AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Last 256 days  ELOG logo
New entries since:Sat Sep 28 11:32:20 2024
ID Date Author Subject Text Attachments
  738   Wed Jun 11 10:13:42 2025 EW, CB, PJWRun 67As run 66, optimisation of beam completed

DSSD4 now working and thresholds
to 0x30 (480keV), working switched to LEC
 Screenshot_from_2025-06-11_11-15-33.pngScreenshot_from_2025-06-11_11-15-16.png 
  737   Wed Jun 11 09:16:55 2025 CBASIC Control Settings11 June 10:18

2025Apr08-13.45.30 settings

DSSD4 not working as of the screenshots
 17x 
  736   Wed Jun 11 08:37:48 2025 CB, PJWRun 6609:38

As Run 67, no changes, CRYRING
operators attempting to improve beam intensity.
 Screenshot_from_2025-06-11_10-21-30.pngScreenshot_from_2025-06-11_10-21-44.png 
  735   Tue Jun 10 22:38:59 2025 JM, CB, PJWRun 6523:40

Offline anlaysis shows two clear
peaks for DSSD1 and 2 at very low energies
 7x 
  734   Tue Jun 10 16:46:39 2025 JM, CB, EW, AY, PC150 keV - Run64Run 64 started.

150 keV/u beam on target, Target
overlap confirmed with lifetime measurement
 42x 
  733   Tue Jun 10 13:29:23 2025 EW, CB, JMThresholds changed Experimented with slow comparator thresholds
as we go down to lower beam energies

Checked deadlayer loses with SRIM,
 Screenshot_from_2025-06-10_14-35-07.pngScreenshot_from_2025-06-10_14-34-59.pngScreenshot_from_2025-06-10_14-34-49.pngScreenshot_from_2025-06-10_14-34-17.png 
  732   Tue Jun 10 09:57:50 2025 CB, JM, PJW, YuL, JGRun 6210:58

As Run 61, no target for background.

200 keV/A
  
  731   Tue Jun 10 09:44:33 2025 JGMBS not running for a weekThe MBS daq was not writing data since
June 2. 22:39 (run_0035.lmd)

This means, no detector and target
  
  730   Tue Jun 10 09:44:30 2025 JGMBS not running for a weekThe MBS daq was not writing data since June
2. 22:39 (run_0035.lmd)
The reason is that
the rfio server was running on atppc025 which
  
  729   Tue Jun 10 09:44:20 2025 JGMBS not running for a weekThe MBS daq was not writing data since June
2. 22:39 (run_0035.lmd)
The reason is that
the rfio server was running on atppc025 which
  
  728   Sun Jun 8 11:55:00 2025 EM, PC, JM, CB, EW, AY, CB, PJW, YuLRun 58,59,60, 6112:52 

Started Run 58 - Beam energy
200 keV/u.
 50x 
  727   Sun Jun 8 10:05:30 2025 EM, PC, JMRun5711:06

Run during beam change. We will
go down to 200 keV/u
  
  726   Sun Jun 8 09:07:22 2025 EM, PC, JMRun56NOTE: RunR55 is missing

Run56: Background run with 250
keV/u. Target off using the usual procedure.
 Screenshot_from_2025-06-08_10-10-06.pngScreenshot_from_2025-06-08_10-15-01.png 
  725   Sat Jun 7 10:23:26 2025 JM, CBcarme-gsi rebooted 10:00

The computer screen controlling
the DAQ on carme-gsi appeared to have crashed.
  
  724   Sat Jun 7 10:06:27 2025 JM, EM, CB, DB, AY, PC, CBRun 5411:10

We have started a new run at the
same energy as R53 (250 keV/u) due to an
 50x 
  723   Fri Jun 6 17:27:03 2025 AY, ST, JM, EM, DBRun 53Run 53 started at 18:25 (started already
earlier but since then data is taken). Everything
is running again. We started at 3E12 at/cm2.
 11x 
  722   Fri Jun 6 16:49:59 2025 CB, AY, STBeam overlap results for 200keV and 250keVFor 200keV the optimal horizontal position
is -5mm.
For 250keV the optimal horizontal
 2025_06_06_17_46_56_Greenshot.png 
  721   Thu Jun 5 16:54:18 2025 EW, ST, CBRun 52 - 0.3 MeV/ARun 52 started at 17:53. Everything is
running again. We started at 3E12 at/cm2

D+ beam deuterium target. D+ beam
 14x 
  720   Thu Jun 5 08:50:00 2025 JM, CF, CB, EWRun 51 - background09:49

DSSD4 has been biased to 100V in
steps of 5V from 60V. It was previously stable
 Screenshot_from_2025-06-05_09-38-05.pngScreenshot_from_2025-06-05_09-46-08.pngScreenshot_from_2025-06-05_09-51-43.png 
  719   Wed Jun 4 10:44:36 2025 EW, CB, JM, OF, JG, STRun 50 - 0.35 MeV/A11:30

Run 50 started.

D+ beam deuterium target. D+ beam
 13x 
  718   Wed Jun 4 00:10:39 2025 JMRun 49 - beam only01:10

Gas target turned off via the shutter
valve.
 6x 
  717   Tue Jun 3 14:54:29 2025 PMH, STRun 48Run 48 started. Everything is running again.
We started at 3E13 at/cm2

D+ beam deuterium target. D+ beam
 6x 
  716   Tue Jun 3 11:16:07 2025 EW, EM, JMRun 47, beam only backgroundRun 47 started. Target cooling down after
water cooler failure, beam only background

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-06-03_12-20-25.pngScreenshot_from_2025-06-03_12-19-36.png 
  715   Mon Jun 2 20:03:43 2025 JG, AG, CB, EW, EMRun 45/46, 0.5 MeV/ARun 45 started.

D+ beam deuterium target. D+ beam
energy is 0.5 MeV/u. (beam calc calculation
 13x 
  714   Mon Jun 2 17:48:07 2025 JG, AGRun 44 scraper testsSame settings are Run 43 but with coasting
beam and scrapers set to:  30 / - 30
mm.
 Screenshot_from_2025-06-02_18-51-24.pngScreenshot_from_2025-06-02_19-27-31.png 
  713   Mon Jun 2 17:25:31 2025 JG, AGRun 43 scraper testsSame settings are Run 42 but bunched beam
and scrapers set to:  30 / - 30 mm.

 
  
  712   Mon Jun 2 16:35:35 2025 EW, AGRun 42 and scraper tests17:00

Scraper tests conducted. We tried
moving in the scrapers both at a fixed position
 Screenshot_from_2025-06-02_17-44-07.pngScreenshot_from_2025-06-02_17-44-50.png 
  711   Mon Jun 2 09:30:38 2025 JM, EW, STRun 41Run 41 started.

D+ beam deuterium target. D+ beam
energy is 0.75 MeV/u. (beam calc calculation
 6x 
  710   Sun Jun 1 15:33:50 2025 EW, JM, CBRun 4016:30

Run 40 started.

D+ beam deuterium target. D+ beam
 10x 
  709   Sun Jun 1 07:46:34 2025 JM, EM, CBRun 3908:45

Run 39 started.

D+ beam deuterium target. D+ beam
 7x 
  708   Sat May 31 10:46:42 2025 TDRun 38 - remote monitoring
11.40 DAQ continues
      File G22-205/R38
 21x 
  707   Sat May 31 09:58:21 2025 JMRun 3810:56

Run 38 started.

D+ beam deuterium target. D+ beam
 10x 
  706   Fri May 30 21:49:08 2025 JM, NP, CBRun 3722:49

Run 37 started.

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-05-31_00-56-32.pngScreenshot_from_2025-05-31_00-58-40.pngScreenshot_from_2025-05-31_06-16-50.png 
  705   Fri May 30 20:47:47 2025 JM, CB, NPRun 3621:47

Run 36 started.

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-05-30_22-45-48.pngScreenshot_from_2025-05-30_22-46-48.png 
  704   Fri May 30 20:06:48 2025 JM, CB, NPRun3521:00

Run 35 started.

D+ beam deuterium target. D+ beam
 8x 
  703   Fri May 30 07:27:41 2025 CB LB JM NP EMWaiting for deuterium08:27

No run going.

Temperatures OK - attach
 8x 
  702   Thu May 29 18:04:47 2025 LB, CB, PMH, JMRun 32,33,34Oven temperature increased, current up
to 3.5E7 pps.

Found beam-target overlap setting
 7x 
  701   Thu May 29 14:39:52 2025 CB LB PMHRun 3115:40

Waiting for Serge to come in to
change beam energy.
 9x 
  700   Wed May 28 16:40:48 2025 EH, SN, LB, OF, EBM, CBRun 28/29/30 - 1.88 MeV/AWe start a new run with real data taking
condititon: beam is ok, target density is
1e12 cm-2, detectors are moving in-out periodically.
 37x 
  699   Wed May 28 10:54:14 2025 LBRun 27Run 27 running

28/05/2025

(ignore 26 - in-between run)
 Screenshot_from_2025-05-28_15-45-13.pngScreenshot_from_2025-05-28_15-46-07.pngScreenshot_from_2025-05-28_15-48-27.pngScreenshot_from_2025-05-28_15-48-38.pngScreenshot_from_2025-05-28_15-49-09.png 
  698   Tue May 27 22:20:11 2025 CB, LB,PWRun 25 - 1.99/2.02 MeV/A23:20

JM thinks we cannot see 7Be locus
on run 24. Possibly the right arm cannot
 27x 
  697   Tue May 27 15:18:46 2025 JG, CN, JMrun 24Run 24 running

27/05/2025

We start a new run with real data
 7x 
  696   Tue May 27 12:49:48 2025 MLIon beam / electron beam settings so far.Screenshots and ParamModi settings export
attached.
 2025-05-27_13-46-30-866.png2025-05-27_13-47-04-130.png2025-05-27_13-47-23-173.png2025-05-27_13-47-52-384.png2025-05-27_13-50-26_YRT1_CRYRING_2025_Li_Marsh.C1.txt 
  695   Tue May 27 08:38:29 2025 TD[How To] Recover DAQ when one FEE64 stops sending data - short(er) version 1) Select 'No Storage' [workspace 4, display
1, browser tab 'TapeServer']
    If already in 'No Storage' mode please
  
  694   Tue May 27 05:24:05 2025 LB,SN, L. Cs. P. J. W.Run 22, 23 - 1.95 MeV/A27/05/2025 ca. 6:00

We start a new run: beam is ok,
target density ok, detectors are moving in-out
 8x 
  693   Tue May 27 05:03:41 2025 JMDAQ restart06:00

FEE modules power cycled.

No issues on power cycle restart.
 7x 
  692   Mon May 26 18:37:17 2025 LC, AG, LB, SNRun 21Run 21 running

26/05/2025 19:42 p.m.

We start a new run with real data
 12x 
  691   Mon May 26 08:56:56 2025 EM,LBRun20Run 20 running

We start a new run since the laser
guys will do some measurements.
 8x 
  690   Sat May 24 18:27:55 2025 EM, LCBackground runs continued R17-R19Summary: Target not running. Background
runs written to disk, some with beam some
without.
 36x 
  689   Sat May 24 08:28:14 2025 TD, EMBackground runs R13-R16Summary: Target not running. Some background
files written to disk, some with beam some
without. 
 29x 
  688   Fri May 23 09:19:40 2025 SN, TDTarget wait, switch lithium oven
10.12 DAQ, Merger & Tape Server running OK
- no storage mode 
 18x 
  687   Thu May 22 06:41:10 2025 JG, TDR6 - R11 scrapers test / pulser walk07.00 

JG found target off (target data stopped
 33x 
  686   Wed May 21 14:38:22 2025 JM, TDR4 and R5 - background15:30

Waiting for the target to cool
down. ETA is 16:30 for cooling to be finished
 7x 
  685   Tue May 20 19:38:36 2025 JMCARME restart19:00

Arrived at GSI.

We have 6Li1+ beam in the ring
 6x 
  684   Sat May 17 11:19:06 2025 JMShifter intructions 2025EMERGENCY SHUTDOWNS

1. CARME motors: Q key
on keyboard while on workspace 1 of appc218
  
  683   Tue May 13 15:07:42 2025 JMOnline monitoring codeCARME_Sort histogramming has been updated
to aid our understanding online.

> XY plots have been updated
 Screenshot_from_2025-05-13_15-14-12.pngScreenshot_from_2025-05-13_15-14-38.pngScreenshot_from_2025-05-13_15-28-48.png 
  682   Mon May 12 13:25:09 2025 JGtarget/ring DAQ - overviewAn MBS DAQ is running to collect two types
of data:
  
  681   Sat Apr 26 22:01:37 2025 CBProxy bridgeProxy bridge enabling anydesk and generic
Internet access dropped due to atppc025 being
rebooted. Found it dropped again late today.
  
  680   Wed Apr 23 11:08:34 2025 TD, JMBackground Run
12.08 DSSSD bias & leakage current - attachments
1-2
 11x 
  679   Tue Apr 22 06:44:02 2025 TDTuesday 22 April
07.40 DSSSD bias & leakage current - attachments
1-3
 Screenshot_from_2025-04-22_07-40-45.pngScreenshot_from_2025-04-22_07-41-10.pngScreenshot_from_2025-04-22_07-47-25.png1.png2.png 
  678   Sun Apr 20 07:30:29 2025 CBDSSD leakage currents over EasterJust after midnight on 20/04 it appears
DSSD #4 leakage current has perfectly stabilised.
See attached.
 Screenshot_2025-04-20_083007.pngScreenshot_2025-04-20_193226.pngScreenshot_2025-04-21_085130.png 
  677   Fri Apr 18 16:18:33 2025 JMD+D BBN energies testD+D minimum energy Ecm = 150 keV which
corresponds to Ed=150 keV/u or Ed=300
keV. Therefore we need a threshold
 16x 
  676   Fri Apr 18 08:17:38 2025 JMMore testing09:10

Arrived at GSI. Leakage currents
status same as before, DSSD4 is still fluctuating.
 15x 
  675   Thu Apr 17 08:51:29 2025 JMGrounding cont.09:00

Came in to see the bias for DSSD4
which has been fluctuating for the past few
 29x 
  674   Wed Apr 16 08:20:05 2025 JMGrounding 09:00

Leakage currents this morning again
appear to have lowered during the night.
 14x 
  673   Tue Apr 15 12:23:10 2025 JMLeakage current / CARME issues14/04/25

Arrived at GSI in the afternoon.

Found that the coolant loop on
 18x 
  672   Thu Apr 10 10:53:14 2025 TDThursday 10 April11.50 DAQ continues
      Data file APR25/R6_13
 8x 
  671   Thu Apr 10 07:02:12 2025 CB (remotely)Current logging enabled - sort ofThere appear to be issues with Shahab's
caenlogging program. It crashes occasionally,
with an error indicating the number of columns
  
  670   Wed Apr 9 10:02:21 2025 TDCARME equipment in CRYRING area moved
There was some tidying up of the CRYRING
hall in advance of this week's EC evaluation
 20250409_102115.jpg20250409_101705.jpg 
  669   Wed Apr 9 02:40:04 2025 TDWednesday 9 April03.37 DAQ continues
      Data file APR25/R5_8
 11x 
  668   Tue Apr 8 10:46:13 2025 TDTuesday 8 April
11.30 CRYRING vacuum and temperature - attachments
1-2
 27x 
  667   Mon Apr 7 08:59:41 2025 TDMonday 7 April
10.00 FEE64 power ON
      CARME IE514 OFF
 8x 
  666   Sun Apr 6 14:21:53 2025 TD[How To] Startup CARME
- water flow/interlock checks
   check water flow to/from inflow/outflow
  
  665   Sun Apr 6 11:40:48 2025 TDOptions DB reconstructedOptions directory corrupted unable to change
Options settings per https://elog.ph.ed.ac.uk/CARME/664
 Screenshot_from_2025-04-06_12-59-39.png 
  664   Sun Apr 6 10:17:49 2025 TDSunday 6 April
11.15 CARME IE514 ion gauge remains OFF
      ML says there are 2x ion gauges with
 15x 
  663   Sat Apr 5 16:15:04 2025 TDFEE64 power interlock installed
Water flow and dew point sensors have been
installed on the outlet and inlet cooling
 11x 
  662   Sat Apr 5 16:13:32 2025 TDSaturday 5 April
12.00 CARME IE514 ion gauge 4.2e-11 mbar
      CARME IE514 OFF
 7x 
  661   Fri Apr 4 10:17:16 2025 TDFriday 4 April
10.43 Reboot carme-gsi - unable to open a
working terminal
  
  660   Mon Mar 10 15:47:27 2025 TDAnalysis data files G22-201 R79_10 & R79_24
Analysis of data files G22-201 R79_10 and
R79_24 - attachments 1-2
 R79_10.txtR79_24.txt 
ELOG V3.1.4-unknown