AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Last 512 days  ELOG logo
ID Date Author Subject Text Attachments
  764   Thu Dec 18 16:30:49 2025 CB, ML, JMAttempting to start CARME backgroundML flicked switch on CAEN bias module to
Enable, and restored remote control.

Attempted to bias the DSSDs. Leakage
 Capture.PNG 
  763   Tue Aug 26 14:43:44 2025 JM, CB, EWCARME on, background run 26 August

14:40

Turned CARME on 
 bias.png 
  762   Thu Jul 17 07:07:56 2025 CBCARME off08:07 CEST

Temperatures ok - attached

DSSDs on. Leakage currents still
 Capture.PNG2.PNG3.PNGCapture.PNG 
  761   Wed Jul 9 11:21:14 2025 EW, CBCARME restarted - long background R98---9 July---

11:00

Turned detectors on - all stable
 32x 
  760   Sun Jul 6 11:35:28 2025 CBAnydesk version updatedUpdated anydesk to 6.3.2 CentOS7 release.

Works now.
  
  759   Sat Jul 5 08:51:33 2025 EBManydesk connection settings   anydesk_settings.png 
  758   Wed Jun 18 14:21:39 2025 CBCARME off15:20

DAQ stopped

Merger & Tape Server stopped
 Screenshot_from_2025-06-18_15-18-31.png 
  757   Tue Jun 17 23:51:58 2025 TD, CB, JGRun 96 - continued
00.31 DAQ continues data file G22-205/R96_27
      
 23x 
  756   Tue Jun 17 19:10:07 2025 NH, PMHRun 9620:00 - Go to YR cave to see what is going
on
 7x 
  755   Tue Jun 17 12:22:50 2025 CB EW JG AG SNRun 94/95/96Run 94

Background with beam at 150 keV
and no target.
 G35Voltage.pdf 
  754   Tue Jun 17 12:14:30 2025 EW, CB, AGRun 93- Background with beam 150keVRun 93- New run at 150keV, background with
beam

13:15 All checks ok
 Screenshot_from_2025-06-17_13-16-52.pngScreenshot_from_2025-06-17_13-16-49.pngScreenshot_from_2025-06-17_13-16-45.pngScreenshot_from_2025-06-17_13-16-43.png 
  753   Tue Jun 17 08:04:09 2025 EW, AG, CBRun 92- Background with beam 90keVRun 92- started at 09:00, background with
beam

Same settings as run 91
 Screenshot_from_2025-06-17_09-03-43.pngScreenshot_from_2025-06-17_09-03-38.pngScreenshot_from_2025-06-17_09-03-34.pngScreenshot_from_2025-06-17_09-03-29.png 
  752   Mon Jun 16 22:06:00 2025 CB, AR, EWRUN 90-9123:00 DAQ restored and data now being written
okay. Checks all okay, see screenshots below.
Histograms reset. 40 bars in bottle @ 23:45
 14x 
  751   Mon Jun 16 21:58:00 2025 CB ARRuns 84-89Found all Merger Links background black
- inactive. Nontheless the tapeservice was
working, the data rate to disk was normal,
  
  750   Mon Jun 16 11:12:22 2025 JG, AK, AR, EHrun 8312:15 restarted measurement with target
- Run 83

same settings as for runs 76, 77
 8x 
  749   Mon Jun 16 10:46:11 2025 CB JM JG AKRun82Background without beam while source is
optimised.
  
  748   Mon Jun 16 08:17:41 2025 JGD2 consumptionThe current bottle of D2 was installed
on friday 06.06. at around 12:00. I assume
we started at 200 bar.
  
  747   Sun Jun 15 10:46:35 2025 EW, EM, AR, AB, CB, JG, AKRun 8111:45 New run started - run 81, same settings
as previous runs (75, 76 etc)

ROOT histograms NOT zeroed
 30x 
  746   Sun Jun 15 07:01:37 2025 EW, EMRun 8008:00 New run started - run 80

Run whilst they are optimising
the beam after losing it, everything else
 Screenshot_from_2025-06-15_08-09-05.pngScreenshot_from_2025-06-15_08-09-00.pngScreenshot_from_2025-06-15_08-08-05.pngScreenshot_from_2025-06-15_08-07-56.pngScreenshot_from_2025-06-15_09-55-36.png 
  745   Fri Jun 13 19:41:32 2025 JG, SHB, JM, AR, EW, OFRun 77, 78, 79New run started - Run 77 after refilling
LN2 dewar

Same settings as Run 75 & 76
 17x 
  744   Fri Jun 13 16:39:18 2025 JG, SHBRun 76Same settings as run 75.

Detector 4 is biased at 100V and
switched from MEC to LEC.
 7x 
  743   Fri Jun 13 14:45:58 2025 JG, SS, JM, CB, EW, ARRun 75 

90 keV/u beam on target, Target
overlap confirmed with lifetime measurement
 Screenshot_from_2025-06-13_16-01-44.png2025-06-13_15-59-53_YRT1_CRYRING_2025_D_Bruno_90keV.C1.txt 
  742   Thu Jun 12 15:33:17 2025 CB, JM, EM, JG, TD, AB, CF, ARRun 7416:34

Like Run 73, but particle detector
in YR10 now active, and recorded in MBS.
 27x 
  741   Thu Jun 12 14:22:27 2025 JM, CB, TD, CF, JG, EMRun 7315:00

Cave closed, waiting for beam to
come back.
 Screenshot_from_2025-06-12_15-23-37.pngScreenshot_from_2025-06-12_15-23-51.pngScreenshot_from_2025-06-12_15-29-14.pngScreenshot_from_2025-06-12_15-31-19.png 
  740   Thu Jun 12 14:08:42 2025 JM, CBRun 72 - pulser walkthroughPulser walkthrough conducted while the
cave was open.

Pulser amplitudes 90000, 80000,
 Screenshot_from_2025-06-12_15-33-03.png 
  739   Thu Jun 12 06:20:50 2025 JMRun 68,69 - background07:20

Started a background run while
the cave is open.
 Screenshot_from_2025-06-12_07-01-00.pngScreenshot_from_2025-06-12_07-20-26.png 
  738   Wed Jun 11 10:13:42 2025 EW, CB, PJW, AR, JMRun 67As run 66, optimisation of beam completed

DSSD4 now working and thresholds
to 0x30 (480keV), switched to LEC
 14x 
  737   Wed Jun 11 09:16:55 2025 CBASIC Control Settings11 June 10:18

2025Apr08-13.45.30 settings

DSSD4 not working as of the screenshots
 17x 
  736   Wed Jun 11 08:37:48 2025 CB, PJWRun 6609:38

As Run 65, no changes, CRYRING
operators attempting to improve beam intensity.
 Screenshot_from_2025-06-11_10-21-30.pngScreenshot_from_2025-06-11_10-21-44.png 
  735   Tue Jun 10 22:38:59 2025 JM, CB, PJWRun 6523:40

Offline anlaysis shows two clear
peaks for DSSD1 and 2 at very low energies
 7x 
  734   Tue Jun 10 16:46:39 2025 JM, CB, EW, AY, PC150 keV - Run64Run 64 started.

150 keV/u beam on target, Target
overlap confirmed with lifetime measurement
 42x 
  733   Tue Jun 10 13:29:23 2025 EW, CB, JMThresholds changed Experimented with slow comparator thresholds
as we go down to lower beam energies

Checked deadlayer loses with SRIM,
 Screenshot_from_2025-06-10_14-35-07.pngScreenshot_from_2025-06-10_14-34-59.pngScreenshot_from_2025-06-10_14-34-49.pngScreenshot_from_2025-06-10_14-34-17.png 
  732   Tue Jun 10 09:57:50 2025 CB, JM, PJW, YuL, JGRun 6210:58

As Run 61, no target for background.

200 keV/A
  
  731   Tue Jun 10 09:44:33 2025 JGMBS not running for a weekThe MBS daq was not writing data since
June 2. 22:39 (run_0035.lmd)

This means, no detector and target
  
  730   Tue Jun 10 09:44:30 2025 JGMBS not running for a weekThe MBS daq was not writing data since June
2. 22:39 (run_0035.lmd)
The reason is that
the rfio server was running on atppc025 which
  
  729   Tue Jun 10 09:44:20 2025 JGMBS not running for a weekThe MBS daq was not writing data since June
2. 22:39 (run_0035.lmd)
The reason is that
the rfio server was running on atppc025 which
  
  728   Sun Jun 8 11:55:00 2025 EM, PC, JM, CB, EW, AY, CB, PJW, YuLRun 58,59,60, 6112:52 

Started Run 58 - Beam energy
200 keV/u.
 50x 
  727   Sun Jun 8 10:05:30 2025 EM, PC, JMRun5711:06

Run during beam change. We will
go down to 200 keV/u
  
  726   Sun Jun 8 09:07:22 2025 EM, PC, JMRun56NOTE: RunR55 is missing

Run56: Background run with 250
keV/u. Target off using the usual procedure.
 Screenshot_from_2025-06-08_10-10-06.pngScreenshot_from_2025-06-08_10-15-01.png 
  725   Sat Jun 7 10:23:26 2025 JM, CBcarme-gsi rebooted 10:00

The computer screen controlling
the DAQ on carme-gsi appeared to have crashed.
  
  724   Sat Jun 7 10:06:27 2025 JM, EM, CB, DB, AY, PC, CBRun 5411:10

We have started a new run at the
same energy as R53 (250 keV/u) due to an
 50x 
  723   Fri Jun 6 17:27:03 2025 AY, ST, JM, EM, DBRun 53Run 53 started at 18:25 (started already
earlier but since then data is taken). Everything
is running again. We started at 3E12 at/cm2.
 11x 
  722   Fri Jun 6 16:49:59 2025 CB, AY, STBeam overlap results for 200keV and 250keVFor 200keV the optimal horizontal position
is -5mm.
For 250keV the optimal horizontal
 2025_06_06_17_46_56_Greenshot.png 
  721   Thu Jun 5 16:54:18 2025 EW, ST, CBRun 52 - 0.3 MeV/ARun 52 started at 17:53. Everything is
running again. We started at 3E12 at/cm2

D+ beam deuterium target. D+ beam
 14x 
  720   Thu Jun 5 08:50:00 2025 JM, CF, CB, EWRun 51 - background09:49

DSSD4 has been biased to 100V in
steps of 5V from 60V. It was previously stable
 Screenshot_from_2025-06-05_09-38-05.pngScreenshot_from_2025-06-05_09-46-08.pngScreenshot_from_2025-06-05_09-51-43.png 
  719   Wed Jun 4 10:44:36 2025 EW, CB, JM, OF, JG, STRun 50 - 0.35 MeV/A11:30

Run 50 started.

D+ beam deuterium target. D+ beam
 13x 
  718   Wed Jun 4 00:10:39 2025 JMRun 49 - beam only01:10

Gas target turned off via the shutter
valve.
 6x 
  717   Tue Jun 3 14:54:29 2025 PMH, STRun 48Run 48 started. Everything is running again.
We started at 3E13 at/cm2

D+ beam deuterium target. D+ beam
 6x 
  716   Tue Jun 3 11:16:07 2025 EW, EM, JMRun 47, beam only backgroundRun 47 started. Target cooling down after
water cooler failure, beam only background

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-06-03_12-20-25.pngScreenshot_from_2025-06-03_12-19-36.png 
  715   Mon Jun 2 20:03:43 2025 JG, AG, CB, EW, EMRun 45/46, 0.5 MeV/ARun 45 started.

D+ beam deuterium target. D+ beam
energy is 0.5 MeV/u. (beam calc calculation
 13x 
  714   Mon Jun 2 17:48:07 2025 JG, AGRun 44 scraper testsSame settings are Run 43 but with coasting
beam and scrapers set to:  30 / - 30
mm.
 Screenshot_from_2025-06-02_18-51-24.pngScreenshot_from_2025-06-02_19-27-31.png 
  713   Mon Jun 2 17:25:31 2025 JG, AGRun 43 scraper testsSame settings are Run 42 but bunched beam
and scrapers set to:  30 / - 30 mm.

 
  
  712   Mon Jun 2 16:35:35 2025 EW, AGRun 42 and scraper tests17:00

Scraper tests conducted. We tried
moving in the scrapers both at a fixed position
 Screenshot_from_2025-06-02_17-44-07.pngScreenshot_from_2025-06-02_17-44-50.png 
  711   Mon Jun 2 09:30:38 2025 JM, EW, STRun 41Run 41 started.

D+ beam deuterium target. D+ beam
energy is 0.75 MeV/u. (beam calc calculation
 6x 
  710   Sun Jun 1 15:33:50 2025 EW, JM, CBRun 4016:30

Run 40 started.

D+ beam deuterium target. D+ beam
 10x 
  709   Sun Jun 1 07:46:34 2025 JM, EM, CBRun 3908:45

Run 39 started.

D+ beam deuterium target. D+ beam
 7x 
  708   Sat May 31 10:46:42 2025 TDRun 38 - remote monitoring
11.40 DAQ continues
      File G22-205/R38
 21x 
  707   Sat May 31 09:58:21 2025 JMRun 3810:56

Run 38 started.

D+ beam deuterium target. D+ beam
 10x 
  706   Fri May 30 21:49:08 2025 JM, NP, CBRun 3722:49

Run 37 started.

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-05-31_00-56-32.pngScreenshot_from_2025-05-31_00-58-40.pngScreenshot_from_2025-05-31_06-16-50.png 
  705   Fri May 30 20:47:47 2025 JM, CB, NPRun 3621:47

Run 36 started.

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-05-30_22-45-48.pngScreenshot_from_2025-05-30_22-46-48.png 
  704   Fri May 30 20:06:48 2025 JM, CB, NPRun3521:00

Run 35 started.

D+ beam deuterium target. D+ beam
 8x 
  703   Fri May 30 07:27:41 2025 CB LB JM NP EMWaiting for deuterium08:27

No run going.

Temperatures OK - attach
 8x 
  702   Thu May 29 18:04:47 2025 LB, CB, PMH, JMRun 32,33,34Oven temperature increased, current up
to 3.5E7 pps.

Found beam-target overlap setting
 7x 
  701   Thu May 29 14:39:52 2025 CB LB PMHRun 3115:40

Waiting for Serge to come in to
change beam energy.
 9x 
  700   Wed May 28 16:40:48 2025 EH, SN, LB, OF, EBM, CBRun 28/29/30 - 1.88 MeV/AWe start a new run with real data taking
condititon: beam is ok, target density is
1e12 cm-2, detectors are moving in-out periodically.
 37x 
  699   Wed May 28 10:54:14 2025 LBRun 27Run 27 running

28/05/2025

(ignore 26 - in-between run)
 Screenshot_from_2025-05-28_15-45-13.pngScreenshot_from_2025-05-28_15-46-07.pngScreenshot_from_2025-05-28_15-48-27.pngScreenshot_from_2025-05-28_15-48-38.pngScreenshot_from_2025-05-28_15-49-09.png 
  698   Tue May 27 22:20:11 2025 CB, LB,PWRun 25 - 1.99/2.02 MeV/A23:20

JM thinks we cannot see 7Be locus
on run 24. Possibly the right arm cannot
 27x 
  697   Tue May 27 15:18:46 2025 JG, CN, JMrun 24Run 24 running

27/05/2025

We start a new run with real data
 7x 
  696   Tue May 27 12:49:48 2025 MLIon beam / electron beam settings so far.Screenshots and ParamModi settings export
attached.
 2025-05-27_13-46-30-866.png2025-05-27_13-47-04-130.png2025-05-27_13-47-23-173.png2025-05-27_13-47-52-384.png2025-05-27_13-50-26_YRT1_CRYRING_2025_Li_Marsh.C1.txt 
  695   Tue May 27 08:38:29 2025 TD[How To] Recover DAQ when one FEE64 stops sending data - short(er) version 1) Select 'No Storage' [workspace 4, display
1, browser tab 'TapeServer']
    If already in 'No Storage' mode please
  
  694   Tue May 27 05:24:05 2025 LB,SN, L. Cs. P. J. W.Run 22, 23 - 1.95 MeV/A27/05/2025 ca. 6:00

We start a new run: beam is ok,
target density ok, detectors are moving in-out
 8x 
  693   Tue May 27 05:03:41 2025 JMDAQ restart06:00

FEE modules power cycled.

No issues on power cycle restart.
 7x 
  692   Mon May 26 18:37:17 2025 LC, AG, LB, SNRun 21Run 21 running

26/05/2025 19:42 p.m.

We start a new run with real data
 12x 
  691   Mon May 26 08:56:56 2025 EM,LBRun20Run 20 running

We start a new run since the laser
guys will do some measurements.
 8x 
  690   Sat May 24 18:27:55 2025 EM, LCBackground runs continued R17-R19Summary: Target not running. Background
runs written to disk, some with beam some
without.
 36x 
  689   Sat May 24 08:28:14 2025 TD, EMBackground runs R13-R16Summary: Target not running. Some background
files written to disk, some with beam some
without. 
 29x 
  688   Fri May 23 09:19:40 2025 SN, TDTarget wait, switch lithium oven
10.12 DAQ, Merger & Tape Server running OK
- no storage mode 
 18x 
  687   Thu May 22 06:41:10 2025 JG, TDR6 - R11 scrapers test / pulser walk07.00 

JG found target off (target data stopped
 33x 
  686   Wed May 21 14:38:22 2025 JM, TDR4 and R5 - background15:30

Waiting for the target to cool
down. ETA is 16:30 for cooling to be finished
 7x 
  685   Tue May 20 19:38:36 2025 JMCARME restart19:00

Arrived at GSI.

We have 6Li1+ beam in the ring
 6x 
  684   Sat May 17 11:19:06 2025 JMShifter intructions 2025EMERGENCY SHUTDOWNS

1. CARME motors: Q key
on keyboard while on workspace 1 of appc218
  
  683   Tue May 13 15:07:42 2025 JMOnline monitoring codeCARME_Sort histogramming has been updated
to aid our understanding online.

> XY plots have been updated
 Screenshot_from_2025-05-13_15-14-12.pngScreenshot_from_2025-05-13_15-14-38.pngScreenshot_from_2025-05-13_15-28-48.png 
  682   Mon May 12 13:25:09 2025 JGMBS DAQ - overviewAn MBS DAQ is running to collect two types
of data:
  
  681   Sat Apr 26 22:01:37 2025 CBProxy bridgeProxy bridge enabling anydesk and generic
Internet access dropped due to atppc025 being
rebooted. Found it dropped again late today.
  
  680   Wed Apr 23 11:08:34 2025 TD, JMBackground Run
12.08 DSSSD bias & leakage current - attachments
1-2
 11x 
  679   Tue Apr 22 06:44:02 2025 TDTuesday 22 April
07.40 DSSSD bias & leakage current - attachments
1-3
 Screenshot_from_2025-04-22_07-40-45.pngScreenshot_from_2025-04-22_07-41-10.pngScreenshot_from_2025-04-22_07-47-25.png1.png2.png 
  678   Sun Apr 20 07:30:29 2025 CBDSSD leakage currents over EasterJust after midnight on 20/04 it appears
DSSD #4 leakage current has perfectly stabilised.
See attached.
 Screenshot_2025-04-20_083007.pngScreenshot_2025-04-20_193226.pngScreenshot_2025-04-21_085130.png 
  677   Fri Apr 18 16:18:33 2025 JMD+D BBN energies testD+D minimum energy Ecm = 150 keV which
corresponds to Ed=150 keV/u or Ed=300
keV. Therefore we need a threshold
 16x 
  676   Fri Apr 18 08:17:38 2025 JMMore testing09:10

Arrived at GSI. Leakage currents
status same as before, DSSD4 is still fluctuating.
 15x 
  675   Thu Apr 17 08:51:29 2025 JMGrounding cont.09:00

Came in to see the bias for DSSD4
which has been fluctuating for the past few
 29x 
  674   Wed Apr 16 08:20:05 2025 JMGrounding 09:00

Leakage currents this morning again
appear to have lowered during the night.
 14x 
  673   Tue Apr 15 12:23:10 2025 JMLeakage current / CARME issues14/04/25

Arrived at GSI in the afternoon.

Found that the coolant loop on
 18x 
  672   Thu Apr 10 10:53:14 2025 TDThursday 10 April11.50 DAQ continues
      Data file APR25/R6_13
 8x 
  671   Thu Apr 10 07:02:12 2025 CB (remotely)Current logging enabled - sort ofThere appear to be issues with Shahab's
caenlogging program. It crashes occasionally,
with an error indicating the number of columns
  
  670   Wed Apr 9 10:02:21 2025 TDCARME equipment in CRYRING area moved
There was some tidying up of the CRYRING
hall in advance of this week's EC evaluation
 20250409_102115.jpg20250409_101705.jpg 
  669   Wed Apr 9 02:40:04 2025 TDWednesday 9 April03.37 DAQ continues
      Data file APR25/R5_8
 11x 
  668   Tue Apr 8 10:46:13 2025 TDTuesday 8 April
11.30 CRYRING vacuum and temperature - attachments
1-2
 27x 
  667   Mon Apr 7 08:59:41 2025 TDMonday 7 April
10.00 FEE64 power ON
      CARME IE514 OFF
 8x 
  666   Sun Apr 6 14:21:53 2025 TD[How To] Startup CARME
- water flow/interlock checks
   check water flow to/from inflow/outflow
  
  665   Sun Apr 6 11:40:48 2025 TDOptions DB reconstructedOptions directory corrupted unable to change
Options settings per https://elog.ph.ed.ac.uk/CARME/664
 Screenshot_from_2025-04-06_12-59-39.png 
  664   Sun Apr 6 10:17:49 2025 TDSunday 6 April
11.15 CARME IE514 ion gauge remains OFF
      ML says there are 2x ion gauges with
 15x 
  663   Sat Apr 5 16:15:04 2025 TDFEE64 power interlock installed
Water flow and dew point sensors have been
installed on the outlet and inlet cooling
 11x 
  662   Sat Apr 5 16:13:32 2025 TDSaturday 5 April
12.00 CARME IE514 ion gauge 4.2e-11 mbar
      CARME IE514 OFF
 7x 
  661   Fri Apr 4 10:17:16 2025 TDFriday 4 April
10.43 Reboot carme-gsi - unable to open a
working terminal
  
  660   Mon Mar 10 15:47:27 2025 TDAnalysis data files G22-201 R79_10 & R79_24
Analysis of data files G22-201 R79_10 and
R79_24 - attachments 1-2
 R79_10.txtR79_24.txt 
ELOG V3.1.3-7933898