  947   Tue Apr 1 15:34:16 2025 TD, MR, CUTests of new AIDA ASIC mezzanines - 2024 production batch
Tests of new AIDA ASIC mezzanines - 2024
production batch
 11x 
  946   Wed Apr 10 16:45:59 2024 TDAIDA interlock
Honeywell HSS DPS sensor information https://elog.ph.ed.ac.uk/AIDA/932
 cynergy3-fsvplc-v3.pdf 
  945   Fri Mar 29 08:39:18 2024 TD, PJCSUnable to start MIDAS DAQ with 1x FEE64 ( aida04 )
> At AIDA test station T9, STFC DL unable
to start MIDAS DAQ with 1x FEE64 ( aida04
  
  944   Thu Mar 28 15:43:47 2024 TDUnable to start MIDAS DAQ with 1x FEE64 ( aida04 )
At AIDA test station T9, STFC DL unable to
start MIDAS DAQ with 1x FEE64 ( aida04 )
 Screenshot_from_2024-03-28_15-43-28.pngScreenshot_from_2024-03-28_15-43-08.pngScreenshot_from_2024-03-28_15-47-49.png 
  943   Thu Mar 28 11:10:09 2024 TDTest of 4x FEE64s at AIDA test station, T9, STFC DLTest of 4x FEE64s at AIDA test station, T9,
STFC DL
 22x 
  942   Wed Mar 13 14:50:04 2024 NH[HowTo] Backup and Restore Raspberry Pi SD CardsMicro SD cards used by the raspberry pis are
cheap but prone to failing
  
  941   Tue Jan 30 14:18:16 2024 NH[HowTo] Update MACB Firmware https://elog.ph.ed.ac.uk/CARME/482  MACB_GSI_Simple.jed 
  940   Thu Dec 14 10:53:27 2023 NH, MP, CC, GASnout RemovedSnout removed from S4

All detectors removed
  
  939   Mon Dec 11 23:56:36 2023 TDTuesday 12 December00.55 Observe high frequency noise in aida02
& aida04 ( n+n FEE64s ) - attachments 1-5
      and aida05 ( p+n FEE64 )
 18x 
  938   Mon Dec 11 11:05:27 2023 TDWR timestamp fail aida05 & aida07
MACB config 
1x level 0
 11x 
  937   Mon Dec 11 09:57:54 2023 TDMonday 11 DecemberWater flow and temperature ( gauges outside
S4 entrance ) OK
 27x 
  936   Sun Dec 10 13:06:27 2023 TDSunday 10 December14.05 S4 closed

Water flow and temperature ( gauges outside
 14x 
  935   Fri Dec 8 12:55:38 2023 TD, NHFEE64 configuration
FEE64 configuration for 1x MSL type BB18(DS)-1000
24cm x 8cm DSSSD
  
  934   Fri Dec 8 11:32:44 2023 NH, CC, VP, TDFriday 8 December
Change n+n FEE64 aida04 d8:80:39:41:f6:b7
 asic #1 faulty
 18x 
  933   Thu Dec 7 17:30:36 2023 NH, CC, VP, TDThursday 7 December
Stack re-assembled - upstream to downstream
 8x 
  932   Wed Dec 6 16:32:03 2023 NHReplacement of faulty Honeywell HSS-DPS sensor
Honeywell HSS-DPS sensor is faulty - attachments
1 & 2
 Honeywell_HSS-DPS_63-2711.pdf1000008603.jpg1000008604.jpg1000008605.jpg 
  931   Mon Dec 4 10:34:48 2023 NHAIDA Todo for 11.12.23This is a short list of things todo or check
before the test beam time on 11.12.23 
Updated after 15:00 CET meeting
  
  930   Fri Nov 24 10:36:06 2023 NHFriday 24 NovemberPulser LEMOs removed from p+n fees
Pulser connected to n+n fees: aida02 and
aida04 
 Screenshot_from_2023-11-24_11-47-29.pngScreenshot_from_2023-11-24_11-47-39.pngScreenshot_from_2023-11-24_11-48-14.pngScreenshot_from_2023-11-24_12-00-33.png 
  929   Thu Nov 23 10:00:16 2023 NHReport - Cannot change per-ASIC Settings> On ASIC settings page trynig to change the
settings for one ASIC (e.g. ASIC1 of aida09)
seems to cause all 4 ASIC settings to change
 Screenshot_from_2023-11-23_10-58-30.pngScreenshot_from_2023-11-23_10-58-57.pngScreenshot_from_2023-11-23_10-59-12.pngScreenshot_from_2023-11-23_10-59-24.png 
  928   Wed Nov 22 15:12:40 2023 TD/tmp/log8015_error   log8015_error 
  927   Wed Nov 22 14:52:43 2023 NHAIDA Pulser CalibrationConnect pulser to all p+n FEEs

Turn on pulser, 100 Hz (attachment 3 for
 Screenshot_from_2023-11-22_15-18-08.pngScreenshot_from_2023-11-22_15-31-43.pngScreenshot_from_2023-11-22_15-21-34.pngScreenshot_from_2023-11-22_16-05-33.png 
  926   Wed Nov 22 13:44:36 2023 NHReport - Cannot change per-ASIC SettingsOn ASIC settings page trynig to change the
settings for one ASIC (e.g. ASIC1 of aida09)
seems to cause all 4 ASIC settings to change
  
  925   Tue Nov 21 13:56:59 2023 NH, CC, HA, MP, AM, VPTuesday 21 NovemberConnect the BB7 on top of the snout to the
former aida05 (FEE above aida01)
Also remove copper busbar that is unused
 8x 
  924   Sat Nov 18 02:28:26 2023 TD, NH, JBSaturday 18 November03.20 c. 3k per spill 13N beam to S4
      Observe scatter of events at all energies
for LEC
 10x 
  923   Fri Nov 17 15:53:03 2023 TD, JB, JGFriday 17 November contd.
AIDA ASIC settuings 2023Nov16-18.55.20
     low comparator p+n FEE64s 0xa, n+n 0xf
 25x 
  922   Fri Nov 17 09:19:41 2023 TD, CC, VPAIDA test 17/11/2023We restarted AIDA (a10277ttachment 6) this
morning and checked rates (attachments 3/4)
and waveforms (attachments 1/2). Temperatures
 46x 
  921   Thu Nov 16 17:43:25 2023 TD, JB, CC, VPAIDA test 16/11/2023 cont.Screenshot uploads as I hit the 50 image
upload limit.
 Screenshot_from_2023-11-16_16-37-22.pngScreenshot_from_2023-11-16_16-36-25.pngScreenshot_from_2023-11-16_16-35-51.pngScreenshot_from_2023-11-16_16-35-30.png 
  920   Thu Nov 16 09:09:58 2023 TD, JB, CC, VPAIDA tests 16/11/2023Viewing AIDA status on Thursday morning 16/11/2023.

 48x 
  919   Wed Nov 15 10:37:00 2023 TDWednesday 15 November
11.36 Water flow, pressure & temperature
( 19 deg C ) OK
 27x 
  918   Tue Nov 14 17:19:11 2023 TDTapeServer, Merger, NetVar etc status   Screenshot_from_2023-11-14_18-18-51.pngScreenshot_from_2023-11-14_18-18-45.pngScreenshot_from_2023-11-14_18-18-34.pngScreenshot_from_2023-11-14_18-18-29.png 
  917   Tue Nov 14 17:08:49 2023 TDReport - high - unable to change ASIC settings directory in Options
Attempting to change the text string specifying
the ASIC settings directory ( 2023Nov14-15.25.24
 Screenshot_from_2023-11-14_18-07-27.pngScreenshot_from_2023-11-14_18-07-56.png 
  916   Tue Nov 14 16:52:54 2023 TDTuesday 14 November
15.06 Quick test of AIDA 24cm x 8cm 'triple'
DSSSD before dismounting to install 1x bPlast
 Screenshot_from_2023-11-14_15-37-10.pngScreenshot_from_2023-11-14_15-37-41.png 
  915   Mon Nov 6 17:30:44 2023 NHAida Alpha AnalysisAnalysis of tape folder /TapeData/BG18OCT23

Using Go4 https://github.com/cej25/DESPEC_NOV23
 alpha_hit.pngalpha_energy.pngalpha_energy_xy.pngalpha_strip_v_energy.png 
  914   Wed Oct 25 12:42:18 2023 CCAIDA testStarted AIDA at 1:41 pm, writing to disk:
file BG18OCT2/R6, stopped at  17:26
pict1: HV supply
 Screenshot_from_2023-10-25_13-42-54.pngScreenshot_from_2023-10-25_13-43-10.pngScreenshot_from_2023-10-25_13-44-00.pngScreenshot_from_2023-10-25_13-43-46.png 
  913   Tue Oct 24 10:54:14 2023 at 19:14NH, CCAIDA testStarted AIDA at 11:54am, writing to disk:
file BG18OCT2/R5, stopped at 19:14
 Screenshot_from_2023-10-24_11-54-48.pngScreenshot_from_2023-10-24_11-55-08.pngScreenshot_from_2023-10-24_11-55-46.pngScreenshot_from_2023-10-24_11-55-33.png 
  912   Mon Oct 23 14:08:06 2023 NH, CCAIDA testStarted AIDA at 3:05pm, writing to disk: file
BG18OCT2/R4, stopped 18.30
 Screenshot_from_2023-10-23_15-08-59.pngScreenshot_from_2023-10-23_15-09-16.pngScreenshot_from_2023-10-23_15-10-01.pngScreenshot_from_2023-10-23_15-09-36.pngScreenshot_from_2023-10-23_18-20-13.png 
  911   Mon Oct 23 10:52:06 2023 NH, CCAIDA testStarted AIDA at 11:50, writing to disk: file
BG18OCT2/R3, stopped around 3 pm
 Screenshot_from_2023-10-23_11-53-28.pngScreenshot_from_2023-10-23_11-53-59.pngScreenshot_from_2023-10-23_11-54-43.pngScreenshot_from_2023-10-23_11-54-54.png 
  910   Thu Oct 19 10:39:20 2023 NHThursday 19 OctoberWater Temp: 20 C - Flow felt on pipe
AIDA interlock OVERRIDE 
 10x 
  909   Wed Oct 18 17:18:57 2023 TDWednesday 18 October   8x 
  908   Thu Oct 12 16:40:21 2023 TDbackground alpha
start 14.55
 13x 
  907   Thu Oct 12 13:02:50 2023 TDThursday 12 October contd.
      ASIC settings 2021Apr29-13-16-00
      slow comparator 0xa ( all p+n junction
 50x 
  906   Thu Oct 12 09:12:34 2023 TDThursday 12 October10.10 Water flow & temp OK
      Power ON
 47x 
  905   Wed Oct 11 16:53:20 2023 TDWednesday 11 October contd.      CAEN N1419ET ch 2 - all outputs non-floating
( internal LK fitted )
      Standard coaxial HV cable chained to
 14x 
  904   Wed Oct 11 09:37:30 2023 TDWednesday 11 October
10.00 Water flow & temp OK
      Power ON
 48x 
  903   Tue Oct 10 08:38:37 2023 TDTuesday 10 October
09.38 Water flow & temp OK
      Power ON
 40x 
  902   Mon Oct 9 14:29:12 2023 TDMonday 9 October contd.
15.20 aida10 LK4 ( front f/p -> gnd ) fitted
- investigate impact aida10 asic #4 edge
 Screenshot_from_2023-10-09_15-40-36.png 
  901   Mon Oct 9 09:03:10 2023 TDMonday 9 October09.55 Water pressure and temp OK
      Power on
 50x 
  900   Sun Oct 8 14:51:59 2023 TDSunday 8 October contd.
Slow comparator 0xf
 28x 
  899   Sun Oct 8 11:44:35 2023 TDSunday 8 October12.22 USB-controlled ac mains relay - interlock
overidden
      Water flow OK. Water temp 19 deg C
 50x 
  898   Tue Oct 3 10:16:06 2023 TDnnrpi2 scriptspi@raspberrypi:~ $ cat ./caen_screen.sh
if ! screen -list | grep -q "caenhv"; then
screen -f -S caenhv /dev/ttyACM0 9600
  
  897   Tue Oct 3 09:14:59 2023 TDTuesday 3 October
09.45 Power up
 Screenshot_from_2023-10-03_11-49-17.pngScreenshot_from_2023-10-03_12-22-30.png 
  896   Mon Oct 2 14:03:42 2023 TDMonday 2 October
15.00 DSSSD bias +60V +6.44uA - breakdown
above c. 60V, bias +100V leakage current
 Screenshot_from_2023-10-02_15-03-02.pngScreenshot_from_2023-10-02_15-02-55.pngScreenshot_from_2023-10-02_15-02-46.png 
  895   Sun Oct 1 12:38:56 2023 TDSunday 1 October12.50 Power up

      All system wide checks OK
 13x 
  894   Sat Sep 30 16:37:06 2023 TDHoneywell HSS-DPS fault
The Honeywell HSS-DPS dew point sensor indicator
( red LED ) is flashing c. 0.5Hz indicating
  
  893   Sat Sep 30 12:14:52 2023 TDSatuurday 30 September12.54 Power up

      All system wide checks OK
 10x 
  892   Thu Sep 28 16:03:40 2023 TDThursday 28 September
17.00 USB-controlled ac mains relay - no
water interlock ( yellow ) LED
 10x 
  891   Thu Aug 31 15:01:11 2023 TDTest of CAEN N1419B - T9, STFC DL
Noise test of CAEN N1419B in T9, STFC DL.
 7x 
  890   Wed Aug 30 15:30:50 2023 TDTest of AIDA ASIC mezzanines with FEE64s - summaryTest of ( previously bench-tested OK ) AIDA
ASIC mezzanines using FEE64 nnlycca5 ( MAC
d8:80:39:41:d7:c3 )
 13x 
  889   Mon Aug 21 13:17:54 2023 TDSilena 7710 HV test - JCMB 21.8.23 Silena 7710 - see attachment 1

Bias -60V
 11x 
  888   Sun Aug 20 16:21:45 2023 TDSilena 7710 HV test - JCMB 20.8.23Silena 7710 - see attachment 1

Bias -60V
 6x 
  887   Sat Aug 19 14:52:42 2023 TDBNC PB-4 & BNC PB-5 pulser test - JCMB 18.8.23BNC PB-4 - see attachment 1

Amplitude 35,000
 21x 
  886   Wed Aug 9 14:40:28 2023 Carole, Nic, JeroenAIDA HV SUPPLY & PULSER TESTTests with the HV supply (CAEN N1419ET)
and Pulse Generator ( BNC PB-5 ) in the detector
lab on the crate behind the DEGAS detectors,
 AIDA_PulserTest_0908_FullPulse.pngAIDA_PulserTest_09.08_5mV_10us_HVOFF.pngAIDA_PulserTest_0908_10mV_10us_50HV.pngHV_0V_090823_1500_wPulser.pngHV_-50V_090823_1500_wPulser.png 
  885   Fri Aug 4 10:04:58 2023 TDFriday 4 August contd.
10.45 Power cycle and reboot
 17x 
  884   Fri Aug 4 09:07:08 2023 TDFriday 4 August
07.00 DAQ stopped
      Overnight run for background alphas
 23x 
  883   Thu Aug 3 14:16:12 2023 TDThursday 3 August contd.
15.16 DSSSD bias +100V leakage current +8.415uA
 21x 
  882   Thu Aug 3 09:21:26 2023 TDThursday 3 August
10.20 DSSSD bias +100V leakage current +6.565uA
- attachment 1
 47x 
  881   Wed Aug 2 15:39:52 2023 TDWednesday 2 August contd.16.22 Add LK1 to aida01
      DSSSD bias -100V leakage current -7.950uA
 11x 
  880   Wed Aug 2 08:44:00 2023 TDWednesday 2 August
09.40 Al snout electrically connected ( <
1 Ohm ) to Al gasket and Al base plate
 48x 
  879   Tue Aug 1 08:50:36 2023 TDTuesday 1 August
09.50 DSSSD bias +100V leakage current +9.255uA
- attachment 2
 30x 
  878   Mon Jul 31 09:43:37 2023 TDMonday 31 July
10.43 DSSSD bias +100V leakage current +7.550uA
 44x 
  877   Mon Jul 24 08:54:48 2023 TDMonday 24 July
09.54 DSSSD#1 bias +100V leakage current
+9.065uA
 17x 
  876   Mon Jul 24 08:39:39 2023 TDaida10 sys console output & aida10 optionsOptions and system cosnole disagree about
which version of the DataAcq program is in
use?
 sys_console_aida10.txtScreenshot_from_2023-07-24_09-48-03.png 
  875   Sun Jul 23 08:50:48 2023 TDSunday 23 July09.50 Cooknell HV2
      2x + polarity, grounded HV channels
 19x 
  874   Sat Jul 22 08:17:48 2023 TDSaturday 22 July09.20 CAEN N1419ET 
      Floating outputs
      Channel #3 + polarity, Channels #0-2
 26x 
  873   Sun Jul 16 14:20:31 2023 TDSunday 16 July contd.15.20 All ERNI pins of aida01 adaptor PCB
OK => FEE64 #1 ASIC #2 channel #5 issue faulty
test C? faulty ASIC channel?
 27x 
  872   Sun Jul 16 09:36:40 2023 TD15-16 July 2023
Saturday 15 July
 40x 
  871   Fri Jul 7 11:59:06 2023 TDTest of AIDA FEE64 - summaryTest of AIDA FEE64s 

ISOL test station STFC DL, T9
 11x 
  870   Fri Jul 7 10:52:34 2023 TD, PJCSTest of AIDA FEE64 d8:80:39:42:0d:0b ( aida03 ) - ASIC mezzanine replaced
Test of AIDA FEE64 d8:80:39:42:0d:0b ( aida03
) - ASIC mezzanine replaced
 16x 
  869   Fri Jul 7 10:15:09 2023 TDTest of AIDA FEE64 d8:80:39:41:f6:ee ( aida01 ) - HDMI connector replaced
Test of AIDA FEE64 d8:80:39:41:f6:ee ( aida01
) - HDMI connector replaced. Cooling plate
 17x 
  868   Thu Jul 6 10:20:25 2023 TDUnable to start Rly16 server
Unable to start Rly16 server - see attachment
1
 Screenshot_from_2023-07-06_10-18-59.png 
  867   Wed Apr 12 12:32:13 2023 PJCSASIC power short problemI have taken videos with an Infrared camera
of the power being supplied to one isolated
ASIC on a mezzanine.
 Mezzanine_Under_test_Wider_view_resized.jpgMezzanine_Under_test_resized.jpg 
  865   Wed Mar 1 16:42:06 2023 Further results from Mezzanine bench testsPJCSCarried out some further work on failed
mezzanine modules.

Inspected them externally and removed
 mezz_cap_gone_resized.jpgmezz_resistors_resized.jpg 
  864   Thu Feb 23 16:15:31 2023 TD PJCSBench test of AIDA FEE64 mezzanines
Attachments 2 & 7 AIDA FEE64 mezzanine with
                  1) adaptor PCB connected
 7x 