|
ID |
Date |
Author |
Subject |
Text |
 |
|
762
|
Thu Jul 17 07:07:56 2025 |
CB | CARME off | 08:07 CEST
Temperatures ok - attached
DSSDs on. Leakage currents still |
   |
|
761
|
Wed Jul 9 11:21:14 2025 |
EW, CB | CARME restarted - long background R98 | ---9 July---
11:00
Turned detectors on - all stable |
32x |
|
760
|
Sun Jul 6 11:35:28 2025 |
CB | Anydesk version updated | Updated anydesk to 6.3.2 CentOS7 release.
Works now. |
|
|
759
|
Sat Jul 5 08:51:33 2025 |
EBM | anydesk connection settings | |
|
|
758
|
Wed Jun 18 14:21:39 2025 |
CB | CARME off | 15:20
DAQ stopped
Merger & Tape Server stopped |
|
|
757
|
Tue Jun 17 23:51:58 2025 |
TD, CB, JG | Run 96 - continued |
00.31 DAQ continues data file G22-205/R96_27
|
23x |
|
756
|
Tue Jun 17 19:10:07 2025 |
NH, PMH | Run 96 | 20:00 - Go to YR cave to see what is going
on
|
7x |
|
755
|
Tue Jun 17 12:22:50 2025 |
CB EW JG AG SN | Run 94/95/96 | Run 94
Background with beam at 150 keV
and no target. |
|
|
754
|
Tue Jun 17 12:14:30 2025 |
EW, CB, AG | Run 93- Background with beam 150keV | Run 93- New run at 150keV, background with
beam
13:15 All checks ok |
   |
|
753
|
Tue Jun 17 08:04:09 2025 |
EW, AG, CB | Run 92- Background with beam 90keV | Run 92- started at 09:00, background with
beam
Same settings as run 91 |
   |
|
752
|
Mon Jun 16 22:06:00 2025 |
CB, AR, EW | RUN 90-91 | 23:00 DAQ restored and data now being written
okay. Checks all okay, see screenshots below.
Histograms reset. 40 bars in bottle @ 23:45 |
14x |
|
751
|
Mon Jun 16 21:58:00 2025 |
CB AR | Runs 84-89 | Found all Merger Links background black
- inactive. Nontheless the tapeservice was
working, the data rate to disk was normal, |
|
|
750
|
Mon Jun 16 11:12:22 2025 |
JG, AK, AR, EH | run 83 | 12:15 restarted measurement with target
- Run 83
same settings as for runs 76, 77 |
8x |
|
749
|
Mon Jun 16 10:46:11 2025 |
CB JM JG AK | Run82 | Background without beam while source is
optimised. |
|
|
748
|
Mon Jun 16 08:17:41 2025 |
JG | D2 consumption | The current bottle of D2 was installed
on friday 06.06. at around 12:00. I assume
we started at 200 bar. |
|
|
747
|
Sun Jun 15 10:46:35 2025 |
EW, EM, AR, AB, CB, JG, AK | Run 81 | 11:45 New run started - run 81, same settings
as previous runs (75, 76 etc)
ROOT histograms NOT zeroed |
30x |
|
746
|
Sun Jun 15 07:01:37 2025 |
EW, EM | Run 80 | 08:00 New run started - run 80
Run whilst they are optimising
the beam after losing it, everything else |
    |
|
745
|
Fri Jun 13 19:41:32 2025 |
JG, SHB, JM, AR, EW, OF | Run 77, 78, 79 | New run started - Run 77 after refilling
LN2 dewar
Same settings as Run 75 & 76 |
17x |
|
744
|
Fri Jun 13 16:39:18 2025 |
JG, SHB | Run 76 | Same settings as run 75.
Detector 4 is biased at 100V and
switched from MEC to LEC. |
7x |
|
743
|
Fri Jun 13 14:45:58 2025 |
JG, SS, JM, CB, EW, AR | Run 75 |
90 keV/u beam on target, Target
overlap confirmed with lifetime measurement |
 |
|
742
|
Thu Jun 12 15:33:17 2025 |
CB, JM, EM, JG, TD, AB, CF, AR | Run 74 | 16:34
Like Run 73, but particle detector
in YR10 now active, and recorded in MBS. |
27x |
|
741
|
Thu Jun 12 14:22:27 2025 |
JM, CB, TD, CF, JG, EM | Run 73 | 15:00
Cave closed, waiting for beam to
come back. |
   |
|
740
|
Thu Jun 12 14:08:42 2025 |
JM, CB | Run 72 - pulser walkthrough | Pulser walkthrough conducted while the
cave was open.
Pulser amplitudes 90000, 80000, |
|
|
739
|
Thu Jun 12 06:20:50 2025 |
JM | Run 68,69 - background | 07:20
Started a background run while
the cave is open. |
 |
|
738
|
Wed Jun 11 10:13:42 2025 |
EW, CB, PJW, AR, JM | Run 67 | As run 66, optimisation of beam completed
DSSD4 now working and thresholds
to 0x30 (480keV), switched to LEC |
14x |
|
737
|
Wed Jun 11 09:16:55 2025 |
CB | ASIC Control Settings | 11 June 10:18
2025Apr08-13.45.30 settings
DSSD4 not working as of the screenshots |
17x |
|
736
|
Wed Jun 11 08:37:48 2025 |
CB, PJW | Run 66 | 09:38
As Run 65, no changes, CRYRING
operators attempting to improve beam intensity. |
 |
|
735
|
Tue Jun 10 22:38:59 2025 |
JM, CB, PJW | Run 65 | 23:40
Offline anlaysis shows two clear
peaks for DSSD1 and 2 at very low energies |
7x |
|
734
|
Tue Jun 10 16:46:39 2025 |
JM, CB, EW, AY, PC | 150 keV - Run64 | Run 64 started.
150 keV/u beam on target, Target
overlap confirmed with lifetime measurement |
42x |
|
733
|
Tue Jun 10 13:29:23 2025 |
EW, CB, JM | Thresholds changed | Experimented with slow comparator thresholds
as we go down to lower beam energies
Checked deadlayer loses with SRIM, |
   |
|
732
|
Tue Jun 10 09:57:50 2025 |
CB, JM, PJW, YuL, JG | Run 62 | 10:58
As Run 61, no target for background.
200 keV/A |
|
|
731
|
Tue Jun 10 09:44:33 2025 |
JG | MBS not running for a week | The MBS daq was not writing data since
June 2. 22:39 (run_0035.lmd)
This means, no detector and target |
|
|
730
|
Tue Jun 10 09:44:30 2025 |
JG | MBS not running for a week | The MBS daq was not writing data since June
2. 22:39 (run_0035.lmd)
The reason is that
the rfio server was running on atppc025 which |
|
|
729
|
Tue Jun 10 09:44:20 2025 |
JG | MBS not running for a week | The MBS daq was not writing data since June
2. 22:39 (run_0035.lmd)
The reason is that
the rfio server was running on atppc025 which |
|
|
728
|
Sun Jun 8 11:55:00 2025 |
EM, PC, JM, CB, EW, AY, CB, PJW, YuL | Run 58,59,60, 61 | 12:52
Started Run 58 - Beam energy
200 keV/u. |
50x |
|
727
|
Sun Jun 8 10:05:30 2025 |
EM, PC, JM | Run57 | 11:06
Run during beam change. We will
go down to 200 keV/u |
|
|
726
|
Sun Jun 8 09:07:22 2025 |
EM, PC, JM | Run56 | NOTE: RunR55 is missing
Run56: Background run with 250
keV/u. Target off using the usual procedure. |
 |
|
725
|
Sat Jun 7 10:23:26 2025 |
JM, CB | carme-gsi rebooted | 10:00
The computer screen controlling
the DAQ on carme-gsi appeared to have crashed. |
|
|
724
|
Sat Jun 7 10:06:27 2025 |
JM, EM, CB, DB, AY, PC, CB | Run 54 | 11:10
We have started a new run at the
same energy as R53 (250 keV/u) due to an |
50x |
|
723
|
Fri Jun 6 17:27:03 2025 |
AY, ST, JM, EM, DB | Run 53 | Run 53 started at 18:25 (started already
earlier but since then data is taken). Everything
is running again. We started at 3E12 at/cm2. |
11x |
|
722
|
Fri Jun 6 16:49:59 2025 |
CB, AY, ST | Beam overlap results for 200keV and 250keV | For 200keV the optimal horizontal position
is -5mm.
For 250keV the optimal horizontal |
|
|
721
|
Thu Jun 5 16:54:18 2025 |
EW, ST, CB | Run 52 - 0.3 MeV/A | Run 52 started at 17:53. Everything is
running again. We started at 3E12 at/cm2
D+ beam deuterium target. D+ beam |
14x |
|
720
|
Thu Jun 5 08:50:00 2025 |
JM, CF, CB, EW | Run 51 - background | 09:49
DSSD4 has been biased to 100V in
steps of 5V from 60V. It was previously stable |
  |
|
719
|
Wed Jun 4 10:44:36 2025 |
EW, CB, JM, OF, JG, ST | Run 50 - 0.35 MeV/A | 11:30
Run 50 started.
D+ beam deuterium target. D+ beam |
13x |
|
718
|
Wed Jun 4 00:10:39 2025 |
JM | Run 49 - beam only | 01:10
Gas target turned off via the shutter
valve. |
6x |
|
717
|
Tue Jun 3 14:54:29 2025 |
PMH, ST | Run 48 | Run 48 started. Everything is running again.
We started at 3E13 at/cm2
D+ beam deuterium target. D+ beam |
6x |
|
716
|
Tue Jun 3 11:16:07 2025 |
EW, EM, JM | Run 47, beam only background | Run 47 started. Target cooling down after
water cooler failure, beam only background
D+ beam deuterium target. D+ beam |
 |
|
715
|
Mon Jun 2 20:03:43 2025 |
JG, AG, CB, EW, EM | Run 45/46, 0.5 MeV/A | Run 45 started.
D+ beam deuterium target. D+ beam
energy is 0.5 MeV/u. (beam calc calculation |
13x |
|
714
|
Mon Jun 2 17:48:07 2025 |
JG, AG | Run 44 scraper tests | Same settings are Run 43 but with coasting
beam and scrapers set to: 30 / - 30
mm. |
 |
|
713
|
Mon Jun 2 17:25:31 2025 |
JG, AG | Run 43 scraper tests | Same settings are Run 42 but bunched beam
and scrapers set to: 30 / - 30 mm.
|
|
|
712
|
Mon Jun 2 16:35:35 2025 |
EW, AG | Run 42 and scraper tests | 17:00
Scraper tests conducted. We tried
moving in the scrapers both at a fixed position |
 |
|
711
|
Mon Jun 2 09:30:38 2025 |
JM, EW, ST | Run 41 | Run 41 started.
D+ beam deuterium target. D+ beam
energy is 0.75 MeV/u. (beam calc calculation |
6x |
|
710
|
Sun Jun 1 15:33:50 2025 |
EW, JM, CB | Run 40 | 16:30
Run 40 started.
D+ beam deuterium target. D+ beam |
10x |
|
709
|
Sun Jun 1 07:46:34 2025 |
JM, EM, CB | Run 39 | 08:45
Run 39 started.
D+ beam deuterium target. D+ beam |
7x |
|
708
|
Sat May 31 10:46:42 2025 |
TD | Run 38 - remote monitoring |
11.40 DAQ continues
File G22-205/R38
|
21x |
|
707
|
Sat May 31 09:58:21 2025 |
JM | Run 38 | 10:56
Run 38 started.
D+ beam deuterium target. D+ beam |
10x |
|
706
|
Fri May 30 21:49:08 2025 |
JM, NP, CB | Run 37 | 22:49
Run 37 started.
D+ beam deuterium target. D+ beam |
  |
|
705
|
Fri May 30 20:47:47 2025 |
JM, CB, NP | Run 36 | 21:47
Run 36 started.
D+ beam deuterium target. D+ beam |
 |
|
704
|
Fri May 30 20:06:48 2025 |
JM, CB, NP | Run35 | 21:00
Run 35 started.
D+ beam deuterium target. D+ beam |
8x |
|
703
|
Fri May 30 07:27:41 2025 |
CB LB JM NP EM | Waiting for deuterium | 08:27
No run going.
Temperatures OK - attach |
8x |
|
702
|
Thu May 29 18:04:47 2025 |
LB, CB, PMH, JM | Run 32,33,34 | Oven temperature increased, current up
to 3.5E7 pps.
Found beam-target overlap setting |
7x |
|
701
|
Thu May 29 14:39:52 2025 |
CB LB PMH | Run 31 | 15:40
Waiting for Serge to come in to
change beam energy. |
9x |
|
700
|
Wed May 28 16:40:48 2025 |
EH, SN, LB, OF, EBM, CB | Run 28/29/30 - 1.88 MeV/A | We start a new run with real data taking
condititon: beam is ok, target density is
1e12 cm-2, detectors are moving in-out periodically. |
37x |
|
699
|
Wed May 28 10:54:14 2025 |
LB | Run 27 | Run 27 running
28/05/2025
(ignore 26 - in-between run) |
    |
|
698
|
Tue May 27 22:20:11 2025 |
CB, LB,PW | Run 25 - 1.99/2.02 MeV/A | 23:20
JM thinks we cannot see 7Be locus
on run 24. Possibly the right arm cannot |
27x |
|
697
|
Tue May 27 15:18:46 2025 |
JG, CN, JM | run 24 | Run 24 running
27/05/2025
We start a new run with real data |
7x |
|
696
|
Tue May 27 12:49:48 2025 |
ML | Ion beam / electron beam settings so far. | Screenshots and ParamModi settings export
attached. |
    |
|
695
|
Tue May 27 08:38:29 2025 |
TD | [How To] Recover DAQ when one FEE64 stops sending data - short(er) version | 1) Select 'No Storage' [workspace 4, display
1, browser tab 'TapeServer']
If already in 'No Storage' mode please |
|
|
694
|
Tue May 27 05:24:05 2025 |
LB,SN, L. Cs. P. J. W. | Run 22, 23 - 1.95 MeV/A | 27/05/2025 ca. 6:00
We start a new run: beam is ok,
target density ok, detectors are moving in-out |
8x |
|
693
|
Tue May 27 05:03:41 2025 |
JM | DAQ restart | 06:00
FEE modules power cycled.
No issues on power cycle restart. |
7x |
|
692
|
Mon May 26 18:37:17 2025 |
LC, AG, LB, SN | Run 21 | Run 21 running
26/05/2025 19:42 p.m.
We start a new run with real data |
12x |
|
691
|
Mon May 26 08:56:56 2025 |
EM,LB | Run20 | Run 20 running
We start a new run since the laser
guys will do some measurements. |
8x |
|
690
|
Sat May 24 18:27:55 2025 |
EM, LC | Background runs continued R17-R19 | Summary: Target not running. Background
runs written to disk, some with beam some
without. |
36x |
|
689
|
Sat May 24 08:28:14 2025 |
TD, EM | Background runs R13-R16 | Summary: Target not running. Some background
files written to disk, some with beam some
without.
|
29x |
|
688
|
Fri May 23 09:19:40 2025 |
SN, TD | Target wait, switch lithium oven |
10.12 DAQ, Merger & Tape Server running OK
- no storage mode
|
18x |
|
687
|
Thu May 22 06:41:10 2025 |
JG, TD | R6 - R11 scrapers test / pulser walk | 07.00
JG found target off (target data stopped |
33x |
|
686
|
Wed May 21 14:38:22 2025 |
JM, TD | R4 and R5 - background | 15:30
Waiting for the target to cool
down. ETA is 16:30 for cooling to be finished |
7x |
|
685
|
Tue May 20 19:38:36 2025 |
JM | CARME restart | 19:00
Arrived at GSI.
We have 6Li1+ beam in the ring |
6x |
|
684
|
Sat May 17 11:19:06 2025 |
JM | Shifter intructions 2025 | EMERGENCY SHUTDOWNS
1. CARME motors: Q key
on keyboard while on workspace 1 of appc218 |
|
|
683
|
Tue May 13 15:07:42 2025 |
JM | Online monitoring code | CARME_Sort histogramming has been updated
to aid our understanding online.
> XY plots have been updated |
  |
|
682
|
Mon May 12 13:25:09 2025 |
JG | MBS DAQ - overview | An MBS DAQ is running to collect two types
of data:
|
|
|
681
|
Sat Apr 26 22:01:37 2025 |
CB | Proxy bridge | Proxy bridge enabling anydesk and generic
Internet access dropped due to atppc025 being
rebooted. Found it dropped again late today. |
|
|
680
|
Wed Apr 23 11:08:34 2025 |
TD, JM | Background Run |
12.08 DSSSD bias & leakage current - attachments
1-2
|
11x |
|
679
|
Tue Apr 22 06:44:02 2025 |
TD | Tuesday 22 April |
07.40 DSSSD bias & leakage current - attachments
1-3
|
    |
|
678
|
Sun Apr 20 07:30:29 2025 |
CB | DSSD leakage currents over Easter | Just after midnight on 20/04 it appears
DSSD #4 leakage current has perfectly stabilised.
See attached. |
  |
|
677
|
Fri Apr 18 16:18:33 2025 |
JM | D+D BBN energies test | D+D minimum energy Ecm = 150 keV which
corresponds to Ed=150 keV/u or Ed=300
keV. Therefore we need a threshold |
16x |
|
676
|
Fri Apr 18 08:17:38 2025 |
JM | More testing | 09:10
Arrived at GSI. Leakage currents
status same as before, DSSD4 is still fluctuating. |
15x |
|
675
|
Thu Apr 17 08:51:29 2025 |
JM | Grounding cont. | 09:00
Came in to see the bias for DSSD4
which has been fluctuating for the past few |
29x |
|
674
|
Wed Apr 16 08:20:05 2025 |
JM | Grounding | 09:00
Leakage currents this morning again
appear to have lowered during the night. |
14x |
|
673
|
Tue Apr 15 12:23:10 2025 |
JM | Leakage current / CARME issues | 14/04/25
Arrived at GSI in the afternoon.
Found that the coolant loop on |
18x |
|
672
|
Thu Apr 10 10:53:14 2025 |
TD | Thursday 10 April | 11.50 DAQ continues
Data file APR25/R6_13
|
8x |
|
671
|
Thu Apr 10 07:02:12 2025 |
CB (remotely) | Current logging enabled - sort of | There appear to be issues with Shahab's
caenlogging program. It crashes occasionally,
with an error indicating the number of columns |
|
|
670
|
Wed Apr 9 10:02:21 2025 |
TD | CARME equipment in CRYRING area moved |
There was some tidying up of the CRYRING
hall in advance of this week's EC evaluation |
 |
|
669
|
Wed Apr 9 02:40:04 2025 |
TD | Wednesday 9 April | 03.37 DAQ continues
Data file APR25/R5_8
|
11x |
|
668
|
Tue Apr 8 10:46:13 2025 |
TD | Tuesday 8 April |
11.30 CRYRING vacuum and temperature - attachments
1-2
|
27x |
|
667
|
Mon Apr 7 08:59:41 2025 |
TD | Monday 7 April |
10.00 FEE64 power ON
CARME IE514 OFF
|
8x |
|
666
|
Sun Apr 6 14:21:53 2025 |
TD | [How To] Startup CARME |
- water flow/interlock checks
check water flow to/from inflow/outflow |
|
|
665
|
Sun Apr 6 11:40:48 2025 |
TD | Options DB reconstructed | Options directory corrupted unable to change
Options settings per https://elog.ph.ed.ac.uk/CARME/664
|
|
|
664
|
Sun Apr 6 10:17:49 2025 |
TD | Sunday 6 April |
11.15 CARME IE514 ion gauge remains OFF
ML says there are 2x ion gauges with |
15x |
|
663
|
Sat Apr 5 16:15:04 2025 |
TD | FEE64 power interlock installed |
Water flow and dew point sensors have been
installed on the outlet and inlet cooling |
11x |
|
662
|
Sat Apr 5 16:13:32 2025 |
TD | Saturday 5 April |
12.00 CARME IE514 ion gauge 4.2e-11 mbar
CARME IE514 OFF
|
7x |
|
661
|
Fri Apr 4 10:17:16 2025 |
TD | Friday 4 April |
10.43 Reboot carme-gsi - unable to open a
working terminal
|
|
|
660
|
Mon Mar 10 15:47:27 2025 |
TD | Analysis data files G22-201 R79_10 & R79_24 |
Analysis of data files G22-201 R79_10 and
R79_24 - attachments 1-2
|
 |
|
659
|
Tue Jul 2 17:43:32 2024 |
TD | Offline analysis G22-201/R89 | Offline analysis data file G22-201/R89_0 to
R89_13 (c. 6h40m data)
|
9x |
|
658
|
Wed Jun 19 12:11:22 2024 |
CB, RSS | CARME status | DSSD off
FEEs off
Motors out, pin inserted, compressed |
|
|
657
|
Wed Jun 19 12:08:34 2024 |
CB + various | Run 101-105 | Run 101: no target. See ELOG entry by TD.
Run 102: ??
Run 103: ?? |
|
|
656
|
Wed Jun 19 12:06:50 2024 |
CB, OF, SS | Run 98/99/100 - higher energy | 10:21 June 17
New energy: 1.125 MeV/u
Target in. Run 98 started. |
|
|
655
|
Wed Jun 19 12:04:02 2024 |
CB + OF, SS | Run 96/97 | Run 96 - as run 89, while we wait for beam
energy change at higher energies
Run stopped around 08:56 |
|
|
654
|
Wed Jun 19 12:01:29 2024 |
TD | 23:00-07:00 Wednesday 19 June | 23.18 DSSSD bias & leakage current OK - attachment
1
FEE64 temps OK - attachment 2
|
23x |
|
653
|
Wed Jun 19 12:00:56 2024 |
CB | Run 93/94/95 - background | 04:00 17 June
Moved the detectors back to the
usual configuration (as per run 89). |
6x |
|
652
|
Wed Jun 19 11:54:26 2024 |
CB | Run 91/92 - moving detectors | ~ 2:00 17 June
Run 91 |
    |
|
651
|
Mon Jun 17 23:10:08 2024 |
CB | Run 90 | 00:10
As run 89, detectors moved fully
out. |
 |
|
650
|
Mon Jun 17 16:26:00 2024 |
JM, RSS, CB | Run 89 | 17:20
(Run 87 Junk and Run 88 does not
exist) |
19x |
|
649
|
Mon Jun 17 06:26:45 2024 |
JM, OF, AK, CB | Change to 5+ beam | 07:00
We are changing to 5+ beam so that
we can access higher energies and possibly |
7x |
|
648
|
Mon Jun 17 05:47:35 2024 |
JM | Run 86 | 06:50
No sign of the resonance during
night shift. New run started but when operators |
|
|
647
|
Mon Jun 17 04:01:16 2024 |
JM | Run 85 | 05:00
Cooler voltage setpoint 247.45
V. |
|
|
646
|
Mon Jun 17 02:05:37 2024 |
JM | Run 84 | 03:00
Cooler voltage setpoint 247.7 V.
FC20 read value 247.15 V. |
|
|
645
|
Mon Jun 17 00:05:13 2024 |
JM | Run 83 | 01:00
Cooler voltage setpoint 247.6 V.
FC20 read value 247.05 V. |
|
|
644
|
Sun Jun 16 22:49:22 2024 |
JM | Run 82 | 23:38
Cooler voltage setpoint 247.5 V.
FC20 read value 246.95 V. |
|
|
643
|
Sun Jun 16 22:40:11 2024 |
JM | Target overlap test - R81 | 23:10
Beam set to bunched mode to observe
beam lifetime. |
|
|
642
|
Sun Jun 16 19:01:30 2024 |
ML, EM | Run 80 | 20:00
Ecooler setpoint 246.8
Readout 246.25 |
|
|
641
|
Sun Jun 16 13:51:11 2024 |
CB EM ML | Run 79 | 14:51
Ecooler setpoint 246.9
Readout 246.35 |
7x |
|
640
|
Sun Jun 16 13:29:05 2024 |
RSS CB | Run 78 | Target clogged? |
|
|
639
|
Sun Jun 16 06:02:31 2024 |
RSS | Run 77 | Run 77 started at 06:48
Cooler voltage setpoint 247.0 V.
|
20x |
|
638
|
Sat Jun 15 21:14:56 2024 |
JM, JS, LC | Run 76 | 22:15
New run 76 - beam on target with
definite target overlap [coasting] |
|
|
637
|
Sat Jun 15 13:30:18 2024 |
JM, JS | Run 75 | 14:30
New run 75 - beam on target with
definite target overlap [coasting] |
  |
|
636
|
Sat Jun 15 06:10:21 2024 |
EM, PMH | Run 74 | 7:00
Cooler voltage setpoint 247.4 V.
|
6x |
|
635
|
Sat Jun 15 00:46:45 2024 |
TD | CRYRING hall temperature transient | CRYRING hall temperature transient - evening
of Friday 14 June
|
|
|
634
|
Fri Jun 14 22:18:18 2024 |
RSS, CB, US | Run 73 | Beam is back.New run started.
Cooler voltage setpoint 247.3 V. |
20x |
|
633
|
Fri Jun 14 19:59:14 2024 |
US, LC, CB | New run with name of 72 is started due to target issue | 21:00
Target is lost. Background run
is being collected. |
 |
|
632
|
Fri Jun 14 14:52:02 2024 |
JM | Beam-Target Overlap Scan | The orbit of the beam in the ring was re-configured
so that the beam position is more central.
With the target density at ~6e11 |
 |
|
631
|
Fri Jun 14 14:48:02 2024 |
CB NP ML | [How To] Change target pressure. EMERGENCY ONLY! | ONLY FOLLOW THESE INSTRUCTIONS if E1 turbo
is below 820 Hz, pressure in E1 is above
2.5E-1 mbar and experts (Nikos, Andreas) |
 |
|
630
|
Fri Jun 14 14:46:54 2024 |
LC, JM, CB, TD, US | Run 71 - beam on target | 15:45
New run 71 - beam on target with
definite target overlap [coasting] |
   |
|
629
|
Fri Jun 14 13:45:21 2024 |
JM, JS, CB, TD, EH | Run 70 - beam on target | 14:45
New run 70 - beam on target with
definite target overlap |
7x |
|
628
|
Fri Jun 14 10:21:24 2024 |
JS, TD | Run 68 | Frank has been tuning the beam since 08:00
detectors moved fully out
11:20 |
9x |
|
627
|
Thu Jun 13 23:01:07 2024 |
RSS, JS, EH | Run 67 - Night shift | Run 67
00:01
DSSSD bias & leakage |
20x |
|
626
|
Thu Jun 13 21:07:30 2024 |
LCS, US | Run 67- beam on target | 22:05
The energy is changed to 247.4
V. |
7x |
|
625
|
Thu Jun 13 14:46:17 2024 |
TD | R66 beam overlap test |
15.45 Start data file G22-201/R66
Beam/target overlap test |
|
|
624
|
Thu Jun 13 09:48:25 2024 |
TD, LCS | Run 65 - beam on target | 10:47
The energy is changed to 247.4
V. |
14x |
|
623
|
Thu Jun 13 06:21:53 2024 |
TD, LCS | Run 64 - contd | 07.22 E1 pump 799Hz, 2.8A, 2.6e-1 mbar, 4.8e+11/cm2
07.24 DSSSD bias & leakage current OK - attachment |
13x |
|
622
|
Thu Jun 13 00:50:33 2024 |
JM, JS | Run 64 - beam on target | 01:50
Right arm at 64.60 mm
Left arm IN at 36.54 mm |
|
|
621
|
Wed Jun 12 07:16:47 2024 |
RSS, YL, JM, TD, CB | Status | 07:56 Gleb has taken the beam to try settings
for the 5+ charge state. As soon as the target
is ready, the 1+ charge state will be given |
6x |
|
620
|
Tue Jun 11 21:16:50 2024 |
TD | Run 63 continued | Run 63 continued
22.06 DSSSD bias & leakage current OK - attachment |
17x |
|
619
|
Tue Jun 11 20:10:25 2024 |
JM | Run 63 - Beam only background | 21:00
Claude has achieved optimal cooling
parameters for the beam |
|
|
618
|
Tue Jun 11 19:44:48 2024 |
OF, SS | Target out and at He | Target has been moved out and H2 switched
off. Changed to He.
Nikos will repair nozzle tomorrow |
|
|
617
|
Tue Jun 11 12:26:07 2024 |
RSS, JS, JM, CB | Run 62 - Beam optimization + Target change | Beam optimization and target change |
|
|
616
|
Tue Jun 11 08:34:50 2024 |
JM, RSS, JS | Run 61 - beam on target | New run 61
Right arm at 64.60 mm
Left arm IN at 36.54 mm |
   |
|
615
|
Tue Jun 11 04:36:17 2024 |
CB, RSS, JS | Run 60 - as 59, left servo in | 05:36
Run started.
Conditions as before, except left |
11x |
|
614
|
Mon Jun 10 20:31:12 2024 |
JM, AK, EH, CB | Run 59 Beam on target | 21:32
New run 59
Right arm at 64.60 mm |
18x |
|
613
|
Mon Jun 10 18:22:47 2024 |
JM | Electron cooler calculations | Ion beam energy is calculated using Beamcalc
(https://web-docs.gsi.de/~lestinsk/beamcalc/electron.php)
Electron current is set to 4.3 |
  |
|
612
|
Mon Jun 10 14:26:52 2024 |
EH, AK | Run 58 | 15:30
Merger OK, Tape server OK
ADC data item statistics OK |
8x |
|
611
|
Mon Jun 10 12:49:56 2024 |
RSS, DB, CB, JM | R58 Space Charge Test |
13:53
DSSSD bias & leakage
current OK - attachment 1
FEE64
temperatures OK - attachment 2
ADC |
   |
|
610
|
Mon Jun 10 07:40:47 2024 |
RSS, DB | Beam | 08:26: There is no beam and Gleb is informed.
08:46: Beam is back. |
|
|
609
|
Mon Jun 10 05:24:49 2024 |
TD, RSS, DB | R57 | 06:45 New data file G22-201/R57
Right arm at 64.60 mm
|
16x |
|
608
|
Sun Jun 9 22:14:23 2024 |
TD, PM, AG | Run 56 - Data taking | 23:15 New run 56 with
Right arm at 64.60 mm
|
31x |
|
607
|
Sun Jun 9 13:45:24 2024 |
CB PMH AG | Run 55 - Data taking | 14:45
New run 55 with:
Right arm at 64.60 mm |
18x |
|
606
|
Sun Jun 9 09:45:27 2024 |
JM, CB | Beam-Target Overlap | Target density this morning had stabalised
at 7e11 at/cm2
This is sufficient to test the |
|
|
605
|
Sun Jun 9 08:30:49 2024 |
JM, CB | Run 54 - beam on target | 09:30
New run 54 with:
Electron cooler setpoint |
7x |
|
604
|
Sat Jun 8 20:32:17 2024 |
LB, JM | Run 52 - beam on target | New run 52 with:
Electron cooler setpoint
244.2 V |
    |
|
603
|
Sat Jun 8 17:46:12 2024 |
TD | [How To] Cycle Left DSSSDs |
Interactive Motion Program [workspace 6,
display 2]
|
|
|
602
|
Sat Jun 8 14:49:14 2024 |
TD | R51 - contd |
15.40 DSSSD bias & leakage current OK - attachments
1-2
|
30x |
|
601
|
Sat Jun 8 10:13:52 2024 |
CB, JM, TD | Run 50/51 - data taking | 11:13
ML enabled ring signals remotely.
Used FakeMotion.dat (read FakeMotion.dat |
8x |
|
600
|
Sat Jun 8 06:13:21 2024 |
CB | Run 47/48/49 - target issues & tests | 07:00
After putting the target back,
we observe strong periodic (5 s) fluctuations |
    |
|
599
|
Sat Jun 8 00:14:39 2024 |
LB | Run 46 - background with beam | RUN 46- started at 00:50
Horizontal beam position = 4.0
mm, vertical beam position = -5.0 mm. |
22x |
|
598
|
Fri Jun 7 22:33:13 2024 |
LB | Run 45 - tests on beam-target overlap | Tried to double check beam-target overlap
by changing beam horizontal coordinate.
In the tablethe counts in the 4000-5200 |
    |
|
597
|
Fri Jun 7 15:53:35 2024 |
TD | DSSD leakage current increase - temperature increase in CRYRING hall | Re-increase in DSSSD leakage current c.
14-15.00 6.6.24
There was a significant temperature |
|
|
596
|
Fri Jun 7 14:09:04 2024 |
JM, CB, DR, CN, LB | Run 44 - 15N Data Taking | 15:35
Electron cooler voltage set point
= 244.3 V |
|
|
595
|
Fri Jun 7 10:05:40 2024 |
CB | Run 41/42/43 - 15N data taking start | 11:05
Confirmed overlap is at 4 mm under
new settings. |
8x |
|
594
|
Thu Jun 6 16:23:10 2024 |
LB CB JM | Run 39 - Run 40 15N | Started run 39.
We have the 15N+ beam with 426 |
15x |
|
593
|
Thu Jun 6 05:44:45 2024 |
DR YL DB LB CB JM | Run 38 - 15N Tests | 06:45
All system checks OK
Target density 3.4e11 |
8x |
|
592
|
Wed Jun 5 13:34:02 2024 |
JM | Run 37 - Change in thresholds | 14:20
Target nozzle currently being replaced.
No beam |
|
|
591
|
Wed Jun 5 13:21:45 2024 |
JM, CB | Run 36 - pulser walkthrough | 14:00
Access to the cave as Nikos and
Andreas have begun work on the target. |
   |
|
590
|
Wed Jun 5 08:34:04 2024 |
JM. DB, PC | Target nozzle change | 09:30
Target density has not improved
despite efforts last night. Mid 10 - low |
|
|
589
|
Tue Jun 4 19:19:26 2024 |
TD | [How To] Recover DAQ when one FEE64 stops sending data | 1) STOP DAQ [workspace 2, display 1, browser
tab 'Run Control']
all FEE64s should change status from 'going' |
|
|
588
|
Tue Jun 4 18:08:04 2024 |
Boudefla Dounia - CB - LB - SD | Run 34 | 19:08
Beam energy = 3 MeV.
Horizontal beam position = 4.0 |
19x |
|
587
|
Tue Jun 4 15:25:36 2024 |
BD US CB | Run 33 | 16:26
Merger OK, Tape server OK
ADC data item statistics looks |
   |
|
586
|
Tue Jun 4 14:13:17 2024 |
JM, CB, DB, US | Run 32- beam only background | 15:15
Run 32 started - Beam, no target
Beam energy = 3 MeV. |
|
|
585
|
Tue Jun 4 06:56:02 2024 |
DFF, PC, LB, JM,NP,AB | Run 31 contd | 8:13
Since 6:40 the target density dramatically
dropped to 10^9 since then it has been unstable |
 |
|
584
|
Tue Jun 4 00:04:39 2024 |
DR, EH | Run 31 | Beam energy = 3 MeV
Horizontal beam position = 4.0
mm, vertical beam position = 0.0 mm. |
|
|
583
|
Mon Jun 3 21:37:20 2024 |
CN, EM, CB | Run30 | Beam energy = 3 MeV
Horizontal beam position = 7.0
mm, vertical beam position = 0.0 mm. |
  |
|
582
|
Mon Jun 3 15:17:41 2024 |
CN, EM, CB | Run29 | 16:15
In the previous run while working
on the target it was discovered that the |
    |
|
581
|
Mon Jun 3 15:10:12 2024 |
CN, EM, CB | Run28 | 16:10
We start a new run after doing
some test with the motor. Injection time |
   |
|
580
|
Mon Jun 3 11:46:07 2024 |
SD, SHB, JM, CN, EM | Run 27 | 12:46 (attachments 1-4)
Run 27 started - Beam no target
Beam energy = 3 MeV |
12x |
|
579
|
Mon Jun 3 08:43:22 2024 |
SD, SHB | Run 26 | 09:44
Run 26 started - Beam no target
Beam energy is being increased |
8x |
|
578
|
Sun Jun 2 23:38:17 2024 |
JM, EM | Run 25 | 00:38
Run 25 started - Beam on target
Beam energy = 1.5 MeV. |
32x |
|
577
|
Sun Jun 2 22:46:47 2024 |
JM, EM, NP | Run24 | 23:47
Run 24 started - Beam on target
Beam energy is 1.5 MeV. |
  |
|
576
|
Sun Jun 2 14:30:16 2024 |
TD | Offline analysis G22-201/R22_0 - R22_11 | Offline analysis data file G22-201/R22_0 to
R22_11
|
8x |
|
575
|
Sun Jun 2 13:04:41 2024 |
JM, AG, CB, DR | Run 23 - vertical beam position and beam lifetime tests | 14:05
Run 22 stopped. Run 23 started
we will now adjust the vertical beam position |
|
|
574
|
Sun Jun 2 08:47:01 2024 |
CB, AG | Run 22 - longer rung with 20 min storage | 09:47
12 seconds pre acc
200x cycles |
    |
|
573
|
Sun Jun 2 06:41:00 2024 |
CB, AG | Run 21 - tests | 07:41
Switching to bunched beam to check
D vs H content. |
10x |
|
572
|
Sat Jun 1 21:56:17 2024 |
JM, EM, EM, TY, CB, AG | Run 20 | 22:56
Run 20 started - beam on target
Beam energy is 1.5 MeV. Horizontal |
18x |
|
571
|
Sat Jun 1 16:38:13 2024 |
TD | Offline analysis G22-201/R17 | Offline analysis data file G22-201/R17
Sort program variables https://elog.ph.ed.ac.uk/CARME/240530_180659/variables.dat
|
8x |
|
570
|
Sat Jun 1 13:33:50 2024 |
TD | Offline analysis APR24/R3 (alpha background) |
Offline analysis data file APR24/R3 (alpha
background)
|
9x |
|
569
|
Sat Jun 1 07:16:15 2024 |
CB, AB, EM, JM | Run 19 - beam target overlap | Morning shift
08:16 - as run 18, target off
9:00 Increased storage time to |
19x |
|
568
|
Fri May 31 21:53:20 2024 |
CB EM, JM,EM AB | Overnight beam tests | 22:53
Run 15 started
Beam tests. We increased the storage |
17x |
|
567
|
Fri May 31 21:03:21 2024 |
CB, EM | Run14 | 22:03
Before this run we checked quickly
beam with the target on but it does not make |
  |
|
566
|
Fri May 31 19:12:01 2024 |
CB, EM | Run 13 - test with beam | 20:00
The beam is set at the correct
energy, operators cross-checked it again. |
  |
|
565
|
Fri May 31 06:01:55 2024 |
JM, TY, PW, EM, CB | Run 12 - beam on target | 07:00
Run 12 started. D+ beam is incident
on the target at 1.5 MeV |
12x |
|
564
|
Thu May 30 13:31:01 2024 |
JM, CB, PW, YL | Run 11 - beam on target overlap | 14:30
Run 11 started. D+ beam in the
ring at 1.5 MeV. |
   |
|
563
|
Thu May 30 09:30:33 2024 |
CB, PW, YL, TD | Run 10 | 10:30
Merger OK, Tape server OK
ADC data item statistics looks |
13x |
|
562
|
Thu May 30 08:33:21 2024 |
CB, PW, YL | Run 8 & 9- detector motion tests | 09:34 - Moved to Run 9 in preparation of
moving detectors. No target yet. Beam in
the ring at 750 keV/A. |
7x |
|
561
|
Thu May 30 07:25:53 2024 |
Yuri, Phil, Nikos | Gas target | The cave is closed and beam is back
The d intensity is about half of
the intensity before the break |
|
|
560
|
Thu May 30 06:00:51 2024 |
Yuri Nikos ... | Open the cave | Nikos needs to enter the cave to work on
the target cooling.
|
|
|
559
|
Wed May 29 17:42:06 2024 |
TD | Offline analysis APR24/R2 (pulser walkthrough) | ADC offsets using pulser walkthrough data
from data file APR24/R2
|
17x |
|
558
|
Wed May 29 16:46:21 2024 |
NP, AB, PM | Run7 - Measurements only with ion beam. | 18:19 Start or run 7: In beam has been
optimzed up to now by Zoran and Claude. ~7E7
particles at injection. From now on, only |
 |
|
557
|
Wed May 29 09:49:35 2024 |
JM, CB | Threshold changes / D+ beam | 09:00
R4 alpha background continues,
currently R4_12 |
   |
|
556
|
Wed May 29 08:10:32 2024 |
JM | Run4 - alpha background | 09:00
R4 alpha background continues,
currently R4_12 |
|
|
555
|
Tue May 28 15:25:21 2024 |
TD, JM, CB | Pulser tests | R3 started
Pulser ON. Approx 2 kHZ.
1.8*w waveforms attachments 1+2 |
    |
|
554
|
Tue May 28 12:38:31 2024 |
TD, JM, CB | Run 2 - Alpha background run |
13.35 FEE64 temperatures OK - attachment
1
|
    |
|
553
|
Mon May 27 15:25:08 2024 |
JM | Startup | 27/05/24
The carme-gsi computer has been
moved from the server room into the shifter |
|
|
552
|
Fri May 10 21:23:35 2024 |
TD, CB, JM | 20Ne7+ test beam | 22.00
Carsten Brandau stopping e-target
experiment Unattended beam overnight. No |
18x |
|
550
|
Sun Apr 28 23:12:11 2024 |
TD | Monday 28 April | 00.09 DAQ continues data file R3_21
DSSSD bias & leakage current OK - attachment |
21x |
|
549
|
Sat Apr 27 23:16:02 2024 |
TD | Sunday 28 April |
00.12 DAQ continues data file R3_15
|
37x |
|
548
|
Fri Apr 26 23:41:16 2024 |
TD | Saturday 27 April |
00.34 DAQ continues data file R3_9
|
37x |
|
547
|
Fri Apr 26 07:05:01 2024 |
TD | Friday 26 April |
08.02 DAQ continues data file R1_14
|
19x |
|
546
|
Thu Apr 25 02:31:25 2024 |
TD | Thursday 25 April |
03.27 DAQ continues - file APR24/R1_7
|
39x |
|
545
|
Wed Apr 24 13:18:09 2024 |
TD | Examples of poor CARME cable management/routing |
Have observed some instances of poor CARME
cable management/routing
|
 |
|
544
|
Wed Apr 24 12:48:35 2024 |
TD | Wednesday 24 April |
Replace AIDA ASIC mezzanine of aida01
|
21x |
|
543
|
Tue Apr 23 17:44:41 2024 |
TD | Tuesday 23 April |
18.43 ASIC settings 2024Feb08-15.59.09
|
12x |
|
542
|
Fri Apr 19 02:47:59 2024 |
TD | Friday 19 April |
03.45
|
12x |
|
541
|
Thu Apr 18 13:34:06 2024 |
TD, JG | Thursday 18 April |
14.30
|
13x |