|
ID |
Date |
Author |
Subject |
Text |
 |
|
680
|
Wed Apr 23 11:08:34 2025 |
TD, JM | Background Run |
12.08 DSSSD bias & leakage current - attachments
1-2
|
10x |
|
679
|
Tue Apr 22 06:44:02 2025 |
TD | Tuesday 22 April |
07.40 DSSSD bias & leakage current - attachments
1-3
|
    |
|
678
|
Sun Apr 20 07:30:29 2025 |
CB | DSSD leakage currents over Easter | Just after midnight on 20/04 it appears
DSSD #4 leakage current has perfectly stabilised.
See attached. |
  |
|
677
|
Fri Apr 18 16:18:33 2025 |
JM | D+D BBN energies test | D+D minimum energy Ecm = 150 keV which
corresponds to Ed=150 keV/u or Ed=300
keV. Therefore we need a threshold |
16x |
|
676
|
Fri Apr 18 08:17:38 2025 |
JM | More testing | 09:10
Arrived at GSI. Leakage currents
status same as before, DSSD4 is still fluctuating. |
15x |
|
675
|
Thu Apr 17 08:51:29 2025 |
JM | Grounding cont. | 09:00
Came in to see the bias for DSSD4
which has been fluctuating for the past few |
29x |
|
674
|
Wed Apr 16 08:20:05 2025 |
JM | Grounding | 09:00
Leakage currents this morning again
appear to have lowered during the night. |
14x |
|
673
|
Tue Apr 15 12:23:10 2025 |
JM | Leakage current / CARME issues | 14/04/25
Arrived at GSI in the afternoon.
Found that the coolant loop on |
18x |
|
672
|
Thu Apr 10 10:53:14 2025 |
TD | Thursday 10 April | 11.50 DAQ continues
Data file APR25/R6_13
|
8x |
|
671
|
Thu Apr 10 07:02:12 2025 |
CB (remotely) | Current logging enabled - sort of | There appear to be issues with Shahab's
caenlogging program. It crashes occasionally,
with an error indicating the number of columns |
|
|
670
|
Wed Apr 9 10:02:21 2025 |
TD | CARME equipment in CRYRING area moved |
There was some tidying up of the CRYRING
hall in advance of this week's EC evaluation |
 |
|
669
|
Wed Apr 9 02:40:04 2025 |
TD | Wednesday 9 April | 03.37 DAQ continues
Data file APR25/R5_8
|
11x |
|
668
|
Tue Apr 8 10:46:13 2025 |
TD | Tuesday 8 April |
11.30 CRYRING vacuum and temperature - attachments
1-2
|
27x |
|
667
|
Mon Apr 7 08:59:41 2025 |
TD | Monday 7 April |
10.00 FEE64 power ON
CARME IE514 OFF
|
8x |
|
666
|
Sun Apr 6 14:21:53 2025 |
TD | [How To] Startup CARME |
- water flow/interlock checks
check water flow to/from inflow/outflow |
|
|
665
|
Sun Apr 6 11:40:48 2025 |
TD | Options DB reconstructed | Options directory corrupted unable to change
Options settings per https://elog.ph.ed.ac.uk/CARME/664
|
|
|
664
|
Sun Apr 6 10:17:49 2025 |
TD | Sunday 6 April |
11.15 CARME IE514 ion gauge remains OFF
ML says there are 2x ion gauges with |
15x |
|
663
|
Sat Apr 5 16:15:04 2025 |
TD | FEE64 power interlock installed |
Water flow and dew point sensors have been
installed on the outlet and inlet cooling |
11x |
|
662
|
Sat Apr 5 16:13:32 2025 |
TD | Saturday 5 April |
12.00 CARME IE514 ion gauge 4.2e-11 mbar
CARME IE514 OFF
|
7x |
|
661
|
Fri Apr 4 10:17:16 2025 |
TD | Friday 4 April |
10.43 Reboot carme-gsi - unable to open a
working terminal
|
|
|
660
|
Mon Mar 10 15:47:27 2025 |
TD | Analysis data files G22-201 R79_10 & R79_24 |
Analysis of data files G22-201 R79_10 and
R79_24 - attachments 1-2
|
 |
|
659
|
Tue Jul 2 17:43:32 2024 |
TD | Offline analysis G22-201/R89 | Offline analysis data file G22-201/R89_0 to
R89_13 (c. 6h40m data)
|
9x |
|
658
|
Wed Jun 19 12:11:22 2024 |
CB, RSS | CARME status | DSSD off
FEEs off
Motors out, pin inserted, compressed |
|
|
657
|
Wed Jun 19 12:08:34 2024 |
CB + various | Run 101-105 | Run 101: no target. See ELOG entry by TD.
Run 102: ??
Run 103: ?? |
|
|
656
|
Wed Jun 19 12:06:50 2024 |
CB, OF, SS | Run 98/99/100 - higher energy | 10:21 June 17
New energy: 1.125 MeV/u
Target in. Run 98 started. |
|
|
655
|
Wed Jun 19 12:04:02 2024 |
CB + OF, SS | Run 96/97 | Run 96 - as run 89, while we wait for beam
energy change at higher energies
Run stopped around 08:56 |
|
|
654
|
Wed Jun 19 12:01:29 2024 |
TD | 23:00-07:00 Wednesday 19 June | 23.18 DSSSD bias & leakage current OK - attachment
1
FEE64 temps OK - attachment 2
|
23x |
|
653
|
Wed Jun 19 12:00:56 2024 |
CB | Run 93/94/95 - background | 04:00 17 June
Moved the detectors back to the
usual configuration (as per run 89). |
6x |
|
652
|
Wed Jun 19 11:54:26 2024 |
CB | Run 91/92 - moving detectors | ~ 2:00 17 June
Run 91 |
    |
|
651
|
Mon Jun 17 23:10:08 2024 |
CB | Run 90 | 00:10
As run 89, detectors moved fully
out. |
 |
|
650
|
Mon Jun 17 16:26:00 2024 |
JM, RSS, CB | Run 89 | 17:20
(Run 87 Junk and Run 88 does not
exist) |
19x |
|
649
|
Mon Jun 17 06:26:45 2024 |
JM, OF, AK, CB | Change to 5+ beam | 07:00
We are changing to 5+ beam so that
we can access higher energies and possibly |
7x |
|
648
|
Mon Jun 17 05:47:35 2024 |
JM | Run 86 | 06:50
No sign of the resonance during
night shift. New run started but when operators |
|
|
647
|
Mon Jun 17 04:01:16 2024 |
JM | Run 85 | 05:00
Cooler voltage setpoint 247.45
V. |
|
|
646
|
Mon Jun 17 02:05:37 2024 |
JM | Run 84 | 03:00
Cooler voltage setpoint 247.7 V.
FC20 read value 247.15 V. |
|
|
645
|
Mon Jun 17 00:05:13 2024 |
JM | Run 83 | 01:00
Cooler voltage setpoint 247.6 V.
FC20 read value 247.05 V. |
|
|
644
|
Sun Jun 16 22:49:22 2024 |
JM | Run 82 | 23:38
Cooler voltage setpoint 247.5 V.
FC20 read value 246.95 V. |
|
|
643
|
Sun Jun 16 22:40:11 2024 |
JM | Target overlap test - R81 | 23:10
Beam set to bunched mode to observe
beam lifetime. |
|
|
642
|
Sun Jun 16 19:01:30 2024 |
ML, EM | Run 80 | 20:00
Ecooler setpoint 246.8
Readout 246.25 |
|
|
641
|
Sun Jun 16 13:51:11 2024 |
CB EM ML | Run 79 | 14:51
Ecooler setpoint 246.9
Readout 246.35 |
7x |
|
640
|
Sun Jun 16 13:29:05 2024 |
RSS CB | Run 78 | Target clogged? |
|
|
639
|
Sun Jun 16 06:02:31 2024 |
RSS | Run 77 | Run 77 started at 06:48
Cooler voltage setpoint 247.0 V.
|
20x |
|
638
|
Sat Jun 15 21:14:56 2024 |
JM, JS, LC | Run 76 | 22:15
New run 76 - beam on target with
definite target overlap [coasting] |
|
|
637
|
Sat Jun 15 13:30:18 2024 |
JM, JS | Run 75 | 14:30
New run 75 - beam on target with
definite target overlap [coasting] |
  |
|
636
|
Sat Jun 15 06:10:21 2024 |
EM, PMH | Run 74 | 7:00
Cooler voltage setpoint 247.4 V.
|
6x |
|
635
|
Sat Jun 15 00:46:45 2024 |
TD | CRYRING hall temperature transient | CRYRING hall temperature transient - evening
of Friday 14 June
|
|
|
634
|
Fri Jun 14 22:18:18 2024 |
RSS, CB, US | Run 73 | Beam is back.New run started.
Cooler voltage setpoint 247.3 V. |
20x |
|
633
|
Fri Jun 14 19:59:14 2024 |
US, LC, CB | New run with name of 72 is started due to target issue | 21:00
Target is lost. Background run
is being collected. |
 |
|
632
|
Fri Jun 14 14:52:02 2024 |
JM | Beam-Target Overlap Scan | The orbit of the beam in the ring was re-configured
so that the beam position is more central.
With the target density at ~6e11 |
 |
|
631
|
Fri Jun 14 14:48:02 2024 |
CB NP ML | [How To] Change target pressure. EMERGENCY ONLY! | ONLY FOLLOW THESE INSTRUCTIONS if E1 turbo
is below 820 Hz, pressure in E1 is above
2.5E-1 mbar and experts (Nikos, Andreas) |
 |
|
630
|
Fri Jun 14 14:46:54 2024 |
LC, JM, CB, TD, US | Run 71 - beam on target | 15:45
New run 71 - beam on target with
definite target overlap [coasting] |
   |
|
629
|
Fri Jun 14 13:45:21 2024 |
JM, JS, CB, TD, EH | Run 70 - beam on target | 14:45
New run 70 - beam on target with
definite target overlap |
7x |
|
628
|
Fri Jun 14 10:21:24 2024 |
JS, TD | Run 68 | Frank has been tuning the beam since 08:00
detectors moved fully out
11:20 |
9x |
|
627
|
Thu Jun 13 23:01:07 2024 |
RSS, JS, EH | Run 67 - Night shift | Run 67
00:01
DSSSD bias & leakage |
20x |
|
626
|
Thu Jun 13 21:07:30 2024 |
LCS, US | Run 67- beam on target | 22:05
The energy is changed to 247.4
V. |
7x |
|
625
|
Thu Jun 13 14:46:17 2024 |
TD | R66 beam overlap test |
15.45 Start data file G22-201/R66
Beam/target overlap test |
|
|
624
|
Thu Jun 13 09:48:25 2024 |
TD, LCS | Run 65 - beam on target | 10:47
The energy is changed to 247.4
V. |
14x |
|
623
|
Thu Jun 13 06:21:53 2024 |
TD, LCS | Run 64 - contd | 07.22 E1 pump 799Hz, 2.8A, 2.6e-1 mbar, 4.8e+11/cm2
07.24 DSSSD bias & leakage current OK - attachment |
13x |
|
622
|
Thu Jun 13 00:50:33 2024 |
JM, JS | Run 64 - beam on target | 01:50
Right arm at 64.60 mm
Left arm IN at 36.54 mm |
|
|
621
|
Wed Jun 12 07:16:47 2024 |
RSS, YL, JM, TD, CB | Status | 07:56 Gleb has taken the beam to try settings
for the 5+ charge state. As soon as the target
is ready, the 1+ charge state will be given |
6x |
|
620
|
Tue Jun 11 21:16:50 2024 |
TD | Run 63 continued | Run 63 continued
22.06 DSSSD bias & leakage current OK - attachment |
17x |
|
619
|
Tue Jun 11 20:10:25 2024 |
JM | Run 63 - Beam only background | 21:00
Claude has achieved optimal cooling
parameters for the beam |
|
|
618
|
Tue Jun 11 19:44:48 2024 |
OF, SS | Target out and at He | Target has been moved out and H2 switched
off. Changed to He.
Nikos will repair nozzle tomorrow |
|
|
617
|
Tue Jun 11 12:26:07 2024 |
RSS, JS, JM, CB | Run 62 - Beam optimization + Target change | Beam optimization and target change |
|
|
616
|
Tue Jun 11 08:34:50 2024 |
JM, RSS, JS | Run 61 - beam on target | New run 61
Right arm at 64.60 mm
Left arm IN at 36.54 mm |
   |
|
615
|
Tue Jun 11 04:36:17 2024 |
CB, RSS, JS | Run 60 - as 59, left servo in | 05:36
Run started.
Conditions as before, except left |
11x |
|
614
|
Mon Jun 10 20:31:12 2024 |
JM, AK, EH, CB | Run 59 Beam on target | 21:32
New run 59
Right arm at 64.60 mm |
18x |
|
613
|
Mon Jun 10 18:22:47 2024 |
JM | Electron cooler calculations | Ion beam energy is calculated using Beamcalc
(https://web-docs.gsi.de/~lestinsk/beamcalc/electron.php)
Electron current is set to 4.3 |
  |
|
612
|
Mon Jun 10 14:26:52 2024 |
EH, AK | Run 58 | 15:30
Merger OK, Tape server OK
ADC data item statistics OK |
8x |
|
611
|
Mon Jun 10 12:49:56 2024 |
RSS, DB, CB, JM | R58 Space Charge Test |
13:53
DSSSD bias & leakage
current OK - attachment 1
FEE64
temperatures OK - attachment 2
ADC |
   |
|
610
|
Mon Jun 10 07:40:47 2024 |
RSS, DB | Beam | 08:26: There is no beam and Gleb is informed.
08:46: Beam is back. |
|
|
609
|
Mon Jun 10 05:24:49 2024 |
TD, RSS, DB | R57 | 06:45 New data file G22-201/R57
Right arm at 64.60 mm
|
16x |
|
608
|
Sun Jun 9 22:14:23 2024 |
TD, PM, AG | Run 56 - Data taking | 23:15 New run 56 with
Right arm at 64.60 mm
|
31x |
|
607
|
Sun Jun 9 13:45:24 2024 |
CB PMH AG | Run 55 - Data taking | 14:45
New run 55 with:
Right arm at 64.60 mm |
18x |
|
606
|
Sun Jun 9 09:45:27 2024 |
JM, CB | Beam-Target Overlap | Target density this morning had stabalised
at 7e11 at/cm2
This is sufficient to test the |
|
|
605
|
Sun Jun 9 08:30:49 2024 |
JM, CB | Run 54 - beam on target | 09:30
New run 54 with:
Electron cooler setpoint |
7x |
|
604
|
Sat Jun 8 20:32:17 2024 |
LB, JM | Run 52 - beam on target | New run 52 with:
Electron cooler setpoint
244.2 V |
    |
|
603
|
Sat Jun 8 17:46:12 2024 |
TD | [How To] Cycle Left DSSSDs |
Interactive Motion Program [workspace 6,
display 2]
|
|
|
602
|
Sat Jun 8 14:49:14 2024 |
TD | R51 - contd |
15.40 DSSSD bias & leakage current OK - attachments
1-2
|
30x |
|
601
|
Sat Jun 8 10:13:52 2024 |
CB, JM, TD | Run 50/51 - data taking | 11:13
ML enabled ring signals remotely.
Used FakeMotion.dat (read FakeMotion.dat |
8x |
|
600
|
Sat Jun 8 06:13:21 2024 |
CB | Run 47/48/49 - target issues & tests | 07:00
After putting the target back,
we observe strong periodic (5 s) fluctuations |
    |
|
599
|
Sat Jun 8 00:14:39 2024 |
LB | Run 46 - background with beam | RUN 46- started at 00:50
Horizontal beam position = 4.0
mm, vertical beam position = -5.0 mm. |
22x |
|
598
|
Fri Jun 7 22:33:13 2024 |
LB | Run 45 - tests on beam-target overlap | Tried to double check beam-target overlap
by changing beam horizontal coordinate.
In the tablethe counts in the 4000-5200 |
    |
|
597
|
Fri Jun 7 15:53:35 2024 |
TD | DSSD leakage current increase - temperature increase in CRYRING hall | Re-increase in DSSSD leakage current c.
14-15.00 6.6.24
There was a significant temperature |
|
|
596
|
Fri Jun 7 14:09:04 2024 |
JM, CB, DR, CN, LB | Run 44 - 15N Data Taking | 15:35
Electron cooler voltage set point
= 244.3 V |
|
|
595
|
Fri Jun 7 10:05:40 2024 |
CB | Run 41/42/43 - 15N data taking start | 11:05
Confirmed overlap is at 4 mm under
new settings. |
8x |
|
594
|
Thu Jun 6 16:23:10 2024 |
LB CB JM | Run 39 - Run 40 15N | Started run 39.
We have the 15N+ beam with 426 |
15x |
|
593
|
Thu Jun 6 05:44:45 2024 |
DR YL DB LB CB JM | Run 38 - 15N Tests | 06:45
All system checks OK
Target density 3.4e11 |
8x |
|
592
|
Wed Jun 5 13:34:02 2024 |
JM | Run 37 - Change in thresholds | 14:20
Target nozzle currently being replaced.
No beam |
|
|
591
|
Wed Jun 5 13:21:45 2024 |
JM, CB | Run 36 - pulser walkthrough | 14:00
Access to the cave as Nikos and
Andreas have begun work on the target. |
   |
|
590
|
Wed Jun 5 08:34:04 2024 |
JM. DB, PC | Target nozzle change | 09:30
Target density has not improved
despite efforts last night. Mid 10 - low |
|
|
589
|
Tue Jun 4 19:19:26 2024 |
TD | [How To] Recover DAQ when one FEE64 stops sending data | 1) STOP DAQ [workspace 2, display 1, browser
tab 'Run Control']
all FEE64s should change status from 'going' |
|
|
588
|
Tue Jun 4 18:08:04 2024 |
Boudefla Dounia - CB - LB - SD | Run 34 | 19:08
Beam energy = 3 MeV.
Horizontal beam position = 4.0 |
19x |
|
587
|
Tue Jun 4 15:25:36 2024 |
BD US CB | Run 33 | 16:26
Merger OK, Tape server OK
ADC data item statistics looks |
   |
|
586
|
Tue Jun 4 14:13:17 2024 |
JM, CB, DB, US | Run 32- beam only background | 15:15
Run 32 started - Beam, no target
Beam energy = 3 MeV. |
|
|
585
|
Tue Jun 4 06:56:02 2024 |
DFF, PC, LB, JM,NP,AB | Run 31 contd | 8:13
Since 6:40 the target density dramatically
dropped to 10^9 since then it has been unstable |
 |
|
584
|
Tue Jun 4 00:04:39 2024 |
DR, EH | Run 31 | Beam energy = 3 MeV
Horizontal beam position = 4.0
mm, vertical beam position = 0.0 mm. |
|
|
583
|
Mon Jun 3 21:37:20 2024 |
CN, EM, CB | Run30 | Beam energy = 3 MeV
Horizontal beam position = 7.0
mm, vertical beam position = 0.0 mm. |
  |
|
582
|
Mon Jun 3 15:17:41 2024 |
CN, EM, CB | Run29 | 16:15
In the previous run while working
on the target it was discovered that the |
    |
|
581
|
Mon Jun 3 15:10:12 2024 |
CN, EM, CB | Run28 | 16:10
We start a new run after doing
some test with the motor. Injection time |
   |
|
580
|
Mon Jun 3 11:46:07 2024 |
SD, SHB, JM, CN, EM | Run 27 | 12:46 (attachments 1-4)
Run 27 started - Beam no target
Beam energy = 3 MeV |
12x |
|
579
|
Mon Jun 3 08:43:22 2024 |
SD, SHB | Run 26 | 09:44
Run 26 started - Beam no target
Beam energy is being increased |
8x |
|
578
|
Sun Jun 2 23:38:17 2024 |
JM, EM | Run 25 | 00:38
Run 25 started - Beam on target
Beam energy = 1.5 MeV. |
32x |
|
577
|
Sun Jun 2 22:46:47 2024 |
JM, EM, NP | Run24 | 23:47
Run 24 started - Beam on target
Beam energy is 1.5 MeV. |
  |
|
576
|
Sun Jun 2 14:30:16 2024 |
TD | Offline analysis G22-201/R22_0 - R22_11 | Offline analysis data file G22-201/R22_0 to
R22_11
|
8x |
|
575
|
Sun Jun 2 13:04:41 2024 |
JM, AG, CB, DR | Run 23 - vertical beam position and beam lifetime tests | 14:05
Run 22 stopped. Run 23 started
we will now adjust the vertical beam position |
|
|
574
|
Sun Jun 2 08:47:01 2024 |
CB, AG | Run 22 - longer rung with 20 min storage | 09:47
12 seconds pre acc
200x cycles |
    |
|
573
|
Sun Jun 2 06:41:00 2024 |
CB, AG | Run 21 - tests | 07:41
Switching to bunched beam to check
D vs H content. |
10x |
|
572
|
Sat Jun 1 21:56:17 2024 |
JM, EM, EM, TY, CB, AG | Run 20 | 22:56
Run 20 started - beam on target
Beam energy is 1.5 MeV. Horizontal |
18x |
|
571
|
Sat Jun 1 16:38:13 2024 |
TD | Offline analysis G22-201/R17 | Offline analysis data file G22-201/R17
Sort program variables https://elog.ph.ed.ac.uk/CARME/240530_180659/variables.dat
|
8x |
|
570
|
Sat Jun 1 13:33:50 2024 |
TD | Offline analysis APR24/R3 (alpha background) |
Offline analysis data file APR24/R3 (alpha
background)
|
9x |
|
569
|
Sat Jun 1 07:16:15 2024 |
CB, AB, EM, JM | Run 19 - beam target overlap | Morning shift
08:16 - as run 18, target off
9:00 Increased storage time to |
19x |
|
568
|
Fri May 31 21:53:20 2024 |
CB EM, JM,EM AB | Overnight beam tests | 22:53
Run 15 started
Beam tests. We increased the storage |
17x |
|
567
|
Fri May 31 21:03:21 2024 |
CB, EM | Run14 | 22:03
Before this run we checked quickly
beam with the target on but it does not make |
  |
|
566
|
Fri May 31 19:12:01 2024 |
CB, EM | Run 13 - test with beam | 20:00
The beam is set at the correct
energy, operators cross-checked it again. |
  |
|
565
|
Fri May 31 06:01:55 2024 |
JM, TY, PW, EM, CB | Run 12 - beam on target | 07:00
Run 12 started. D+ beam is incident
on the target at 1.5 MeV |
12x |
|
564
|
Thu May 30 13:31:01 2024 |
JM, CB, PW, YL | Run 11 - beam on target overlap | 14:30
Run 11 started. D+ beam in the
ring at 1.5 MeV. |
   |
|
563
|
Thu May 30 09:30:33 2024 |
CB, PW, YL, TD | Run 10 | 10:30
Merger OK, Tape server OK
ADC data item statistics looks |
13x |
|
562
|
Thu May 30 08:33:21 2024 |
CB, PW, YL | Run 8 & 9- detector motion tests | 09:34 - Moved to Run 9 in preparation of
moving detectors. No target yet. Beam in
the ring at 750 keV/A. |
7x |
|
561
|
Thu May 30 07:25:53 2024 |
Yuri, Phil, Nikos | Gas target | The cave is closed and beam is back
The d intensity is about half of
the intensity before the break |
|
|
560
|
Thu May 30 06:00:51 2024 |
Yuri Nikos ... | Open the cave | Nikos needs to enter the cave to work on
the target cooling.
|
|
|
559
|
Wed May 29 17:42:06 2024 |
TD | Offline analysis APR24/R2 (pulser walkthrough) | ADC offsets using pulser walkthrough data
from data file APR24/R2
|
17x |
|
558
|
Wed May 29 16:46:21 2024 |
NP, AB, PM | Run7 - Measurements only with ion beam. | 18:19 Start or run 7: In beam has been
optimzed up to now by Zoran and Claude. ~7E7
particles at injection. From now on, only |
 |
|
557
|
Wed May 29 09:49:35 2024 |
JM, CB | Threshold changes / D+ beam | 09:00
R4 alpha background continues,
currently R4_12 |
   |
|
556
|
Wed May 29 08:10:32 2024 |
JM | Run4 - alpha background | 09:00
R4 alpha background continues,
currently R4_12 |
|
|
555
|
Tue May 28 15:25:21 2024 |
TD, JM, CB | Pulser tests | R3 started
Pulser ON. Approx 2 kHZ.
1.8*w waveforms attachments 1+2 |
    |
|
554
|
Tue May 28 12:38:31 2024 |
TD, JM, CB | Run 2 - Alpha background run |
13.35 FEE64 temperatures OK - attachment
1
|
    |
|
553
|
Mon May 27 15:25:08 2024 |
JM | Startup | 27/05/24
The carme-gsi computer has been
moved from the server room into the shifter |
|
|
552
|
Fri May 10 21:23:35 2024 |
TD, CB, JM | 20Ne7+ test beam | 22.00
Carsten Brandau stopping e-target
experiment Unattended beam overnight. No |
18x |
|
550
|
Sun Apr 28 23:12:11 2024 |
TD | Monday 28 April | 00.09 DAQ continues data file R3_21
DSSSD bias & leakage current OK - attachment |
21x |
|
549
|
Sat Apr 27 23:16:02 2024 |
TD | Sunday 28 April |
00.12 DAQ continues data file R3_15
|
37x |
|
548
|
Fri Apr 26 23:41:16 2024 |
TD | Saturday 27 April |
00.34 DAQ continues data file R3_9
|
37x |
|
547
|
Fri Apr 26 07:05:01 2024 |
TD | Friday 26 April |
08.02 DAQ continues data file R1_14
|
19x |
|
546
|
Thu Apr 25 02:31:25 2024 |
TD | Thursday 25 April |
03.27 DAQ continues - file APR24/R1_7
|
39x |
|
545
|
Wed Apr 24 13:18:09 2024 |
TD | Examples of poor CARME cable management/routing |
Have observed some instances of poor CARME
cable management/routing
|
 |
|
544
|
Wed Apr 24 12:48:35 2024 |
TD | Wednesday 24 April |
Replace AIDA ASIC mezzanine of aida01
|
21x |
|
543
|
Tue Apr 23 17:44:41 2024 |
TD | Tuesday 23 April |
18.43 ASIC settings 2024Feb08-15.59.09
|
12x |
|
542
|
Fri Apr 19 02:47:59 2024 |
TD | Friday 19 April |
03.45
|
12x |
|
541
|
Thu Apr 18 13:34:06 2024 |
TD, JG | Thursday 18 April |
14.30
|
13x |
|
540
|
Wed Mar 6 10:47:11 2024 |
JG, TD | Wednesday 6 March - PEXARIA5 WR test |
Courtesy Nik Kurz, JG has installed a PEXARIA5
PCIe card adjacent to CARME - BuTIS single-mode |
   |
|
539
|
Wed Feb 21 07:38:32 2024 |
TD | Wedneday 21 February |
10.54 23.2.24 Bias OFF |
24x |
|
538
|
Tue Feb 20 14:12:32 2024 |
JM | Shutdown | CARME DAQ shutdown. FEEs turned OFF and
all MIDAS server windows closed.
Detector bias turned OFF. |
|
|
537
|
Tue Feb 20 13:20:44 2024 |
OF, AG, JG, ML | R48 status check | Doing afternoon check. Checked the leakage
currents, all ok. Attachment 1
Temperatures ok, attchment 2 |
   |
|
536
|
Tue Feb 20 09:57:57 2024 |
OF, AG, ML | Run 48 status check | Doing morning check. Checked the leakage
currents, all ok. Attachment 1
Temperatures ok, attchment 2 |
    |
|
535
|
Tue Feb 20 09:51:37 2024 |
JM | Run 48 beam on target | Run 48 started |
|
|
534
|
Tue Feb 20 08:41:08 2024 |
OF, AG | still no beam CRYRING | We have mosty empty injections into CRYRING.
Only sporadically the beam with good intensity
is injected. |
|
|
533
|
Tue Feb 20 07:50:10 2024 |
JM | DAQ restart | DAQ restarted. Run46. All appears OK, aida01
shows high rates across ASIC 4 even with
no beam which could not be resolved via ASIC |
|
|
532
|
Mon Feb 19 21:46:32 2024 |
EH, EM, CB | Run 45 + end of late shift | 22:54
We have moved the gas jet target out (y=4000),
the density has dropped to zero.
|
14x |
|
531
|
Mon Feb 19 08:45:22 2024 |
JM, JG, SHB, EM, EH | Run 44 - cooled beam on target | 09:43
Run 44 started cooled beam
on target |
35x |
|
530
|
Mon Feb 19 06:01:17 2024 |
SHB, JM, JG | Run 42 morning shift | 07:00
Observed reduction in YR09 presure
over last few hours in ML online plot. Beam |
6x |
|
529
|
Mon Feb 19 05:10:48 2024 |
TD | Run 42 night shift contd. | 06.03 DAQ continues file G22-86/R42_32
DSSSD bias & leakage current - attachments |
6x |
|
528
|
Sun Feb 18 22:03:56 2024 |
TD | Run 42 night shift |
23.03 DAQ continues file G22-86/R42_21
|
47x |
|
527
|
Sun Feb 18 13:58:33 2024 |
AR, OF, JM | Run 42 - cooled beam on target | Run 42 - 15:00
Detectors IN (left arm pot =36.54
mm, right arm pot = 70.49 mm). Stationary. |
27x |
|
526
|
Sun Feb 18 13:10:18 2024 |
TD | Sunday 18 February - DSSSD 0 aida01 and aida04 *.*.L spectra |
DSSSD 0 aida01 1*L spectra, aida04 **L spectra
|
    |
|
525
|
Sun Feb 18 07:53:51 2024 |
HW AG | Run 40 Morning Shift | 08:57 Doing morning check. Checked the
leakage currents, all ok. Attachment 1
Tempritures of, attchment 2 |
27x |
|
524
|
Sun Feb 18 00:16:55 2024 |
JM CB | Run 40 - night shift | 01:17
Run 40 continues.
Beam intensity looks OK. Oscillates |
15x |
|
523
|
Sat Feb 17 14:29:03 2024 |
JM, CB, AR, AB | Run 40 - cooled beam on target | 15:27
Run 40 started cooled beam on target
Detectors IN (left arm pot =36.5 |
31x |
|
522
|
Sat Feb 17 13:21:44 2024 |
JM, CB | Beam on target - motors tests | 14:01
Run 36 started.
We put both detectors to the fully |
  |
|
521
|
Sat Feb 17 06:19:27 2024 |
JM, CB | Run 35 - contd | 07:10
FEE temperatures OK
System checks OK |
    |
|
520
|
Fri Feb 16 22:03:27 2024 |
TD | Run 35 - night shift |
22.51 DAQ continues file G22-86/R35_36
|
49x |
|
519
|
Fri Feb 16 10:02:41 2024 |
JM, OF, CB, AR, EM | Run 35 - cooled beam on target | 11:01
Run 35 started cooled beam on target
Detectors IN (left arm pot =36.5 |
27x |
|
518
|
Thu Feb 15 21:07:00 2024 |
JM, AB, AR, OF | Run33 - cooled beam on target | 22:27
Run 33 started cooled beam on target.
Detectors IN (left arm pot =36.5 |
22x |
|
517
|
Thu Feb 15 13:18:30 2024 |
JG | MBS DAQ: target & ring values | We are running an MBS DAQ to record the
attached list of slow control values of the
ring and the target. In most cases this is |
|
|
516
|
Thu Feb 15 12:40:52 2024 |
JM. CB, AR, AB | Run30 - uncooled beam on target | Run started 13:40
Target density 4.3e11, Beam injection
is ~1e7, Pressure in the ring is ~1e-10 mbar. |
29x |
|
515
|
Thu Feb 15 10:39:50 2024 |
JM, JG, ML, AG, CB | Run29 - beam optimisation | 11:27
Run 29 started. Beam energy is
1.3435 MeV/u with a cooler voltage of 751.3 |
|
|
514
|
Wed Feb 14 16:52:46 2024 |
JM, AR, CB, JG | Run28 - beam on target |
Beam energy - 1.361 MeV/u
17:12 |
42x |
|
513
|
Wed Feb 14 14:59:13 2024 |
JM, CB, NP, ML, AG, AB | Run 27 -Beam on target optimisation | Run 27 Started to check optimsation of
the beam - target overlap.
Beam intensity at injection is |
|
|
512
|
Wed Feb 14 14:06:28 2024 |
CB AR JM | Pulser Walkthrough |
15:06
Run25
Pulser walkthrough
EGG
Ortec 448 Pulser
Amplitide 90,000-10,000
@ 10,000 step
Normalise 5.0
Attenuators |
|
|
511
|
Wed Feb 14 08:44:32 2024 |
CB AR JM | Motors test and turbo ON | Run number changed 09:44 - Now run 23
Moving motors with the injection
Ring signal very weird, moving |
11x |
|
510
|
Tue Feb 13 17:19:43 2024 |
JM, AR, NP, AB, RSS | Run22 - cooled beam on target (definitely maybe) | 18:05 We believe we have an overlap between
the beam and the target. Run 22 started.
|
48x |
|
509
|
Tue Feb 13 08:34:44 2024 |
Hw, JM, AR, CB, NP, AB, RSS | Status of DAQ - beam overlap | Check the status of the DAQ system, with
Tom. All correct. See attachments:
1 Leackage currents |
10x |
|
508
|
Mon Feb 12 01:40:48 2024 |
TD, JM, CB, AR, RSS | Run17 - Run20 |
02.35 DAQ continues file G22-88/R17_30
|
49x |
|
507
|
Sun Feb 11 13:28:46 2024 |
JM, CB, TD | Run16 - beam on target | 13:37 Run started - no beam in the ring
(One of the ring magnets was still on RED
when it should have been set to green by |
30x |
|
506
|
Sun Feb 11 07:03:34 2024 |
TD | Sunday 11 February |
02.02 DAQ continues G22-86/R15_21
alpha background
|
20x |
|
505
|
Sat Feb 10 17:05:13 2024 |
TD | Run 15 - background |
17.55 DAQ continues G22-86/R15_11
alpha background
|
20x |
|
504
|
Sat Feb 10 10:00:44 2024 |
AR RSS JM CB | Run 13, 14 | System checks: all ok
Attatchment 1: Rates ok
Attatchment 2: Temperatures ok |
23x |
|
503
|
Fri Feb 9 17:04:39 2024 |
JM, AR, CB, NH | Run12 - Background | |
|
|
502
|
Fri Feb 9 11:58:04 2024 |
TD + CB, JM, AR, NH, AB | Run10 contd, Run11 |
12.46 DAQ continues G22-88/R10_14
|
27x |
|
501
|
Fri Feb 9 07:57:38 2024 |
AR, CB, AB, JM | Run10 - First cool beam on target | 8:58
System wide checks okay, except
|
27x |
|
500
|
Thu Feb 8 17:11:50 2024 |
CB, EH | Pulser walkthrough |
17:30 File G22-88/R8
Pulser walkthrough
EGG
Ortec 448 Pulser
Amplitide 90,000-10,000
@ 10,000 step
Normalise 5.0
Attenuators |
 |
|
499
|
Thu Feb 8 14:59:59 2024 |
JM, TD | Change p+n FEE64 settings | ASIC settings for the pn FEEs has been reset
to the default aida settings. This was done
to combat the observed dropping of several |
|
|
498
|
Thu Feb 8 11:22:28 2024 |
JM | Shifters instruction 2024 | EMERGENCY SHUTDOWNS
1. CARME motors: Q key
on keyboard while on workspace 1 of appc218 |
|
|
497
|
Wed Feb 7 13:50:20 2024 |
Elena Hanu, Carlo Bruno, Michael Lestinsky | Afternoon shift | 14:50
Temperature, Statistics fine (see |
  |
|
496
|
Wed Feb 7 10:09:14 2024 |
CB, JG, EM | Morning Shift | 11:00
Changed slow comp threshold to
0x32 (500 keV). Checkloaded. |
   |
|
495
|
Tue Feb 6 09:39:54 2024 |
CB | Detector bias tests | 10:30 Found ADC#4 on aida 1 and 4 are suddenly
noisy. See attach 1-2. Checkloaded multiple
times - no effect. |
13x |
|
494
|
Mon Feb 5 20:15:31 2024 |
CB, TD | Detector move in/out signals | 17.43 setup signals from detector movement
controller.
|
|
|
493
|
Mon Feb 5 19:43:52 2024 |
CB, TD, ML | BuTIS reference for VETAR2 |
16.40 CB/ML install fibre optic cable from
patch panel beneath dipole downstream of |
  |
|
492
|
Mon Feb 5 12:48:50 2024 |
CB TD | Pulser walkthough - Run4 |
13.41 DAQ start - file G22-88/R4
|
 |
|
491
|
Mon Feb 5 05:45:26 2024 |
CB TD | Run3 - end | 06.40 DAQ continues file G22-88/R3_42
DSSSD bias OK - attachment 1
|
47x |
|
490
|
Sun Feb 4 08:40:04 2024 |
CB TD | Run3 - contd | 09.30 DAQ continues file G22-88/R3_17
DSSSD bias OK - attachment 1
|
22x |
|
489
|
Sat Feb 3 15:05:10 2024 |
CB, TD | [How To] Restart Anydesk | 1. Check Proxy server is correct
localhost : 8080
incoming connections 7070 |
|
|
488
|
Sat Feb 3 00:13:03 2024 |
CB TD | Run1 end - R3 start |
01.07 DAQ continues file G22-88/R1_46
background alpha
|
50x |
|
487
|
Fri Feb 2 09:58:58 2024 |
TD | TapeServer not writng data to disk - plus fix | DAQ and NewMerger appear to be cofigured correctly.
Can allocate device, create volume and open |
7x |
|
486
|
Fri Feb 2 08:59:36 2024 |
JM, TD, CB | Run1 start - pulser widths spreadsheet | Current pulser widths excel spreadsheet attached
09.58 DSSSD bias OK - attachment 1
|
20x |
|
485
|
Thu Feb 1 14:45:09 2024 |
JM, CB | NewMerger setup | To include alll 16 FEE modules in the NewMerger
we edited the file /MIDAS/DB/EXPERIMENTS/MERGE/Options/carme-gsi
from MERGE.LinksAvailable string 5 to MERGE.LinksAvailable |
|
|
484
|
Thu Feb 1 10:04:11 2024 |
JM, CB | Shaping time testing | Arrived at the control room to find we
had lost connection to the power relay. We
rebooted the nnrpi1 and re-connected according |
31x |
|
483
|
Wed Jan 31 09:49:38 2024 |
JM, TD | Optimising - Wednesday 31 | Removed ground from DSSD #1 to the chamber
and set MACBs so that timestamp is from the
NIM WR emulator not the VME VETAR2. |
25x |
|
482
|
Tue Jan 30 14:04:30 2024 |
NH | [HowTo] Update MACB Firmware | This is how to update the MACB firmware using
the opensource tool xc3sprog
|
   |
|
481
|
Tue Jan 30 09:14:50 2024 |
JM, TD | Tuesday 30 January |
09.00 CARME IE514 5.1e-11mbar
|
32x |
|
480
|
Mon Jan 29 15:32:08 2024 |
TD, JM | Monday 29 January contd. |
Test + and test - daisy chain cabling extended
from DSSSD #1 to #2 to DSSSD #1 to DSSSD |
16x |
|
479
|
Mon Jan 29 08:52:07 2024 |
TD JM | Monday 29 January |
09.50 CARME IE514 5.1e-11 mbar ( ambient
temperature 16 deg C )
|
32x |
|
478
|
Sat Jan 27 20:38:15 2024 |
PJCS | [INFO] Steps to diagnose White Rabbit problems | This is a suggested sequence of actions
to help with the current problem with the
White Rabbit timestamp distribution. Test |
|
|
477
|
Mon Jan 22 16:29:31 2024 |
TD | Saturday 20 January | 11.00 No WLAN/WiFi
came-gsi private LAN appears to be
OK
|
30x |
|
476
|
Fri Jan 19 11:17:50 2024 |
JG, TD | Friday 19 January |
12.20 CARME IE514 4.1e-11mbar, ambient temperature
16.7 deg C
|
18x |
|
475
|
Thu Jan 18 17:21:00 2024 |
TD | Thursday 18 January | Network ( dhcpd.conf ) and MIDAS startup.tcl/Options/ASIC
settings/rfs filesystems configured
|
|
|
474
|
Wed Jan 17 19:21:20 2024 |
TD | AIDA spares |
Spare AIDA hardware
|
|
|
473
|
Wed Jan 17 19:15:47 2024 |
TD | Wednesday 17 January |
CAEN N1419ET remote control via carme-gsi
and nnrpi1 - see https://elog.ph.ed.ac.uk/CARME/472
|
|
|
472
|
Wed Jan 17 10:31:05 2024 |
TD | Remote control of CAEN N1419ET from nnrpi1 |
Login to nnrpi1 from carme-gsi using ssh
|
|
|
471
|
Tue Jan 16 16:01:48 2024 |
TD | Change CARMEraspberrypi to nnrpi1 |
Change RPi from CARMEraspberrypi to nnrpi1
to provide carme-gsi access to Rly16 to control |
|
|
470
|
Tue Jan 16 14:36:30 2024 |
TD | CARME configuration |
FEE64
|
    |
|
469
|
Tue Jan 16 08:57:44 2024 |
JG, DR, TD | Tuesday 16 January | 10.00 Outflow manifold returned from workshop
with leaking attachment point welding re-worked.
|
8x |
|
468
|
Mon Jan 15 18:51:28 2024 |
JG, DR, TD | Monday 15 January |
Cooling water manifolds
|
|
|
467
|
Sun Jan 14 12:31:32 2024 |
JM, CB | FEE positions mac addresses | *Updated following FEE changes. Correct
as of 31/01/24
FEE modules are labelled according |
|
|
466
|
Sat Jan 13 14:32:21 2024 |
CB, JM | Leaky manifold and cable management | Found two leaks in the welding of the manifolds,
marked them in tape. Manifold to be repaired
on Monday. Remember to re-install missing |
  |
|
465
|
Sat Jan 13 14:25:05 2024 |
CB, JM | Bias tests with all FEEs connected | Connected all FEEs.
The two top fees corresponding
to the bottom right detector are connected |
 |
|
464
|
Thu Jan 11 19:57:20 2024 |
CB, JM | All FEE holders mounted | After discussions with Davide, changed
the holes in the FEE holders for the bottom-right
detector to slots in order to slightly change |
|
|
463
|
Wed Jan 10 19:27:08 2024 |
CB, JM | Manifold and more bias tests | Mounted water manifold on CARME with help
from GSI plumber. Connected all the hoses
with Swagelok self-locking connectors. Tested |
|
|
462
|
Wed Jan 10 10:22:41 2024 |
CB, JM | Some FEEs mounted - issues with Det#2 (bottom left) | Started mounting some FEEs. We ran into
some mechanical issues due to the new ERNI
connectors on the new flexi-rigid adaptor |
 |
|
461
|
Mon Jan 8 19:29:57 2024 |
CB, JM | Manifold repaired + fee assembly in bench | Davide extracted the stuck blind plugs
and re-threaded all missing ports. Completed
manifold assembly, except for main inlet/outlet |
   |
|
460
|
Mon Jan 8 19:27:36 2024 |
CB, JM | Leak current tests overnight | Left bias in overnight. Leakage current
decreased and stabilised. See attached. Bias
off as we prepare to mount the fees. |
|
|
459
|
Sun Jan 7 15:38:57 2024 |
CB, JM | Manifolds mostly assembled + bias overnight check | Assembled most of the connectors on the
new (green) manifolds. Two blanking pulgs
stuck when mounting - cannot remove them |
|
|
458
|
Fri Jan 5 12:29:10 2024 |
JM, CB | Further bias tests | Biased detectors this morning to 150V,
the leakage current for all detectors appears
stable and is ~3.5 uA. We have also replaced |
|
|
457
|
Thu Jan 4 13:15:10 2024 |
CB, JM | Tent removed - bias test | Removed tent, octagon, Neg cables.
Disconnected and removed Baking
Pi, TC08, thermocouples. |
|