AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 19 of 35  ELOG logo
Entry  Wed Jun 2 14:53:05 2021, OH, TD, Merger/Tapeserver issues after reboot of aida-3 6x
On 01/06/21 aida-3 was rebooted as the graphical user interface had frozen.
We were also unable to connected to MIDAS via ssh port forwarding.
Entry  Sun May 30 08:57:53 2021, TD, Sunday 30 May 9x
09.55 DAQ continues - file S496/R18_588
      alpha background
Entry  Sat May 29 13:13:45 2021, TD, Saturday 29 May 9x
14.10 DAQ continues - file S496/R18_539
      alpha background
Entry  Fri May 28 10:29:07 2021, TD, Friday 28 May 9x
11.30 DAQ continues - file S496/R18_472
      alpha background
Entry  Thu May 27 12:25:53 2021, TD, Thursday 27 May 9x
13.29 DAQ continues - file S496/R18_443
      alpha background
Entry  Wed May 26 13:21:59 2021, TD, Wednesday 26 May 9x

14.22 DAQ continues - file S496/R18_369
      alpha background
Entry  Tue May 25 11:16:54 2021, TD, Tuesday 25 May 7x
12.16 DAQ continues file S496/R18_324
      alpha background
Entry  Mon May 24 09:57:07 2021, TD, Monday 24 May 19x

07.30 Hot HEC channels multiple FEE64s
      ASIC check fixes
Entry  Sat May 22 23:40:32 2021, TD, Sunday 23 May Screenshot_2021-05-23_AIDA_Alerting_-_Grafana.pngScreenshot_2021-05-23_Statistics_aidas-gsi.pngScreenshot_2021-05-23_Temperature_and_status_scan_aidas-gsi.png810.pngR16_33

00.40 Unable to connect to FEE64s 1-7
      DAQ power cycled OK
Entry  Sat May 22 13:40:56 2021, TD, Saturday 22 May 23x

14.37 DAQ continues file S496/R15_14
Entry  Fri May 21 23:19:23 2021, TD, Saturday 22 May 00:00-08:00 29x

00.16 413Gb remaining /TapeData filesystem
      estimate 413/2 x 177s = 10.15h to filesystem full - OK
Entry  Fri May 21 15:03:48 2021, CA, Friday 21st May 16:00 - 00:00 shift 17x
16:00 CA takes over
      DSSD1 n+n sides 0x20 on ASICs 1-3 and 0x64 on ASIC 4
      DSSD2 n+n sides 0x1b on ASICs 1-3 and 0x64 on ASIC 4
Entry  Fri May 21 07:03:50 2021, OH, TD, Friday 21 May 08:00-16:00 9x
08:00 OH and TD take over
      Current settings p+n sides at 0xc
      DSSD1 n+n sides 0x20 on ASICs 1-3 and 0x64 on ASIC 4
Entry  Fri May 21 06:09:28 2021, ML, system wide checks 8x
System  wide checks at 7am CET

All seems fine, nothing significant to report

Slight increase of dead time noted in FEE 3, 5 and 7.
Entry  Fri May 21 02:17:47 2021, ML, system wide checks 9x
Wide check at 3am -

All fine.

Same output as at the beginning of the shift (see my previous entry) and attachments.
Entry  Thu May 20 23:26:11 2021, Marc Labiche (ML), system wide checks 9x
System Wide check at begining of the night shift:

-----

Clock status test result: Passed 16, Failed 0
Entry  Thu May 20 14:56:33 2021, OH, Thursday 20th May 16:00 - 24:00 10x
16:00 p+n threshold 0xc (120keV)
      n+n threshold DSSD2 0x20 (250keV) ASICS 1-3, 0x64 ASIC4
      n+n threshold DSSD2 0x19 (250keV) ASICS 1-3, 0x64 ASIC4
Entry  Thu May 20 07:03:02 2021, CA, Thursday May 20th 08:00 - 16:00 shift 40x
08:00 CA takes over

08:04 DAQ continues ok - writing to file R14_989
Entry  Thu May 20 01:00:30 2021, Muneerah, Thu May 20 00:00-08:00 13x
02:00 System check

The ucesb has stopped around 00:26, the team in the lab ask us to restart AIDA! Called OH for this but the team in the lab figured out thats
no need to restart AIDA!
Entry  Wed May 19 20:02:27 2021, NH, AIDA Dead Time Analysis 6x
Some plots of AIDA dead time (From PAUSE/RESUME data items) against time.

The histograms are binned in intervals of 100 ms, with the blue bars corresponding to dead time in the FEE - the y-value is the percent of the 100ms interval
ELOG V3.1.3-7933898