AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 7 of 11  ELOG logo
  ID Date Authordown Subject
  126   Sun Nov 12 18:32:52 2017 MB DK run 112
Header: 4.4 MeV/u CH2_16 sample
Ender: 
====================================================
Run number			:   112
Date				:   12/11
Start time			:   19.32
Stop time			:   22.27
Trigger rate (MIDAS)	        :   3
Blocks written		        :   733
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated                      :   3
1- Gated                        :   3 
2- dE                           :   146000
3- E                            :   17
4- HI                           :   258
5- Pulser                       :   2
6- Clock			:   969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u)		:   4.4 MeV/u
Beam intensity (epA)	        :   0.8 
Target				:   CH2_16
Ladder position	(mm)	        :   127.95 
HI Degrader foil (um)		:   10 mu
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		:   -40
del_E leakage (uA)		:   0.76
E voltage (V)			:   -350
E leakage (uA)		        :   2.10
E_hi voltage (V)		:   -14
E_hi leakage (uA)		:   2.76
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive)	(A)	:   1.55
PA power (Up, negative) (A)     :   0.55
PA power (Down, positive) (A)	:   0.8
PA power (Down, negative) (A)   :   0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)	(mbar)	        :   6.2E-6
Pressure (old gauge) (mbar)     :   1.8E-5
Pressure (SEC)	(mbar)         	:   3.6E-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)	deg	        :   -10.0
Temp (chamber)	deg	        :    5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: data during first 5 mins of run were taken with sample at 126.95 mm rather than 127.95 mm
at 21:05, RILIS begins brief laser maintenance.  21:19 finished.
====================================================
  192   Thu Oct 4 13:07:33 2018 KGSchematics for gas-cell tests
in_atmosphere.png : schematic for testing gas-cell in atmosphere

Feedthrough.png : feed through schematic for testing vacuum chamber and gas cell
  199   Thu Oct 25 13:25:16 2018 KGCurrent gas cell status
(Wrapped up)

    Cell b : 15um Al exit, 12.5um Al entrance.  L/R ~0.4Torr/hr overnight (in vacuum)

    Cell d : 15um Al exit, 3um Ti entrance. L/R ~ 0.8Torr/hr overnight (in vacuum)

(In testing)

    Cell a : 15um Al exit, undecided which window will be used. At current epoxy on screw in joints for arms of cell. Testing in atmosphere to see if can reach adequate seal with this.
  55   Thu Nov 9 01:24:01 2017 Daid. MircoRun 54
Header: Continue with 5.0 MeV/u and CH2
Ender: Checked control room, about 2:40.  Target current is 2 A (low...should be 430 A).  No beam seen at our FC, although MIDAS seemed to have events.
NB: You can monitor the target current on any network computer via: https://op-webtools.web.cern.ch/Vistar/vistars.php?usr=GPS 
====================================================
Run number			: 54
Date				: 9 Nov 2017
Start time			: 02:24:23
Stop time			: 03:02
Trigger rate (MIDAS)	        : 2181
Blocks written		        : 8749
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy			: 5.0 MeV/u
Beam intensity		        : 
Target				: #2 CH2_16 ( 450 ~ 480 ug/cm^2)
Ladder position		        : 127.95 mm
HI Degrader foil (um)		: 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		: -32 V
del_E leakage (uA)		: 0.015 uA
E voltage (V)			: -350 V
E leakage (uA)		        : 1.77 uA
E_hi voltage (V)		: -14 V
E_hi leakage (uA)		: 0.82 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive)	: 1.55 A
PA power (upstream, negative)   : 0.55 A
PA power (downstream, positive)	: 0.8 A
PA power (downstream, negative) : 0.3 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)		        : 7.75 x 10^-6 mbar
Pressure (old gauge)	        : 2.5 x 10^-5 mbar
Pressure (SEC)	           	: 4.1 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)		        : -10.1 deg
Temp (chamber)		        : 5.5 deg
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
====================================================
  56   Thu Nov 9 03:32:55 2017 Daid. MircoRun 55
Header: Continue 5.0 MeV/u with CH2 after target re-heating
Ender: End
====================================================
Run number			: 55
Date				: 9 Nov 2017
Start time			: 04:32
Stop time			: 06:34
Trigger rate (MIDAS)	        : 2081
Blocks written		        : 16180
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy			: 5.0 MeV/u
Beam intensity		        : ~2 epA -> (2*10^-12)/(24*1.602*10^-19) = 520833 pps
   NB: See https://elog.ph.ed.ac.uk/ISOLDE/54 for factor 24 rather than 20 (theoretical estimate)
Target				: #2 CH2_16 (450~480 ug/cm^2)
Ladder position		        : 127.95 mm
HI Degrader foil (um)		: 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		: -32 V
del_E leakage (uA)		: 0.02 uA
E voltage (V)			: -350 V
E leakage (uA)		        : 1.75 uA
E_hi voltage (V)		: -14 V
E_hi leakage (uA)		: 0.82 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive)	: 1.52 A
PA power (upstream, negative)   : 0.55 A
PA power (downstream, positive)	: 0.8 A
PA power (downstream, negative) : 0.32 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)		        : 7.5 x 10^-6 mbar
Pressure (old gauge)	        : 2.3 x 10^-5 mbar
Pressure (SEC)	           	: 4.0 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)		        : -10.0 deg
Temp (chamber)		        : +5.4 deg
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: First laser does not have a red peak at the center, but maybe okay for this shift.
Attaching PSB and GPS screenshots, as we need to monitor them regularly.
At 6:18 to 6:40, we started getting four rings from the PS Booster.  The 1st ring had a fairly low intensity, and the operators later dropped it.  These times were confirmed 
exactly with communication with PS operators.
again.
====================================================
  58   Thu Nov 9 05:35:44 2017 Daid. MircoRun 56
Header: 5.0 MeV/u CH2, Laser 2 is turned off on purpose to check background.
Ender: Could not see many real events beside pulser and current was very low
====================================================
Run number			: 56
Date				: 9 Nov 2017
Start time			: 06:34:45
Stop time			: 06:54:37
Trigger rate (MIDAS)	        : 2030
Blocks written		        : 2488
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy			: 5.0 MeV/u
Beam intensity		        : (cannot be measured)
Target				: #2 CH2_16 (450~480 ug/cm^2)
Ladder position		        : 127.95 mm
HI Degrader foil (um)		: 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		: -32 V
del_E leakage (uA)		:  0.025 uA
E voltage (V)			: -350 V
E leakage (uA)		        :  1.735 uA
E_hi voltage (V)		: -14 V
E_hi leakage (uA)		:  0.825 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive)	:  1.53 A
PA power (upstream, negative)   :  -0.55 A
PA power (downstream, positive)	:  0.8 A
PA power (downstream, negative) :  -0.28 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)		        :  7.4 x 10^-6 mbar
Pressure (old gauge)	        :  2.2 x 10^-5 mbar
Pressure (SEC)	           	:  3.9 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)		        :  - 10.1 deg
Temp (chamber)		        :  + 5.5 deg
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
comment: Why is the trigger rate nearly the same with the laser on and off ??!!
  59   Thu Nov 9 06:02:41 2017 Daid. MircoRun 57
Header: Continue with 5.0 MeV/u and CH2.  Laser back on.
Ender: 
====================================================
Run number			: 57
Date				: 9 / 11
Start time			: 06:55
Stop time			: 
Trigger rate (MIDAS)	        : 2078
Blocks written		        : 
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy			: 5.0 MeV/u
Beam intensity		        : 1.5 to 2.0 epA
Target				: #2 CH2
Ladder position		        : 127.95 mm
HI Degrader foil (um)		: 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		: -32.0 V
del_E leakage (uA)		: 0.025 uA
E voltage (V)			: -350 V
E leakage (uA)		        : 1.735 uA
E_hi voltage (V)		: -14 V
E_hi leakage (uA)		: 0.825 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive)	: 1.55 A
PA power (upstream, negative)   : 0.55 A
PA power (downstream, positive)	: 0.8 A
PA power (downstream, negative) : 0.28 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)		        : 7.4 x 10^-6 mbar
Pressure (old gauge)	        : 2.2 x 10^-5 mbar
Pressure (SEC)	           	: 3.9 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)		        : -10.0 deg
Temp (chamber)		        : 5.5 deg
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
====================================================
  92   Sat Nov 11 00:01:41 2017 Daid. MircoTrigger and scalars for 4.0 MeV/u
Tom et al. tuned the trigger this evening, before we began the runs.  (Run 82, or Run 83??)

===TRIGGER===

Trigger condition is: E OR HI/ds

We count the CAMAC OR signals as follows: A,B
    A: Which CAMAC module?  Left to right, 1,2,3,4,5
    B: Which module channel? This is the number engraved on the module by the LEMO output.

==E Definition==
All p-n sides of E detector: 
    RAL 109 discrim cable numbers: 4, 5, 7
       => Corresponds to CAMAC OR Numbers 2,2; 2,1; 3,1, respectively.
    
==HI/ds Definition==
All p-n sides of HI detector: 8, 9, 11
    RAL 109 discrim cable numbers 
       => Corresponds to CAMAC OR Numbers 4,3; 4,2; 5,3, respectively.

ds=Downscale; ds factor is 8 = 2^8 = 256

===SCALARS===

0: Ungated
1: Gated
2: dE (n-n) [Cable 3]
3: E (n-n)  [Cable 6]
4: HI (n-n) [Cable 10]
5: Pulser
6: Clock

===DISCUSSION===
The n-n side of the E detector seems to be noisier than the p-n side.  Thus the p-n side is used for the trigger logic, whilst the n-n side is used for the scalar.

However, there seems to be something confusing about using the p-n side for the true trigger but the n-n side for the scalars.  It means we cannot compare the scalars self-
consistently to each other.  That is, the gated or ungated signals do not have a strong correlation with the individual detector scalars.  In principle if we have enough LEMO 
cables and Fan In/Fan Out modules, we should simply propagate the p-n signals to both the trigger (when relevant, i.e. E detector) and the scalars alike.  For now we don't 
touch anything, though.
  53   Wed Nov 8 23:14:38 2017 Daid, Ruchi, MircoRun 53
Header: Restart 5.0 MeV/u w/ CH2 after PS comes back (3 rings until the morning)
Ender: End
====================================================
Run number			: 53
Date				: 9 Nov 2017
Start time			: 00:13:50
Stop time			: 02:23:31
Trigger rate (MIDAS)	        : 2193
Blocks written		        : 31000
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy			: 5.0 MeV/u
Beam intensity		        : < 6 x 10^5 pps
Target				: #2 CH2_16 (450~480 ug/cm^2)
Ladder position		        : 127.95
Degrader foil (um)		: 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		: -32.5 V
del_E leakage (uA)		: 0.005 uA
E voltage (V)			: -350 V
E leakage (uA)		        : 1.82 uA
E_hi voltage (V)		: -14 V
E_hi leakage (uA)		: 0.82 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive)	: 1.55 A
PA power (upstream, negative)   : 0.55 A
PA power (downstream, positive)	: 0.8 A
PA power (downstream, negative) : 0.3 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)		        : 8.05 x 10^-6 mbar
Pressure (old gauge)	        : 2.5 x 10^-5 mbar
Pressure (SEC)	           	: 4.2 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)		        : -10.0
Temp (chamber)		        : +5.5
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
====================================================
  46   Wed Nov 8 20:40:33 2017 Daid, RuchiRun 49
Header: First test with RIB.  Irises closed.
End: End

~21:45
8 Nov 2017

Target #2: Position 127.95 mm; CH2_16: 450~480 ug/cm^2.

59Cu beam is on.  Nominal intensity was 6 x 10^5 pps.  5.0 MeV/u.

**Iris are all closed.**

Biases:  
dE: -33 V; 0.00 uA
E: -350 V; 1.99 uA
HI: -14 V; 0.86 uA
  47   Wed Nov 8 20:46:23 2017 Daid, RuchiRun 50
Header: First run with irises open.  30 min run.
Ender: Call from PS-Booster.  Stop run.

Date: 8 Nov 2017
Start: 21:46 
Stop: 22:18

Target #2: Position 127.95 mm; CH2_16: 450~480 ug/cm^2.

59Cu beam is on.  Nominal intensity was 6 x 10^5 pps.  5.0 MeV/u.

**Iris are all open.**

Biases (leak currents did not change opening the irises)
dE: -33 V; 0.00 uA
E: -350 V; 1.99 uA
HI: -14 V; 0.86 uA

Pulsers are in.  
     Positive: 2 Hz, 1.4 V.
     Negative: Low freq, 1200 setting.

Scalars 0 and 1 (see https://elog.ph.ed.ac.uk/ISOLDE/49 ) were in at the beginning of the run.  Scalar 2 was added part way through.  LEMO cables were not long enough to add 3 & 
4 until after the run was stopped (swapped short cables for longer ones elsewhere.)

Scalar 0 was showing a number of multiple hits.  It was directly from the Fan In / Fan Out.  At the end of the run, I switched it to the Lecroy 622 which has a larger width.

We stopped because the PS-Booster called about cleaning one of the rings.  (At first I misunderstood exactly what was going on or who called, but I stopped.)
  52   Wed Nov 8 23:06:48 2017 Daid, RuchiRun 52 (junk)
(Junk -- see comments)
====================================================
Run number			: 52
Date				: 9 Nov 2017
Start time			: 
Stop time			: 
Trigger rate (MIDAS)	        : 
Blocks written		        :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy			: 
Beam intensity		        :
Target				: 
Ladder position		        :
Degrader foil (um)		: 
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		: 
del_E leakage (uA)		: 
E voltage (V)			:
E leakage (uA)		        :
E_hi voltage (V)		: 
E_hi leakage (uA)		:
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)		        :
Pressure (old gauge)	        :
Pressure (SEC)	           	:
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)		        :
Temp (chamber)		        :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: 2 minutes after run starts, PS-Booster calls.  They will go back to 3 rings, giving us the beam back in ten minutes
====================================================
  60   Thu Nov 9 06:30:35 2017 Daid, MircoSpectra (Shift 1)
Screen shots for accumulated data before the target went down.  Should be (at least) runs 53 & 54 inclusive, possibly back to the start of RI beam on CH2 target.
  50   Wed Nov 8 22:08:55 2017 DaidRun 51
Header: Restart 5.0 MeV/u CH2 with 3 PS rings.
Ender: Stop run.  We want good data with a smaller file size for fast analysis, as well as to get on a 2 hour schedule.
====================================================
Run number			: 51
Date				: 8 Nov 2017
Start time			: 22:44
Stop time			: 00:04
Trigger rate (MIDAS)	        : 2192
Blocks written		        : 20460
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy			: 5.0 MeV/u
Beam intensity		        : (was 6 x 10^5, but we have only 3 /4 PS-Booster rings)
Target				: #2 CH2_16
Ladder position		        : 127.95
Degrader foil (um)		: 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		: -33
del_E leakage (uA)		: 0.00
E voltage (V)			: -350
E leakage (uA)		        : 1.87
E_hi voltage (V)		: -14
E_hi leakage (uA)		: 0.83
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)		        : 8.25 x 10^-6 mbar
Pressure (old gauge)	        : 2.6 x 10^-5 mbar
Pressure (SEC)		        : 4.3 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)		        : -9.8
Temp (chamber)		        : +6.0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Only 3 out of 4 rings at PS-Booster for now
(We stopped slightly from miscommunication.)
23:34: PS-Booster calls.  Trying to add Ring 1 back.  By 23:36 we can see all four rings.  (In one supercycle, all rings drop.)
====================================================
  54   Wed Nov 8 23:46:32 2017 DaidCharge State Distributions
Faraday cup readout at the end of our chamber should change based on whether or not the target is in and also the 59Cu beam energy.

The effect could be as much as 10 to 20%.  At some point, we should check the Faraday cup reading with the CH2 target and with the empty target.
  109   Sat Nov 11 17:45:10 2017 DK, TD, ASM, RG, MDRun 97
Header: CH2 target in, Laser #2 off, 4.0 MeV/u
Ender: Stopped run to modify DAQ trigger 
====================================================
Run number			: 97
Date				: 11 / 11 / 2017
Start time			: 18:48
Stop time			: 18.55
Trigger rate (MIDAS)	        : 
Blocks written		        : 1
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated                      : 0
1- Gated                        : 0
2- dE                           : 142k
3- E                            : 60
4- HI                           : 43
5- Pulser                       : 24
6- Clock			: 976
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u)		: 4.0 MeV/u nominal
Beam intensity (epA)	        : 0.05 to 0.06
Target				: CH_2 30+25
Ladder position	(mm)	        : 67.26
HI Degrader foil (um)		: 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		: -40
del_E leakage (uA)		: 0.67
E voltage (V)			: -350
E leakage (uA)		        : 2.10
E_hi voltage (V)		: -14
E_hi leakage (uA)		: 2.67
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive)	(A)	: 1.5
PA power (Up, negative) (A)     : .55
PA power (Down, positive) (A)	: .25
PA power (Down, negative) (A)   : .8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)	(mbar)	        : 6.9 x 10^-6
Pressure (old gauge) (mbar)     : 1.95 x 10^-5
Pressure (SEC)	(mbar)         	: 3.9 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)	deg	        : -10.1
Temp (chamber)	deg	        : 5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Increased pulser rate to 250 Hz, to flush the previous buffer in the Tape Server.  
See https://elog.ph.ed.ac.uk/ISOLDE/106 with "0 blocks written"
====================================================
  1   Fri Jan 27 11:02:03 2017 DK, PBNotes from visit to CERN
Here I am simply digitizing my notes from our visit to CERN 17~18 January 2017.  They may not be perfectly linear or organized, but may be searchable.

==ISOLDE Hall Info==

*Safety shoes and hard hats are required for everyone.  We need to buy our own in the future and bring them with us.

The 'general purpose scattering chamber' seems to in fact be named the Scattering Experiments Chamber (SEC).
     Contact Joakim Cederkall at Lund University in Sweden joakim.cederkall@cern.ch (DK has collaborated with him before in 2012)
     Secondary contact olof.tendblad@cern.ch

2 meters downstream of SEC we see the SAND neutron detector array.
     Contact Ismael Martel at University of Huelva in Spain ismael.martel.bravo@cern.ch
     Array structure is on wheels, but needs to be moved before our experiment, presumably by someone from that collaboration
          Of course, we don't know after the SEC relocation from station 2 to station 3 that SAND will be installed in the same relative position or not

SEC has eight (8) transverse ports evenly spaced about its circumference
     We need adapters to connect to this
     The nominal ISOLDE beamline pipe is 50 mm diameter
     Chamber itself is about 1 meter in diameter, about 70 cm tall.  Shape is a cylindrical prism with hemispheres on top and bottom
     Calculated volume about 0.55 cubic meters
     Support structure is about 1 x 1 square meter footprint, about 125 cm tall
     2 large-volume pumps in parallel.
          TMP: PTM 5400 ALCATEL CORP x2
          Oil roughing pumps Edwards 12 x2
     According to Karl, its pressure is in the low 10^-6 mbar region, but everything seemed off when we visited so cannot confirm precise value
     Presumably it requires the overhead crane to open it
          Not many people have the license
          Although we don't need to access it very often if at all
          Karl said they are arguing to install a small fixed crane for that purpose after relocation which wouldn't need a license
     SEC is being disconnected over the weekend (21~22 Jan)
         
Alignment in ISOLDE Hall (not very sensible to write w/o diagram)
     POT1, POT2 are on the wall downstream of the beam lines
     POT3 and POTREX are on the beam-right side before it is turned and delivered to the target stations
     Geodetic survey points -- though we don't really know how they are used

Downstream of station 3 (under construction) is XT03 which is a crosshair on the wall
     Presume it was used for alignment of the steering magnet base
          Bases are installed but the quadrupoles are still off to the side

There is no port on the station 2 bending magnet to offer a straight line of sight down to the target station
     How was the alignment performed?
     We assume station 3 will be installed in a similar manner, unfortunately.

Station 3
     Expected to be complete by the end of February

Station 2
     HELIOS-type device will be installed at station 2
     This is presently called ISS and is mainly being done by the Swedish group (Lund?)
     Footprints were drawn on the ground downstream of the present SEC point
     How much space will the fence to prohibit near-approach for B-field safety be?

Distances around the stations
     From the target positions to the far wall is over 10m, though a lot of equipment and storage lines the wall area
     Beam-right wall from station beam-line 3 is about 180 cm
     7 m to station 2 -> ~5 m between station 2 and 3
     End of station #2 to the end of the SEC including the beam pipe is ~210 cm

At some point, we must provide a list of items ot be imported and used so it can be approved by the CERN Safety groups

==Meeting notes with Karl Johnston==

HIE-ISOLDE may begin physics around the last week of June (say 24~25th)
     A MINIBALL experiment is usually prioritized first, given the track record and existing infrastructure and experience.

From the end of April there will be about 2 months of commissioning, ideally
     Though, in years past, the timeline was too tight and commissioning was basically not performed during this period

They will start the cryogenics on Tuesday, 24th January

ISS will start to be installed in May for about 3 weeks (? hand writing and detail of notes is poor on this point)

Anytime in mid-March should be okay for the Edinburgh group to ship

59Cu is a candidate for an early run this year
     As soon as early July perhaps in an ideal world
  193   Mon Oct 8 12:05:25 2018 DK, PBGas cell supports
These are used to connect the gas cell to the target ladder.  We only had the one, and it would be more convenient if each gas cell has its own, to avoid swapping them back and forth.

Drawings attached.
  129   Sun Nov 12 23:52:10 2017 DK, MD, RGRun 115 - short
Header: Continue 4.4 MeV / u @ CH2
Ender: Run stopped short as the IHS tripped
====================================================
Run number			: 115
Date				: 13/11/2017
Start time			: 00:52:06
Stop time			: 01:06:27
Trigger rate (MIDAS)	        : 3
Blocks written		        : 58 
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated                      : 3
1- Gated                        : 3
2- dE                           : 150k
3- E                            : 15
4- HI                           : 363
5- Pulser                       : 1
6- Clock			: 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u)		: 4.4 MeV
Beam intensity (epA)	        : 
Target				: CH2_16
Ladder position	(mm)	        : 127.95
HI Degrader foil (um)		: 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		: -40
del_E leakage (uA)		: 0.77
E voltage (V)			: -350
E leakage (uA)		        : 2.09
E_hi voltage (V)		: -14
E_hi leakage (uA)		: 2.80
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive)	(A)	: 1.55
PA power (Up, negative) (A)     : 0.59
PA power (Down, positive) (A)	: 0.8
PA power (Down, negative) (A)   : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)	(mbar)	        : 6.3 x 10^-6
Pressure (old gauge) (mbar)     : 1.7 x 10^-5
Pressure (SEC)	(mbar)         	: 3.8 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)	deg	        : -10.1
Temp (chamber)	deg	        : +5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
====================================================
  167   Wed Nov 15 05:26:46 2017 DK, MD, CLWRun 153
Header: Continue with CH2 and 5.0 MeV/u
Ender: end of beam time
====================================================
Run number			: 153
Date				: 15 / 11 / 2017
Start time			: 06:24:46
Stop time			: 08:29:53
Trigger rate (MIDAS)	        : 3
Blocks written		        : 532
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated                      : 4
1- Gated                        : 3
2- dE                           : 58k
3- E                            : 79
4- HI                           : 448
5- Pulser                       : 1
6- Clock			: 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u)		: 5.0 MeV/u (nominal)
Beam intensity (epA)	        : 2.5
Target				: CH2_33+10+01
Ladder position	(mm)	        : 97.61
HI Degrader foil (um)		: 15 um
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		: -40
del_E leakage (uA)		: 0.69
E voltage (V)			: -350
E leakage (uA)		        : 2.065
E_hi voltage (V)		: -14
E_hi leakage (uA)		: 3.30
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive)	(A)	: 1.55
PA power (Up, negative) (A)     : 0.59
PA power (Down, positive) (A)	: 0.8
PA power (Down, negative) (A)   : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)	(mbar)	        : 7.7 x 10^-6
Pressure (old gauge) (mbar)     : 2.0 x 10^-5
Pressure (SEC)	(mbar)         	: 4.9 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)	deg	        : -10.1
Temp (chamber)	deg	        : +5.9
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
====================================================
ELOG V3.1.4-unknown