AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 20 of 35  ELOG logo
  IDdown Date Author Subject Text Attachments
  320   Mon May 17 15:14:35 2021 LJWMonday 17th May 2021 16:00-20:0016:25

Informed at shift handover that
there has been no beam.
 9x 
  319   Fri May 14 19:01:09 2021 JSFriday 14th May 20:00-00:0020:00 Taking over from CB

20:33 Doing full checks.
 27x 
  318   Fri May 14 17:30:56 2021 TDAnalysis of S496 files R5_18, R5_32 & R5_45
S496/R5_18 - attachment 1
 R5_18R5_32R5_45 
  317   Fri May 14 14:57:32 2021 CB + OH, TD, NHFriday 14th May 16:00-20:0016:00 Shift taken over from CA

16:00 
 33x 
  316   Fri May 14 07:05:08 2021 CAFriday 14th May 08:00 - 16:00 shift08:00 CA takes over

08:28 Problem at UNILAC - no beam
 24x 
  315   Thu May 13 23:58:05 2021 OHFriday 14th May 00:00 - 08:0000:00 OH Takes over.
 PULSER SETTINGS
---------------------------
 21x 
  314   Thu May 13 21:21:25 2021 Philippos and Marcsystem wide checksWide checks at Time 22:22 CET

Clock status test result: Passed
16, Failed 0
 13x 
  313   Thu May 13 19:52:36 2021 Philippos and MarcConnection problemAt 20:15, We lost connection with AnyDesk.

Liliana restarted Anydesk on the
AIDA DAQ PC. All seemed fine on AIDA DAQ
 2021-05-13_ucesb_scalers.png 
  312   Thu May 13 17:05:42 2021 Muneerah, MArcThu 13 May 04:00-00:0019:08 System Check

Rates from ucesb below 1 kHz

Atachment 1 Stats
 130521_1802_Stats.png130521_1802_Temp.png130521_1804_Voltages.png 
  311   Thu May 13 07:10:17 2021 CA, TDMay 13th 08:00 - 16:00 shift08:10 all system wide checks ok *except*

      all FEE64 modules fail ADC calibration
 34x 
  310   Thu May 13 00:51:40 2021 Muneerah and OHThu 13 May 00:00-08:0001:50 Beam on
The leakage current and the voltages been
monitered every half an hour and logged in
 7x 
  309   Wed May 12 18:53:38 2021 JSWed 12 20:00-00:0019:51 Shift change

Stats ok
 ucesb.pngbias1.pngScreenshot_2021-05-12_Statistics_aidas-gsi.pngScreenshot_2021-05-12_Temperature_and_status_scan_aidas-gsi.pngbias2.png 
  308   Wed May 12 15:03:10 2021 CB, OHWed 12 16:00-20:0016:00 Shift change

Statistics OK (attach 1)
 15x 
  307   Wed May 12 06:59:55 2021 OH, RDPWed 12 May 08:00-16:0008:00 While the rates appeared to have quietened
around 7am they are back to their previous
rate now.
 1dImplants.png1dImplants2.png512.png513.png 
  306   Wed May 12 02:07:59 2021 MA, BAWed 12 May 00:00-08:0003:12 System Check

attachment 1 : Current

attachment 2 : Temperature
 9x 
  305   Tue May 11 07:21:24 2021 OHTuesday 11 May08:20 System wide checks all ok except
 Base  Current  Difference
aida01 fault   0xc10c :   0xc10e :   2  
 210511_0823_Stats.png210511_0824_Temp.png210511_0825_Bias.png 
  304   Mon May 10 11:45:15 2021 NHConfusing behaviour of rates Testing the behaviour of powering down the
fast ADCs in aida01 (the hot FEE)
  
  303   Mon May 10 08:49:37 2021 TDMonday 10 May09.51 All system wide checks OK *except*

 21x 
  302   Sun May 9 19:29:23 2021 TDSunday 9 May   14x 
  301   Sat May 8 09:05:04 2021 TDSaturday 8 May
09.54 FEE64 temperatures OK - attachment
1
 27x 
ELOG V3.1.4-unknown