AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF  ELOG logo
Entry  Tue Apr 16 12:24:01 2024, Emmanuel, MWD amplitude (dE and E) 26Al_PDF.pdf
Entry  Mon Mar 25 12:57:30 2024, Clw, Adapters for ntof setup 20240325_125536.jpg20240325_125528.jpg
Entry  Thu Dec 7 09:48:23 2023, Emmanuel, MWDdetector and User Input UserInput_Silicons.hMWDdetector.cc
Entry  Mon Oct 2 08:53:06 2023, Emmanuel, Empty Frame Empty_Frame.jpeg
Entry  Thu Sep 28 15:32:16 2023, Emmanuel, LiF sample in 20230928_154334.jpg20230928_155923.jpg20230926_115053.jpg20230928_155747.jpg
Entry  Wed Sep 27 09:54:06 2023, Emmanuel, 10B sample in 20230926_113136.jpg20230926_113811.jpg20230926_115036.jpg20230926_115053.jpg20230926_111737.jpg
Entry  Tue Sep 5 16:09:45 2023, Emmanuel, Drop in gain for DEED 14 alndeed14.pngalndeed14b.pngalndeed14old.png
Entry  Mon Aug 21 12:08:59 2023, TD, RAL108 +/-15V PSU test - JCMB 21.8.23 13x
Entry  Sat Aug 19 14:14:26 2023, TD, RAL108 +/-15V PSU test - JCMB 18.8.23 10x
Entry  Thu Aug 17 10:26:51 2023, Nikolay Sosnin, Data Processing 
Entry  Tue Aug 15 11:41:27 2023, TD, NS, Monday 14 August - vacuum chamber pressure 20230814_083514.jpg
Entry  Tue Aug 15 10:17:39 2023, TD, NS, RAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 August 7x
Entry  Mon Aug 14 11:00:13 2023, TD, RAL108 +/-15V PSU test in ISOLDE hall 13x
Entry  Sat Aug 12 09:24:19 2023, Nikolay Sosnin, 26Al Protons 
Entry  Fri Aug 11 16:50:58 2023, Nikolay Sosnin, EDET24 EDET24_Card.JPGEDET24_Cable.JPG
Entry  Fri Aug 11 13:16:56 2023, Nikolay Sosnin, E Front Incorrect Cabling 
Entry  Fri Aug 11 13:06:54 2023, Annie, Signal Spreadsheet info IMG_2920.JPGIMG_2921.JPGIMG_2922.JPG
Entry  Fri Aug 11 10:12:02 2023, Annie, Pressure, voltage and current check IMG_2915.JPGIMG_2916.JPGIMG_2918.JPG
Entry  Thu Aug 10 16:11:57 2023, TD, NS, AR, Noise 20230810_162959.JPGIMG_2906.jpeg20230810_164219.JPG
    Reply  Fri Aug 11 10:02:08 2023, TD, NS, AR, Noise 20230811_104233.jpg20230811_104253.jpg
Entry  Fri Aug 11 09:17:28 2023, Annie, Li target scans 7Li_foil_side1_post_processed.pdf7Li_foil_side2_post_processed.pdfIMG_2914.JPG
Entry  Fri Aug 11 09:11:04 2023, Annie, Pulse Settings IMG_2908.JPGIMG_2909.JPGIMG_2910.JPGIMG_2911.JPG
Entry  Fri Aug 11 08:41:31 2023, Annie, Al target & chamber set up 15x
Entry  Thu Aug 10 11:30:32 2023, Nikolay Sosnin, Silicons and LiF3+Gafchromic Target 18x
Entry  Thu Aug 10 10:50:15 2023, Nikolay Sosnin, Al26 Chamber Cabling/Vacuum/NIM 23x
Entry  Thu Aug 10 10:05:48 2023, CLW, Gafchromics Foil 20230809_165433.jpg20230810_085457.jpg20230809_165436.jpg
Entry  Thu Aug 10 10:04:13 2023, CLW, Photos inside chamber Al26 run Aug2023 8x
Entry  Thu Aug 10 09:55:50 2023, CLW, Photos of Chamber, Al26 Run Aug23 13x
Entry  Thu Aug 10 09:20:37 2023, CLW, Detector Signal Cabling Al26 Aug 2023 8x
Entry  Thu Aug 10 09:10:02 2023, CLW, Detector Setup Al26 Run 2023 20230809_181749.jpg20230809_181758.jpg20230809_172545.jpg20230809_172442.jpg
Entry  Mon Jul 31 10:21:41 2023, Nikolay Sosnin, n_TOF Data and Filtering Al26_Filtering.pptx
Entry  Thu Jul 27 11:53:52 2023, TD, MSL type W1 detector data for 26Al(n,X) experiment EAR2, n_TOF 
Entry  Thu Jul 27 11:25:35 2023, Claudia, Al-26 planning meeting summary DSC00366.JPGDSC00346.JPG
Entry  Mon Jul 3 13:01:30 2023, Emmanuel, Boxes for nTOF experiments to CERN 
Entry  Sun Oct 9 21:07:02 2022, Nikolay Sosnin, Boron Sample 3 Measurement 14x
Entry  Sun Oct 9 20:57:54 2022, Nikolay Sosnin, Detectors in-beam, no target 12x
Entry  Sat Oct 8 11:57:36 2022, Nikolay Sosnin, Change of Detector-Target Separation 17x
Entry  Sat Oct 8 11:56:49 2022, Nikolay Sosnin, Silicon Strips of Concern 
Entry  Fri Oct 7 20:04:30 2022, Nikolay Sosnin, Change of Pulser Setting 
Entry  Fri Oct 7 17:17:08 2022, Nikolay Sosnin, Change of Pulser Delay 
Entry  Thu Oct 6 14:58:29 2022, Nikolay Sosnin, Change of Pulser Delay 
Entry  Thu Oct 6 11:45:39 2022, Nikolay Sosnin, Assembly Setup Days 1 and 2 25x
Entry  Thu Oct 6 11:07:47 2022, Nikolay Sosnin, Change of sample/Addition of pulser 
Entry  Thu Oct 6 09:34:30 2022, Claudia, Test setup Photos and cabling 20221005_174742.jpg20221005_174759.jpg20221005_184752.jpg20221005_184801.jpg20221005_174742.jpg
Entry  Thu Oct 6 09:28:33 2022, Claudia, Items to be replaced for next run 20221005_122654.pdf
Entry  Thu May 26 09:20:32 2022, Nick / Claudia, Inventory of Items at n_TOF for (n,cp) experiments rn_image_picker_lib_temp_e85b2099-7b73-4246-843d-6351800c2709.jpgrn_image_picker_lib_temp_3ff5f819-1e0c-4278-bbbc-01038a0a0c94.jpg
Entry  Fri Sep 9 10:01:18 2016, Sarah, Leakage currents 09.09.16 
Entry  Fri Sep 2 12:03:40 2016, Sarah, SPD card changed 
Entry  Fri Sep 2 12:01:57 2016, Sarah, Leakage currents 02.09.16 
Entry  Tue Aug 23 15:34:38 2016, Claudia, Leakage currents 23.08.16 
Entry  Wed Aug 17 15:10:05 2016, Sarah, Leakage currents 12.08.16 
Entry  Thu Aug 11 08:19:37 2016, Sarah, Leakage currents 10.8.16 
Entry  Tue Aug 9 15:57:52 2016, Sarah, Leakage currents 09.08.16 
Entry  Mon Aug 8 11:02:13 2016, Sarah, Leakage currents 08.08.16 
Entry  Wed Aug 3 14:48:09 2016, Sarah, Leakage currents 02.08 - 03.08 
Entry  Wed Aug 3 09:48:31 2016, Sarah, EFED10 alpha calibration checks 
Entry  Tue Aug 2 08:14:26 2016, Sarah, Leakage currents spreadsheet (26/07- 01/08) Leakage_currents.xlsx
Entry  Sun Jul 31 15:56:32 2016, Sarah, DEED16 Alpha calibration checks (205169) 
Entry  Sun Jul 31 15:02:57 2016, Sarah, DEED6 Alpha calibration checks (205168) 
Entry  Sun Jul 31 14:32:34 2016, Sarah, DEED1 Alpha calibration checks (205168) 
Entry  Sun Jul 31 13:43:56 2016, Sarah, Alpha spectra DEED0_alpha_spec_pulser.SpeDEED5_alpha_spec_pulser.SpeDEED15_alpha_spec_pulser.SpeEFED9_alpha_spec_pulser.SpePHDI_alpha_spec_pulser.Spe
Entry  Thu Jul 28 16:00:43 2016, Sarah, List of to-dos 
Entry  Wed Jul 27 13:20:53 2016, Sarah, Gafchromic images 6x
Entry  Fri Oct 16 16:11:41 2015, Sarah Lonsdale, 09/10/15 Photos of detectors (reversed dE wiring) and upper level frame for future set up, leakage current 2015-10-09_09.16.16.jpg2015-10-09_09.16.22.jpg2015-10-09_09.29.23.jpg2015-10-09_09.29.35.jpg2015-10-09_09.30.02.jpg
Entry  Fri Oct 16 16:01:41 2015, Sarah Lonsdale, 08/10/15 Removed source and sample, leakage current check 
Entry  Fri Oct 16 15:56:01 2015, Sarah Lonsdale, 07/10/15 Alpha source in, change to pulser delay 6x
Entry  Fri Oct 16 15:41:14 2015, Sarah Lonsdale, 06/10/15 Changes to DAQ and pulser settings 2015-10-06_delay.jpg2015-10-06_trig.jpg
Entry  Fri Oct 16 15:36:13 2015, Sarah Lonsdale, 06/10/15 Leakage, dE signal problem solving and external pulser trigger 6x
Entry  Tue Oct 13 21:04:49 2015, Claudia Lederer, Photos of Test Setup 5-10 October 2015 DSC00042.JPGDSC00048.JPGDSC00056.JPGDSC00065.JPG
Entry  Mon Oct 12 12:07:24 2015, Sarah Lonsdale, 05/10/15 Changes to DAQ settings 
Entry  Mon Oct 12 12:04:51 2015, Sarah Lonsdale, 05/10/15 Photo of detector distances and layout 8x
Entry  Mon Oct 12 11:50:52 2015, Sarah Lonsdale, 05/10/15 Pulser, Wiring information and DAQ initial set up 2015-10-05_15.19.54.jpg2015-10-05_15.20.24.jpg2015-10-05_15.22.39.jpg2015-10-05_15.22.46.jpg
Entry  Mon Oct 12 11:27:02 2015, Sarah Lonsdale, 05/10/15 - Set up notes 8x
ELOG V3.1.4-unknown