AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC, Page 16 of 36
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
714 Entries
Goto page
Previous
1
,
2
,
3
...
15
, 16,
17
...
34
,
35
,
36
Next
ID
Date
Author
Subject
Text
425
Sun May 8 17:43:57 2022
NH
AIDA FEE64 Layout
AIDA FEE64 layout with respect to the beam.
424
Sun May 8 15:10:45 2022
TD
Sunday 8 May
DSSSD bias and FEE64 power OFF during Ge
install
6x
423
Sat May 7 13:27:39 2022
TD
AIDA configuration
Adaptor PCB link settings
422
Sat May 7 09:55:53 2022
TD
Saturday 7 May
Attachments 1 & 2 per FEE64 1.8.L spectra
15x
421
Fri May 6 09:31:41 2022
TD NH
Friday 6 May
10:30 DAQ appears to have stopped
33x
420
Wed May 4 16:50:04 2022
NH
AIDA 4th May
bPlas has been mostly cabled in now
Reseat LAN cable (AIDA Switch -> AIDA-3)
419
Tue May 3 14:15:17 2022
NH
AIDA Updates 2 May
PAUSE/RESUME stats are dominated by 2x FEE64s
- aida07 and aida16
418
Mon May 2 13:08:49 2022
NH
AIDA Updates 2 May
The snout endcap has been sealed with new
copper tape over the red tape
417
Mon May 2 09:52:20 2022
OH
Shifter checklist 2022
Every 30 minutes:
- Reload statistics (Web browser tab screen
416
Thu Apr 28 18:45:09 2022
NH
Alpha Background Run
Runs are in /TapeData/BGAPR22 located on 8TB
disk "SecondDrive" (N.B. 2A experiment is
using ThirdDrive)
415
Wed Apr 27 15:47:46 2022
NH, HA, SA, CJ
AIDA 27 Apr 22
Remount snout in S4 (photos to come)
Alignment with DEGAS OK but a bit short...
DEGAS platform will be brought 31 mm closer
7x
414
Fri Apr 8 08:59:42 2022
OH, NH
Friday 8th April
09:59 Noticed that the right hand ribbon cable
for aida07 was offset vertically by 1. i.e.
Only 1 of the 2 rows of pins in. Unbiassed
11x
413
Thu Apr 7 12:42:14 2022
OH, NH, TD
Thursday 7 April
Re-assembled triple snout re-installed on
the AIDA stand - DSSSD ribbon cables and
8x
412
Wed Apr 6 10:09:21 2022
OH, NH, TD
Wednesday 6 April
DSSSD bias OFF. DAQ STOPped
Attachment 6 FEE64 temps OK
6x
411
Tue Apr 5 12:46:52 2022
TD
MSL type BB18(DS)-1000 triple - cable lengths
OH/NH disassembling current AIDA triple snout
and DSSSD stack.
410
Tue Apr 5 08:52:16 2022
TD
Tuesday 5 April
DSSSD bias OFF. DAQ STOPped
Attachment 1 FEE64 temps OK
6x
409
Mon Apr 4 09:19:49 2022
TD
Monday 4 April
AIDA adaptor PCB config - all LKs removed
*except*
12x
408
Sun Apr 3 10:56:11 2022
TD
Sunday 3 April
all system wide checks OK *except* aida10
failed ADC calibration
35x
407
Sat Apr 2 10:42:49 2022
TD
Saturday 2 April
11.10 Found aida08 not running - merger/TapeServer
stalled
21x
406
Wed Mar 9 10:15:56 2022
NH TD
Wednesday 9 March - noise tests contd.
11.15 - S4 is currently closed no access
If access possible (should be) plan is
38x
Goto page
Previous
1
,
2
,
3
...
15
, 16,
17
...
34
,
35
,
36
Next
ELOG V3.1.3-7933898