am not able to set
it up again. I switch off bias and fees
|
|
|
738
|
Tue Nov 4 16:34:47 2025 |
MP, NH | Bi207 source data, 700keV | Some FEES were not acquiring data for some
reason we could not understand. We lowered
the thresholds to 200 keV, then rose them |
|
|
737
|
Tue Nov 4 14:57:19 2025 |
MP | Bi207 source data, 700keV | - Bias and basic checks: the pulser FWHM
appears to be ~170, which is the same we
have obtained at the end of last week. |
   |
|
736
|
Thu Oct 30 16:43:36 2025 |
MP, NH | Setup and data taking with 207Bi | Data taking and DAQ stopped now (17.40)
|
|
|
735
|
Thu Oct 30 10:06:21 2025 |
MP, NH | Setup and data taking with 207Bi | - Initialised the Merger and Tape server
- loading of settings: EXPERIMENTS/AIDA/2025Oct29-16.11.06
- aida16 very noisy (attachments |
    |
|
734
|
Wed Oct 29 14:11:01 2025 |
JB, MP | 207Bi source test - data taking | 15:10 MP entered and check the water pressure
OK.
15:10 DSSSDs biased - OK.
|
7x |
|
733
|
Wed Oct 29 13:39:13 2025 |
TD | AIDA FEE64 adaptor PCB to AIDA DSSSD cabling |
The cables form the AIDA FEE64 adaptor PCB
to the MSL type BB18 DSSSDs are constructed |
|
|
732
|
Wed Oct 29 13:01:08 2025 |
NH | Update of AnyDesk | AnyDesk was updated to the latest version
that supports CentOS 7 (EOL OS)
|
|
|
731
|
Wed Oct 29 12:56:29 2025 |
TD | Further setup for 207Bi test | Remember that 'ADC calibration'
refers to the setup of the fast serial output
of the AD9222 Octal, 50MSPS, 14 bit ADC which |
|
|
730
|
Wed Oct 29 08:12:35 2025 |
MP | Further setup for 207Bi test | Inspection of side FEEs (2,6,4,8) and possible
grounding improvements:
- all screws and nuts for copper |
    |
|
729
|
Tue Oct 28 12:43:38 2025 |
JB, GB, MP, AM | Further setup of tests for 207Bi test | - Ch 2 and 3 of CAEN HV module changed to
negative polarity, Ch 0,1 still with positive
polarity
|
14x |
|
728
|
Mon Oct 27 18:08:11 2025 |
TD | Changing ground setup from 25102025 | 19.06 Found HV OFF, DAQ GOing
DAQ STOP
|
|
|
727
|
Mon Oct 27 11:55:00 2025 |
JB, MP, GB, NH | Changing ground setup from 25102025 | 12:55 We are going to try the follow changes
to the AIDA scheme of 241012025.
|
9x |
|
726
|
Sun Oct 26 16:22:38 2025 |
TD | [How To] Check ASIC settings |
tcsh
cd /MIDAS/DB/EXPERIMENTS/AIDA/<ASIC settings |
|
|
725
|
Fri Oct 24 14:33:37 2025 |
JB, GB, MP, AM | Snout grounding, bias and test input layout as of 24.10.2025 | |
|
|
724
|
Fri Oct 24 12:29:02 2025 |
JB, GB, MP, AM, NH | 207Bi source threshold tests | > > >
> > > We have dismounted the AIDA stack and
bPlast and realigned the cables so that they |
11x |
|
723
|
Fri Oct 24 10:31:59 2025 |
JB, GB, MP, AM, NH | 207Bi source threshold tests | > >
> > We have dismounted the AIDA stack and
bPlast and realigned the cables so that they |
6x |
|
722
|
Thu Oct 23 18:45:12 2025 |
TD | Thursday 23 October 2025 |
19.45 Remote system check
|
6x |
|
721
|
Thu Oct 23 12:22:31 2025 |
JB, GB, MP, AM, NH | 207Bi source threshold tests | >
> We have dismounted the AIDA stack and bPlast
and realigned the cables so that they can |
8x |
|
720
|
Wed Oct 15 09:41:24 2025 |
JB, GB, MP | 207Bi source threshold tests |
We have dismounted the AIDA stack and bPlast
and realigned the cables so that they can |
  |
|
719
|
Mon Oct 13 15:04:53 2025 |
JPB, NH, GB, MP | Dismount AIDA and realign the cables | We have dismounted the AIDA stack and bPlast
and realigned the cables so that they can
fit into the adaptors.
|
 |
|
718
|
Thu Jul 24 15:50:01 2025 |
CC, MP, NK | Check of BB7 impact | HT of upstream AIDA from iseg, HT
cable shielded, 100V, 17 uA. HT
of downstream AIDA from CAEN, AIDA#0. Both |
   |
|
717
|
Thu Jul 24 13:36:34 2025 |
CC, MP, NK | AIDA05 connected and disconnected compared to AIDA09 | HT cable shielded, HT
of upstream AIDA from iseg, HT of downstream
AIDA from CAEN. Both channel 0 and 1 of CAEN |
10x |
|
716
|
Thu Jul 24 10:28:04 2025 |
CC, NK, MP | Comparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8L | BB7 is still connected but not biased (same
configuration as the previous elog). The
channel of the CAEN power supply #0 is connected |
8x |
|
715
|
Wed Jul 23 17:02:22 2025 |
CC, NK | Comparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8L | BB7 is still connected but not biased (same
configuration as the previous elog). The
channel of the CAEN power supply #0 is connected |
8x |
|
714
|
Wed Jul 23 15:56:00 2025 |
CC, MP, NK | Test of AIDA05 with new bias module | Attachment1: AIDA05.1.8L when AIDA05 connected,
biased at 101 V with shielded cables. BB7
is still connected but not biased (same configuration |
|
|
713
|
Wed Jul 23 15:04:26 2025 |
CC, MP, NK | Test of AIDA05 with BB7 connected to Mesytec but not biased | Attachment1: AIDA05.1.8L when AIDA05 connected,
biased at 100 V with not-shielded cables,
after the DEGAS platform has been closed, |
|
|
712
|
Wed Jul 23 13:59:37 2025 |
CC, NK | Shielding of the snout | Attachment1: AIDA05.1.8L when AIDA05 connected,
biased at 100 V with not-shielded cables,
CAEN HT, after the base of the |
|
|
711
|
Wed Jul 23 13:08:30 2025 |
CC, NK | Comparison of channels in the same FEE64 and ASIC 05.1 | Biased at 100, AIDA05 connected, HT cables
not shielded CAEN HT
Attachment 1: AIDA05.1.8L --> |
    |
|
710
|
Wed Jul 23 09:37:34 2025 |
CC, NK | Comparison pulser FWHM with/without HT and detector cables | This elog is the first reliable.
Before, the histograms have not been zero'd
Each test are done and compared |
9x |
|
709
|
Tue Jul 22 18:00:45 2025 |
CC, NK, MP | FWHM aida FEE | AIDA05 completely disconnected, all the
others FEEs64 are fully connected
Attachment 1: aida05, FWHM= 95 |
 |
|
708
|
Tue Jul 22 17:00:26 2025 |
MP, CC | Status | Test with shielded HV cables for both detectors.
The FWHM for ch1 is now 184 ch.
Yesterday cables for cards 5, 6, |
 |
|
707
|
Mon Jul 21 13:01:19 2025 |
MP | Status | Status before grounding checks |
 |
|
706
|
Sun Jun 15 10:53:08 2025 |
TD | Sunday 15 June 2025 |
11.45 DSSSD bias & leakage current - attachment
1
|
41x |
|
705
|
Sat Jun 14 11:20:45 2025 |
TD | Saturday 14 June 2025 |
12.21 BNC PB-5 settings
Amplitude 1.0V
|
30x |
|
704
|
Fri Jun 13 12:42:39 2025 |
CC, TD | Friday 13 June 2025 |
13.42 ASIC settings 2025Jun12-13.53.04
*all* FEE64s slow comparator 0x64
|
10x |
|
703
|
Thu Jun 12 13:15:25 2025 |
GB, CC, NK, MP, TD | Thursday 12 June 2025 |
EMC tests with NK (Orsay)
|
 |
|
702
|
Tue Apr 8 08:52:39 2025 |
TD | AIDA grounding |
AIDA DSSSDs and FEE64-DSSSD cabling are electrically
isolated (by design) from snout, mounting |
 |
|
701
|
Tue Mar 11 11:53:18 2025 |
TD | Monday 10 March |
18.30 AIDA powered up for brief test
|
11x |
|
700
|
Sat Feb 22 12:35:38 2025 |
TD | Offline analysis data files R9_85-R9_199 (84Mo setting) |
Start 00:43 22.2.25 https://elog.gsi.de/despec/G-24-00302/57
AIDA data file R9_85
|
22x |
|
699
|
Thu Feb 20 17:06:42 2025 |
JB, CC, TD,MP | WR error for aida 13,14,15,16 | WR timestamp errors resolved after reseating
the HDMI cables to the MACB |
|
|
698
|
Wed Feb 12 10:46:01 2025 |
TD | Offline analysis data files S181 R4_351-396 | Analysis data files R4_351-396
|
25x |
|
697
|
Fri Jan 31 17:26:47 2025 |
CC, TD, MP | Friday 31 January contd. |
18.18 bPlas and BB7 installs complete
Restart AIDA DAQ, Merger, Tape Server |
16x |
|
696
|
Fri Jan 31 13:48:29 2025 |
JB | AIDA analysis from HI-DESPEC meeting 20.11.2024 | AIDA analysis and presentation by J. Bormans
for AIDA made in the HISPEC-DESPEC collaboration
meeting. |
|
|
695
|
Fri Jan 31 09:37:47 2025 |
CC, TD, MP | Friday 31 January | Implantation stack mounted - BB18(DS)-1000
+ bPlas + bPlas + 3x BB7(DS)-1000
|
26x |
|
694
|
Wed Jan 15 11:58:08 2025 |
TD | Offline analysis data files S505 R3_9 - R3_128 (207Hg setting) |
Aanlysis data files R3_9 - R3_128 (207Hg
setting)
|
27x |
|
693
|
Mon Jan 13 17:38:18 2025 |
TD | Offline analysis of S505 data files |
First timestamp of R2_105 0x16FAEC5E54AABF6C
|
10x |
|
692
|
Mon Jan 13 11:32:30 2025 |
TD | Offline analysis S505 data file R3_150 | Offline analysis of S505 data files R3_150
first WR ts
|
22x |
|
691
|
Sat Jan 11 14:14:21 2025 |
TD | aida06 crashed and rebooted 10.1.25 | aida06 crashed and rebooted sometime ( 14:48
- 23:25 ) yesterday. System console log appended.
|
|
|
690
|
Sat Jan 11 14:05:03 2025 |
TD | Saturday 11 January 2024 |
14.37 Detector bias & leakage current OK
- attachment 1
|
17x |
|
689
|
Fri Jan 10 10:03:43 2025 |
TD | LEC fast comparator threshold too low | > > >
> > > LEC fast comparator has been set to
0x2 (200keV) which is *very* low and means |
|
|
688
|
Thu Jan 9 17:56:14 2025 |
TD | LEC fast comparator threshold too low | > >
> > LEC fast comparator has been set to 0x2
(200keV) which is *very* low and means the |
|
|
687
|
Thu Jan 9 17:36:50 2025 |
TD | LEC fast comparator threshold too low | >
> LEC fast comparator has been set to 0x2
(200keV) which is *very* low and means the |
|
|
686
|
Thu Jan 9 16:25:51 2025 |
TD | LEC fast comparator threshold too low |
LEC fast comparator has been set to 0x2 (200keV)
which is *very* low and means the fast comparator |
|
|
685
|
Thu Jan 9 15:43:17 2025 |
JB, CC, MP | Timing test platform moved in | 16:30 We moved the platform in. The system
was still biased and the DAQ was still running.
The system seems to be okay, temperatures |
  |
|
684
|
Thu Jan 9 12:46:43 2025 |
JB, MP, CC | AIDA timing test |
|
   |
|
683
|
Wed Jan 8 16:47:05 2025 |
JB, MP, CC | AIDA timing test |
|
|
|
682
|
Wed Jan 8 10:46:50 2025 |
TD | Report - aida06 -boot fail due to network issue | 8:01:25/11:42:48|0x000000d00000-0x000000fe0000
: "user_kernel"
08:01:25/11:42:48|0x000000fe0000-0x000001000000 |
|
|
681
|
Wed Jan 8 10:08:29 2025 |
JB, GB, SD, MP, CC, JG | AIDA noise test with platform in position | Yesterday we spent time essentially performing
a dry run to get AIDA DAQ and bPlast into
the time sorter, there were some issues with |
   |
|
680
|
Mon Dec 30 15:43:42 2024 |
TD | [How To] Restart AnyDesk |
See also https://elog.ph.ed.ac.uk/CARME/489
|
|
|
679
|
Mon Dec 23 10:54:46 2024 |
TD | Monday 23 December 2024 |
11.54 re-established remote access via AnyDesk
- details to follow
|
|
|
678
|
Tue Dec 17 12:45:36 2024 |
JB, MP, CC | AIDA timing test |
|
  |
|
677
|
Mon Dec 16 13:07:04 2024 |
JB, MP, CC | AIDA timing test | https://elog.gsi.de/despec/Implantation+Stack/9?suppress=1
- Day 1 ELOG
Day2: |
16x |
|
676
|
Sat Dec 14 11:52:42 2024 |
TD | Saturday 14 December |
11:00 Visual inspection FEE64 adaptor PCBs
& cabling
|
27x |
|
675
|
Wed Dec 11 14:46:21 2024 |
TD, JB, CC, MP | Mounting of AIDA, bPlast and BB7 for test | Snout assembled for detector position and
timing test.
The planned test is to use a BGO |
   |
|
674
|
Mon Dec 9 12:28:01 2024 |
NH, CC, MP | Test of BB7 on AIDA Electronics | BB7 connected to aida07, sitting in a cardboard
box
|
|
|
673
|
Thu Dec 5 11:18:46 2024 |
TD | Offline analysis S100 data files R21_0-R21_99 | Offline analysis of S100 data files R21_0
- R21_99 (162Eu setting)
|
23x |
|
672
|
Wed Dec 4 09:57:24 2024 |
TD | HISPEC DESPEC meeting presentation - November 2024 -0 Summary of AIDA performance 2024 | |
|
|
671
|
Tue Nov 19 11:24:25 2024 |
TD | Anydesk restarted remotely |
Anydesk restarted remotely per https://elog.ph.ed.ac.uk/CARME/489 |
|
|
670
|
Tue Nov 5 15:19:35 2024 |
TD | S505 offline analysis R5_780 - R5_814 | Offline analysis of data files S505/R5_780
- R5_814 (corresponding to MBS data files
73-74)
|
24x |
|
669
|
Wed Aug 14 12:40:11 2024 |
JB | Repaired DSSSD delivery 14.09.2024 | Three BB18-1000 triples AIDAs collected
on 14.09.2024
Find attached visual of the wafer |
11x |
|
668
|
Sun Jul 14 16:52:28 2024 |
TD | S181 R7_38-44 | |
7x |
|
667
|
Sun Jul 14 14:37:53 2024 |
TD | S181 R6_375-380 | |
6x |