211
|
Tue Nov 20 16:06:09 2018 |
dk | Projected Inventory of ISOLDE | (To be confirmed / finalized)
==Rack Electronics==
Two (2) 19" electronics racks
=Rack #1=
2 (Two) RAL Amp crate (1 full with modules, 1 with five (5) modules)
21 RAL 109 modules in total. (NB: Extras are borrowed from Miniball)
Two (2) NIM Fans
Four (4) Cable patch boxes
Ribbon cables for patch
Two (2) Preamp power supplies
+/-15 Volt type, up to several Amperes
=Rack #2=
VME crate, with power cable
Seven (7) Silena ADCs
One (1) S9418 ACQ controller
Two (2) CAEN V767 TDC
One (1) CAEN 560
One (1) MVME 24XX Motorola crate Controller
26 ribbon cables
Twelve (12) for analog
Twelve (12) for discrim
Two (2) extra
Camac crate
Five (5) Logic Shaped Outputs (CAMAC)
Two (2) CAMAC / VME converter
One (1) LeCroy 622 Quad Logic (NIM)
One (1) Ortec 566 TAC (NIM)
One (1) Lecroy 222 dual GDG
One (1) Ortec 459 bias supply
NIM crate
One (1) BNC PB-5 digital pulse generator
One (1) BNC PB-4 analog pulse generator -- returned to Edinburgh 2018.12
One (1) Analog ratemeter 4678
One (1) ECL-NIM-ECL EC 1601
One (1) Silena Quad Bias Supply 7710 -- swapped with functional unit 2018.11 from problems in 59Cu
Two (2) LeCroy 419A Logic FI/FO
One (1) Ortec 572 Amplifier
One (1) LeCroy Quad Discriminator 821
One (1) NIM Cooknell homebrew PA Power Supply
One (1) Cooknell Preamplifier
4 (Four) additional Long ribbon cables
2x spare HVBNC cables
BNC to Lemo
Lemo to Ribbon box
lemo cables
==Preamp setup==
2 Preamp feedthrough
Bolts and washers
2 O-Rings + 1 spare
16way BNC multicore
o-ring for ribbon feedthroughs
Julabo Chiller & Insulated External Chiller Lines
Swagelok nylon and brasss ferrels for gas line / coolant piping
spare straight and right angle swagelok fittings
thin green polymer tubing (gas lines, cooling system)
thermometer
thermocouple cable
1 thermocouple vacuum gauge
==Generic Power Connections==
3 Power Bars
20x IEC leads
2x Swiss to UK leads
==Vacuum systems==
Chamber, sliding mount
Scrolling pump
Backflow interlock
Large TMP from TUDA
Controller
Small TMP
Controller
TMP bolts (large and small)
Two (2) vacuum hoses
Valve for TP 1 & 2
vacuum clamps
Two (2) inverse magnetron ion gauges
Multi gauge reader
Old inv magnetron vac gauge meter
Upstream beamline pipe
Gate valve, nipple, adaptor flange to SEC
N2 pipe with valve
Mechanical pressure gauge and "plus" type connector
Blanking kindey plate
bellows
bellow cage
TMP/gauge mounting pipe
==Silicon Detectors and Components==
Two (2) Micron S2-type 1000 um SSDs
Three (3) Micron S2-type 75 um SSDs
dummy detectors
20 ~1 cm spacers for SSD mounting
9 ~2 cm spacers for SSD mounting
Degrader Foils
Irises and controller box
Al heavy ion degraders of various thicknesses.
3 Hamamatsu Photodiodes
1 PCB for Hamamatsu Photodiodes
3 degrader foils (10, 15 20 um Al)
==Beam Diagnostics==
Faraday cup
current integrator for FC
cctv camera power lead
ZnS (or similar) scint screen
==Computer==
Sun Microsystems Tower
Dell monitor
Sun keyboard
Sun mouse
Ethernet hub
==Misc==
alignment plugs for chamber
2 ch oscilloscope
2 (two) basic voltmeters
middle foot sections of blue frame
6 feet for chamber stand
All bolts for chamber stand
Spacers
3 large O-Rings for chamber (spare)
Bolts, nuts and spacers for chamber end flanges and center
short bits of blue frame
braces off blue frame
Wheels for frame
Tools
Safety boots and helmets-
-Daid
-Toby
-Mirco
-Claudia
-Sarah
-Conor
==In Edinburgh==
Target ladder and components |
|
210
|
Tue Nov 20 14:07:37 2018 |
dk | Blue Loan Book Scan | Scan is attached, including all items denoted in the loan book as being taken to ISOLDE.
This will be useful for a complete compilation of our inventory. |
|
209
|
Mon Nov 12 11:25:58 2018 |
CBH | Expected Proton Energy Plots | Attached are the plots from MC simulations of the energies the detected particles are to have, with the top plot showing the dE-E plot and the bottom plot showing the total energy of the particles.
Please note the height of the peaks is not indicative of the counts expected and there is a low proton background expected between the entrance and exit window elastic peaks - see attached plot from Margerin (2014). |
|
208
|
Sat Nov 10 18:48:04 2018 |
dk | Travel schedule spreadsheet | https://docs.google.com/spreadsheets/d/1kvCWF13RMH83fssuN2_JLZXJwNL4rUGSEeKOWAIHUi0/edit#gid=0
or
https://tinyurl.com/isolde-44ti |
|
206
|
Thu Nov 8 10:01:32 2018 |
CBH, DK | New Struts Installation | Struts arrived and were installed on Wednesday. The holes on one side of each of the struts to connect the wheels to were slightly too wide (11.5 cm vs 10.5 cm).
We've taken away part of the wheel holders and now they seem to be fitting in.
See attached photos:
1. First wheel with wide holder holes
2. Close up of work done
3. Second wheel with wide holder holes (on opposite corner of chamber)
4. Close up of work done
5. Wheel holder that was warped previously
6. Wheel holder that was warped previously, other perspective
7. What chamber looks like as of Wednesday afternoon
8. Lead sheets to make chamber a little bit more secure. |
|
205
|
Wed Nov 7 14:27:45 2018 |
CBH, DK | Beam Plan for Miguel and Alberto (ISOLDE beam operators) |
Presently, we are scheduled for 9 days:
Nov 26-28 are three (3) days nominally for beam development
Nov 29-Dec 4 are six (6) days nominally for physics data taking
Dec 5-6: Shutdowns and important tests are planned by ISOLDE team
Dec 7th - power gets shut off to ISOLDE
==Run Plan==
1 day for ion source and 2.8 MeV/u beam dev
1 day for High E_cm statistics, using the 2.8 MeV/u beam with 6 um Ti foil. Stop when we are happy with the number of counts we've gotten.
1 day for 1.9 MeV/u energy beam dev (for use with mid E_cm)
1.5 days for Mid E_cm statistics, using the 1.9 MeV/u beam with 3um Ti foil. Stop when we are happy with the number of counts we've gotten.
(Switch back to 2.8 MeV/u beam, takes under 1 hour)
4.5 days for Low E_cm (as long as we can), using 2.8 MeV/u beam and 12.5 um Al foil.
Time must be allocated for He runs and background Ar / empty runs. Ratios of background to reaction runs can be decided depending on the number of counts we see, and also dependent on if we need RP to change gas in the cell.
If 1.9 MeV/u proves too challenging, we may consider to switch to 2.2 MeV/u instead, TBD during machine time.
Over the weekend of 1-2 Dec we cannot change the beam (no operators) nor our target (no RP), so it is crucial we start the low E_cm run before then.
If 1.9 MeV/u beam energy is slightly different that's fine, however it would be preferable if the 2.8 MeV/u beam energy was no lower, especially for the low E_cm run.
---Total 9 days---
|
|
|
204
|
Mon Nov 5 16:26:34 2018 |
DK, CBH | Draft run plan | Please see https://elog.ph.ed.ac.uk/ISOLDE/203 for the E_cm calculations.
Presently, we are scheduled for 9 days:
Nov 26-28 are three (3) days nominally for beam development
Nov 29-Dec 4 are six (6) days nominally for physics data taking
It is not required to use all beam dev time at the beginning of the run, and we can take data in here with a beam we like before moving on. We do, however, have to care for the fact that over the weekend of 1-2 Dec that we cannot
change the beam (no operators) nor our target (no RP).
==Tentative Run Plan==
1 day for ion source and 2.8 MeV beam dev
1 day for High E_cm statistics, using the 6 um Ti foil
1 day for lower energy beam dev (for use with mid E_cm)
1.5 days for Mid E_cm statistics
(Switch back to 2.8 MeV/u beam, takes under 1 hour)
4.5 days for Low E_cm
---Total 9 days---
==Conditions==
The High E_cm and Low E_cm can not only share the same 2.8 MeV/u beam, which is considered a fairly easy beam since this is the nominal REX energy.
The Mid E_cm requires its own beam, and we have two conditions to choose from.
=High E_cm=
6um Ti, 2.8 MeV/u beam: Ecm=5.56-5.86 MeV
Pro: Beam energy is 'easy'
Pro: Can share E_beam with Low E_cm
=Mid E_cm=
2.5um HAVAR, 2.2 MeV beam: Ecm=4.76-5.06 MeV
Pro: Beam energy was delivered previously in 2012
Con: Physics protons show up below the elastic ones
3um Ti, 1.88 MeV/u beam: Ecm=4.27-4.58 MeV
Pro: Physics protons show up above the elastic ones
Pro: We already made the gas cell
Pro: Very similar E_cm to Margerin (but different conditions)
Con: Beam energy might be difficult to achieve (but possible)
=Low E_cm=
12.5 Al, 2.8 MeV/u beam: Ecm=3.41-3.72 MeV
Pro: We have the foil installed and tested
Pro: Beam is 'easy'
Pro: Can share E_beam with High E_cm |
|
203
|
Mon Nov 5 13:52:46 2018 |
CBH | CoM energies for 44Ti(alpha,p) reaction for different entrance windows and beam energies | Assuming 200 Torr helium target., elastic and reaction peaks do not have signifcant overlap unless stated:
3um Ti, 1.88 MeV/u beam: Ecm=4.27-4.58 MeV
3um Ti, 2.2 MeV/u beam: Ecm=5.50-5.80 MeV
12.5 Al, 2.8 MeV/u beam: Ecm=3.41-3.72 MeV
2.5 um HAVAR, 1.88 MeV/u beam: Ecm=3.54-3.85 MeV (peaks overlap)
2.5um HAVAR, 2.2 MeV beam: Ecm=4.76-5.06 MeV
6um Ti, 2.2 MeV/u beam: Ecm=3.15-3.47 MeV
6um Ti, 2.8 MeV/u beam: Ecm=5.56-5.86 MeV |
|
202
|
Fri Nov 2 17:01:16 2018 |
DK | Inventory going to CERN by easyJet | Conor will take:
==Black clicker case==
Foam packed, gas cell "b" with 12.5 um Al entrance window.
Target ladder with broken gas cell installed.
Daid will take:
==Backpack etc==
1 box with 4 quick-release gas tube hoses.
One bag with 6 teflon foot supports.
One small bag with gain screwdriver, 2 LEMO barrels, a bag of M2 screws from Japan, 1 gas cell saddle.
Gas cell feedthrogh, in bubble wrap
Gas cell vacuum bypass, including analog gauge dial.
One bag with extra O-rings and the acrylic window for the gas feedthrough itself
Silena Quad Bias Supply 7710
4 imperial spanners for Swagelok
2 Notebooks (common one and daid's one) |
|
201
|
Wed Oct 31 16:01:33 2018 |
DK | Measuring foil thickness | A couple scans from my notes which may be useful.
One discusses alpha energy loss in nominal kitchen foil (~12 um) and also introduces my technique to calibrate a thin (~20 um) SSD. Sorry I forget which student's thesis it's from, either Sakaguchi of CNS Tokyo or perhaps Dahee Kim of
Ewha. They both did alpha measurements in 2015 as memory serves. It shows we could measure the thickness of the 12.5 um Al foil from Goodfellow with a standard source.
The second is just an email to a colleague about how I went about measuring some foils by weight. In that case, I want to get an idea on "how much aluminium might be evaporated on the mylar" and I got, I believe, a pretty sensible
answer. Of course, I *assumed* that the mylar was the nominal value. |
|
200
|
Wed Oct 31 14:50:36 2018 |
DK | Strut shipping info | http://www.dhl.com/en/express/tracking.html?AWB=1647723055&brand=DHL |
|
199
|
Thu Oct 25 13:25:16 2018 |
KG | Current gas cell status | (Wrapped up)
Cell b : 15um Al exit, 12.5um Al entrance. L/R ~0.4Torr/hr overnight (in vacuum)
Cell d : 15um Al exit, 3um Ti entrance. L/R ~ 0.8Torr/hr overnight (in vacuum)
(In testing)
Cell a : 15um Al exit, undecided which window will be used. At current epoxy on screw in joints for arms of cell. Testing in atmosphere to see if can reach adequate seal with this. |
|
198
|
Wed Oct 10 10:57:33 2018 |
DK | Chamber wheel bolt spacing | From Ruchi's friend Rob. |
|
197
|
Tue Oct 9 14:25:54 2018 |
DK | Au foil request to STFC | http://npg.dl.ac.uk/TargetRequests/
https://www.technologysi.stfc.ac.uk/Pages/Target-frames.aspx
The standard frame is NSF CP type 3
Asked for 5x 100 ug/cm^2 Au. |
|
196
|
Tue Oct 9 10:40:13 2018 |
DK | To-do Meeting Notes: July, August, September, October | Each month's notes are attached. Unfinished business naturally carries over to the next month.
This elog will be updated with new notes as necessary.
NB: These are the notes composed *prior* to the meeting, thus do not include any suggestions or corrections. |
|
195
|
Mon Oct 8 17:02:47 2018 |
DK | Target ladder photo from previous experiment | From Alex, attached. |
|
194
|
Mon Oct 8 12:07:18 2018 |
DK | Gas cell check with He sniffer | Notes from an email:
Tested the chamber with the leak checker. We got 3.7 x 10^-6 mbar
liters / sec. I estimate the chamber's leak rate around 1 mbar / 4
hours or so, and I randomly guess its volume is 100 ml. If I smash
those numbers I get ~10^-5 mbar liters / sec which is a similar order.
I turned off the pumps for the weekend but left the He gas in the
cell. |
|
193
|
Mon Oct 8 12:05:25 2018 |
DK, PB | Gas cell supports | These are used to connect the gas cell to the target ladder. We only had the one, and it would be more convenient if each gas cell has its own, to avoid swapping them back and forth.
Drawings attached. |
|
192
|
Thu Oct 4 13:07:33 2018 |
KG | Schematics for gas-cell tests | in_atmosphere.png : schematic for testing gas-cell in atmosphere
Feedthrough.png : feed through schematic for testing vacuum chamber and gas cell |
|
191
|
Thu Sep 27 12:41:06 2018 |
DK | Strut measurement request | For posterity
==========
Hi Ruchi,
Could you ask a friend for me to make a measurement with a ruler? I
attach a PDF you may send along. It shows a basic picture of the blue
chamber stand, a picture of the broken part, and an arrow with what I
need to know. Second page of PDF shows what kind of signage should be
on the items of interest.
The steel wheel mounts have two bolts which connect them to the
struts. We want to know the spacing between the *center* of one bolt
to the second bolt, so that we know the spacing to drill into the new
struts. There are 4 such steel wheel mounts, two on a pair of struts.
My guess is the value is something around 12 cm give or take. But I
need a precise value and I forgot to measure it in August.
The chamber stand is located to the beam left of XT01 (Miniball) in
ISOLDE hall, or it was ...
Cheers,
daid |
|
190
|
Thu Sep 27 11:14:34 2018 |
CBH | Photos and Measurements from August CERN Trip | Chamber frame width=65cm
Chamber frame height=146cm
Chamber frame length=230cm
Centre of mass of chamber (from ground)=173cm
Wheel span=160cm
SEC to wall=124cm
Ventilation box to container (to get to garage)=121cm
Photos of broken ends of struts attached. |
|
189
|
Mon Sep 24 14:44:48 2018 |
DK | ISOLDE vacuum schematic | Attached. PDF is produced with Gnome Dia -- source file attached as well.
Bellow near GV is not depicted. None of SEC components are depicted (as they would be irrelevant with the GV in place).
Need to make inset for gas flow system. |
|
188
|
Thu Aug 30 15:14:50 2018 |
DK | Gate Valve | Some notes on the broken gate valve that should go between SEC and our chamber at XT03. |
|
187
|
Thu Aug 23 18:57:15 2018 |
DK | What daid is taking from ISOLDE to Edinburgh | 1 bolt for chamber stand structure, for reference for new struts.
2 target ladders: spare 1/2 style ladder, ladder from inside chamber, including the bits to connect to actuator
2 dual photodiode frames for degraders. (Existing at CERN are 3 more, with 10, 15, and 20 um Al foil over one side, respectively)
Acrylic window from beam upstream (front) top of chamber, where gas feedthrough is meant to go. |
|
186
|
Thu Aug 23 18:23:27 2018 |
DK | Where to find (our) stuff at ISOLDE | =Overview=
Shoes, hard hats, 'underpants', spiders, etc: Cardboard box "R", Garage entry of ISOLDE, shelf opposite turnstyle.
Electronics racks: between XT02 and XT03 beam lines. Atop racks are power strips, box of ribbon cables
Chamber, stand: beam left of XT01.
Wooden chamber shipping box: MIA?!
5 SSDs, 3 photodiodes, (10, 15, 20 um Al degraders for photodiodes), heavy ion degrader foils of 59Cu: MINIBALL fragile cabi
All others: Building 275, in the 7 metal boxes.
=New inventory after moving chamber=
Summary:
1 A Toolbag etc, packed aug 2018 - has Faraday cup cable in pocket
2 F Packings only
3 O extra ribbon cables, helmet, TV power supply (look here as last resort)
4 C Packed Aug 2018, see below. Small TMP, vacuum gauge readouts, etc
5 B Large TMP, packed august 2018
6 P vacuum tubes, chamber innards, irises, bolts and such
7 Q tom's favorite PC and components
==Box A==
Toolbag
has faraday cup cable, inner pocket
SEC flange to connect our beam line !!
bolts to fix chamber to stand, in a bag in outer pocket
1 photodiode preamp, outer pocket.
fan, peter's idea how to cool small TMP
==Box B==
Large TMP
Connectors and cut allen key for chamber mounting -- daid's pocket, intending to tape to inside top of box
(nothing else, just these item)
==Box C==
Large TMP controller
Small TMP, with valve attached at exit and C clamp on top to connect to chamber.
Small TMP controller
Both digital vacuum gauge readouts
===unlabeled subbox of C (quickly sealed w/ blue tape)===
3 power supply cables (1 w/ swiss converter)
2 SHV cables (for inv. magnetron gauges)
1 funky cable for other vacuum gauge
1 bag of unknown origin pre-existing in box:
1 fuse
1 ferrite clamp
1 bumper foot
===2nd unlabelled subbox===
handed to me by someone, from near XT03.
appears to be related w/ chamber internal video camera...LEDs, wires, RCA connectors, etc
==Box P==
(added vacuum tubes)
Attached: Notices posted with much enthusiasm. |
|
185
|
Thu Nov 23 13:16:56 2017 |
CLW | Beam energies | Beam energy measurements can be found in the electronic logbook for ISO-REX-HIE
https://op-webtools.web.cern.ch/elogbook/
measurements for all energies were:
E = 4.985 MeV/u. dE (FWHM)= 0.6%
E=4.715 MeV/u, dE(FWHM)=0.6%
E = 4.29 MeV/u dE(FWHM) = 0.5%
E=3.99 MeV/u .Energy spread around 0.5%.
E = 3.61 MeV/u with dE(FWHM) = 0.55% |
|
184
|
Thu Nov 16 16:24:29 2017 |
RG CLW MD | Run 173 Pulse Walkthrough HI n-side | Header: Pulser walkthrough, HI n-side, trigger on HI detector this time
Ender: Change to digital pulser to check as non-linearity was observed at low amplitudes.
====================================================
Run number : 173
Date : 16/11/2017
Start time : 17:26:17
Stop time : 17:30:37
Trigger rate (MIDAS) : 1k
Blocks written :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 1.6k
1- Gated : 1k
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) :
Target :
Ladder position (mm) :
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.55
E voltage (V) : -350
E leakage (uA) : 2.53
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.95
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:Trigger on E detector!
==================================================== |
|
183
|
Thu Nov 16 16:14:04 2017 |
RG CLW MD | Run 172 Pulse Walkthrough HI n-side | Header: Pulser walkthrough, HI n-side
Ender: Change to digital pulser to check as non-linearity was observed at low amplitudes.
====================================================
Run number : 172
Date : 16/11/2017
Start time : 17:17:34
Stop time : 17:23:08
Trigger rate (MIDAS) : 5k
Blocks written :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 11k
1- Gated : 2k
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) :
Target :
Ladder position (mm) :
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.55
E voltage (V) : -350
E leakage (uA) : 2.53
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.95
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:Trigger on E detector!
==================================================== |
|
182
|
Thu Nov 16 16:06:07 2017 |
RG CLW MD | Run 171 Pulse Walkthrough HI n-side | Header: Pulser walkthrough, HI n-side
Ender: negative pulser, rise time 0.05 us, fall time 1ms, delay .5 us,ref INT, width 0.5 us, Amplitude: 9 on
dial, no attenuation, in steps of 1 , 250 Hz
====================================================
Run number : 171
Date : 16/11/2017
Start time : 17:06:55
Stop time : 17:11:28
Trigger rate (MIDAS) : 5k
Blocks written :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 19k
1- Gated : 5k
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) :
Target :
Ladder position (mm) :
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.55
E voltage (V) : -350
E leakage (uA) : 2.53
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.95
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:Trigger on E detector!
==================================================== |
|
181
|
Thu Nov 16 15:57:29 2017 |
RG CLW MD | Run 170 Pulse Walkthrough HI p-side | Header: Pulser walkthrough, HI p-side
Ender: positive pulser, fall time 1ms, delay 250 ns, 10 V in steps of 1, 250 Hz
====================================================
Run number : 170
Date : 16/11/2017
Start time : 17:00:09
Stop time : 17:05:14
Trigger rate (MIDAS) : 6400
Blocks written :
Run Scalers (approx rates)
0- Ungated : 27000
1- Gated : 6000
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
Beam energy (MeV/u) :
Beam intensity (epA) :
Target :
Ladder position (mm) :
HI Degrader foil (um) :
Comments: Trigger on E detector!
==================================================== |
|
180
|
Thu Nov 16 15:43:48 2017 |
RG CLW MD | Run 169 Pulse Walkthrough E n-side | Header: Pulser walkthrough, E n-side
Ender: negative pulser, rise time 0.05 us, fall time 1ms, delay .5 us,ref INT, width 0.5 us, Amplitude: 6 on
dial, no attenuation, in steps of 1 , 250 Hz
====================================================
Run number : 169
Date : 16/11/2017
Start time : 16:55:56
Stop time : 16:58:57
Trigger rate (MIDAS) : 7500
Blocks written :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 27k
1- Gated : 7k
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) :
Target :
Ladder position (mm) :
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.55
E voltage (V) : -350
E leakage (uA) : 2.53
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.95
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
179
|
Thu Nov 16 15:37:35 2017 |
RG, MD, CLW | Run 167 JUNK | |
|
178
|
Thu Nov 16 15:33:24 2017 |
RG CLW MD | Run 168 Pulse Walkthrough E p-side | Header: Pulser walkthrough, E p-side
Ender: positive pulser, fall time 1ms, delay 250 ns, 6 V in steps of 0.5, 250 Hz
====================================================
Run number : 168
Date : 16/11/2017
Start time : 16:49:05
Stop time : 16:55:06
Trigger rate (MIDAS) : 7961
Blocks written : 8522
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 33k
1- Gated : 7k
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) :
Target :
Ladder position (mm) :
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.55
E voltage (V) : -350
E leakage (uA) : 2.53
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.95
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Trigger on each pulser run OR between all strips of the detector to be measured.
==================================================== |
|
177
|
Thu Nov 16 15:24:42 2017 |
RG CLW MD | Run 166 Pulse Walkthrough dE n-side | Header: Pulser walkthrough, dE n-side
Ender: negative pulser, rise time 0.05 us, fall time 1ms, delay .5 us,ref INT, width 0.5 us, Amplitude: 7 on
dial, att. 5, in steps of 1 , 250 Hz
====================================================
Run number : 165
Date : 16/11/2017
Start time : 16:29:35
Stop time : 16:33:08
Trigger rate (MIDAS) : 7961
Blocks written : 5000
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 50k
1- Gated : 6k
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) :
Target :
Ladder position (mm) :
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.55
E voltage (V) : -350
E leakage (uA) : 2.53
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.95
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
176
|
Thu Nov 16 15:14:39 2017 |
RG CLW MD | Run 165 Pulse Walkthrough dE p-side | Header: Pulser walkthrough, dE p-side
Ender: positive pulser, fall time 1ms, delay 250 ns, 1.6 V in steps of 0.2, 250 Hz
====================================================
Run number : 165
Date : 16/11/2017
Start time : 16:22:02
Stop time : 16:26:11
Trigger rate (MIDAS) : 7961
Blocks written :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 90k
1- Gated : 8k
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) :
Target :
Ladder position (mm) :
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.55
E voltage (V) : -350
E leakage (uA) : 2.53
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.95
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
175
|
Thu Nov 16 11:20:51 2017 |
RG CLW MD | Run 162 -HI det calibration | Header: 4alpha source - Heavy Ion detector calibration
Ender:
====================================================
Run number : 162
Date : 16/11/2017
Start time : 12:22:54
Stop time : 13:02:47
Trigger rate (MIDAS) : 1200
Blocks written : 5651
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 1194
1- Gated : 1179
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) :
Target : 4alpha source
Ladder position (mm) :
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) :
del_E leakage (uA) :
E voltage (V) :
E leakage (uA) :
E_hi voltage (V) : -14
E_hi leakage (uA) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Thresholds on amplifiers ~1mV. Forgot to note down leakage currents
==================================================== |
|
174
|
Wed Nov 15 16:24:35 2017 |
RG CLW | Run 160 - strip numbering E detector | Header: 4alpha source off center (to the top)
Ender:
====================================================
Run number : 160
Date : 15/11/2017
Start time : 17:25:25
Stop time : 17:30:14
Trigger rate (MIDAS) : 8000
Blocks written : 5469
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 23000
1- Gated : 8000
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) :
Target : 4alpha source
Ladder position (mm) : 16.92
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) :
del_E leakage (uA) :
E voltage (V) :
E leakage (uA) :
E_hi voltage (V) :
E_hi leakage (uA) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
173
|
Wed Nov 15 16:05:25 2017 |
RG CLW | Run 159 - E detector calibration | Header: 4alpha source run for E det calubration
Ender:
====================================================
Run number : 159
Date : 15/11/2017
Start time : 17:01:03
Stop time : 17:24:21
Trigger rate (MIDAS) : 6700
Blocks written : 23895
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 30000
1- Gated : 9000
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) :
Target : 4alpha source
Ladder position (mm) : 36.92
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) :
del_E leakage (uA) :
E voltage (V) : -350
E leakage (uA) :
E_hi voltage (V) :
E_hi leakage (uA) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Didn't note the leakage current, but it was all normal.
==================================================== |
|
172
|
Wed Nov 15 15:41:41 2017 |
RG CLW | Run 157 - EJunk | Header: 4alpha source
Ender:
====================================================
Run number : 157
Date : 15/11/2017
Start time : 16:42:21
Stop time : 16:46:22
Trigger rate (MIDAS) : 1450
Blocks written : 1175
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 1700
1- Gated : 1400
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) :
Target : 4alpha source
Ladder position (mm) : 0.00
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) :
del_E leakage (uA) :
E voltage (V) :
E leakage (uA) :
E_hi voltage (V) :
E_hi leakage (uA) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
171
|
Wed Nov 15 14:18:30 2017 |
DK | Issues and problems encountered | Objective log on perceived issues. (As a benchmark, I enumerated 17 such issues on my previous RIB experiment March 2017.)
In no particular order...
1) Sun PC:
Cannot properly connect to internet, disallowing SSH access
Important for external monitoring
Better to control DAQ from ISOLDE data room in case of ISOLDE issues
Connecting to CERN network screwed with DNS, borking local DNS hence DAQ
Double mouse clicking often skipped run numbers
2) Vacuum:
Barely acceptable, and manual gate valve leaked!
Keep in mind, interlock system showed higher than true values
44Ti requires a gas cell and vacuum load may increase considerably
(Chamber needs gas-feedthrough lines and gas-flow control system)
Cooling lines are known to leak badly
3) SSDs:
HI detector leak current increased considerably during the run
Noisy n-n sides
To be discussed
4) Scalers
Scalers were made with noisy n-n sides, making interpretation confusing
We lacked LEMO cables to provided summed p-n scalers
5) Decay halflife
A simple handheld monitor turned out to be effective for 59Cu
That won't work for 44Ti ...
6) Unused aparatus should be minimized
(Time & money)
Photodiodes
ZnS screen / camera
Manual gate valve (see above)
7) Shift plan/schedule
No definitive plan -- need pre exp. meeting
Shift schedule became arbitrary, w/ several flip/flops
RP requirements limited access to chamber
8) Shift work
Run log was made with short notice
Style may not be ideal for data analyst
Copy/paste errors et al were observed
Deadtime log was suggested to be added
(Other issues might be circumvented w/ SSH access to Sun PC)
9) Purpose
Detail & motivation of exp. was not clear to all members
10) Faraday Cup
Data taken by TIMBER system, which is better to integrate w/ our DAQ
Strange non-physical fluctuations which we like ISOLDE team to resolve
Timestamp differences of Sun PC and TIMBER PC?
11) Silena HV module
Module was found to falsely report applied bias
12) Alpha calibration / pulser walkthrough
Lacking prior to experiment owing to manpower and technical difficulties
13) Sort codes and simulations
It was common to discuss received vs. expected data w/o fast clear answer |
|
169
|
Wed Nov 15 11:33:31 2017 |
RG CLW | Run 155 - calibration del E | Header: 4alpha source run for delE detector calibration
Ender:
====================================================
Run number : 155
Date : 15/11/2017
Start time : 12:33:44
Stop time : 15:48:24
Trigger rate (MIDAS) : 4400
Blocks written :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 16000
1- Gated : 5000
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) :
Target : 4alpha source
Ladder position (mm) : 56.92
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) :
E voltage (V) : -350
E leakage (uA) :
E_hi voltage (V) :
E_hi leakage (uA) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Forgot to note down the leakage current but it was normal
==================================================== |
|
168
|
Wed Nov 15 07:39:26 2017 |
MD, DK, CLW | End of beamtime, modules reading before turning off | Header: end of beamtime - modules reading
Ender:
====================================================
Date : 15 / 11 / 2017
Time : 08:42
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 2
1- Gated : 0 (MIDAS not running)
2- dE : 96k
3- E : 88
4- HI : 2
5- Pulser : 2
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : no beam
Beam intensity (epA) :
Target : (CH2_33+10+01)
Ladder position (mm) : (97.61)
HI Degrader foil (um) : (15 um)
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.69
E voltage (V) : -350
E leakage (uA) : 2.06
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.295
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.58
PA power (Down, positive) (A) : 0.80
PA power (Down, negative) (A) : 0.26
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 7.5 x 10^-6
Pressure (old gauge) (mbar) : 1.9 x 10^-5
Pressure (SEC) (mbar) : 4.9 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : +5.0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
08:44 turned Detector Bias off, Preamps off, Change chiller to 20.0 deg and after heating up, switched it off
==================================================== |
|
167
|
Wed Nov 15 05:26:46 2017 |
DK, MD, CLW | Run 153 | Header: Continue with CH2 and 5.0 MeV/u
Ender: end of beam time
====================================================
Run number : 153
Date : 15 / 11 / 2017
Start time : 06:24:46
Stop time : 08:29:53
Trigger rate (MIDAS) : 3
Blocks written : 532
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 3
2- dE : 58k
3- E : 79
4- HI : 448
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 5.0 MeV/u (nominal)
Beam intensity (epA) : 2.5
Target : CH2_33+10+01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 15 um
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.69
E voltage (V) : -350
E leakage (uA) : 2.065
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.30
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.59
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 7.7 x 10^-6
Pressure (old gauge) (mbar) : 2.0 x 10^-5
Pressure (SEC) (mbar) : 4.9 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : +5.9
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
166
|
Wed Nov 15 03:25:08 2017 |
MD,DK | Run 152 | Header: Continue with 5.0 MeV/u on CH2_33+10+01
Ender: End
====================================================
Run number : 152
Date : 15 / 11 / 2017
Start time : 04:19:13
Stop time : 06:24:38
Trigger rate (MIDAS) : 4
Blocks written : 531
====================================================
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 61k
3- E : 131
4- HI : 478
5- Pulser : 1
6- Clock : 969
====================================================
Beam energy (MeV/u) : 5.0 MeV/u (nominal)
Beam intensity (epA) :
Target : CH2_33+10+01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 15 um Al
====================================================
del_E voltage (V) : -40
del_E leakage (uA) : 0.68
E voltage (V) : -350
E leakage (uA) : 2.07
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.28
====================================================
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.58
PA power (Down, positive) (A) : 0.79
PA power (Down, negative) (A) : 0.27
====================================================
Pressure (IMG1) (mbar) : 7.9 x 10^-6
Pressure (old gauge) (mbar) : 2.1 x 10^-5
Pressure (SEC) (mbar) : 4.9 x 10^-6
====================================================
Temp (Chiller) deg : -10.1
Temp (chamber) deg : 5.6
====================================================
Comments:
==================================================== |
|
165
|
Wed Nov 15 01:02:59 2017 |
DK, MD | Run 151 | Header: Continue with 5.0 MeV/
Ender:
====================================================
Run number : 151
Date : 15 / 11 / 2017
Start time : 02:03:26
Stop time : 04:19:06
Trigger rate (MIDAS) : 5
Blocks written : 577
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 5
1- Gated : 4
2- dE : 62k
3- E : 128
4- HI : 495
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 5.0 MeV/u (nominal)
Beam intensity (epA) : 2.25
Target : CH2_33+10+01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.66
E voltage (V) : -350
E leakage (uA) : 2.065
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.265
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.59
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 8.2 x 10^-6
Pressure (old gauge) (mbar) : 2.2 x 10^-5
Pressure (SEC) (mbar) : 5.0 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -9.9
Temp (chamber) deg : 5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Proton beam intensity dropped briefly, from 2:50 to 3:00 AM (drop was about ~5 min). Normal value was 1.5 uA, dropped down to 0.5 uA before recovered.
==================================================== |
|
164
|
Tue Nov 14 23:07:06 2017 |
MD, DK | Run 150 | Header: 5.0 MeV/u wit CH2
Ender: End
====================================================
Run number : 150
Date : 15 / 11 / 2017
Start time : 00:04:11
Stop time : 02:03:18
Trigger rate (MIDAS) : 4
Blocks written : 507
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 64k
3- E : 82
4- HI : 645
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 5.0 MeV/u (nominal)
Beam intensity (epA) : 2.75
Target : CH2_33+10+01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.65
E voltage (V) : -350
E leakage (uA) : 2.06
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.245
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.59
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 8.75 x 10^-6
Pressure (old gauge) (mbar) : 2.4 x 10^-5
Pressure (SEC) (mbar) : 5.1 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : 5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
163
|
Tue Nov 14 20:56:33 2017 |
SL, MB, DK, MD | Run 149 | Header: 5 MeV/u on CH2_33+10+01
Ender: End
====================================================
Run number : 149
Date : 14 / 11 / 2017
Start time : 21:52:18
Stop time : 00:04:04
Trigger rate (MIDAS) : 5
Blocks written : 572
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 60875
3- E : 90
4- HI : 594
5- Pulser : 1
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 5.0 MeV/u (nominal)
Beam intensity (epA) : ~2pA
Target : CH2_33+10+01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 15 um
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.62
E voltage (V) : -350
E leakage (uA) : 2.03
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.08
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.26
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 1.3 x 10^-5
Pressure (old gauge) (mbar) : 3.1 x 10^-5
Pressure (SEC) (mbar) : 5.7 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : +5.7
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
====================================================
Back to CH2... |
|
162
|
Tue Nov 14 20:13:10 2017 |
SL, MB, DK | Run 148 | Header: 5 MeV/u on empty frame
Ender:
====================================================
Run number : 148
Date : 14 / 11 / 2017
Start time : 21:16:50
Stop time : 21:50:13
Trigger rate (MIDAS) : 2
Blocks written : 130
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 2
1- Gated : 1
2- dE : 75494
3- E : 111
4- HI : 4
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 5.0 MeV/u (nominal)
Beam intensity (epA) : ~2pA
Target : Empty Frame
Ladder position (mm) : 52.09
HI Degrader foil (um) : 15 um
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.62
E voltage (V) : -350
E leakage (uA) : 2.03
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.08
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.26
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 1.3 x 10^-5
Pressure (old gauge) (mbar) : 3.1 x 10^-5
Pressure (SEC) (mbar) : 5.7 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : +5.7
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
161
|
Tue Nov 14 18:35:59 2017 |
SL, MB | Run 147 | Header: 5 MeV/u on C_09
Ender:
====================================================
Run number : 147
Date : 14 / 11 / 2017
Start time : 19:44:41
Stop time : 21:11:52
Trigger rate (MIDAS) : 5
Blocks written : 383
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 6
1- Gated : 5
2- dE : 57836
3- E : 114
4- HI : 852
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 5.0 MeV/u (nominal)
Beam intensity (epA) : ~2pA
Target : C_09
Ladder position (mm) : 82.44
HI Degrader foil (um) : 15 um
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.61
E voltage (V) : -350
E leakage (uA) : 1.99
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.08
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.26
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 1.3 x 10^-5
Pressure (old gauge) (mbar) : 3.1 x 10^-5
Pressure (SEC) (mbar) : 5.7 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -9.9
Temp (chamber) deg : +5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
160
|
Tue Nov 14 18:30:11 2017 |
SL, MB | Run 146 | Junk |
|
159
|
Tue Nov 14 16:00:29 2017 |
CLW, MB, SJL,RG | Run 145 | Header: 5 MeV/u on CH2 33,10,01
Ender: End to allow laser cleaning
====================================================
Run number : 145
Date : 14 / 11 / 2017
Start time : 17:02:01
Stop time : 19:28:30
Trigger rate (MIDAS) : 3
Blocks written : 610
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 3
2- dE : 76k
3- E : 95
4- HI : 425
5- Pulser : 1
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 5.0 MeV/u (nominal)
Beam intensity (epA) : ~2pA
Target : CH2_33+10+01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 15 um
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.54
E voltage (V) : -350
E leakage (uA) : 1.75
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.55
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.26
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 1.2 x 10^-5
Pressure (old gauge) (mbar) : 4.3 x 10^-5
Pressure (SEC) (mbar) : 7.0 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : +5.2
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
158
|
Tue Nov 14 15:59:42 2017 |
CLW | Run 144 JUNK | valve closed |
|
157
|
Tue Nov 14 14:30:51 2017 |
SL | Photos inside chamber (detectors, IRIS, etc) | |
|
155
|
Tue Nov 14 08:09:31 2017 |
CLW | Run 142 | Header: Protons are back, continue 3.6 MeV/u on CH2
Ender:
====================================================
Run number : 142
Date : 14 / 11 / 2017
Start time : 09:10:50
Stop time : 10:48:31
Trigger rate (MIDAS) : 6
Blocks written : 436
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 5
1- Gated : 5
2- dE : 36k
3- E : 4
4- HI : 500
5- Pulser : 1
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.6 MeV/u (nominal)
Beam intensity (epA) :
Target : CH2_33+10+01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 10 um
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.79
E voltage (V) : -350
E leakage (uA) : 2.09
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.22
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.26
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.5 x 10^-6
Pressure (old gauge) (mbar) : 1.8 x 10^-5
Pressure (SEC) (mbar) : 4.2 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : +6.2
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
154
|
Tue Nov 14 07:04:13 2017 |
DK, MD, CL | Run 140 | Header: Protons are back, continue 3.5 MeV/u on CH2
Ender:
====================================================
Run number : 140
Date : 14 / 11 / 2017
Start time : 08:05:36
Stop time : 08:29:06
Trigger rate (MIDAS) : 3
Blocks written : 103
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 2
1- Gated : 2
2- dE : 48k
3- E : 3
4- HI : 55
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.5 MeV/u (nominal)
Beam intensity (epA) :
Target : CH2_33+10+01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 10 um
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.79
E voltage (V) : -350
E leakage (uA) : 2.09
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.22
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.26
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.5 x 10^-6
Pressure (old gauge) (mbar) : 1.8 x 10^-5
Pressure (SEC) (mbar) : 4.2 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : +6.2
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
153
|
Tue Nov 14 06:22:29 2017 |
DK, MD | Run 139 | Header: Continue at 3.5 MeV/u w/ CH2
Ender: No protons are coming to ISOGPS
====================================================
Run number : 139
Date : 14 / 11 / 2017
Start time : 07:17:32
Stop time : 08:00:39
Trigger rate (MIDAS) : 6
Blocks written : 196
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 5
1- Gated : 5
2- dE : 59k
3- E : 6
4- HI : 670
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.5 MeV/u (nominal)
Beam intensity (epA) : 1.5
Target : CH2_33+10+01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 10 um
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.795
E voltage (V) : -350
E leakage (uA) : 2.08
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.20
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.25
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.4 x 10^-6
Pressure (old gauge) (mbar) : 1.25 x 10^-5
Pressure (SEC) (mbar) : 4.2 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 6.0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: We notice the rates are wrong about 8:00. It seems the beam stopped about 7:55 or later.
==================================================== |
|
152
|
Tue Nov 14 06:18:32 2017 |
MD, DK | Run 137, 138 - Junk | The newly started runs were stopped by MIDAS - bad clicking mouse... |
|
151
|
Tue Nov 14 04:16:18 2017 |
MD, DK | Run 136 |
Header: CH2_33+10+01 with 3.5 MeV/u
Ender:
====================================================
Run number : 136
Date : 14 / 11 / 2017
Start time : 05:16:57
Stop time : 07:16:32
Trigger rate (MIDAS) : 5
Blocks written : 552
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 5
1- Gated : 5
2- dE : 60k
3- E : 4
4- HI : 812
5- Pulser : 2
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.5 MeV/u (nominal)
Beam intensity (epA) : ~1.75
Target : CH2_33_10_01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.80
E voltage (V) : -350
E leakage (uA) : 2.085
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.15
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.58
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.4 x 10^-6
Pressure (old gauge) (mbar) : 1.6 x 10^-5
Pressure (SEC) (mbar) : 4.1 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -9.9
Temp (chamber) deg : +6.0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
150
|
Tue Nov 14 02:16:10 2017 |
DK, MD | Run 135 | Header: Back to CH2 with 3.5 MeV/u
Ender:
====================================================
Run number : 135
Date : 14 / 11 / 2017
Start time : 03:16:18
Stop time : 05:16:51
Trigger rate (MIDAS) : 5
Blocks written : 562
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 6
1- Gated : 5
2- dE : 59k
3- E : 5
4- HI : 787
5- Pulser : 2
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.5 MeV/u (nominal)
Beam intensity (epA) : ~1.6
Target : CH2_33_10_01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.80
E voltage (V) : -350
E leakage (uA) : 2.08
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.09
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.58
PA power (Down, positive) (A) : 0.79
PA power (Down, negative) (A) : 0.26
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.4 x 10^-6
Pressure (old gauge) (mbar) : 1.6 x 10^-5
Pressure (SEC) (mbar) : 4.1 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -9.9
Temp (chamber) deg : +6.1
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
149
|
Tue Nov 14 01:41:17 2017 |
MD, DK | Run 134 |
Header: 3.5 MeV/u on Empty frame
Ender: Stop
====================================================
Run number : 134
Date : 14/11/2017
Start time : 02:41:25
Stop time : 03:13:24
Trigger rate (MIDAS) : 2
Blocks written : 124
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 1
1- Gated : 1
2- dE : 54k
3- E : 5
4- HI : 12
5- Pulser : 2
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.5 MeV / u
Beam intensity (epA) : 1.4 - 1.5
Target : Empty (#Pos7)
Ladder position (mm) : 52.09
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.80
E voltage (V) : -350
E leakage (uA) : 2.075
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.085
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.58
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.4 E-06
Pressure (old gauge) (mbar) : 1.65 E-05
Pressure (SEC) (mbar) : 4.1 E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -9.9
Temp (chamber) deg : 6.1
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
148
|
Tue Nov 14 00:41:22 2017 |
MD, DK | Run 133 |
Header: 3.5 MeV/u on C_09
Ender:
====================================================
Run number : 133
Date : 14/11/2017
Start time : 01:36:51
Stop time : 02:38:39
Trigger rate (MIDAS) : 6
Blocks written : 301
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 6
1- Gated : 6
2- dE : 57k
3- E : 9
4- HI : 901
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.5 MeV / u
Beam intensity (epA) : 1.5 - 1.75
Target : C_09 (#Pos5)
Ladder position (mm) : 82.44
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.80
E voltage (V) : -350
E leakage (uA) : 2.07
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.04
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.58
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.35 E-06
Pressure (old gauge) (mbar) : 1.65 E-05
Pressure (SEC) (mbar) : 4.1 E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 6.1
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
147
|
Mon Nov 13 23:12:50 2017 |
MD, DK | Run 132 | Header: Continue CH2 with 3.5 MeV/u
Ender:
====================================================
Run number : 132
Date : 13 / 11 / 2017 - 14 / 11 / 2017
Start time : 23:37:15
Stop time : 01:34:17
Trigger rate (MIDAS) : 7
Blocks written : 545
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 5
1- Gated : 5
2- dE : 74k
3- E : 5
4- HI : 693
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.5 MeV/u (nominal)
Beam intensity (epA) : ~1.75 (min 1, max 3)
Target : CH2_33_10_01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.79
E voltage (V) : -350
E leakage (uA) : 2.05
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.95
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.58
PA power (Down, positive) (A) : 0.79
PA power (Down, negative) (A) : 0.25
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.3 x 10^-6
Pressure (old gauge) (mbar) : 1.6 x 10^-5
Pressure (SEC) (mbar) : 4.0 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 5.9
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: trigger rate seem to fluctuate with tendency to go down. (WHY unclear)
01:14 5, 5, 57k, 7, 886, 1, 971
--> less events on noisy back side of detector, which could be just from detector or can be the target loosing
protons, so we have really less events..
==================================================== |
|
145
|
Mon Nov 13 20:52:03 2017 |
SL RG DK | Run 131 |
Header: CH2 #33_10_01, beam energy 3.5 MeV/u
Ender:
====================================================
Run number : 131
Date : 13/11/17
Start time : 21:53:18
Stop time : 23:37:07
Trigger rate (MIDAS) : 7
Blocks written : 489
——————————————————————————————
Run Scalers (approx rates)
0- Ungated : 5
1- Gated : 5
2- dE : 128835
3- E : 25
4- HI : 887
5- Pulser : 2
6- Clock : 969
——————————————————————————————
Beam energy (MeV/u) : 3.6
Beam intensity (epA) : 1.7
Target : CH2 #33_10_01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 10 Al
——————————————————————————————
del_E voltage (V) : -40
del_E leakage (uA) : 0.79
E voltage (V) : -350
E leakage (uA) : 2.05
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.86
——————————————————————————————
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.6
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.3
——————————————————————————————
Pressure (IMG1) (mbar) : 6.3E-06
Pressure (old gauge) (mbar) : 1.6E-05
Pressure (SEC) (mbar) : 4.0E-06
——————————————————————————————
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 5.3
——————————————————————————————
Comments:
==================================================== |
|
144
|
Mon Nov 13 19:09:53 2017 |
SL RG | Run 129 | Junk - double pressed stop acquisition |
|
143
|
Mon Nov 13 19:05:20 2017 |
SL RG | Run 130 |
Header: CH2 #33_10_01, beam energy 3.5 MeV/u
Ender:
====================================================
Run number : 130
Date : 13/11/17
Start time : 20:20:37
Stop time : 21:52:39
Trigger rate (MIDAS) : 5
Blocks written : 429
——————————————————————————————
Run Scalers (approx rates)
0- Ungated : 5
1- Gated : 5
2- dE : 128571
3- E : 23
4- HI : 656
5- Pulser : 1
6- Clock : 969
——————————————————————————————
Beam energy (MeV/u) : 3.6
Beam intensity (epA) : 1.7
Target : CH2 #33_10_01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 10 Al
——————————————————————————————
del_E voltage (V) : -40
del_E leakage (uA) : 0.79
E voltage (V) : -350
E leakage (uA) : 2.05
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.86
——————————————————————————————
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.6
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.3
——————————————————————————————
Pressure (IMG1) (mbar) : 6.3E-06
Pressure (old gauge) (mbar) : 1.7E-05
Pressure (SEC) (mbar) : 4.0E-06
——————————————————————————————
Temp (Chiller) deg : -10.2
Temp (chamber) deg : 5.3
——————————————————————————————
Comments:
==================================================== |
|
142
|
Mon Nov 13 17:23:16 2017 |
RG SL | Run 128 | Header: CH2 #33_10_01, beam energy 3.5 MeV/u
Ender: Stop for laser optimisation
====================================================
Run number : 128
Date : 13/11/2-17
Start time : 18:24:39
Stop time : 19:57:51
Trigger rate (MIDAS) : 6
Blocks written : 412
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 142346
3- E : 29
4- HI : 668
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.6
Beam intensity (epA) : 1.3
Target : CH2 #33_10_01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 10 Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.79
E voltage (V) : -350
E leakage (uA) : 2.06
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.85
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.6
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.3
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.3E-06
Pressure (old gauge) (mbar) : 1.7E-05
Pressure (SEC) (mbar) : 4.0E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : 5.3
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
141
|
Mon Nov 13 15:06:09 2017 |
MB, CLW, SJL | Run 127 |
Header: CH2 #33+10+01, beam energy 3.6
Ender:
====================================================
Run number : 127
Date : 13/11/2017
Start time : 16:07:39
Stop time : 18:24:21
Trigger rate (MIDAS) : 3
Blocks written : 620
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 5
1- Gated : 5
2- dE : 149k
3- E : 41
4- HI : 857
5- Pulser : 1
6- Clock : 970
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.6
Beam intensity (epA) : 1.3
Target : CH2 #33_10_01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 10 Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.80
E voltage (V) : -350
E leakage (uA) : 2.08
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.84
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.25
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.2E-06
Pressure (old gauge) (mbar) : 1.7E-05
Pressure (SEC) (mbar) : 3.8E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 5.3
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
140
|
Mon Nov 13 14:25:20 2017 |
MB, CLW, SJL | Run 126 |
Header: CH2 #33+10+01, beam energy 3.6
Ender: no beam at the start, so start afresh with run with continuour beam (hopefully)
====================================================
Run number : 126
Date : 13/11/2017
Start time : 15:37:38
Stop time : 16:07:35
Trigger rate (MIDAS) : 3
Blocks written : 128
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 5
1- Gated : 5
2- dE : 149k
3- E : 41
4- HI : 857
5- Pulser : 1
6- Clock : 970
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.6
Beam intensity (epA) : 1.3
Target : CH2 #33_10_01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 10 Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.80
E voltage (V) : -350
E leakage (uA) : 2.08
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.84
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.25
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.2E-06
Pressure (old gauge) (mbar) : 1.7E-05
Pressure (SEC) (mbar) : 3.8E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 5.3
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Laser intervention. No beam at start of run (first ~15 minutes).
==================================================== |
|
139
|
Mon Nov 13 12:10:18 2017 |
MB, CLW, SJL | Run 125 |
Header: CH2 #33+10+01, beam energy 3.6
Ender:
====================================================
Run number : 124
Date : 13/11/2017
Start time : 13:11:55
Stop time : 14:55:49
Trigger rate (MIDAS) : 6
Blocks written : 504
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 5
1- Gated : 5
2- dE : 36k
3- E : 40
4- HI : 680
5- Pulser : 1
6- Clock : 970
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.6
Beam intensity (epA) : 1.1
Target : CH2 #33_10_01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 10 Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.77
E voltage (V) : -350
E leakage (uA) : 2.08
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.81
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.6
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.1E-06
Pressure (old gauge) (mbar) : 1.7E-05
Pressure (SEC) (mbar) : 3.7E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : 5.3
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
138
|
Mon Nov 13 10:10:52 2017 |
MB, CLW, SJL, PJW | Run 124 |
Header: CH2 #33+10+01, beam energy 3.6
Ender:
====================================================
Run number : 124
Date : 13/11/2017
Start time : 11:05:23
Stop time : 13:11:19
Trigger rate (MIDAS) : 5
Blocks written : 572
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 5
1- Gated : 5
2- dE : 157k
3- E : 27
4- HI : 621
5- Pulser : 1
6- Clock : 970
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.6
Beam intensity (epA) : 1~.2
Target : CH2 #33_10_01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 10 Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.77
E voltage (V) : -350
E leakage (uA) : 2.08
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.81
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.6
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.3E-06
Pressure (old gauge) (mbar) : 1.7E-05
Pressure (SEC) (mbar) : 3.9E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : 5.6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Beam tuned to 3.6 MeV/u. Fresh CH2 in beam.
==================================================== |
|
137
|
Mon Nov 13 10:01:39 2017 |
MB, CLW, SJL, PJW | Run 123 JUNK | JUNK |
|
136
|
Mon Nov 13 07:23:23 2017 |
MB, CLW | Run 122 |
Header: CH2 #16, beam energy 4.4
Ender:
====================================================
Run number : 122
Date : 13/11/2017
Start time : 08:23:28
Stop time : 09:20:04
Trigger rate (MIDAS) : 5
Blocks written : 237
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 3
1- Gated : 3
2- dE : 155k
3- E : 29
4- HI : 439
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.29 (as measured by operators)
Beam intensity (epA) : 1
Target : CH2 #16
Ladder position (mm) : 127.95
HI Degrader foil (um) : 10 Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.77
E voltage (V) : -350
E leakage (uA) : 2.08
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.81
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.6
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.3E-06
Pressure (old gauge) (mbar) : 1.7E-05
Pressure (SEC) (mbar) : 3.9E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : 5.6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Laser cleaning between 08:10 and 08:20.
==================================================== |
|
135
|
Mon Nov 13 06:08:52 2017 |
MD, RG | Run 121 |
Header: CH2 #16, beam energy 4.4
Ender:
====================================================
Run number : 121
Date : 13/11/2017
Start time : 07:05:41
Stop time : 08:14:51
Trigger rate (MIDAS) : 4
Blocks written : 285
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 3
1- Gated : 3
2- dE : 154k
3- E : 27
4- HI : 264
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.4
Beam intensity (epA) : 1.3
Target : CH2 #16
Ladder position (mm) : 127.95
HI Degrader foil (um) : 10 Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.77
E voltage (V) : -350
E leakage (uA) : 2.08
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.81
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.6
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.4E-06
Pressure (old gauge) (mbar) : 1.7E-05
Pressure (SEC) (mbar) : 3.9E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : 5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Laser cleaning between 08:10 and 08:20.
==================================================== |
|
134
|
Mon Nov 13 06:06:23 2017 |
MD, RG | Run 120 - junk | Double klick on stopp, so it jumped to 121. R120 file should be empty or non existing. |
|
133
|
Mon Nov 13 03:52:48 2017 |
MD, RG | Run 119 |
Header: CH2 #16, beam energy 4.4
Ender:
====================================================
Run number : 119
Date : 13/11/2017
Start time : 04:51:09
Stop time : 07:05:09
Trigger rate (MIDAS) : 4
Blocks written : 560
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 150k
3- E : 27
4- HI : 328
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.4
Beam intensity (epA) : 1.0 - 1.2
Target : CH2 #16
Ladder position (mm) : 127.95
HI Degrader foil (um) : 10 Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.77
E voltage (V) : -350
E leakage (uA) : 2.08
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.80
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.6
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.4 E-06
Pressure (old gauge) (mbar) : 1.7 E-05
Pressure (SEC) (mbar) : 3.9 E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : +5.6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
132
|
Mon Nov 13 02:59:37 2017 |
RG MD | Run 118 - short | Header: CH2 #16, beam energy 4.4
Ender: IHS tripped (third time tonight)
====================================================
Run number : 118
Date : 13/11/2017
Start time : 04:00:25
Stop time : 04:36:39
Trigger rate (MIDAS) : 3
Blocks written : 152
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 125k
3- E : 33
4- HI : 375
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.4
Beam intensity (epA) : 1.3
Target : CH2 #16
Ladder position (mm) : 127.95
HI Degrader foil (um) : 10 Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.77
E voltage (V) : -350
E leakage (uA) : 2.08
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.80
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.59
PA power (Down, positive) (A) : 0.79
PA power (Down, negative) (A) : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.4E-06
Pressure (old gauge) (mbar) : 1.7E-05
Pressure (SEC) (mbar) : 3.9E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : 5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
131
|
Mon Nov 13 00:57:24 2017 |
MD, DK, RG | Run 117 | Header: 4.4 MeV/u on @ CH2
Ender:
====================================================
Run number : 117
Date : 13/11/17
Start time : 01:56:45
Stop time : 04:00:20
Trigger rate (MIDAS) : 3
Blocks written : 521
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 3
1- Gated : 3
2- dE : 158k
3- E : 22
4- HI : 566
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.4
Beam intensity (epA) : 1.0 - 1.5
Target : CH2_16
Ladder position (mm) : 127.95
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.77
E voltage (V) : -350
E leakage (uA) : 2.09
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.80
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.59
PA power (Down, positive) (A) : 0.79
PA power (Down, negative) (A) : 0.26
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.4 E-06
Pressure (old gauge) (mbar) : 1.7 E-05
Pressure (SEC) (mbar) : 3.9 E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 5.6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
130
|
Mon Nov 13 00:12:24 2017 |
RG MD DK | Run 116 | Header: CH2 #16, beam energy 4.4 MeV/u
Ender: Run stopped short - IHS tripped
====================================================
Run number : 116
Date : 13/11/2017
Start time : 01:12
Stop time : o1:41:50
Trigger rate (MIDAS) : 4
Blocks written : 117
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 155999
3- E : 15
4- HI : 351
5- Pulser : 2
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.4
Beam intensity (epA) : 1.45
Target : CH2_16
Ladder position (mm) : 127.95
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.77
E voltage (V) : -350
E leakage (uA) : 2.09
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 0.8
PA power (Up, negative) (A) : 0.3
PA power (Down, positive) (A) : 1.55
PA power (Down, negative) (A) : 0.6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.4E-06
Pressure (old gauge) (mbar) : 1.8E-05
Pressure (SEC) (mbar) : 3.8E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10
Temp (chamber) deg : 5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
129
|
Sun Nov 12 23:52:10 2017 |
DK, MD, RG | Run 115 - short | Header: Continue 4.4 MeV / u @ CH2
Ender: Run stopped short as the IHS tripped
====================================================
Run number : 115
Date : 13/11/2017
Start time : 00:52:06
Stop time : 01:06:27
Trigger rate (MIDAS) : 3
Blocks written : 58
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 3
1- Gated : 3
2- dE : 150k
3- E : 15
4- HI : 363
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.4 MeV
Beam intensity (epA) :
Target : CH2_16
Ladder position (mm) : 127.95
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.77
E voltage (V) : -350
E leakage (uA) : 2.09
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.80
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.59
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.3 x 10^-6
Pressure (old gauge) (mbar) : 1.7 x 10^-5
Pressure (SEC) (mbar) : 3.8 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : +5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
128
|
Sun Nov 12 23:51:34 2017 |
MD, DK, RG | Run 114 - Junk | Double clicked the start / stop so it is blank. |
|
127
|
Sun Nov 12 21:27:23 2017 |
DK, MB | Run 113 | Header: Continue 4.4 MeV/u on CH2
Ender: End
====================================================
Run number : 113
Date : 12 / 11 / 2017
Start time : 22:27
Stop time : 00.51.46
Trigger rate (MIDAS) : 4
Blocks written : 613
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 142k
3- E : 21
4- HI : 570
5- Pulser : 1
6- Clock : 977
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.4 MeV / u (nominal)
Beam intensity (epA) : 1.5
Target : CH2_16
Ladder position (mm) : 127.95
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.77
E voltage (V) : -350
E leakage (uA) : 2.10
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.79
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.6
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.3
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.3 x 10^-6
Pressure (old gauge) (mbar) : 1.8 x 10^-5
Pressure (SEC) (mbar) : 3.7 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -9.9
Temp (chamber) deg : 6.0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
126
|
Sun Nov 12 18:32:52 2017 |
MB DK | run 112 | Header: 4.4 MeV/u CH2_16 sample
Ender:
====================================================
Run number : 112
Date : 12/11
Start time : 19.32
Stop time : 22.27
Trigger rate (MIDAS) : 3
Blocks written : 733
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 3
1- Gated : 3
2- dE : 146000
3- E : 17
4- HI : 258
5- Pulser : 2
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.4 MeV/u
Beam intensity (epA) : 0.8
Target : CH2_16
Ladder position (mm) : 127.95
HI Degrader foil (um) : 10 mu
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.76
E voltage (V) : -350
E leakage (uA) : 2.10
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.76
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.2E-6
Pressure (old gauge) (mbar) : 1.8E-5
Pressure (SEC) (mbar) : 3.6E-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: data during first 5 mins of run were taken with sample at 126.95 mm rather than 127.95 mm
at 21:05, RILIS begins brief laser maintenance. 21:19 finished.
==================================================== |
|
125
|
Sun Nov 12 17:44:49 2017 |
MB DK RG | run 111 | Header: empty target, 4.4 MeV/u
Ender: End
====================================================
Run number : 111
Date : 12/11
Start time : 18:44
Stop time : 19:24
Trigger rate (MIDAS) : 2
Blocks written : 157
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 2
1- Gated : 2
2- dE : 138000
3- E : 15
4- HI : 12
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.4 MeV/u
Beam intensity (epA) : about 1
Target : empty
Ladder position (mm) : 52.09
HI Degrader foil (um) : 10 mu
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40 V
del_E leakage (uA) : 0.77 muA
E voltage (V) : -350 V
E leakage (uA) : 2.1 muA
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.76 muA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.6
PA power (Down, positive) (A) : 0.79
PA power (Down, negative) (A) : 0.27
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.2E-6
Pressure (old gauge) (mbar) : 1.8E-5
Pressure (SEC) (mbar) : 3.6E-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10
Temp (chamber) deg : 5.9
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
124
|
Sun Nov 12 15:34:39 2017 |
DK, MB | Run 110 | Header: Carbon target at 4.4 MeV/u
Ender: End
====================================================
Run number : 110
Date : 12/11/2017
Start time : 16:35:36
Stop time : 18:37:21
Trigger rate (MIDAS) : 3
Blocks written : 515
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 132k
3- E : 30
4- HI : 449
5- Pulser : 1
6- Clock : 970
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.4 MeV/u
Beam intensity (epA) : 0.5 to 2.0 (median around 1)
Target : C_25
Ladder position (mm) : 112.78
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.77
E voltage (V) : -350
E leakage (uA) : 2.10
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.75
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.25
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.1 x 10^-6
Pressure (old gauge) (mbar) : 1.8 x 10^-5
Pressure (SEC) (mbar) : 3.4 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 6.2
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
123
|
Sun Nov 12 13:24:51 2017 |
CLW, PJW | Run 109 | Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender: End
====================================================
Run number : 109
Date : 12.11.17
Start time : 14:25:46
Stop time : 16:26:07
Trigger rate (MIDAS) : 5
Blocks written : 505
Run Scalers (approx rates)
0- Ungated : 3
1- Gated : 3
2- dE : 124k
3- E : 35
4- HI : 608
5- Pulser : 2
6- Clock : 969
Beam energy (MeV/u) : 4.29 (as determined by operators)
Beam intensity (epA) :
Target : (CH2)n #16
Ladder position (mm) : 127.95
HI Degrader foil (um) : 10 um Al
del_E voltage (V) : -40
del_E leakage (uA) : -0.77
E voltage (V) : -350
E leakage (uA) : -2.11
E_hi voltage (V) : -14
E_hi leakage (uA) : -2.73
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.25
Pressure (IMG1) (mbar) : 6.1E-06
Pressure (old gauge) (mbar) : 1.8E-05
Pressure (SEC) (mbar) : 3.4E-06
Temp (Chiller) deg : -10
Temp (chamber) deg : 6.1
Comments:
====================================================
|
|
122
|
Sun Nov 12 11:19:06 2017 |
CLW, PJW | Run 108 | Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender:
====================================================
Run number : 108
Date : 12.11.17
Start time : 12:18:59
Stop time : 14:25:38
Trigger rate (MIDAS) : 5
Blocks written :
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 125k
3- E : 32
4- HI : 573
5- Pulser : 1
6- Clock : 969
Beam energy (MeV/u) : 4.29 (as determined by operators)
Beam intensity (epA) : ~1.5 pA
Target : (CH2)n #16
Ladder position (mm) : 127.95
HI Degrader foil (um) : 10 um Al
del_E voltage (V) : -40
del_E leakage (uA) : -0.77
E voltage (V) : -350
E leakage (uA) : -2.11
E_hi voltage (V) : -14
E_hi leakage (uA) : -2.72
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.25
Pressure (IMG1) (mbar) : 6.2E-06
Pressure (old gauge) (mbar) : 1.8E-05
Pressure (SEC) (mbar) : 3.4E-06
Temp (Chiller) deg : -10
Temp (chamber) deg : 5.8
Comments:
====================================================
|
|
121
|
Sun Nov 12 09:17:49 2017 |
CLW, PJW, TD | Run 107 | Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender:
====================================================
Run number : 107
Date : 12.11.17
Start time : 10.18
Stop time : 12:18:52
Trigger rate (MIDAS) : 5
Blocks written : 514
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 120k
3- E : 27
4- HI : 719
5- Pulser : 1
6- Clock : 969
Beam energy (MeV/u) : 4.4
Beam intensity (epA) :
Target : (CH2)n #16
Ladder position (mm) : 128.95*
HI Degrader foil (um) : 10 um Al
del_E voltage (V) : -40
del_E leakage (uA) : -0.78
E voltage (V) : -350
E leakage (uA) : -2.12
E_hi voltage (V) : -14
E_hi leakage (uA) : -2.71
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.25
Pressure (IMG1) (mbar) : 6.3E-06
Pressure (old gauge) (mbar) : 1.8E-05
Pressure (SEC) (mbar) : 3.5E-06
Temp (Chiller) deg : -10
Temp (chamber) deg : 5.8
Comments: Dimo cleans laser c. 10.20-10.35
====================================================
* target ladder reading by Tom 128.95, by Claudia 127.95 and Phil says ~128. True position depends how good the
marker is lining up with scale
|
|
120
|
Sun Nov 12 09:16:01 2017 |
CLW, PJW, TD | Run 106 | junk - ignore |
|
118
|
Sun Nov 12 06:23:36 2017 |
RG MB | Run 105 | Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: run ends OK to change beam energy from 4.0MeV/u to 4.29MeV/u
====================================================
Run number : 105
Date : 12/11/2017
Start time : 07:24
Stop time : 09:03
Trigger rate (MIDAS) : 4
Blocks written : 422
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 133020
3- E : 16
4- HI : 456
5- Pulser : 1
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.0
Beam intensity (epA) : 1.25
Target : CH2 30+25
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.7
E voltage (V) : -350
E leakage (uA) : 2.11
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.7
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.3
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.4E-06
Pressure (old gauge) (mbar) : 1.8E-05
Pressure (SEC) (mbar) : 3.5E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10
Temp (chamber) deg : 5.7
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Proton current at GPS smaller (1.7 uA compared to 2.0 uA in previous run)
==================================================== |
|
117
|
Sun Nov 12 04:22:57 2017 |
RG MB | Run 104 | Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender:
====================================================
Run number : 104
Date : 12/11/2017
Start time : 05:21
Stop time : 07:23
Trigger rate (MIDAS) : 5
Blocks written : 526
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 6
1- Gated : 5
2- dE : 142604
3- E : 17
4- HI : 472
5- Pulser : 1
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.0
Beam intensity (epA) : ~2
Target : CH2 30+25
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.7
E voltage (V) : -350
E leakage (uA) : 2.11
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.67
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.6
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.26
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.4E-06
Pressure (old gauge) (mbar) : 1.8E-05
Pressure (SEC) (mbar) : 3.6E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -9.9
Temp (chamber) deg : 5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
116
|
Sun Nov 12 01:46:23 2017 |
RG MB | Run 103 | Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: Run stopped as the beam went off. Noticed on the HI det scalar
====================================================
Run number : 103
Date : 12/11/2017
Start time : 02:42
Stop time : 04:17
Trigger rate (MIDAS) : 4
Blocks written : 415
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 140503
3- E : 18
4- HI : 767
5- Pulser : 1
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.0 MeV/u
Beam intensity (epA) : 2.0
Target : CH2 30+25
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.69
E voltage (V) : -350
E leakage (uA) : 2.1
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.64
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.6
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.29
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.5E-06
Pressure (old gauge) (mbar) : 1.9E-05
Pressure (SEC) (mbar) : 3.7E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 5.9
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
115
|
Sun Nov 12 01:28:26 2017 |
RG MB | Run 102 - Junk | Header: CH2 #30+25, Beam energy 4.0 MeV/u
Ender: Run stopped short as the RF cavity tripped
====================================================
Run number : 102
Date : 12/11/2017
Start time : 02:29
Stop time : 02:35
Trigger rate (MIDAS) : 2 Hz
Blocks written : 23
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 1
1- Gated : 1
2- dE : 145957
3- E : 17
4- HI : 3
5- Pulser : 2
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) : 0.05
Target :
Ladder position (mm) :
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) :
del_E leakage (uA) :
E voltage (V) :
E leakage (uA) :
E_hi voltage (V) :
E_hi leakage (uA) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
114
|
Sat Nov 11 23:30:25 2017 |
RG MB | Run 101 |
Header: CH2 #30+25, Beam energy 4.0 MeV/u
Ender:
====================================================
Run number : 101
Date : 12/11/2017
Start time : 00:27
Stop time : 02:29
Trigger rate (MIDAS) : 6
Blocks written : 484
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 146151
3- E : 16
4- HI : 654
5- Pulser : 1
6- Clock : 968
——————————————————————————————
Beam energy (MeV/u) : 4.0
Beam intensity (epA) : 1.75
Target : CH2 30+25
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
——————————————————————————————
del_E voltage (V) : -40
del_E leakage (uA) : 0.69
E voltage (V) : -350
E leakage (uA) : 2.1
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.64
——————————————————————————————
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.6
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.28
——————————————————————————————
Pressure (IMG1) (mbar) : 6.6E-06
Pressure (old gauge) (mbar) : 1.9E-05
Pressure (SEC) (mbar) : 3.7E-06
——————————————————————————————
Temp (Chiller) deg : -10
Temp (chamber) deg : 5.9
——————————————————————————————
Comments:
==================================================== |
|
113
|
Sat Nov 11 20:27:28 2017 |
TD, DK, RG, MB | Run 100 | Header: Continue CH2 at 4.0 MeV/u
Ender:
====================================================
Run number : 100
Date : 11 / 11 / 2017
Start time : 21:28
Stop time : 00:27
Trigger rate (MIDAS) : 6
Blocks written : 784
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 150k
3- E : 20
4- HI : 556
5- Pulser : 1
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.0 MeV/u (nominal)
Beam intensity (epA) : 1.75
Target : CH2 30+25
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.68
E voltage (V) : -350
E leakage (uA) : 2.10
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.59
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.25
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.8 x 10^-6
Pressure (old gauge) (mbar) : 1.9 x 10^-5
Pressure (SEC) (mbar) : 3.8 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -9.9
Temp (chamber) deg : 6.0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: At 21:57, we are notified by RILIS team that they would like to do some cleaning and laser maintenance before leaving for the night. It should take 15 minutes. We
will watch the scalars but continue the run. 22:14 beam is off. 22:18 the laser tuning is finished.
==================================================== |
|
112
|
Sat Nov 11 19:35:28 2017 |
TD | MIDAS DAQ configuration & MIDAS logs 1-11.11.17 | |
|
111
|
Sat Nov 11 18:31:10 2017 |
TD, DK | Run 99 | Header: 4.0MeV/u 59Cu20+ + (CH2)n, Laser #2 *on*
Ender: Normal run stop
====================================================
Run number : 99
Date : 11.11.17
Start time : 19.31
Stop time : 21:27
Trigger rate (MIDAS) :
Blocks written : 501
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 142k
3- E : 27
4- HI : 596
5- Pulser : 1
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.0 MeV/u nominal
Beam intensity (epA) : 1.7-2.5
Target : CH_2 30+25
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : -0.67
E voltage (V) : -350
E leakage (uA) : -2.10
E_hi voltage (V) : -14
E_hi leakage (uA) : -2.57
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.5
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.25
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.9E-6
Pressure (old gauge) (mbar) : 1.9E-5
Pressure (SEC) (mbar) : 3.8E-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : +5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: BNC PB-4 Frequency to minimum (c. 1Hz)
*All* SortSas and hist spectra zero'd at start of run
Online sort program sort4.f
End of run had 2 alphas. In ~12 hours (w/o subtracting down time) for runs 85~93 we had 22. Stats seem about right.
==================================================== |
|
110
|
Sat Nov 11 18:06:42 2017 |
TD, DK | Run 98 | Header: CH2 target in, Laser #2 off, 4.0 MeV/u
Ender: ends OK
====================================================
Run number : 98
Date : 11 / 11 / 2017
Start time : 18:55
Stop time : 19:23
Trigger rate (MIDAS) : 24
Blocks written : 1089
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 24
1- Gated : 24
2- dE : 142k
3- E : 62
4- HI : 42
5- Pulser : 24
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.0 MeV/u nominal
Beam intensity (epA) : 0.05 to 0.06
Target : CH_2 30+25
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : -0.67
E voltage (V) : -350
E leakage (uA) : -2.10
E_hi voltage (V) : -14
E_hi leakage (uA) : -2.67
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.5
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.25
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.9E-6
Pressure (old gauge) (mbar) : 1.95E-5
Pressure (SEC) (mbar) : 3.9E-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : +5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: DAQ trigger changed to OR( E p+n strips) .OR. PRE-SCALED-OR( E_HI p+n strips ) .OR. Pulser
==================================================== |
|
109
|
Sat Nov 11 17:45:10 2017 |
DK, TD, ASM, RG, MD | Run 97 | Header: CH2 target in, Laser #2 off, 4.0 MeV/u
Ender: Stopped run to modify DAQ trigger
====================================================
Run number : 97
Date : 11 / 11 / 2017
Start time : 18:48
Stop time : 18.55
Trigger rate (MIDAS) :
Blocks written : 1
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 0
1- Gated : 0
2- dE : 142k
3- E : 60
4- HI : 43
5- Pulser : 24
6- Clock : 976
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.0 MeV/u nominal
Beam intensity (epA) : 0.05 to 0.06
Target : CH_2 30+25
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.67
E voltage (V) : -350
E leakage (uA) : 2.10
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.67
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.5
PA power (Up, negative) (A) : .55
PA power (Down, positive) (A) : .25
PA power (Down, negative) (A) : .8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.9 x 10^-6
Pressure (old gauge) (mbar) : 1.95 x 10^-5
Pressure (SEC) (mbar) : 3.9 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : 5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Increased pulser rate to 250 Hz, to flush the previous buffer in the Tape Server.
See https://elog.ph.ed.ac.uk/ISOLDE/106 with "0 blocks written"
==================================================== |
|
108
|
Sat Nov 11 17:36:54 2017 |
ASM | more halflife stuff | Fitting those half life data more reasonably... fitted the decay curve with y=a*exp(-b*t)+c to all the data points, comes up with t1/2=(85.8+/-2.6)s |
|
107
|
Sat Nov 11 17:19:54 2017 |
ASM, CL, TD... | halflife | Placed a hand held rad monitor near the faraday cup and took rate readings every 20 seconds, right after inserting the gate valve in front of SEC:
seconds counts/s
0 590
20 499
40 474
60 400
80 353
100 290
120 259
140 234
160 207
180 187
200 175
220 146
240 135
260 124
280 120
300 109
320 107
340 103
360 85
380 86
400 84
420 94
440 81
460 76
480 76
500 74
Then fitted this for half life.
Assuming a steady state background of 70 cps, and using the first 7 data points... the half life comes out as 82.1 +/-3.9 s.
Excellent agreement with known halflife of 59Cu.
|
|
106
|
Sat Nov 11 17:08:50 2017 |
RG, DK, CL, TD, AM, MD | Run 96 | Header: Continue with 4.0 MeV/u Empty Frame
Ender:
====================================================
Run number : 96
Date : 11 / 11 / 2017
Start time : 18:09:43
Stop time : 18:40
Trigger rate (MIDAS) :
Blocks written : 0 blocks written, it says.
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 0 (actually ~0.1 Hz)
1- Gated : 0 (actually ~0.1 Hz)
2- dE : 150k
3- E : 30
4- HI : 37
5- Pulser : 2
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : Nominal 4.0 MeV/u
Beam intensity (epA) :
Target : Empty Frame
Ladder position (mm) : 52.09
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.67
E voltage (V) : -350
E leakage (uA) : 2.10
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.57
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.79
PA power (Down, negative) (A) : 0.25
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.9 x 10^-6
Pressure (old gauge) (mbar) : 2.0 x 10^-5
Pressure (SEC) (mbar) : 3.9 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 5.9 ~ 6.0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Increased pulser rate to 250 Hz after the run, to flush the previous buffer in the Tape Server.
See run 97
==================================================== |
|
105
|
Sat Nov 11 15:17:24 2017 |
CLW, PJW, RG, TD, MD, DK | Run 95 | Header: Continue with 4.0 MeV/u on Carbon after laser cleaning
Ender:
====================================================
Run number : 95
Date : 11 / 11 / 2017
Start time : 16:16:21
Stop time : 18:07:05
Trigger rate (MIDAS) : 2 to 5
Blocks written : 65
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 3
1- Gated : 3
2- dE : 133658
3- E : 26
4- HI : 651
5- Pulser : 2
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : Nominal 4.0 MeV/u
Beam intensity (epA) : 1.75ish pA
Target : C_25
Ladder position (mm) : 112.82 mm
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.67
E voltage (V) : -350
E leakage (uA) : 2.105
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.55
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.79
PA power (Down, negative) (A) : 0.25
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 7.0 x 10^-6
Pressure (old gauge) (mbar) : 2.0 x 10^-5
Pressure (SEC) (mbar) : 3.9 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -9.9 to -10.2
Temp (chamber) deg : 5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: no beam for last few mins as we tested the radioactivity in the faradaycup with valve closed
==================================================== |
|
104
|
Sat Nov 11 14:15:12 2017 |
CLW, PJW, RG | Run94 | Header: 3.99 MeV/u and C_25.
Ender: We stop because the lasers are being cleaned, and we saw the scalars drop. See Comment below.
====================================================
Run number : 93
Date : 11/11/17
Start time : 15:09:09
Stop time : 16:08:46
Trigger rate (MIDAS) : 3
Blocks written : 35
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 3
1- Gated : 3
2- dE : 134k
3- E : 52
4- HI : 559
5- Pulser : 2
6- Clock : 970
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.99 MeV/u
Beam intensity (epA) : ~1.5 pA
Target : C_25 (Pos#3; 430-500 ug/cm2)
Ladder position (mm) : 112.78
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.67
E voltage (V) : -350
E leakage (uA) : 2.11
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.53
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : -0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : -0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 7.1 E-06
Pressure (old gauge) (mbar) : 2.0 E-05
Pressure (SEC) (mbar) : 4.0 E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : 5.5
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: At around 16:00, the laser team goes in to do some cleaning. We are continuing to run while watching our scalars.
==================================================== |
|
103
|
Sat Nov 11 12:16:28 2017 |
CLW, PJW, RG | Run 93 |
Header: 3.99 MeV/u and CH2_30+25. Beam is back
Ender:
====================================================
Run number : 93
Date : 11/11/17
Start time : 13:17:12
Stop time : 15:00:51
Trigger rate (MIDAS) : 2-4
Blocks written : 57
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 3
1- Gated : 2
2- dE : 135k
3- E : 68
4- HI : 727
5- Pulser : 2
6- Clock : 970
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.99 MeV/u
Beam intensity (epA) : ~1.5-2 pA
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.67
E voltage (V) : -350
E leakage (uA) : 2.11
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.50
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : -0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : -0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 7.2 E-06
Pressure (old gauge) (mbar) : 2.1 E-05
Pressure (SEC) (mbar) : 4.0 E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 5.6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
102
|
Sat Nov 11 11:21:22 2017 |
CLW, PJW, RG | Run 92 |
Header: 3.99 MeV/u and CH2_30+25. Beam is back
Ender:
====================================================
Run number : 92
Date : 11/11/17
Start time : 12:22:50
Stop time : 12:50:13
Trigger rate (MIDAS) : 2-4
Blocks written : 14
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 3
1- Gated : 3
2- dE : 140k
3- E : 69
4- HI : 686
5- Pulser : 2
6- Clock : 970
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.99 MeV/u
Beam intensity (epA) :
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.67
E voltage (V) : -350
E leakage (uA) : 2.11
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.50
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : -0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : -0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 7.2 E-06
Pressure (old gauge) (mbar) : 2.1 E-05
Pressure (SEC) (mbar) : 4.0 E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -9.9
Temp (chamber) deg : 5.4
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Run had to be stopped early because some parts of the accelerator tripped. Miguel sorted it out remotely.
==================================================== |
|
101
|
Sat Nov 11 09:20:56 2017 |
CLW, MD, PJW | Run 91 |
Header: 3.99 MeV/u and CH2_30+25. Beam is back
Ender:
====================================================
Run number : 91
Date : 11/11/17
Start time : 10:20:26
Stop time : 12:22:08
Trigger rate (MIDAS) : 4
Blocks written : 78
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 4
1- Gated : 3
2- dE : 135k
3- E : 66
4- HI : 788
5- Pulser : 2
6- Clock : 970
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.99 MeV/u
Beam intensity (epA) : ~2 pA
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.65
E voltage (V) : -350
E leakage (uA) : 2.11
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.43
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : -0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : -0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 7.4 E-06
Pressure (old gauge) (mbar) : 2.2 E-05
Pressure (SEC) (mbar) : 4.1 E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : 5.3
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
100
|
Sat Nov 11 07:45:34 2017 |
Claudia | Checking Laser quality | There is an option to see when the beam is gone if it is due to lasers or due to the accelerator.
- window next to proton requestion switch
- put middle faraday cup in
- switch mass to stable copper 63Cu
- check faraday cup current. should be around 1-3 nA
- switch back to 59Cu
-Faraday Cup out
- further descption is on a piece of paper upstairs |
|
99
|
Sat Nov 11 07:44:16 2017 |
MD, CLW, PJW | Run 90 |
Header: 3.99 MeV/u and CH2_30+25. Beam is back
Ender:
====================================================
Run number : 90
Date : 11/11/17
Start time : 08:31:59
Stop time : 10:20:20
Trigger rate (MIDAS) : 3
Blocks written :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 3
1- Gated : 3
2- dE : 132k
3- E : 64
4- HI : 621
5- Pulser : 2
6- Clock : 970
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.99 MeV/u
Beam intensity (epA) : ~2.2 pA
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.65
E voltage (V) : -350
E leakage (uA) : 2.11
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.43
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : -0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : -0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 7.6 E-06
Pressure (old gauge) (mbar) : 2.2 E-05
Pressure (SEC) (mbar) : 4.3 E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 5.7 (from before)
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
Laser was optimized as well before (see picture for conditions)
==================================================== |
|
98
|
Sat Nov 11 06:57:14 2017 |
MD, CLW, PJW | Run 89 |
Header: 3.99 MeV/u and CH2_30+25. Continue after Laser update (cleaning), but still no real beam
Ender:
====================================================
Run number : 89
Date : 11/11/17
Start time : 07:57:31
Stop time : 08:31:57
Trigger rate (MIDAS) : 0
Blocks written : 1
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.99 MeV/u
Beam intensity (epA) : 0.05 - 0.1 pA
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.65
E voltage (V) : -350
E leakage (uA) : 2.11
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.42
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : -0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : -0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 7.65 E-06
Pressure (old gauge) (mbar) : 2.2 E-05
Pressure (SEC) (mbar) : 4.3 E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : 5.6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
8 good event in first 8 minutes
then laser was optimized, but still 0.1pA beam (almost nothing), called Miguel and he fixed it remotely
Beam back at 08:28:20, so the last 3 minutes there was some beam. Stopped to start a new run.
==================================================== |
|
97
|
Sat Nov 11 05:49:00 2017 |
AM & MD | run 88 | Header: 3.99 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 88
Date : 11/11/17
Start time : 06:49:09
Stop time : 07:34:34
Trigger rate (MIDAS) : 0
Blocks written : 1
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 0 (or near as damn it)
1- Gated : 0
2- dE : 138k
3- E : 56
4- HI : 15
5- Pulser : 2
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.99 MeV/u
Beam intensity (epA) : ~ 0.1 pA (yes!)
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.65
E voltage (V) : -350
E leakage (uA) : 2.11
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.42
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : -0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : -0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 7.8 E-06
Pressure (old gauge) (mbar) : 2.35 E-05
Pressure (SEC) (mbar) : 4.3 E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : 5.7
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Laser needs cleaning - person (Dima) on the way. Right now, very low beam current. Stopped when Dima arrived
==================================================== |
|
96
|
Sat Nov 11 03:58:58 2017 |
MD, ASM | Run 87 |
Header: 3.99 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 87
Date : 11/11/17
Start time : 04:48:45
Stop time : 06:38:00
Trigger rate (MIDAS) : 3
Blocks written : 44
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 3
1- Gated : 3
2- dE : 125k
3- E : 60
4- HI : 575
5- Pulser : 2
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.99 MeV/u
Beam intensity (epA) : ~ 1.5 pA
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.64
E voltage (V) : -350
E leakage (uA) : 2.11
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.41
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : -0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : -0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 8.0 E-06
Pressure (old gauge) (mbar) : 2.4 E-05
Pressure (SEC) (mbar) : 4.4 E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : 5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Noticed beam had gone, so stopped the run.
==================================================== |
|
95
|
Sat Nov 11 01:40:48 2017 |
MD, DMK, ASM | Run 86 |
Header: 3.99 MeV/u and CH2_30+25. Continue after reheat the primary target (GPS) between 02:20 and 02:30
Ender:
====================================================
Run number : 86
Date : 11/11/17
Start time : 02:37:15
Stop time : 04:48:36
Trigger rate (MIDAS) : 2
Blocks written : 87
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 3
1- Gated : 3
2- dE : 136k
3- E : 103
4- HI : 432
5- Pulser : 2
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.99 MeV/u
Beam intensity (epA) : ~1.5 pA (spread is decreased: 0.7 - 2.2pA) (pictures from 3:44 and 4:35)
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.63
E voltage (V) : -350
E leakage (uA) : 2.12
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.40
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : -0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : -0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 8.35 E-06
Pressure (old gauge) (mbar) : 2.6 E-05
Pressure (SEC) (mbar) : 4.6 E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 5.6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
02:14 realized target current was done, but not long. Stopped Run 85
02:18 send protons to beam dump and then called PS to stop them
02:20 in Knob open application: current was set to 0, Reset, turned ON and was increased with medium steps of
around 10A.
02:30 target current readout at 438 A (set to 433 A) again. Proton back on target
04:40 Laser quality is decreasing. Watched the bars (green and blue) a while and observed huge fluctuation.
Green bar (right) is very low in general, and blue bar (left) is jumping between full and something less of
one half. I thought that should be more stabil.
04:46 Events in E_a+E_HI-sepctra: 6 event between 67-129MeV (not sure when it last was reset) --> very low event
rate.
If the beam is running is mainly checked in MIDAS by looking at trigger(0 and 1) and on refresh update of
spectra s3008 (ADC versus channel (s2order) to see new events. n+n-side of detectors still seeing much noise,
which is also obvious in the scalar rates.
==================================================== |
|
93
|
Sat Nov 11 00:24:19 2017 |
MD, ASM, DMK | Run 85 |
Header: 3.99 MeV/u and CH2_30+25.
Ender: primary target current (RED) down to 5V...
====================================================
Run number : 85
Date : 11/11
Start time : 01:23:45
Stop time : 02:14
Trigger rate (MIDAS) : 3-4
Blocks written : 18
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 3
1- Gated : 3
2- dE : 109k
3- E : 102
4- HI : 624
5- Pulser : 2
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 3.99 MeV/u
Beam intensity : 1.7 - 2.0 pA
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position : 67.26
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.61
E voltage (V) : -350
E leakage (uA) : 2.125
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.4
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 mA
PA power (upstream, negative) : -0.55 mA
PA power (downstream, positive) : 0.8 mA
PA power (downstream, negative) : -0.28 mA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 8.6E-06 mbar
Pressure (old gauge) : 2.7E-05 mbar
Pressure (SEC) : 4.7E-06 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.0 degrees C
Temp (chamber) : 5.8 degrees C
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
02.14 realized target current was down. Should have happened quite recently.
Interestingly, when target current was down (no Cu-beam) the gated and ungated trigger rate was 0, although
Pulser was 2. Is the pulser somehow excluded from the trigger??
==================================================== |
|
92
|
Sat Nov 11 00:01:41 2017 |
Daid. Mirco | Trigger and scalars for 4.0 MeV/u | Tom et al. tuned the trigger this evening, before we began the runs. (Run 82, or Run 83??)
===TRIGGER===
Trigger condition is: E OR HI/ds
We count the CAMAC OR signals as follows: A,B
A: Which CAMAC module? Left to right, 1,2,3,4,5
B: Which module channel? This is the number engraved on the module by the LEMO output.
==E Definition==
All p-n sides of E detector:
RAL 109 discrim cable numbers: 4, 5, 7
=> Corresponds to CAMAC OR Numbers 2,2; 2,1; 3,1, respectively.
==HI/ds Definition==
All p-n sides of HI detector: 8, 9, 11
RAL 109 discrim cable numbers
=> Corresponds to CAMAC OR Numbers 4,3; 4,2; 5,3, respectively.
ds=Downscale; ds factor is 8 = 2^8 = 256
===SCALARS===
0: Ungated
1: Gated
2: dE (n-n) [Cable 3]
3: E (n-n) [Cable 6]
4: HI (n-n) [Cable 10]
5: Pulser
6: Clock
===DISCUSSION===
The n-n side of the E detector seems to be noisier than the p-n side. Thus the p-n side is used for the trigger logic, whilst the n-n side is used for the scalar.
However, there seems to be something confusing about using the p-n side for the true trigger but the n-n side for the scalars. It means we cannot compare the scalars self-
consistently to each other. That is, the gated or ungated signals do not have a strong correlation with the individual detector scalars. In principle if we have enough LEMO
cables and Fan In/Fan Out modules, we should simply propagate the p-n signals to both the trigger (when relevant, i.e. E detector) and the scalars alike. For now we don't
touch anything, though. |
|
91
|
Fri Nov 10 21:59:05 2017 |
SL, MD | Run 84 |
Header: 3.99 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 84
Date : 10/11 to 11/11
Start time : 23:03
Stop time : 01:22:11
Trigger rate (MIDAS) :
Blocks written : 48
——————————————————————————————
Run Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
——————————————————————————————
Beam energy : 3.99 MeV/u
Beam intensity : 1.7 - 2.0 pA
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position : 67.26
HI Degrader foil (um) : 10 um Al
——————————————————————————————
del_E voltage (V) : -40
del_E leakage (uA) : 0.6
E voltage (V) : -210
E leakage (uA) : 2.02
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.325
——————————————————————————————
PA power (upstream, positive) : 1.55 mA
PA power (upstream, negative) : -0.55 mA
PA power (downstream, positive) : 0.8 mA
PA power (downstream, negative) : -0.28 mA
——————————————————————————————
Pressure (IMG1) : 1.0E-05 mbar
Pressure (old gauge) : 3.8E-05 mbar
Pressure (SEC) : 5.4E-06 mbar
——————————————————————————————
Temp (Chiller) : -9.9 degrees C
Temp (chamber) : 5.5 degrees C
——————————————————————————————
Comments:
==================================================== |
|
90
|
Fri Nov 10 20:30:57 2017 |
SL | Run 83 |
Header: 3.99 MeV/u and CH2_30+25.
Ender: Recompiling sort code.
====================================================
Run number : 83
Date : 10/11
Start time : 21:30
Stop time : 22:59
Trigger rate (MIDAS) :
Blocks written : 150
——————————————————————————————
Run Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
——————————————————————————————
Beam energy : 3.99 MeV/u
Beam intensity : 1.7 - 2.0 pA
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position : 67.26
HI Degrader foil (um) : 10 um Al
——————————————————————————————
del_E voltage (V) : -40
del_E leakage (uA) : 0.6
E voltage (V) : -210
E leakage (uA) : 2.02
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.325
——————————————————————————————
PA power (upstream, positive) : 1.55 mA
PA power (upstream, negative) : -0.55 mA
PA power (downstream, positive) : 0.8 mA
PA power (downstream, negative) : -0.28 mA
——————————————————————————————
Pressure (IMG1) : 1.0E-05 mbar
Pressure (old gauge) : 3.8E-05 mbar
Pressure (SEC) : 5.4E-06 mbar
——————————————————————————————
Temp (Chiller) : -9.9 degrees C
Temp (chamber) : 5.5 degrees C
——————————————————————————————
Comments:
==================================================== |
|
89
|
Fri Nov 10 19:57:49 2017 |
SL | Run 82 |
Header: 3.99 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 82
Date : 10/11
Start time : 21:03
Stop time : 21:30
Trigger rate (MIDAS) :
Blocks written :
——————————————————————————————
Run Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
——————————————————————————————
Beam energy : 3.99 MeV/u
Beam intensity : 1.98 pA
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position : 67.26
HI Degrader foil (um) : 10 um Al
——————————————————————————————
del_E voltage (V) : -40
del_E leakage (uA) : 0.6
E voltage (V) : -210
E leakage (uA) : 2.02
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.325
——————————————————————————————
PA power (upstream, positive) : 1.55 mA
PA power (upstream, negative) : -0.55 mA
PA power (downstream, positive) : 0.8 mA
PA power (downstream, negative) : -0.28 mA
——————————————————————————————
Pressure (IMG1) : 1.0E-05 mbar
Pressure (old gauge) : 3.8E-05 mbar
Pressure (SEC) : 5.4E-06 mbar
——————————————————————————————
Temp (Chiller) : -9.9 degrees C
Temp (chamber) : 5.5 degrees C
——————————————————————————————
Comments:
==================================================== |
|
88
|
Fri Nov 10 19:01:13 2017 |
SL | Run 81 |
Header: 3.99 MeV/u and CH2_30+25.
Ender: Stopped to check E hardware.
====================================================
Run number : 81
Date : 10/11
Start time : 20:20
Stop time : 20:50
Trigger rate (MIDAS) :
Blocks written : 70
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 0
1- Gated : 0
2- dE : 12k
3- E : 92
4- HI : 50
5- Pulser : 2
6- Clock : 970
——————————————————————————————
Beam energy : 3.99 MeV/u
Beam intensity : 1.8 pA
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position : 67.26
HI Degrader foil (um) : 10 um Al
——————————————————————————————
del_E voltage (V) : -40
del_E leakage (uA) : 0.6
E voltage (V) : -350
E leakage (uA) : 2.17
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.325
——————————————————————————————
PA power (upstream, positive) : 1.55 mA
PA power (upstream, negative) : -0.55 mA
PA power (downstream, positive) : 0.8 mA
PA power (downstream, negative) : -0.28 mA
——————————————————————————————
Pressure (IMG1) : 1.0E-05 mbar
Pressure (old gauge) : 3.8E-05 mbar
Pressure (SEC) : 5.4E-06 mbar
——————————————————————————————
Temp (Chiller) : -9.9 degrees C
Temp (chamber) : 5.5 degrees C
——————————————————————————————
Comments:
==================================================== |
|
87
|
Fri Nov 10 16:32:19 2017 |
Claudia | RAL Amplitude Thresholds | Thresholds of RAL amplifiers set to: dE 30mV; E 20 mV, HI 20 mV |
|
86
|
Fri Nov 10 14:48:22 2017 |
TD | Calibration |
ADC offsets calculated using data files R42-r47
ADC gains calculated using data files R26, R30 & R38
Re-sorting data files R26, R30 & R38 using calculated ADC offsets and gains
the 241Am alpha peak centroids are at
E_HI 86 c(3) = 5.380*10/86 = 0.625581
E_alpha 251 c(2) = 5.380*10/251 = 0.214343
dE_alpha 1021 c(1) = 5.380*10/1021 = 0.0526934
Calculate energies (100keV bins) for channel i using
e(i) = INT( c(n) * gain(i) * ( data(i) - offset(i) ) + 0.5 ) |
|
85
|
Fri Nov 10 10:46:54 2017 |
SL | Investigation of E detector thickness | While changing HI degrader foil to 10um Al, the E detector was investigated, due to previously observed alpha punch-through.
On visual inspection, the E detector appeared to be 1mm in thickness, leading us to believe that instead we were not fully depleting the detector.
The bias supply was investigated, and was found to be supplying a lower voltage (on all channels) than was shown on the display (14V -> 2V in reality, 350V -> 60V in reality).
The bias module was replaced, and the faulty module marked as such.
As a result of this change, the configuration of the detector bias channels has been altered (as ch 2 on new module can't supply >100V).
-------------
New Configuration:
Detector : Voltage : Leakage Current
Ch 1 - dE : 40 V : 0.92 uA
Ch 2 - HI : 14 V : 2.52 uA
Ch 3 - E : 350 V : 3.91 uA |
|
84
|
Fri Nov 10 08:31:06 2017 |
TD | CAEN V767 TDC trigger/channel 0 logic change | Approximately 5-10% of events overnight were 'bad' i.e. missing TDC data
Checked the CAEN V767 trigger/channel 0 logic (without beam) this morning
and observed that the delayed event trigger was within 20-30ns of trailing
edge of MON2 (trigger accepted). Increased width of MON2 from 100ns to 150ns.
Check whether this change reduces or eliminates 'bad' events when beam
returns. |
|
83
|
Fri Nov 10 07:00:14 2017 |
MD, CLW, ASM, TD | Run 80 |
Header: 4.7 MeV/u and CH2_30+25.
Ender: beam stop at PS (6 hour interruption)
====================================================
Run number : 80
Date : 10/11
Start time : 08:00:49
Stop time : 08:35:05
Trigger rate (MIDAS) : 8
Blocks written : 202
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 9
1- Gated : 8
2- dE : 42
3- E : 8
4- HI : 482
5- Pulser : 2
6- Clock : 967
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 4.7 MeV/u
Beam intensity : not checked this run (should be around 1.5pA)
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32
del_E leakage (uA) : 0.8
E voltage (V) : -350
E leakage (uA) : 1.745
E_hi voltage (V) : -13.5 to -14
E_hi leakage (uA) : 0.905
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : -0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : -0.28 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 6.75E-06
Pressure (old gauge) : 1.9E-05
Pressure (SEC) : 3.9E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.0
Temp (chamber) : 5.5
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
- since 6:20 RF problem on ring2 (although 3 full inj are shown) : ~1.6E+14 protons only
- 8.21 comment on PS: 6 hours of no beam
- 08:35 stop run, because no beam
==================================================== |
|
82
|
Fri Nov 10 04:53:34 2017 |
MD, ASM | Run 79 | Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 79
Date : 10/11
Start time : 05:52:13
Stop time : 08:00:08
Trigger rate (MIDAS) : 8
Blocks written : 789
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 11
1- Gated : 10
2- dE : 49
3- E : 8
4- HI : 536
5- Pulser : 2
6- Clock : 967
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 4.7 MeV/u
Beam intensity : ~1.8 pA (~1.5 pA @7.30) --> Laser quality is decreasing
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32
del_E leakage (uA) : 0.8
E voltage (V) : -350
E leakage (uA) : 1.745
E_hi voltage (V) : -13.5 to -14
E_hi leakage (uA) : 0.895
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : -0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : -0.28 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 6.8E-06
Pressure (old gauge) : 1.9E-05
Pressure (SEC) : 3.9E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -9.9
Temp (chamber) : 5.6 (from before)
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
- since 6:20 RF problem on ring2 (although 3 full inj are shown) : ~1.6E+14 protons only
- 07:34 MIDAS crashed ("arithmetic exception (core dumped)")
- 07:36 restart MIDAS-session: DAQ is still fine, start spectrum viewer, SortSas still open and working, Open
Scalers (tick "Enable Rates") fine)
==================================================== |
|
81
|
Fri Nov 10 04:18:41 2017 |
MD, ASM | Run 78 | Header: 4.7 MeV/u and Empty frame.
Ender:
====================================================
Run number : 78
Date : 10/11
Start time : 05:18:20
Stop time : 05:49:43
Trigger rate (MIDAS) : 2-3
Blocks written : 165
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 2
1- Gated : 2
2- dE : 31
3- E : 2
4- HI : 11
5- Pulser : 2
6- Clock : 967
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 4.7 MeV/u
Beam intensity : ~2.0 pA (at the end maybe ~1.7 pA)
Target : Empty frame (Pos#7)
Ladder position : 52.09
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32
del_E leakage (uA) : 0.8
E voltage (V) : -350
E leakage (uA) : 1.75
E_hi voltage (V) : -13.5 to -14
E_hi leakage (uA) : 0.895
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : -0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : -0.28 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 6.8E-06
Pressure (old gauge) : 1.9E-05
Pressure (SEC) : 3.9E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.0
Temp (chamber) : 5.6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: scaler on HI-det: around 10 --> prescaler = 0. Thats why only E trigger. Check if trigger technique
also suits empty frame runs.
see few dE versus E event --> scattered on target frame (I guess)
==================================================== |
|
80
|
Fri Nov 10 02:12:06 2017 |
MD, ASM, DK | Run 77 |
Header: 4.7 MeV/u and C_09. continue after fixing IHS Cavity (part of normal conducting linac)
Ender:
====================================================
Run number : 77
Date : 10/11
Start time : 03:13:59
Stop time : 05:14:52
Trigger rate (MIDAS) : 6
Blocks written : 796
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 8
1- Gated : 7
2- dE : 34
3- E : 7
4- HI : 586
5- Pulser : 2
6- Clock : 967
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 4.7 MeV/u
Beam intensity : 2.25 pA
Target : C_09 (Pos#5; ~545 ug/cm2)
Ladder position : 82.44
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32.5
del_E leakage (uA) : 0.8
E voltage (V) : -350
E leakage (uA) : 1.75
E_hi voltage (V) : -14
E_hi leakage (uA) : 0.88
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 6.8E-06
Pressure (old gauge) : 1.9E-05
Pressure (SEC) : 3.9E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -9.9
Temp (chamber) : 5.6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
before run number increased twice --> no run76
2h of Carbon reference.
==================================================== |
|
79
|
Fri Nov 10 01:29:51 2017 |
ASM, MD, DK | run 75 | Header: 4.7 MeV/u and C_09. PS back, but need to check how much beam actually there was before next issue
Ender: no beam at our sample; IHS cavity (part of normal conducting linac) tripped
====================================================
Run number : 75
Date : 10/11
Start time : 02:20:11
Stop time : 02:41:21
Trigger rate (MIDAS) :
Blocks written : 77
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 2
1- Gated : 2
2- dE : 7
3- E : 2
4- HI : 2
5- Pulser : 967
6- Clock : 0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 4.7 MeV/u
Beam intensity : 2.0-2.5 pA (in the beginning)
Target : C_09 (Pos #5 - 82.44mm), chosen due to similar thickness as CH2_30+25, as used before
Ladder position : 82.44
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32
del_E leakage (uA) : 0.8
E voltage (V) : -350
E leakage (uA) : 1.75
E_hi voltage (V) : -14
E_hi leakage (uA) : 0.88
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 6.8E-06
Pressure (old gauge) : 1.9E-05
Pressure (SEC) : 3.8E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.1
Temp (chamber) : 5.4 (from before)
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: realised no beam on target after couple of minutes: normal conducting cavity tripped
Alex and Daid try to fix it.
==================================================== |
|
78
|
Thu Nov 9 23:10:38 2017 |
MD | preparation for Carbon C_09 (Run 75) | 10/11/17: 00:03
switch target ladder to Pos #5: 82.44 mm
Carbon foil C_09 in place
(similar thickness as CH2_30+25, as used before)
Ready for beam coming back. |
|
77
|
Thu Nov 9 21:31:16 2017 |
SL | Run 74 |
Header: 4.7 MeV/u and CH2_30+25.
Ender: STOP due to PSB fire.
====================================================
Run number : 74
Date : 09/11
Start time : 22:33
Stop time : 23:42
Trigger rate (MIDAS) :
Blocks written : 422
——————————————————————————————
Run Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5pA
Target : #6 CH2_33+35
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : 32
del_E leakage (uA) : 0.75
E voltage (V) : 350
E leakage (uA) : 1.73
E_hi voltage (V) : 14
E_hi leakage (uA) : 0.85
——————————————————————————————
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
——————————————————————————————
Pressure (IMG1) : 7.0E-06
Pressure (old gauge) : 2.0E-05
Pressure (SEC) : 3.9E-06
——————————————————————————————
Temp (Chiller) : -10
Temp (chamber) : 5.4
——————————————————————————————
Comments:
ISOLDE: (PSB is 1 ring down - CCC operator to return 1st ring when fixed)
Fluctuations in intensity throughout run, as operator attempts to restart.
Final decision made to run with 3 rings and more runs per supercycle at 23:10.
==================================================== |
|
76
|
Thu Nov 9 20:46:29 2017 |
SL | Run 73 |
Header: 4.7 MeV/u and CH2_30+25.
Ender: NO BEAM FROM PSB - called CCC and stopped run.
====================================================
Run number : 73
Date : 09/11
Start time : 21:44
Stop time : 22:25
Trigger rate (MIDAS) :
Blocks written : 263
——————————————————————————————
Run Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.7pA
Target : #6 CH2_33+35
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : 32
del_E leakage (uA) : 0.75
E voltage (V) : 350
E leakage (uA) : 1.73
E_hi voltage (V) : 14
E_hi leakage (uA) : 0.85
——————————————————————————————
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
——————————————————————————————
Pressure (IMG1) : 7.0E-06
Pressure (old gauge) : 2.0E-05
Pressure (SEC) : 3.9E-06
——————————————————————————————
Temp (Chiller) : -10
Temp (chamber) : 5.4
——————————————————————————————
Comments:
TDCs now in common stop mode, previously in normal mode. Now working correctly.
==================================================== |
|
75
|
Thu Nov 9 19:06:08 2017 |
SL | Run 68-71 | JUNK |
|
74
|
Thu Nov 9 18:56:13 2017 |
SL | Run 72 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 72
Date : 09/11
Start time : 20:14
Stop time : 21:41
Trigger rate (MIDAS) :
Blocks written : 570
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 12
1- Gated : 10
2- dE : 59
3- E : 8
4- HI : 672
5- Pulser : 2
6- Clock : 967
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.7pA
Target : #6 CH2_33+35
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : 32
del_E leakage (uA) : 0.75
E voltage (V) : 350
E leakage (uA) : 1.73
E_hi voltage (V) : 14
E_hi leakage (uA) : 0.85
——————————————————————————————
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
——————————————————————————————
Pressure (IMG1) : 7.0E-06
Pressure (old gauge) : 2.0E-05
Pressure (SEC) : 3.9E-06
——————————————————————————————
Temp (Chiller) : -10
Temp (chamber) : 5.4
——————————————————————————————
Comments:
TDCs now in common stop mode, previously in normal mode. Now working correctly.
==================================================== |
|
73
|
Thu Nov 9 17:35:32 2017 |
RG | Run 67 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 67
Date : 09/11
Start time : 18:30
Stop time : 19:57
Trigger rate (MIDAS) : 10
Blocks written : 463
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 10
1- Gated : 9
2- dE : 48
3- E : 7
4- HI : 561
5- Pulser : 2
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.7pA
Target : #6 CH2_33+35
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : 32
del_E leakage (uA) : 0.75
E voltage (V) : 350
E leakage (uA) : 1.73
E_hi voltage (V) : 14
E_hi leakage (uA) : 0.85
——————————————————————————————
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
——————————————————————————————
Pressure (IMG1) : 7.0E-06
Pressure (old gauge) : 2.0E-05
Pressure (SEC) : 3.9E-06
——————————————————————————————
Temp (Chiller) : -10
Temp (chamber) : 5.4
——————————————————————————————
Comments:
saving spectra: /directory/r67/spectra
"Online dE v E and PI v dE+E spectra show foldback for alpha events at
c. 32MeV which implies that the thickness of the E detector is c. 500um."
==================================================== |
|
72
|
Thu Nov 9 17:01:49 2017 |
TD | CAEN V560 Scalers added to datastream | CAEN V560 Scaler channels #0-7 have been added to the EbyE datastream by adding
per event readout of defined VME registers identified as group 31, items 0-15
w26> cat /MIDAS/experiments/daq/VMEDataSources
32 0x00660010 32 31 0
32 0x00660014 32 31 2
32 0x00660018 32 31 4
32 0x0066001c 32 31 6
32 0x00660020 32 31 8
32 0x00660024 32 31 10
32 0x00660028 32 31 12
32 0x0066002c 32 31 14 |
|
71
|
Thu Nov 9 16:30:15 2017 |
SL | Run 66 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (p+n E OR p+n HI (with 2^8 prescaler))
Ender:
====================================================
Run number : 66
Date : 9 / 11
Start time : 18:09
Stop time : 18:30
Trigger rate (MIDAS) :
Blocks written : 84
——————————————————————————————
Run Scalars
0- Ungated : 14
1- Gated : 12
2- dE : 51
3- E : 11
4- HI : 672
5- Pulser : 2
6- 1kHz Clock : 967
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.0 x 10^-6 mbar
Pressure (old gauge) : 2.0 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.2 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments: Beam stopped short because the beam went off from PBS towards the end.
==================================================== |
|
70
|
Thu Nov 9 15:55:56 2017 |
SL | Run 65 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (E - corrected, not HI, now ~50% live time)
Ender:
====================================================
Run number : 65
Date : 9 / 11
Start time : 16:56
Stop time : 17:27
Trigger rate (MIDAS) :
Blocks written : 179
——————————————————————————————
Run Scalars
0- Ungated : 10
1- Gated : 10
2- dE : 50
3- E : 10
4- HI : 666
5- Pulser : 2
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.1 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
in sum spectra S4000: Counts above 100 MeV: 12
==================================================== |
|
69
|
Thu Nov 9 15:34:14 2017 |
SL | Run 64 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (JUST E, not HI, now ~50% live time)
Ender: Stopping as trigger seems slightly off
====================================================
Run number : 64
Date : 9 / 11
Start time : 16:38
Stop time : 16:56
Trigger rate (MIDAS) :
Blocks written : 102
——————————————————————————————
Run Scalars
0- Ungated : 10
1- Gated : 10
2- dE : 75
3- E : 6
4- HI : 90
5- Pulser : 2
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.1 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
==================================================== |
|
68
|
Thu Nov 9 15:03:21 2017 |
SL | Run 63 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (dE+E, not HI, now ~50% live time)
Ender:
====================================================
Run number : 63
Date : 9 / 11
Start time : 16:03
Stop time : 16:33
Trigger rate (MIDAS) :
Blocks written : 270
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 56
1- Gated : 34
2- dE : 43
3- E : 5
4- HI : 654
5- Pulser : 2
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.1 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
in sum spectra S4000: Counts above 100 MeV: 8
==================================================== |
|
67
|
Thu Nov 9 12:15:33 2017 |
SL | TIMBER: Faraday Cup Measurements | Faraday Cup (at end of Edinburgh chamber) measurements recorded in TIMBER (from approx 10.00 9/11/17). |
|
66
|
Thu Nov 9 12:14:05 2017 |
SL | Run 62 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 62
Date : 9 / 11
Start time : 13:55
Stop time : 16:03
Trigger rate (MIDAS) : 50
Blocks written : 1299
——————————————————————————————
Run Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.1 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
==================================================== |
|
65
|
Thu Nov 9 10:15:38 2017 |
Sarah Lonsdale | Run 61 |
Header: 5.0 MeV/u and Carbon (C_25).
Ender:
====================================================
Run number : 61
Date : 9 / 11
Start time : 11:19
Stop time : 12:04
Trigger rate (MIDAS) : 1205
Blocks written : 482
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 500
1- Gated : 100
2- dE : 5
3- E : 5
4- HI : 2
5- Pulser : 400
——————————————————————————————
Beam energy : 5.0 MeV/u
Beam intensity : 1.5 to 2.0 epA **
Target : #3 C_25
Ladder position : 112.78 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.0 V
del_E leakage (uA) : 0.085 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.825 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.2 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
==================================================== |
|
64
|
Thu Nov 9 09:49:03 2017 |
Sarah Lonsdale | Run 60 |
Header: 5.0 MeV/u and Empty Frame. Tuned beam to lower scatter, solved dE counting issue. Pulser scaler has been added.
Ender:
====================================================
Run number : 60
Date : 9 / 11
Start time : 10:50
Stop time : 11:14
Trigger rate (MIDAS) : 20
Blocks written : 180
——————————————————————————————
Beam energy : 5.0 MeV/u
Beam intensity : 1.5 to 2.0 epA **
Target : #7 Empty Frame
Ladder position : 52.09 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.0 V
del_E leakage (uA) : 0.085 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.825 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.2 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
==================================================== |
|
62
|
Thu Nov 9 08:20:21 2017 |
Claudia | Restarting Target Current & Line Current | 0) If target or line drop, STOP THE BEAM!!
1) If you SEE target or line current go down (top right window of monitors next to the corridor):
Use Knobs open application (monitor below); remember set value; type 0 in set window; click Mode - Reset; click Mode - On. increase current in steps of 100 A
2) If Target or line current off and it happened a while ago
Use Knobs open application (monitor below); type 0 in set window; click Mode - Reset; click Mode - On Use Isolde Target heating GPs application (in monitor below); |
|
61
|
Thu Nov 9 07:15:49 2017 |
MD | Tips for Babysitting ISOLDE during shifts | from ISOLDE webpage |
|
60
|
Thu Nov 9 06:30:35 2017 |
Daid, Mirco | Spectra (Shift 1) | Screen shots for accumulated data before the target went down. Should be (at least) runs 53 & 54 inclusive, possibly back to the start of RI beam on CH2 target. |
|
59
|
Thu Nov 9 06:02:41 2017 |
Daid. Mirco | Run 57 | Header: Continue with 5.0 MeV/u and CH2. Laser back on.
Ender:
====================================================
Run number : 57
Date : 9 / 11
Start time : 06:55
Stop time :
Trigger rate (MIDAS) : 2078
Blocks written :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity : 1.5 to 2.0 epA
Target : #2 CH2
Ladder position : 127.95 mm
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32.0 V
del_E leakage (uA) : 0.025 uA
E voltage (V) : -350 V
E leakage (uA) : 1.735 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.825 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 7.4 x 10^-6 mbar
Pressure (old gauge) : 2.2 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
58
|
Thu Nov 9 05:35:44 2017 |
Daid. Mirco | Run 56 |
Header: 5.0 MeV/u CH2, Laser 2 is turned off on purpose to check background.
Ender: Could not see many real events beside pulser and current was very low
====================================================
Run number : 56
Date : 9 Nov 2017
Start time : 06:34:45
Stop time : 06:54:37
Trigger rate (MIDAS) : 2030
Blocks written : 2488
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity : (cannot be measured)
Target : #2 CH2_16 (450~480 ug/cm^2)
Ladder position : 127.95 mm
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32 V
del_E leakage (uA) : 0.025 uA
E voltage (V) : -350 V
E leakage (uA) : 1.735 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.825 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.53 A
PA power (upstream, negative) : -0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : -0.28 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 7.4 x 10^-6 mbar
Pressure (old gauge) : 2.2 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : - 10.1 deg
Temp (chamber) : + 5.5 deg
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
comment: Why is the trigger rate nearly the same with the laser on and off ??!! |
|
57
|
Thu Nov 9 05:33:50 2017 |
TD | Charge State Distributions | > Faraday cup readout at the end of our chamber should change based on whether or not the target is in and also the 59Cu
beam energy.
>
> The effect could be as much as 10 to 20%. At some point, we should check the Faraday cup reading with the CH2 target
and with the empty target.
For comparison, csd predicts 5.00MeV/u 59Cu?+ -> 4.66MeV/u 59Cu24+ following the 0.5mg/cm2 (CH2)n target
w29> csd
Charge State Distributions in Solid and Gaseous Targets
Is target solid(1) or gaseous(2) ? 1
Enter energy (MeV), mass (amu) and charge of ion: 275 59 29
Enter minimum and maximum charge states: 1 29
Energy: 275.0 QNOT: 24.1 RHO: 1.3 EPS: -64.6
Charge %
1 0.0
2 0.0
3 0.0
4 0.0
5 0.0
6 0.0
7 0.0
8 0.0
9 0.0
10 0.0
11 0.0
12 0.0
13 0.0
14 0.0
15 0.0
16 0.0
17 0.0
18 0.0
19 0.1
20 0.5
21 2.7
22 9.6
23 21.9
24 30.3
25 23.6
26 9.4
27 1.7
28 0.1
29 0.0
Options available:
end(1) , medium(2) , ion(3) , charge states(4) |
|
56
|
Thu Nov 9 03:32:55 2017 |
Daid. Mirco | Run 55 | Header: Continue 5.0 MeV/u with CH2 after target re-heating
Ender: End
====================================================
Run number : 55
Date : 9 Nov 2017
Start time : 04:32
Stop time : 06:34
Trigger rate (MIDAS) : 2081
Blocks written : 16180
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity : ~2 epA -> (2*10^-12)/(24*1.602*10^-19) = 520833 pps
NB: See https://elog.ph.ed.ac.uk/ISOLDE/54 for factor 24 rather than 20 (theoretical estimate)
Target : #2 CH2_16 (450~480 ug/cm^2)
Ladder position : 127.95 mm
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32 V
del_E leakage (uA) : 0.02 uA
E voltage (V) : -350 V
E leakage (uA) : 1.75 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.82 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.52 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.32 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 7.5 x 10^-6 mbar
Pressure (old gauge) : 2.3 x 10^-5 mbar
Pressure (SEC) : 4.0 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.0 deg
Temp (chamber) : +5.4 deg
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: First laser does not have a red peak at the center, but maybe okay for this shift.
Attaching PSB and GPS screenshots, as we need to monitor them regularly.
At 6:18 to 6:40, we started getting four rings from the PS Booster. The 1st ring had a fairly low intensity, and the operators later dropped it. These times were confirmed
exactly with communication with PS operators.
again.
==================================================== |
|
55
|
Thu Nov 9 01:24:01 2017 |
Daid. Mirco | Run 54 | Header: Continue with 5.0 MeV/u and CH2
Ender: Checked control room, about 2:40. Target current is 2 A (low...should be 430 A). No beam seen at our FC, although MIDAS seemed to have events.
NB: You can monitor the target current on any network computer via: https://op-webtools.web.cern.ch/Vistar/vistars.php?usr=GPS
====================================================
Run number : 54
Date : 9 Nov 2017
Start time : 02:24:23
Stop time : 03:02
Trigger rate (MIDAS) : 2181
Blocks written : 8749
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity :
Target : #2 CH2_16 ( 450 ~ 480 ug/cm^2)
Ladder position : 127.95 mm
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32 V
del_E leakage (uA) : 0.015 uA
E voltage (V) : -350 V
E leakage (uA) : 1.77 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.82 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.3 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 7.75 x 10^-6 mbar
Pressure (old gauge) : 2.5 x 10^-5 mbar
Pressure (SEC) : 4.1 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.1 deg
Temp (chamber) : 5.5 deg
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
54
|
Wed Nov 8 23:46:32 2017 |
Daid | Charge State Distributions | Faraday cup readout at the end of our chamber should change based on whether or not the target is in and also the 59Cu beam energy.
The effect could be as much as 10 to 20%. At some point, we should check the Faraday cup reading with the CH2 target and with the empty target. |
|
53
|
Wed Nov 8 23:14:38 2017 |
Daid, Ruchi, Mirco | Run 53 | Header: Restart 5.0 MeV/u w/ CH2 after PS comes back (3 rings until the morning)
Ender: End
====================================================
Run number : 53
Date : 9 Nov 2017
Start time : 00:13:50
Stop time : 02:23:31
Trigger rate (MIDAS) : 2193
Blocks written : 31000
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity : < 6 x 10^5 pps
Target : #2 CH2_16 (450~480 ug/cm^2)
Ladder position : 127.95
Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.005 uA
E voltage (V) : -350 V
E leakage (uA) : 1.82 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.82 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.3 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 8.05 x 10^-6 mbar
Pressure (old gauge) : 2.5 x 10^-5 mbar
Pressure (SEC) : 4.2 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.0
Temp (chamber) : +5.5
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
52
|
Wed Nov 8 23:06:48 2017 |
Daid, Ruchi | Run 52 (junk) | (Junk -- see comments)
====================================================
Run number : 52
Date : 9 Nov 2017
Start time :
Stop time :
Trigger rate (MIDAS) :
Blocks written :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy :
Beam intensity :
Target :
Ladder position :
Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) :
del_E leakage (uA) :
E voltage (V) :
E leakage (uA) :
E_hi voltage (V) :
E_hi leakage (uA) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) :
Pressure (old gauge) :
Pressure (SEC) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) :
Temp (chamber) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: 2 minutes after run starts, PS-Booster calls. They will go back to 3 rings, giving us the beam back in ten minutes
==================================================== |
|
51
|
Wed Nov 8 22:21:35 2017 |
Ruchi | Beam transmission | By the end of beam tuning (around 6pm), beam transmission between Faraday cups at the end of SEC and at end of Edinburgh chamber:
~100% through 10mm collimator (empty target frame)
> 50% thought 3mm collimator
|
|
50
|
Wed Nov 8 22:08:55 2017 |
Daid | Run 51 | Header: Restart 5.0 MeV/u CH2 with 3 PS rings.
Ender: Stop run. We want good data with a smaller file size for fast analysis, as well as to get on a 2 hour schedule.
====================================================
Run number : 51
Date : 8 Nov 2017
Start time : 22:44
Stop time : 00:04
Trigger rate (MIDAS) : 2192
Blocks written : 20460
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity : (was 6 x 10^5, but we have only 3 /4 PS-Booster rings)
Target : #2 CH2_16
Ladder position : 127.95
Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -33
del_E leakage (uA) : 0.00
E voltage (V) : -350
E leakage (uA) : 1.87
E_hi voltage (V) : -14
E_hi leakage (uA) : 0.83
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 8.25 x 10^-6 mbar
Pressure (old gauge) : 2.6 x 10^-5 mbar
Pressure (SEC) : 4.3 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -9.8
Temp (chamber) : +6.0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Only 3 out of 4 rings at PS-Booster for now
(We stopped slightly from miscommunication.)
23:34: PS-Booster calls. Trying to add Ring 1 back. By 23:36 we can see all four rings. (In one supercycle, all rings drop.)
==================================================== |
|
49
|
Wed Nov 8 22:00:00 2017 |
daid | Scalars | Present scalars:
0: Ungated
1: Gated
2: dE
3: E
4: HI
5: Pulser
6: 1 kHz Clock
To add: |
|
48
|
Wed Nov 8 21:21:31 2017 |
Ruchi Garg, Daid | RunLogTemplate | Header:
Ender:
====================================================
Run number :
Date :
Start time :
Stop time :
Trigger rate (MIDAS) :
Blocks written :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) :
Target :
Ladder position (mm) :
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) :
del_E leakage (uA) :
E voltage (V) :
E leakage (uA) :
E_hi voltage (V) :
E_hi leakage (uA) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
47
|
Wed Nov 8 20:46:23 2017 |
Daid, Ruchi | Run 50 | Header: First run with irises open. 30 min run.
Ender: Call from PS-Booster. Stop run.
Date: 8 Nov 2017
Start: 21:46
Stop: 22:18
Target #2: Position 127.95 mm; CH2_16: 450~480 ug/cm^2.
59Cu beam is on. Nominal intensity was 6 x 10^5 pps. 5.0 MeV/u.
**Iris are all open.**
Biases (leak currents did not change opening the irises)
dE: -33 V; 0.00 uA
E: -350 V; 1.99 uA
HI: -14 V; 0.86 uA
Pulsers are in.
Positive: 2 Hz, 1.4 V.
Negative: Low freq, 1200 setting.
Scalars 0 and 1 (see https://elog.ph.ed.ac.uk/ISOLDE/49 ) were in at the beginning of the run. Scalar 2 was added part way through. LEMO cables were not long enough to add 3 &
4 until after the run was stopped (swapped short cables for longer ones elsewhere.)
Scalar 0 was showing a number of multiple hits. It was directly from the Fan In / Fan Out. At the end of the run, I switched it to the Lecroy 622 which has a larger width.
We stopped because the PS-Booster called about cleaning one of the rings. (At first I misunderstood exactly what was going on or who called, but I stopped.) |
|
46
|
Wed Nov 8 20:40:33 2017 |
Daid, Ruchi | Run 49 | Header: First test with RIB. Irises closed.
End: End
~21:45
8 Nov 2017
Target #2: Position 127.95 mm; CH2_16: 450~480 ug/cm^2.
59Cu beam is on. Nominal intensity was 6 x 10^5 pps. 5.0 MeV/u.
**Iris are all closed.**
Biases:
dE: -33 V; 0.00 uA
E: -350 V; 1.99 uA
HI: -14 V; 0.86 uA |
|
45
|
Wed Nov 8 17:12:01 2017 |
TD | MIDAS logs | Attachment 1 - snoop -d bge1 log following MVME CPU reset
Attachment 2 - VME CPU system console
Fixed MVME2354 CPU RPC timeout when mounting MIDAS filesytem (see attachment 2)
by changing Sun workstation name services configuration file /etc/nsswitch.conf
to remove dns i.e. from
hosts: files dns
ipnodes: files dns
to
hosts: files
ipnodes: files
*Why* this works is a good question ... |
|
44
|
Tue Nov 7 14:38:25 2017 |
Ruchi Garg | Target ladder configuration | |
|
43
|
Mon Nov 6 16:12:47 2017 |
Peter Black | chamber drawings | work in progress. |
|
41
|
Mon Nov 6 10:52:58 2017 |
Peter Black | alignment hardware drawings | |
|
40
|
Mon Nov 6 10:50:33 2017 |
Peter Black | foil mount drawings | |
|
39
|
Mon Nov 6 10:46:53 2017 |
Peter Black | Faraday cup drawings | Note that the removal of the supressor reqires the special allen key. |
|
38
|
Sun Nov 5 20:25:10 2017 |
Ruchi | Circuit diagram and cable mapping | |
|
37
|
Sat Nov 4 14:10:20 2017 |
daid | Julabo chiller operation | This log entry contains a basic instruction on how to operate the Julabo liquid flow chiller.
There are 5 buttons (left to right): Up/Down, Enter, 1/0.
To toggle power to the device, use 1/0 (on/off). NB: This only turns the electronics on, and does not initiate circulation / cooling.
When switched on, it will display sequentially some basic information sequentially. One may generally ignore these, and wait until it displays the current temperature.
To adjust or check the set point, tap either of Up/Down. To change the set point, press and hold either up or down. Release the button when the desired set point is reached,
and tap up/down to do the fine tuning.
Once the desired set point is entered, the display will return to the current temperature reading.
To turn on circulation / chilling, press and hold Enter (the down/left facing arrow). One needs to hold this button several seconds. It is obvious when it begins to operate, as
it will make more sounds, and additionally the Snowflake LED indicator should turn on (unless the current temperature is lower than the set point, it may simply flash briefly).
The set point can be adjusted while the circulation / chilling is on, as above.
To turn the circulation / chilling off, hold down Enter again for several seconds.
Best to raise the set point to ~20 degrees and wait for it to reach the value, before turning off circulation, and finally the device (0 button). |
|
36
|
Sat Nov 4 06:29:03 2017 |
TD | MIDASsort online sort programs, spectrum titles, calibration s/w & READMEs | |
|
35
|
Mon Oct 30 09:46:04 2017 |
Peter Black | Notes on iris install/operation | The iris mounts have 2 superimposed constellations of 3mm mounting holes on them that correspond to those of the S2 detector, however the 85x85 square is missing one hole and the 110x40 rectangle is rotated by 45°. Either constellation may be used. Fixing is intended with M3x16 bolts into 10mm standoffs used to attach the detector to its mount.
Electrical connection is by a 5 pin DuPont connector. A feedthrough with flying tail ribbon cable inside and M12 5 pin A-coded industrial sensor connector outside for each iris is supplied that should fin in the same flange as the cooling pipes. The connection between the ribbon and the actuator is to be made with the red coded wire on the ribbon to the yellow wire on the actuator such that the visible metallic portion on the pins is visible on the same side of both the male and female connectors when matted.
The control box needs to be mounted outside the chamber and the cables connected to the feedthroughs.
Power is supplied from the 12v PSU provided.
Twiddle knob to make iris open and close...
Notes:
- When handling the irises it is advisable to leave them in the open position.
- Don’t get grease on the irises or they will jam up and the actuator is strong enough to destroy them.
- The actuators contain a small quantity of grease, if this turns out to be an issue with the vacuum I will strip them down and degrease them.
- The controllers are “tuned” to the actuators so try not to muddle them up. (U and D)
- When not in use I would suggest removing power from them as they will potentially radiate some RF noise and just made your signals noisier.
- Datasheet for controller https://s3.amazonaws.com/actuonix/Actuonix+LAC+Datasheet.pdf
- They have been roughly set so that closed is a 20mmm orifice. If you need to adjust them open the control box and twiddle the pot next to the one next to the USB port (P2 right if you look at the data sheet). Cycle the power and to open and close it again, repeat until the desired orifice is achieved.
- Pins 1, 4 and 5 of X2 are the feedback potentiometer for the actuators so if you want to know where the actuators are (you think they may have jammed etc.) you can simply measure the voltage between 1 and 4 with the power on or the resistance with the power off
|
|
34
|
Tue Oct 24 09:27:24 2017 |
Peter Black, DK | Safety words | 
Plate 1. Contents of chamber

Plate 2. not ideal, but shows some of the scattering chamber and support stand
Better picture would have:
1) Wheels with feet
2) Chamber closed up
3) Not a bunch of junk from unpacking
Chamber system needs some kind of name for the documentation.
Overview
The Edinburgh Scattering Chamber is designed for charged-particle induced reaction cross section measurements of astrophysical interest.
One of its main features is radial symmetry, compatible with the TRIUMF UK Detector Array (TUDA) which mainly uses the Micron S2-type silicon strip detectors (SSDs) placed downstream of the target.
The geometric similarity between the two setups allows the employment of similar hardware such as preamplifier PCBs, cooling plates, etc.
The arrangement allows for a large solid-angle coverage for light-ion detection (> 50% of 4-pi in the centre-of-mass frame), light ion particle identification by the deltaE-E method.
At present, our interests are aimed at neutron-deficient, medium-mass beams.
In this case and with the use of a thin target, beam-like recoils can also be detected further downstream by an additional S2 detector in coincidence with light ions with a typical efficiency >25% (depending on the precise geometry).
An adjustable target slider can hold up to ten targets (generally thin-film samples like CH_2, collimators, beam diagnostic devices ...), and we have plans to accommodate a windowed gas cell in the future to serve as a helium target. A CMOS pinhole camera is also provided to allow viewing of targets which will mainly be used in conjunction with a ZnS screen for beam tuning.
The end of the chamber is equipped with a detachable Faraday cup to assist with beam tuning and monitoring the beam intensity during experimental runs (depending on the radioactive beam intensity).
Chamber Design
The chamber is welded aluminium construction in the form of 2 barrels connected coaxially with flanges on each end. The barrels and flanges are secured with M14 bolts and sealed with ISO 400 centring O-rings.
The chamber is designed to be connected to the downstream port of the existing Scattering Chamber Experiments (SEC) installed at HIE-ISOLDE beam line XT03 by a KF50 port on the upstream end of the chamber. This connection has a turbo pump mounted on it to ensure that the vacuum exposed to the downstream systems is as low as possible. Further additions to the connection are a constrained bellow to take up any misalignment, an electrical break to prevent ground loops and a gate vale to allow the chamber to be opened without exposing the beam line to atmosphere.
All of this enables us to shoot through the SEC and have a minimal impact on other existing experimental setups.
The chamber is cylindrical and can be opened on the downstream side by sliding the end flange in the beam direction.
The end flange is mounted perpendicular to a sliding support structure, so that the chamber can be opened and serviced without the use of an overhead crane nor any requirements of heavy lifting.
Internally, the majority of the equipment is mounted on four rods installed on the inside of the end flange, which extend the full length of the chamber when sealed are supported by complimentary receiving sockets on the inner side of the upstream chamber end flange.
The chamber and its associated equipment (chiller, electronics racks) are fitted with wheels for easy positioning, enabling the chamber to be connected and disconnected from the XT03 beamline with relative ease.
The support structure is more than twice as long as the chamber itself, so that the chamber can be fully opened and easily serviced. This results in the chamber being stable in in the fore/aft direction but due to the height of the beam line and a preference for a small footprint the top heavy nature of the chamber and support it is potentially unstable in the side to side direction. To alleviate this outriggers are installed on the bottom of the upstream and downstream structure with retractable wheels. The wheels can be fully lowered when the chamber needs to be relocated, and otherwise the wheels are kept installed with minimal floor clearance to provide mechanical support in the beam left or right directions should the need arise (e.g. to prevent accidental tipping).
Targets:
Targets are mounted on NSF CP Type 3 frames and theses are in turn mounted on a ladder with 10 positions (this ladder will also accommodate NBI Type 2 frames). The ladder also has holes to accept 2 Hamamatsu photo diodes for beam tuning.
Targets used are polyethylene foils as a proton target (CH2) and carbon foils for background subtraction. The polyethylene foils are two sandwiched foils of ~150 ug/cm^2 (300 ug/cm^2 total) are custom-manufactured by Paul Morrall of the STFC Daresbury Laboratory, while the carbon foils were bought commercially from Arizona Carbon Foil Co.
A silver/copper doped ZnS target is also provided for beam-spot viewing.
Collimators with various opening apertures (phi 1 mm to 10 mm) are also placed on the target slider to assist during beam tuning.
Detector Mounts
The SSDs and preamplifiers are mounted on opposite sides of one (or more) metallic disk(s), which can then in turn be mounted on the four support rods provided inside the chamber.
Only the detector is located on the front side of the disk, so that it is impossible for the beam to directly strike any of the electronics.
Thus, the printed circuit board, preamplifiers, and cooling plates are located on the beam downstream side of the support disk.
The preamplifiers are housed inside the vacuum chamber during normal operation, as this enables us to reduce the cable path length between the detectors and preamplifiers while allowing the chamber itself to serve as a Faraday cage, which both reduce the electronic noise.
However, electronics in a vacuum have only limited means to cool, thus we use a forced-flow external refrigeration system to cool the preamplifiers. This takes the form of a chiller using a 50/50 mixture of ethanol and water as the heat transfer medium, operated between -5 and -10 degrees when the preamplifiers are under vacuum.
To protect the detectors during beam tuning remote controlled irises are fitted to each detector.
Detectors and photodiode also have provision for degrader foils to be mounted in front of them.
We prepared several Al degrader foils purchased commercially from Goodfellow Inc. All foils were tested to be light-tight prior to and after mounting. All foils are mounted on 1 mm thick Al stock with vacuum-rated epoxy, left to dry for 24 hours for proper curing. Foils prepared for the photodiode have an opening of 1 cm diameter and include 10, 15 and 20 um nominal thicknesses. Foils prepared for the heavy ion detection with Micron S2 DSSDs have an opening of ~72 mm in diameter are 6, 10, 15, and 20 um nominal thicknesses; these foils have a 20 mm diameter gap punched in the center, to avoid being struck directly by (and thus scattering) the beam.
Associated hardware
The chamber is complimented with a vacuum system comprising mainly of a 500l/s turbo pump and dry scroll pump in addition as previously mentioned a small turbo is provided on the beam line connection and shares the scroll pump. Various gauges provide monitoring of the pressure in the chamber from atmosphere down to 10^-6mbar.
2 off 42U 19” racks provide space for amplifiers and diagnostic equipment. The amplification chain consists of:
1) RAL 109 8 channel amplifier and discriminators (24 units) with custom power supplies;
2) Analog signals are sent to Silena ADCs in a VME
3) Discriminator signals are split, one line sent to one of five Logic Shaped Outputs, which feed to logical signal processing in a NIM crate generating the trigger signal for the DAQ
4) The second of the split discriminator signals are sent to a CAEN V767 TDC in the VME crate.
The data are then collected and processed on a Sun Microsystems Tower via an ethernet hub which relays the data via a Silena 9419 ACQ Controller in the VME crate.
Remote control of the irises is performed with a custom control unit powered by a 12V PSU
To provide power to all the systems 3 power strips, 10 way each, are used. Nominally one provides power to pumps and vacuum systems, one preamps and 19" rack equipment, and the last one computers and test equipment. The total load of the system is approximate 15A @ 230V. All power is distributed through BS1363 plugs and distribution boards that are fitted with SEV 1011 plugs for local power compatibility. All equipment categorised as IEC 61140 Class 1 is therefore earthed through their power connections. The chamber is electrically isolated from the beam line by an electrical break and from its frame by nonconductive spacers. The chamber forms part of the electromagnetic noise protection for the detectors so is electrically connected to the electronics.
All equipment has been tested for electrical safety at Edinburgh before sending to CERN.
|
|
33
|
Thu Oct 19 14:41:19 2017 |
daid | heavy ion degrader foil - full / new | See entry https://elog.ph.ed.ac.uk/ISOLDE/28 for a full description, but editing the same elog is altering attachment numbers etc.
Here I've added 20 um foil as well as 5.3 MeV/u (~313 MeV) 59Cu beam.
The first set is 59Cu(p,alpha)56Ni showing 56Ni in the heavy ion detector, with different beam energies and Al degrader foil thicknesses.
The second set is for 59Cu(12C,12C)59Cu scattering. |
|
32
|
Thu Oct 19 10:55:54 2017 |
Claudia | Meeting 19.10. | CERN-Edinburgh Liaison
- FC at end of SEC: manual
- Network access: port free.
- N2 gas ?
- -date for connection of SEC to our chamber: week 30. October, 2nd November alignment.
- collimator in front of chamber ?? contact Jorge Alberto about beam tuning in general (maybe add contingency high energy point) ? cc Karl
look for 4 deliveries: 2 bags gain resistors, 1 box luvac, 1 box farnell
2) Parts to be prepared in Edinburgh
- Iris: no news should be done today
- spare feedthrough for cooling, to be done.
- Al degrader: we have 2x10, 2x15 um (hole in center and light checked). 6 um still to prepare, 20 um maybe. mounts to be delivered.
- Photo diodes x2 along with degrader foil: PCB & photodiodes here. extra holes for ladder. drawings there. making degrader foil holder. target ladder remade. Preamps, amps? ask Tom. Cocknell preamp tested. 20 mv/MeV (250 MeV max). maybe borrow some more amps from miniball.
- Faraday cup SHV to SMA converter: needs to be glued together
- Window port for front of chamber? Peter to manufacture
- Extra ribbon cables are needed? need to check with calibration. Also need long ribbon cables. will be done today/tomorrow
- Photographs and diagrams of experimental setup -- organized clearly for beam operators during tuning: add technical drawing on elog Peter will make it coherent. Safety Folder/Risk Assessment. Safety Datasheets (Ethanol).
- Alignment -- 2 end caps and one target ladder mount for optics reflector (8 mm diameter?) For survey people. Peter: two ends are done, drawings for S2 and target ladder mount points are at workshop
- Adjustable feet to be produced for radial alignment: Toby, almost done
- degrading of 12C - on elog.
3)Decisions / Analysis
- Alpha analysis: dE and HI detectors seem ok, We need spare cables for Detector to preamplifier.
- Sort Routine — Ruchi +Alex+Tom
- Target ladder config finalization: 2 photodiodes, collimator (what size, we have 3 mm and 10mm), Beam viewer, 3 CH2 and 2 Carbon.
- Calibration of Target ladder positions. Peter / Daid
- CH2 and C sample choice. So far CH2 Target 1: 30+25 (480ug/cm2); CH2 Target 2: 16 (400 ug/cm2). Check combination 33+1+10. New Ch2 from Paul - all will be sent here
4) CERN Presence:
- Ruchi: 22 Oct - ~20 Nov
- Mirco: 22-27 Oct, 5- ~20 Nov ?
- Claudia: 22-27 Oct, 5- ~20 Nov
- Daid: from 30 Oct
- Peter: from ~1 Nov
- Toby: from 30 Oct
- Alex 6-11 Nov
- Tom 8- ?? Nov
Sarah: 8 - ?? Nov
|
|
31
|
Thu Oct 12 12:45:54 2017 |
Claudia | Meeting 12.10.17 | Email sent to Karl and Olof about
- FC at end of SEC
- Gain resistor package
- Network access
- N2 gas
- date for connection of SEC to our chamber
- collimator in front of chamber ?
Next week call Karl. Daid will look at old Olof emails
2) Parts to be prepared in Edinburgh
- - Iris under construction, add. stop so it does not close all the way. coming along nicely. might have to increase detector distance a bit for safety. no news
- spare feedthrough for cooling, to be done
- Al degrader: We have 15 um and 6&10 um in Edinburgh, Daid will check if light-tight. We will prepare one 15, one 10 and on 6, possibly backups. Make hole, we have frames. more frames
- Photo diodes x2 along with degrader foil: PCB & photodiodes here. extra holes for ladder. coming along. 2 diodes need a bit less than 2 space, 10 spaces in total, maybe 11. drawings there. Preamps, amps? ask Tom
- Faraday cup SHV to SMA converter: Peter on order
- Window port for front of chamber? Peter to manufacture
- Extra ribbon cables are needed? need to check with calibration. Also need long ribbon cables. Peter will make 2 new ones. Peter has bits
- Photographs and diagrams of experimental setup -- organized clearly for beam operators during tuning: add technical drawing on elog Peter will make it coherent. Safety Folder/Risk Assessment. Safety Datasheets (Ethanol). send to Karl
- Alignment -- 2 end caps and one target ladder mount for optics reflector (8 mm diameter?) For survey people. Peter: two ends are done, drawings for S2 and target ladder mountain points not made yet.
- Adjustable feet to be produced for radial alignment: Peter / Toby
3)Decisions / Analysis
- Alpha analysis: dE and HI detectors seem ok, We need spare cables for Detector to preamplifier.
- Sort Routine — ask Tom
- Target ladder config finalization: 2 photodiodes, collimator (what size, we have 3 mm and 10mm), Beam viewer, We need to verify how many positions we have. 3 CH2 and 2 Carbon.
- Calibration of Target ladder positions. Peter / Daid
- CH2 and C sample choice. So far CH2 Target 1: 30+25 (480ug/cm2); CH2 Target 2: 16 (400 ug/cm2). Check combination 33+1+10. New Ch2 from Paul —> Check thickness asap!
|
|
30
|
Thu Oct 5 11:34:34 2017 |
Claudia | Meeting 5.10.17 | POINTS FOR DISCUSSION
- Email sent to Karl and Olof about
- FC at end of SEC
- Gain resistor package
- Network access
- N2 gas
To ask still:
- date for connection of SEC to our chamber
- collimator in front of chamber ?
No reply, remind next week, best by phone
2) Parts to be prepared in Edinburgh
- -Iris under construction, add. stop so it does not close all the way. coming along nicely. might have to increase detector distance a bit for safety.
- spare feedthrough for cooling, to be done
- Al degrader: We have 15 um and 8 um in Edinburgh, Daid will check if light-tight. We dont have 8, but we have 10 and 6 um which should both be possible. We will prepare one 15, one 8 and on 6, possibly backups. Check what it would do for straggling if there is no hole in the middle of the foil. use 20 mm cookie cutter for circle. earth foils? Tom: Make hole, we have frames.
- Photo diodes x2 along with degrader foil: PCB for photodiodes. extra holes for ladder. coming along. 2 diodes need a bit less than 2 space, 10 spaces in total, maybe 11.
- Faraday cup SHV to SMA converter: Peter to order
- Window port for front of chamber? Peter to draw
- Extra ribbon cables are needed? Need short cables detector to preamp. Also need long ribbon cables. Peter will make 2 new ones
- Photographs and diagrams of experimental setup -- organized clearly for beam operators during tuning: add technical drawing on elog Peter will make it coherent. Safety Folder/Risk Assessment. Safety Datasheets (Ethanol).
- Alignment -- 2 end caps and one target ladder mount for optics reflector (8 mm diameter?) For survey people. Peter: two ends are done, drawings for S2 and target ladder mountain points not made yet.
- Adjustable feet to be produced for radial alignment: Peter / Toby
3)Decisions / Analysis
- Alpha analysis: dE and HI detectors seem ok, We need spare cables for Detector to preamplifier.
- Sort Routine: Tom will provide sort routine and test file to look at real data.
- Target ladder config finalization: 2 photodiodes, collimator (what size, we have 3 mm and 10mm), Beam viewer, 3 CH2 and 2 Carbon.
- Calibration of Target ladder positions. Peter / Daid
- CH2 and C sample choice. So far CH2 Target 1: 30+25 (480ug/cm2); CH2 Target 2: 16 (400 ug/cm2)
|
|
29
|
Wed Oct 4 18:57:16 2017 |
dk | Digitized run notes from tests at CERN | Transcription of paper logbook for runs. Please check as I cannot read all the writing.
Wednesday 13/9/2017
Detectors installed:
2083-9, 74 um, dE layer
3080-23, 1012 um, E layer
2410-23, 65 um, HI layer
Det. Bias Leak
dE -24 0.46
E -350 2.61
HI -14 1.05
Runs 0 - 5 : junk
Run 10
Header: Alpha calibration
Date: 13/9/2017
Start: 18:03 (CERN)
Stop: 18:12
Note: Some cables disconnected to test CANNOT READ
Run 11
Header: Alpha calibration
Date: 13/9/2017
Start: 18:16
Stop:
Notes:
ADC Ch Notes
1 0-15 ok
1 16-31
2 0-15 7+8 only pulser
2 16-31 ok
3 0-15 only pulser
3 16-31 19 low gain (other notes but crossed out)
4 0-15 6 low (noise?), rest fine
4 16-31 only pulser
5 0-15 "probably okay"
5 16-31 "probably okay"
6 0-31 "probably okay"
-------
Thursday 14/9/2017
Det. Bias Leak
dE -24 0.44
E -351 2.4
HI -14 0.95
Run 12
Header:
Date: 14/9/2017
Start: 11:50
Stop: 12:08
Note: Bad. Pulser switched on through run
Run 13
Header: Pulser ON
Date: 14/9/2017
Start: 12:07
Stop:
Notes: good
ADC Notes
1 ch 0 ... bad resolution in pulser
2 ch 7,8 no alphas
3 ch 0 low gain, ch 0-15 almost only pulser but maybe shieled from alpha source & low noise
3 ch 24 low resolution
4 ch 6 no alphas, ch 7 low gain for alphas but not for pulser
4 ch 16-31 no alpha (maybe shielded & low noise)
5 okay
6 okay
TDC missing #1-32, #1-80,120,123
14:00 before turning off biases:
Det. Bias Leak
dE -24 0.4
E -351 2.15
HI -14.5 0.89
15:15 - Vent to remove dE layer
Extra SSD cable arrives
TDC mapping
Det. Side TDC ch
dE p+n 16-63
E n+n 64-79
HI p+n 80-127
Bias detectors
Det. Bias Leak
E -350 1.83
HI -14 0.8
Run 15
Header:
Date: 14/9/2017
Start: 18:22
Stop: 18:25
Notes: Bad. Pulser to 2 Hz
Run 16
Header: Alpha source in front of E detector
Date: 14/9/2017
Start: 18:31
Stop:
Notes: Bad. CANNOT READ
Run 17
Header:
Date: 14/9/2017
Start: 18:32
Stop:
Notes: Bad. ADC #4 ch 6, 7 bad.
Switch U7e8 (??) (n+n side p+n) from E detector
Problem moved -> CANNOT READ
-------
Friday 15/9/2017
10:00 bias detectors
Det. Bias Leak
E -351 2.13
HI -14.5 0.88
T: -4.9 C
P: 4.9 x 10^-6 mbar
Run 19
Header: alpha-calib of E layer 3080-23
Date: 15/9/2017
Start:
Stop:
Notes:
No TDC data ...?
ADC Ch Comments
1 0-31 Pulser (only) in all channels except ch2 which has a few counts across whole spectrum (hair)
Resolutions range from 2.0 -> 7.0
Pulser centroid ~ channel 2800 in all spectra (except ch 2 of course)
2 0-15 Pulser in all channels, ~channel 2000 (i.e. similar gains)
Resolution ~ 2.0 ch, except ch 8 sigma = 4.5 ch
2 16-31 Pulser in all channels at ~channel 3000
Resolution ~ 2.0 ch, excehpt ch 24 which is 6.7 ch & ch 16: 4.35 ch.
3 0-31 Pulser & alphas in all channels
(Not 19...see below)
Resolution is *poor* in ch0
All gains look similar
Alpha spectra in similar channel numbers as for other ADCs, but pulser at only 1/2 the channel number
(A drawing is given to compare ch0 to ch1-15.)
3 19 Gain seems very low
Pulser @ channel 430, alphas @ channel 200
So about 1/5 of gain of others in ADC 3 channels
4 0-15 All but ch 6 very similar (good)
ch 6: Pulser in similar channel to other spectra, but narrower (~4 ch, c.f. ~8-10 channels for other spectra.)
And alphas are much lower gain, appearing ~ ch 70, c.f. 1100 for others
4 16-31 All okay. Triple alpha @ ~ channel 1150, pulser @ 2800
5 0-31 All okay (though low gain - deliberately)
6 0-31 Ok, see above for ADC 5 notes.
Det. Bias Leak
E -351 2.08
HI -14.5 0.88
Restart MIDAS; VME crate
=> TDC signals return
12:02 Removed E layer #3080-23 (HI layer #2410-23 remains unchanged)
New 1035 um Si installed #2951-22. It uses a different bias voltage than the previous E layer (-160 vs. -351 V)
12:50 Stop DAQ (run 22 larger than necessary)
Run 23 (?? no note)
Header:
Date:
Start:
Stop:
Notes:
ADC ch Comments
1 0-15 Pulser only, similar gains
ch 2 no pulser (hair)
No alphas (unsurprising!)
1 16-31 Pulser only, similar gains
All okay.
(No alphas, unsurprising!)
2 0-31 Pulser only, no alphas, similar gains
All okay
3 0-15 Pulser + alphas
alphas in all strips
alpha similar gains and resolutions
pulser in ch 0 at ~1/2 amplitude
3 16-31 Pulser + alphas.
ch 19 pulser and alphas at much reduced channel number ~1/5 gain
4 0-15 Pulser + alphas
ch 6 no alphas - Pulser narrow (no detector capacitence?)
ch 7 alphas at reduced gain (~1/5), pulser narrow
4 16-31 All good
5 0-31 All good (low gains - by design)
6 0-31 All good (low gains - by design)
v767 #1 TDC
ch Comments
0 1 peak
1-15 No data
16-31 1 peak
32 No peaoks
33 1 peak + 1 small peak
34-44 2 peaks
45-47 1 peak
48 1 peak + hair
49-52 1 peak
53 1 peak + hair
54-56 2 peaks
57-63 1 peak
64-79 broad region of data (alphas?)
80-86 1 peak
87 1 peak + 1 smaller peak
88 Mainly 1 or 2 peaks + lots of hair
89 1 peak
90,91 2 peaks
92-95 1 peak
96 1 peak
97-127 Mainly 1 peak
Cable for 1 mm E detector must be faulty
Before opening the chamber:
Det. Bias Leak
E -160 1.12
HI -14.5 0.92
(When trying to switch the cable to the SSD, apparently it was not fully connected. Some time is lost to pump, vent, check, etc)
After new cabling is confirmed and evacuation is complete:
Det. Bias Leak
E -160 1.17
HI 14.5 0.96
Run 24
Header: Check new cable
Date: 15/9/2017
Start: 16:18 (UK)
Stop: 16:35 (UK)
Notes:
ADC ch Comments
3 0-15 okay
3 16-31 ch 19 low gain
4 0-15 ch 5, ch 7 low gain
4 16-31 okay |
|
28
|
Thu Sep 28 03:38:18 2017 |
dk | heavy ion degrader foil - updated | --original email text--
Using Claudia's code, I added a layer of Al foil before the heavy ion
silicon detector. The attached plots correspond to the heavy ion
portion of fig 3(a) in the proposal. Thus it only uses ground-state
transitions and doesn't account for geometry or efficiency etc. I opt
to show only the highest and lowest beam energies for each simulation.
As I said before, something between 10 and 20 um of Al was likely to
be the correct choice, which is confirmed. 10 um is almost to thin to
guarantee the signals are below 200 MeV, while for 20 um we start
having issues of detecting the lowest energy recoils for the low
energy run.
We can discuss the selection in more detail at the next meeting, but
most probably we can just use some kitchen foil, adopting whatever its
thickness of 13 to 15 um depending what we find.
The attached file starts with no degrader, then adds 10 um Al, and 1
um Al steps up to 20 um.
--Updated 2 Oct to include 5 um ~ 10 um--
As ~185 MeV is the maximum energy, but the gain resistors may vary by up to ~10%, then the 'maximium safe energy' is about 160 MeV. This we can get for the highest energy run
with 15 um Al (we have it in stock); however, then the lowest energy case becomes about 30 MeV, or less than 1 MeV/u, which may be an issue for straggling etc. So we will
prepare two foils, as it is seen even for the low energy beam, it comes almost to 190 MeV without a degrader foil. In fact, any foil thickness between 5 ~ 10 um may be okay
(we have 8 um in stock).
Using also all 5 energies (212, 236, 260, 277, 295) then we see that the two lowest energies are okay for 8 um foil, and the three highest energies are suitable for 15 um foil.
NB: 19 Oct I deleted 15 um (previously attachment 2) and now it is attachment 8.
Note that the beam energy order (right to left, left to right) differs between the first PDF and the second two.
--4 Oct--
Existing 8um Al foils are not the right size. Check 6 um and 10 um in detail, as we have more stock of these two. Attached.
--12 Oct--
Attachments 5-7 show the 59Cu energy after the degrader foils for elastic (12C,12C) scattering. Foil thicknesses are 6, 10, 15 um of Al, respectively. Note that the angular
range shows up to 15 degrees (larger than the case of the (p,a)). |
|
Draft
|
Thu Sep 28 03:34:20 2017 |
dk | heavy ion degrader foil |
--text from email--
Using Claudia's code, I added a layer of Al foil before the heavy ion
silicon detector. The attached plots correspond to the heavy ion
portion of fig 3(a) in the proposal. Thus it only uses ground-state
transitions and doesn't account for geometry or efficiency etc. I opt
to show only the highest and lowest beam energies for each simulation.
As I said before, something between 10 and 20 um of Al was likely to
be the correct choice, which is confirmed. 10 um is almost to thin to
guarantee the signals are below 200 MeV, while for 20 um we start
having issues of detecting the lowest energy recoils for the low
energy run.
We can discuss the selection in more detail at the next meeting, but
most probably we can just use some kitchen foil, adopting whatever its
thickness of 13 to 15 um depending what we find.
The attached file starts with no degrader, then adds 10 um Al, and 1
um Al steps up to 20 um. |
|
26
|
Mon Sep 25 14:50:46 2017 |
dk | To do list before main exp. - update from meeting 28th September | NB: This list may be incomplete!
CERN side:
Beam operators hope for a FC which can be automated at the end of SEC: Olof ?
Gain resistors (and other items) sent to CERN. Where are they? KJ has them? Check with Karl
w26 PC needs to get online. Contact Olof when we return to ISOLDE to confirm the network port is still free.
Daid. Need to register the device to CERN
Dry N2 bottle: ask Karl
Edinburgh side:
Iris automated controls and mounts: in construction. Add additional stop so doesnt close all the way. Peter
Cooling line chamber feed through: get spare. Peter
Get Al degrader foil for heavy ions (~13 um), mount on dummy frame etc. probably fine from store. Should get 15
um for highest beam energy. With lowest beam energy we might need to change the foil: Daid
Alpha spectral analysis: to be sorted. Daid, Claudia, Tom, Ruchi
Sort routines for dE-E plots, etc, for online analysis: Tom
Photo diodes x2 along with degrader foil: PCB for photodeiodes, PCB for photodiodes. extra holes for ladder. Peter
Target ladder config finalization: 2 photodiodes, collimator (what size, we have 3 mm and 10mm), Beam viewer,
We need to verify how many positions we have. Need at least 2 CH2 and 1 Carbon. Daid, Claudia
Extra ribbon cables are needed? need to check with calibration. Also need long ribbon cables
Beam viewer: see target ladder
Faraday cup SHV to SMA converter: Peter
Window port for front of chamber? Peter
Photographs and diagrams of experimental setup -- organized clearly for beam operators during tuning: add
technical drawing on elog.
Alignment -- 2 end caps and one target ladder mount for optics reflector (8 mm diameter?) For survey people. Peter
Adjustable feet to be produced for radial alignment: Peter / Toby
Contact CERN about date for beam connection: As soon as possible after 20th October. Talk to Karl/Olof.
Collimator at exit of SEC ? needs to be aligned. Ask what the other beamlines do - does olof have collimator
ahead of his chamber
Calibration of Target ladder positions. Peter / Daid
Email to Karl & Olof about:
- FC after SEC
- Parcel of gain resistors
- date for connection of SEC to our chamber
- collimator in front of chamber ?
- N2 bottle |
|
25
|
Thu Sep 21 14:54:00 2017 |
Claudia | Alpha Calibration Spectra | Alpha Calibration Runs (need to check settings in logbook)
0-63: dE detector and 32-47 is n+n; 64-127 E detector and 96-111 is n+n; 128-191 HI detector
Run 13: alpha source in fromt of dE detector (0-63). All detectors connected.
- 0-15 OK
- 16-31 OK
- 32-47 pulser appears at higher amplitude, alphas in a similar spot
- 48-63 OK
- 64-79 ch64 low gain but only for pulser (alphas look fine)
- 80-95 ch83 low gain, ch88 bad resolution. some strips show alphas
- 96-111 ch102 no alphas, ch103 low gain
- 112-127 pulser OK
- 128-191 (HI detector) looks ok
-
-
dE Layer is Removed
Run 15: alpha source in front of E detector, no dE
- 0-15 OFF
- 16-31 OFF
- 32-47 OFF
- 48-63 OFF
- 64-79 ch64 low gain but only for pulser (alphas look fine)
- 80-95 ch83 low gain, ch88 bad resolution.
- 96-111 ch102 no alphas, ch103 low gain
- 112-127 OK
Run 16: alpha source in front of E detector, no dE
- 0-15 OFF
- 16-31 OFF
- 32-47 OFF
- 48-63 OFF
- 64-79 ch64 low resolution, low gain but only for pulser
- 80-95 ch83 low gain, ch88 bad resolution.
- 96-111 ch102 /ch103 problem
- 112-127 OK
Run 18 does not seem to be in Run book
Run 18: alpha source in front of E detector,
- 0-15 OFF
- 16-31 OFF
- 32-47 OFF
- 48-63 OFF
- 64-79 ch64 as Run 16
- 80-95 ch83 as Run 16
- 96-111 alphas there but there are two pulser peaks in all segments, and a lot of alpha peaks...
- 112-127 OK
Run 19: same settings as Run 16
- 0-15 OFF
- 16-31 OFF
- 32-47 OFF
- 48-63 OFF
- 64-79 ch64 as Run 16
- 80-95 ch83 as Run 16
- 96-111 102/103 empty/low gain
- 128-143 OK
- 144-159 152-154 low resolution
- 160-175 OK
- 176-191 OK
For later runs the information is taken from logbook as no runs have been saved:
Run 23: E detector switched to #2951-22
- 0-15 OFF
- 16-31 OFF
- 32-47 OFF
- 48-63 OFF
- 64-79 ch64 as Run16
- 80-95 ch83 as Run 16
- 96-111 102/103 empty/low gain
- 112-127 OK
Run 24 Cable for 1 mm E detector must be faulty; Check new cable
- 64-79 OK
- 80-95 ch 83 low gain
- 96-111 ch 101, ch 103 low gain
- 112-127 OK
|
|
24
|
Tue Sep 19 14:54:47 2017 |
Claudia, Toby | Setup Photos | |
|
23
|
Thu Sep 14 15:40:42 2017 |
TD | MSL type S2 bias data | |
|
22
|
Thu Sep 14 14:07:21 2017 |
pb | alignment | Chat with survey team
1. mauf plugs for both ends of chamber with concentric 8mmH7 holes, with nylon tipped grub screws/clamp bars
2. Manuf of target with 8mmH7 hole
3. Manuf detector with 8mmH7 hole
4. Manuf of 4x pad sliders for feet for radial alignment.
Report from survey team attached. |
|
21
|
Thu Sep 14 10:29:25 2017 |
Claudia | Alpha Calibration | Run 1-10 Test
14 September 2017
Run 11 Start 18:16 (CERN time)
Faults:
adc#2 7,8 missing segments (n+n side dE)
adc#3 19 low gain (p+n E)
some strips have no noise but maybe that is OK.
Run 12 Start 11:50
Pulse switched on halfway through
Run 13 Start 12:08
Pulser on
ADC spectra:
#1 ch0 bad resolution (also pulser)
#2 ch7 ch8: no alphas, pulser there
#3 ch0 low gain, ch24 low resolution
#4 ch 7 low gain only for alphas (not pulser)
TDC missing: ch 32,80,120,123
Not understood yet: 1mm detector has peak at ~1.5 MeV @ adc#3 ch20-30 (with ALL alpha events when visible , 24 looks very distorted); not visible in ADC#4 (n+n) no alpha in ADC#6 although segment. |
|
20
|
Thu Sep 14 10:24:34 2017 |
Claudia | Detector - ADC connection | ADC#1 0-31: p+n dE
ADC#2 32-48: n+n dE
ADC#2 49-64: p+n dE
ADC#3 0-31: p+n E
ADC#4 32-48: n+n E
ADC#4 49-64: p+n E
ADC#5 0-31: p+n HI
ADC#6 32-48: n+n HI
ADC#7 49-64: p+n HI |
|
19
|
Thu Sep 14 09:47:02 2017 |
dk | discussion with beam operators | CERN side
Faraday cup at the end of SEC, ideally with automated control to insert and remove
Edinburgh side
Photographs of chamber, diagrams, measurement, nicely organised
FC output from SHV to SMA, to input to CERN preamp
Beam viewer scintillating min beam intensity?
Irises to protect SSDs are essential since the beams will be tuned for energy case by case and not at once.
Collimator sizes for the target ladder?
Window view port to confirm iris settings?
Photodiodes should be on the opposite side of the target ladder from the collimator. |
|
18
|
Thu Sep 14 08:37:27 2017 |
Claudia | Detector installation | dE detector: 2083-9, 74 um thick, V_depletion=12V; V_operating=24 V
E detector: 3080-23, 1012 um thick, V_d=110; V_o=350 V
HI detector: 2410-23, 65 um; V_d=7 ; V_o=14 V
Connect bias cables 14,15,16 (dE,E,HI)
Quad Bias Supply ports 1,2,3 (dE,E,HI). There seems to be some offset voltage on them (V1=3V, V2=7V, V3=1V, V4=4V) Seems to go dowon when preamps are on.
Leakage Currents
dE:
dE Leakage Currents
Voltage |
Current (uA) |
7 |
0.15 |
11 |
0.22 |
16 |
0.31 |
21 |
0.39 |
24 |
0.44 |
E:
Voltage |
Leakage Current (uA) |
15 |
0.28 |
20 |
0.37 |
30 |
0.49 |
40 |
0.60 |
50 |
0.72 |
60 |
0.82 |
81 |
1.04 |
100 |
1.2 |
122 |
1.4 |
140 |
1.55 |
160 |
1.7 |
180 |
1.82 |
202 |
1.96 |
225 |
2.06 |
250 |
2.18 |
275 |
2.29 |
300 |
2.39 |
326 |
2.47 |
340 |
2.52 |
350 |
2.55 |
HI:
Voltage (V) |
Current (uA) |
3 |
0.21 |
6 |
0.46 |
8 |
0.61 |
10 |
0.72 |
12 |
0.87 |
14 |
1.02 |
|
|
Draft
|
Wed Sep 13 15:28:18 2017 |
| | Discussion with ISOLDE staff -> things to sort out:
1) Removable Faraday Cup between Scattering Chamber and our Chamve |
|
16
|
Sat Sep 9 09:39:38 2017 |
Claudia | Vacuum Readings at ISOLDE Hall | Thursday, 7th September:
Vaccum after pumping all night preamps off, chiller off
- 09:37: IMG1 2.3E-5 mbar, Chamber 7.5 E-5 mbar; Julabo off;
- 09:38: IMG1 2.1E-5 mbar; Chamber 6.6E-5 mbar; Julabo 20 Celsius
- 09:41: IMG1 2E-5; Chamber 6.6E-5; Julabo 5 Celsius
- 09:55: IMG1 1.3E-5; Chamber 1.3E-5
- 10:10 IMG1 1.2E-5; Chamber 4.5E-5;
Preamp power ON, Chiller on 5 Celsius
- 10:25 IMG1 1.3E-5; 5E-5; Thermocoupling Readout 16 Celsius
- 11:20 IMG1 1.5E-5; 6.1E-5 Thermocoupling Readount 19.3
- 13:08 IMG1 1.6E-5; 5.5E-5
- 14:16 IMG1 1.4E-5; 5.1E-5
- 15:40 IMG1 1.4E-5; 4.9E-5
- 17:55 IMG1 1.3E-5; 4.5E-5
Preamp OFF, chiller off
8th September
--> Leak test with He, replace target ladder with blank and refit feedtrhrough (upstream detectors), identify some scratches
start pumping
- 23:50 IMG1 2.2E-5; Chamber 9E-5
9th September
- 08:17 IMG1 1.3E-5; 5.1E-5 mbar
Leak test but no leaks found anywhere now.
Chiller on 5 Celsius, preamplifiers ON
- 10:55 IMG1 9.1E-6; 3.8E-5
- 12:00 IMG1 8.9E-6; 4.0E-5
- 14:50 IMG1 8.1E-6; 3.6E-5
Preamplifiers OFF
- 15:05 IMG1 6.3E-6; 2.9E-5 (9.8 C)
- 15:12 IMG1 6.1E-1; 2.9E-5 (9.3 C)
- 15:25 IMG1 5.9E-6; 2.8E-5 (9.0 C)
Chiller OFF (not sure when exactly chiller was turned off)
Sunday 10/09/2017
- 22:50 IMG1 8.8E-06; 3.4E-05
Monday 11/09/2017
- 9:20 IMG1 8.2E-06; 2.7E-05
Leak test on Cooling loop. --> Big leak detected. Open up chamber to replace cooling.
Tuesday 12/09/2017
Several tests done for cooling, it seems that even the smallest possible cooling loop is leaky.
- 19:00, close chamber and start pumping
- 19:13 start both turbo pumps at 9.9E-1 mbar
- 19:23 P=2.7E-4 mbar
Note that big Turbopump has been switched to normal start so pumping times not comparable with before. Maximum wattage of pump should be 420 W
Wednesday 13/09/2017
- 9:15 8.5E-6 mbar; 3.1E-5mbar
- 9:30 Cooling ON, switched to -10C
- 10:05 4.4E-6 mbar; 1.7E-5 bar (-9.9C on chiller)
- 10:15 preamps on, -10 C, 4.1E-6; 1.6E-5 mbar
- 10:22 T readout 5.6 C, 4.6E-6; 1.8E-5
- 10:26 T readount 6.2 C; 4.8E-6 mbar, 1.9E-5 mbar
- 10:40 4.9E-6 mbar; 1.9E-5 mbar
Preamps off, cooler off
open chamber for detector installation and some checks; close chamber and pump
- 18:55 7.2E-5; 3.3E-4 mbar
- 20:45 4.4E-5; 1.8E-4 mbar (nopreamp, no chiller)
Thursday, 14 September 2017
- 9:25 1.1E-5mbar; 4.3E-5 mbar
open chamber to discuss with beam operators
- 11:05 close chamber start pumping
- 11:20 1.2 mbar, turbo pumps on
- 11:32 4.1E-4 mbar; 1.1E-3 mbar
|
|
15
|
Fri Sep 8 19:12:19 2017 |
TD | MIDAS DAQ configuration |
MIDAS DAQ configuration files from directories w26:/MIDAS/experiments/daq
and w26:/MIDAS/TapeServer/SunOS |
|
14
|
Fri Sep 8 19:03:23 2017 |
TD | w26 network configuration |
Network configuration files for workstation w26 (Sun Ultra 45)
serial # 0743TFC0DQ
host ID # 840e6006
MAC address 0:14:4f:e:60:6
The MIDAS DAQ configured to use ppc1 (MVME 2431 CPU) connected
to w26 via port 1 (/dev/bge1) |
|
13
|
Wed Aug 16 15:30:04 2017 |
DK, MD | Shipping Inventory | ==BOX A== 59kg - 600mm x 600mm x 800mm
VME crate, with power cable
7 Silena ADCs
1 S9418 ACQ controller
2 CAEN V767 TDC
CAEN 560
MVME 24XX Motorola crate Controller
26 ribbon cables
12 for analog
12 for discrim
2 extra
==BOX B== 49kg - 600mm x 600mm x 800mm
RAL amp crate (full with modules)
Ribbon cables for patch
1 NIM Fan
2 Cable patch boxes
==BOX C== 40kg - 600mm x 600mm x 800mm
RAP amp crate (only 5 modules)
Ribbon cables for patch
1 NIM Fan
2 Cable patch boxes
==BOX D== 29kg - 450mm x 450mm x 450mm
Scrolling pump
Backflow interlock
==BOX E==
Target ladder and components
==BOX F== 92kg - 600mm x 600mm x 800mm
Large TMP
Small TMP
2 TMP controllers
2 Preamp feedthrough
Bolts and washers
2 O-Rings + 1 spare
2 Preamp power supplies
TMP bolts (large and small)
20x IEC leads
2x Swiss to UK leads
Box E
Box G
2x spare HVBNC cables
middle foot sections of blue frame
2x vacuum hoses
==BOX G==
2 inverse magnetron ion gauges
1 thermocouple vacuum gauge
==BOX H==
Multi gauge reader
==Box I==
Chiller & Pipes
Chamber, sliding mount
Box H (gauge reader)
Box E (target ladder)
4 Long ribbon cables
3 Power Bars
==BOX J==
6 feet for chamber stand
All bolts for chamber stand
Spacers
==BOX K==
Valve for TP 1 & 2
vacuum clamps
==BOX L==
Upstream beamline pipe
Gate valve, nipple, adaptor flange to SEC
N2 pipe with valve
Mechanical pressure gauge and "plus" type connector
Swagelok nylon and brasss ferrels for gas line / coolant piping
==BOX M==
Bolts, nuts and spacers for chamber end flanges and center
==BOX N=
Blanking kindey plate
bellows
bellow cage
o-ring for ribbon feedthroughs
spare straight and right angle swagelok fittings
TMP/gauge mounting pipe
Faraday cup
dummy detectors
thermocouple cbable
cctv camera power lead
BNC to Lemo
Lemo to Ribbon box
lemo cables
20 ~1 cm spacers for SSD mounting
9 ~2 cm spacers for SSD mounting
==BOX O== 84kg - 600mm x 600mm x 800mm
Box J, K. L. M, N, S, T
Old inv magnetron vac gauge meter
thin green polymer tubing (gas lines, cooling system)
current integrator for FC
3 large O-Rings for chamber (spare)
thermometer
short bits of blue frame
braces off blue frame
16way BNC multicore
==BOX P== 83kg - 600mm x 600mm x 800mm
Camac crate
5x Logic Shaped Outputs (CAMAC)
2x CAMAC / VME converter
1 LeCroy 622 Quad Logic (NIM)
1 Ortec 566 TAC (NIM)
1 Lecroy 222 dual GDG
1 Ortec 459 bias supply
NIM crate
1 BNC PB-5 digital pulse generator
1 BNC PB-4 analog pulse generator
1 Analog ratemeter 4678
1 ECL-NIM-ECL EC 1601
1 Silena Quad Bias Supply 7710
2 LeCroy 419A Logic FI/FO
==BOX Q== 52kg - 600mm x 600mm x 800mm
Sun Microsystems Tower
==BOX R== 37kg - 600mm x 450mm x 700mm
Wheels for frame
Tools
Safety boots and helmets-
-Daid
-Toby
-Mirco
-Claudia
==BOX S==
2 S2 1000 um SSDs
==BOX T==
3 S2 75 um SSDs
==Box U==
1 green gremlin
2 pink unicorns
==Bundle 1== 16kg - 1600mm x 400mm x 150mm
==Bundle 2== 8kg - 700mm x 150mm x 150mm
==Bundle 3== 15kg - 1400mm x 300mm x 150mm
==Bundle 4== 12kg - 650mm x 1150mm x 100mm
==Bundle 5== 23kg = 2300mm x 150mm x 150mm
Number of Packages: 10 Boxes, 5 Bundles
NET WEIGHT: ~800kg |
|
Draft
|
Wed Aug 16 15:29:57 2017 |
DK | Shipping Inventory | ==BOX A==
VME crate
26 ribbon cables
12 for analog
12 for discrim
2 extra
==BOX B==
RAL amp crate (full with modules)
Ribbon cables for patch
1 NIM Fan
2 Cable patch boxes
==BOX C==
RAP amp crate (only 5 modules)
Ribbon cables for patch
1 NIM Fan
2 Cable patch boxes
==BOX D==
Scrolling pump
Backflow interlock |
|
11
|
Wed Aug 16 12:53:43 2017 |
DK | To do / missing | Photodiode
Electronics
Foil mount (12 um Al seems okay, but check more carefully)
Beam viewing material
Previous order very delayed
==TDC data==
*Check for remaining LeCroy 622 quad logic unit
ask Stephan http://www.ph.ed.ac.uk/people/stephan-eisenhardt
*Conversion cables for CAEN V767 TDC input
*RAL ADC output split of ribbon cable
==SSDs==
How to protect the S2s during beam tuning?
Can the ISOLDE operators easily restore beam optics settings or not?
(Determines if we can do all the beam tuning at once or if we have to separate them)
Controlable iris aka Star Wars door -- contact Simon Fox at York
Dynamic range of the preamps is only maximum 200 MeV, so we need a foil to degrade the heavy ion energy
Gain resistors for up to three dynamic range settings |
|
10
|
Thu Jun 1 13:09:38 2017 |
DK | Testing email header, part II | Checking some server settings for the elog system regarding the email notification.
And testing updating an elog.
Testing again... |
|
9
|
Wed May 24 16:18:22 2017 |
MD | Notes from visit of ISOLDE at 23rd May 2017 | Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall)
The scattering chamber will take place at the gray surface with all tube connector.
The end of scattering chamber is ISO 100. Do we have the right adapter for the tube to connect?
The scattering chamber, with a lot of electronics inside, has a pressure of something E-06 mbar, so our pressure should fit well.
Our faraday cup was asked to have the possibility to monitor if we getting beam or not.
Behind the scattering chamber there will be a setup for Neutron Time of Flight experiment on C15 in the end of august and on 9/10Li in the end of October 2017.
The setup length will be additional 5-6 meters (close to left end of the poster/wooden box on picture).
Offline Setup:
Offline Setup next to parallel wall will probably not be possible due to the other setup, but there is at least 2-3m*4-5m space on the wall, where the beam line points to (corner). We just have to leave some space that people can access the crane ladder.
No specific time was discussed, because the current setup has to first installed.
Alignment:
The Tools are mounted at the wall (2 points) and are setup in the corner (stand from bottom). It is an electronic system, no further details from Karl, but contact has been established.
Beam Height:
Beam height is 1.75m. We will bring our own metal frame for support. What is our height (range) at the moment?
For Offline test we can have an alpha source.
Power plug: SWISS standard à need ADAPTERs
3 normal plugs per grounded access point (with C16 fuse). For offline testing we can easily use 1-2 access points, which would be enough.
Near the installation place at the beamline are also 2 access points, which we will share with the scattering chamber. In case we also use extension to the offline ones, although safety regulation allow no cables on the floor, so we always have to use cable guides above. (I´m not sure how they deal with power cables…)
Next point: cables guide are used, so we have to bring longer BNC cables and the other long ribbon cables.
No camacs crates are spotted at the moment by Karl, which we could use.
No OIL pumps are allowed anymore at HIE – ISOLDE. Our roughing pump and Turbo pump are working without oil, aren´t they?
Grounded crates??
Expectations:
They want to have a drawing of our setup (chamber including metal frame, crates, vacuum pipes, water cooling, … maybe add work place with PC)
And all the SAFETY Regulation papers should be prepared.
Important!!! Everything is temporary:
There are daily changes in the setup at XT03 with scattering chamber and neutron TOF setup in the next week and when ISS chamber will be installed, the odds and ends near the wall and the corner will hopefully disappear, so we will have a better picture how much space in the end will be there.
I will visit ISOLDE in the beginning of June again to see the progress.
Forgot to ask:
Any special placement for water cooling or can we still use shortest possible distance to chamber? |
|
Draft
|
Wed May 24 16:09:10 2017 |
MD | Notes from visit of ISOLDE at 23rd May 2017 | Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall)
The scattering chamber will take place at the gray surface with all tube connector.
The end of scattering chamber is ISO 100. Do we have the right adapter for the tube to connect?
The scattering chamber, with a lot of electronics inside, has a pressure of something E-06 mbar, so our pressure should fit well.
Our faraday cup was asked to have the possibility to monitor if we getting beam or not.
Behind the scattering chamber there will be a setup for Neutron Time of Flight experiment on C15 in the end of august and on 9/10Li in the end of October 2017.
The setup length will be additional 5-6 meters (close to left end of the poster/wooden box on picture).
Offline Setup:
Offline Setup next to parallel wall will probably not be possible due to the other setup, but there is at least 2-3m*4-5m space on the wall, where the beam line points to (corner). We just have to leave some space that people can access the crane ladder.
No specific time was discussed, because the current setup has to first installed.
Alignment:
The Tools are mounted at the wall (2 points) and are setup in the corner (stand from bottom). It is an electronic system, no further details from Karl, but contact has been established.
Beam Height:
Beam height is 1.75m. We will bring our own metal frame for support. What is our height (range) at the moment?
For Offline test we can have an alpha source.
Power plug: SWISS standard à need ADAPTERs
3 normal plugs per grounded access point (with C16 fuse). For offline testing we can easily use 1-2 access points, which would be enough.
Near the installation place at the beamline are also 2 access points, which we will share with the scattering chamber. In case we also use extension to the offline ones, although safety regulation allow no cables on the floor, so we always have to use cable guides above. (I´m not sure how they deal with power cables…)
Next point: cables guide are used, so we have to bring longer BNC cables and the other long ribbon cables.
No camacs crates are spotted at the moment by Karl, which we could use.
No OIL pumps are allowed anymore at HIE – ISOLDE. Our roughing pump and Turbo pump are working without oil, aren´t they?
Grounded crates??
Expectations:
They want to have a drawing of our setup (chamber including metal frame, crates, vacuum pipes, water cooling, … maybe add work place with PC)
And all the SAFETY Regulation papers should be prepared.
Important!!! Everything is temporary:
There are daily changes in the setup at XT03 with scattering chamber and neutron TOF setup in the next week and when ISS chamber will be installed, the odds and ends near the wall and the corner will hopefully disappear, so we will have a better picture how much space in the end will be there.
I will visit ISOLDE in the beginning of June again to see the progress.
Forgot to ask:
Any special placement for water cooling or can we still use shortest possible distance to chamber? |
|
Draft
|
Wed May 24 15:21:37 2017 |
MD | Notes from visit of ISOLDE at 23rd May 2017 | Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall)
The scattering chamber will take place at the gray surface with all tube connector.
The end of scattering chamber is ISO 100. Do we have the right adapter for the tube to connect?
The scattering chamber, with a lot of electronics inside, has a pressure of something E-06 mbar, so our pressure should fit well.
Our faraday cup was asked to have the possibility to monitor if we getting beam or not.
Behind the scattering chamber there will be a setup for Neutron Time of Flight experiment on C15 in the end of august and on 9/10Li in the end of October 2017.
The setup length will be additional 5-6 meters (close to left end of the poster/wooden box on picture).
Offline Setup:
Offline Setup next to parallel wall will probably not be possible due to the other setup, but there is at least 2-3m*4-5m space on the wall, where the beam line points to (corner). We just have to leave some space that people can access the crane ladder.
No specific time was discussed, because the current setup has to first installed.
Alignment:
The Tools are mounted at the wall (2 points) and are setup in the corner (stand from bottom). It is an electronic system, no further details from Karl, but contact has been established.
Beam Height:
Beam height is 1.75m. We will bring our own metal frame for support. What is our height (range) at the moment?
For Offline test we can have an alpha source.
Power plug: SWISS standard à need ADAPTERs
3 normal plugs per grounded access point (with C16 fuse). For offline testing we can easily use 1-2 access points, which would be enough.
Near the installation place at the beamline are also 2 access points, which we will share with the scattering chamber. In case we also use extension to the offline ones, although safety regulation allow no cables on the floor, so we always have to use cable guides above. (I´m not sure how they deal with power cables…)
Next point: cables guide are used, so we have to bring longer BNC cables and the other long ribbon cables.
No camacs crates are spotted at the moment by Karl, which we could use.
No OIL pumps are allowed anymore at HIE – ISOLDE. Our roughing pump and Turbo pump are working without oil, aren´t they?
Grounded crates??
Expectations:
They want to have a drawing of our setup (chamber including metal frame, crates, vacuum pipes, water cooling, … maybe add work place with PC)
And all the SAFETY Regulation papers should be prepared.
Important!!! Everything is temporary:
There are daily changes in the setup at XT03 with scattering chamber and neutron TOF setup in the next week and when ISS chamber will be installed, the odds and ends near the wall and the corner will hopefully disappear, so we will have a better picture how much space in the end will be there.
I will visit ISOLDE in the beginning of June again to see the progress.
Forgot to ask:
Any special placement for water cooling or can we still use shortest possible distance to chamber? |
|
6
|
Wed Apr 26 12:10:04 2017 |
DK | Testing email header | I asked IT about putting the elog name into the email subject line (useful for those of us subscribed to more than one elog). They said they enabled it for ISOLDE. Let's test
to see!
Another test (June 1st) |
|
5
|
Tue Apr 18 11:05:43 2017 |
Mirco / Claudia | Setup Preparation | status of the setup - 07/04/2017
status of the setup - 21/04/2017 |
|
4
|
Tue Mar 14 10:57:20 2017 |
Claudia | Meeting Edinburgh 14 March 10 am 2017 | 1) DAQ
We have 192 channels to DAQ working. Mirco will test the silicon detectors with an alpha source in the next 2 weeks.
2) Vacuum
In the moment we reach 6E-6. There are still 2 tiny leaks. There will be an extra turbo for the upstream beam line which should improve the vacuum for ISOLDE purposes.
We need to check how fast we can pump down as might need to open the chamber between tuning and beam time (detectors need to be protected from tune beam).
3) Alignment
Alignment of the sample positions can be done here (Mirco/Peter). Claudia will contact Karl about a survey team for alignment at ISOLDE. Then we can talk to them directly.
4) Shipping
We aim to ship the setup to CERN by the end of March. We will try to go over to CERN for initial setup middle of April (to be confirmed with Karl)
5) Equipment needed from CERN
Claudia will ask Karl about availability of a CAMAC crate and 2 NIM bins.
6) Safety
Peter will order safety boots and hard hats.
Those who do not have ISOLDE access need to attend the ISOLDE radiation protection course.
7) Availability for Preparations
Tom not here: 25 March - 3 April, 25 April - middle June
Daid not here: until middle June ?
8) Samples CH2, CD2
Paul has new batch and should send alpha spectra soon. |
|
3
|
Sun Feb 19 12:22:16 2017 |
td, md | Vacuum and detector test | ------17.2.17 ------------------------------------------------------
closing chamber
use Leak testing pump
16.50 p = 0.6 mbar --> starting Turbo pump
18.25 Turbo @ 30kRPM, 33W
Pressure 7.0E-04mbar, backing pressure (leak tester) 0.1mbar
------18.2.17 ------------------------------------------------------
12.30 Turbo @ 42kRPM, 25W
Pressure 6.0E-05mbar, backing pressure (leak tester) 0.1mbar
FL601 started , temperature 25.8 deg C, set point -5.0 deg C
16.10 Turbo @ 42kRPM, 18W
Pressure 1.8E-05mbar, backing pressure (leak tester) 9.3E-2mbar
FL601 set point -5.0 deg C, actual -1.6 deg C
19.2.17
12.20 Turbo @ 42kRPM, 15W
Pressure 1.5E-05mbar, backing pressure (leak tester) 9.3E-2mbar
FL601 set point -5.0 deg C, actual -2.0 deg C
------20.2.17 -------------------------------------------------------
14.30 Turbo @ 42kRPM, 14W
Pressure 1.2E-05mbar, backing pressure (leak tester) 9.2E-2mbar
FL601 set point -5.0 deg C, actual -2.3 deg C
21.2.17
10.10 Turbo @ 42kRPM, 14W
Pressure 1.1E-05mbar, backing pressure (leak tester) 9.2E-2mbar
FL601 set point -5.0 deg C, actual -2.5 deg C
16.30 Turbo @ 42kRPM, 13W
Pressure 1.0E-05mbar, backing pressure (leak tester) 9.2E-2mbar
FL601 set point -5.0 deg C, actual -2.4 deg C
-----22.2.17 -------------------------------------------------------
11.00 Turbo @ 42kRPM, 13W
Pressure 1.0E-05mbar, backing pressure (leak tester) 9.2E-2mbar
FL601 set point -5.0 deg C, actual -2.4 deg C
11.02 +/-15V preamp power ON
11.06 Pressure 1.2E-05mbar, FL601 actual temp -1.8 deg C
11.12 Pressure 1.3E-05mbar, FL601 actual temp -1.4 deg C
14.01 Pressure 1.5E-05mbar, FL601 actual temp -1.0 deg C
14.02 +/-15V preamp power OFF
14.15 Pressure 1.1E-05mbar, FL601 actual temp -1.9 deg C
15.27 Pressure 1.0E-05mbar, FL601 actual temp -2.0 deg C
------23.2.17 -----------------------------------------------------
14.40 Pressure 8.6E-06mbar, FL601 actual temp -2.4 deg C
17.10 Pressure 8.1E-06mbar, FL601 actual temp -2.5 deg C
------24.2.17 -----------------------------------------------------
13.08 Turbo @ 42kRPM, 13W
Pressure 7.0E-06mbar, backing pressure (leak tester) 9.1E-2mbar, leak rate 3.3E-10 mbar.l/s
FL601 set point -5.0 deg C, actual -2.2 deg C
14.30 Pressure 6.8E-06mbar, FL601 actual temp -2.5 deg C
+/-15V preamp power ON
14.49 Pressure 9.9E-06mbar, FL601 actual temp -1.0 deg C
17.44 Pressure 1.1E-05mbar, FL601 actual temp -1.0 deg C
19.00 Pressure 1.1E-05mbar, FL601 actual temp -1.0 deg C
+/-15V preamp power OFF
------26.2.17 ---------------------------------------------------
11.44 Turbo @ 42kRPM, 13W
Pressure 7.5E-06mbar, backing pressure (leak tester) 9.1E-2mbar, leak rate 1.8E-10 mbar.l/s
FL601 set point -5.0 deg C, actual -2.0 deg C
+/-15V preamp power ON
14.02 Pressure 1.2E-05mbar, FL601 actual temp -0.9 deg C
18.19 +/-15V preamp power OFF
Pressure 1.2E-05mbar, FL601 actual temp -0.9 deg C
------27.2.17 ---------------------------------------------------
11.44 Turbo @ 42kRPM, 13W, 0.7A, 33 degree
Pressure 6.8E-06mbar, backing pressure (leak tester) 9.1E-2mbar, leak rate 1.3E-10 mbar.l/s
FL601 set point -5.0 deg C, actual -2.4 deg C
13.15 pressure 6.7E-06mbar;
Turn off Turbo pump and open chamber!
##################################################################
##################################################################
------2.3.17------------------------------------------------------
using leak testing pump as backing/pre pump (start it with open valve --otherwise there will be alarm signal of leak
rate changing dramatically)
showing some time scales for pumping (p_back is the pressure measured in backing pump and p_TC2 is the second gauge
plugged and measured inside the chamber
16.03 p_back = 39mbar; p_TC2 = 1.0E+03mbar
16.29 p_back = 1.3mbar; p_TC2 = 8.4E+02mbar
16.45 p_back = 0.8mbar; p_TC2 = 6.7E+02mbar
16.59 p_back = 0.6mbar; p_TC2 = 4.1E+02mbar
18.26 p_back = 0.2mbar; p_TC2 = 4.0E+00mbar
--> starting Turbopump (accelerating up with safety check step in between)
18.30 p_back = 0.3mbar; p_TC2 = 3.5E+00mbar
(release more gas from the chamber into pipe by TP)
18.34 Turbo @ I=1.8A, P=28W, 7 kRPM, 27 deg C
p_TC2 = 1.9E+00mbar
18.38 Turbo @ I=6.0A, upto P=90W, 10 kRPM, 29 deg C
18.42 Turbo @ I=2.5A, P=38W, 11 kRPM, 29 deg C
p_TC2 = 5.5E-01mbar
18.55 Turbo @ I=1.1A, P=17W, 15 kRPM, 31 deg C
p_TC2 = 4.1E-02mbar
18.59 Turbo @ I=4.5A, P=82W, 19 kRPM, 31 deg C
p_TC2 = 2.3E-02mbar
------3.3.17-------------------------------------------------------
11.05 Turbo @ 42kRPM, 13W
Pressure 5.5E-05mbar, FL601 ON
FL601 set point -5.0 deg C, actual +24 deg C
+/-15V preamp power ON
14.15 Turbo @ 42kRPM, 0.7A, 14W, 33 deg C
Pressure 1.2E-05mbar, backing pressure (leak tester) 9.2E-2mbar, leak rate between 2E-12 and 1.4E-11 mbar.l/s
FL601 set point -5.0 deg C, actual -1.4 deg C
14.30 Adding insulation to water pipe and try to deflect hot air from chiller away from cold pipes
14.40 - 15.40: +/-15V preamp power ON
15.00 Turbo @ 42kRPM, 0.8A, 16W, 33 deg C
Pressure 1.8E-05mbar
FL601 set point -5.0 deg C, actual -0.7 deg C
15.40 Turbo @ 42kRPM, 0.8A, 17W, 33 deg C
Pressure 2.1E-05mbar
FL601 set point -5.0 deg C, actual -0.6 deg C
16.10 Turbo @ 42kRPM, 0.7A, 14W, 33 deg C
Pressure 1.2E-05mbar
FL601 set point -5.0 deg C, actual -1.6 deg C
17.30 Turbo @ 42kRPM, 0.7A, 14W, 33 deg C
Pressure 1.1E-05mbar
FL601 set point -5.0 deg C, actual -1.7 deg C
------06.03.17 ----------------------------------------------
power fluctuations turned off the chiller
13.42 Turbo @ 42kRPM, 1.0A, 19W, 33 deg C
Pressure 2.2E-05mbar
FL601 off.
Turn on FL601, which went from -5.0 up to actual +0.1 deg C and started cooling again.
visible impact on the pressure:
13.46 Turbo @ 42kRPM, 1.0A, 18W, 33 deg C
Pressure 1.1E-05mbar
FL601 set point -5.0 deg C, actual -0.1 deg C
14.04 Turbo @ 42kRPM, 0.7A, 14W, 33 deg C
Pressure 8.7E-06mbar
FL601 set point -5.0 deg C, actual -1.6 deg C
14.26 Turbo @ 42kRPM, 0.7A, 13W, 33 deg C
Pressure 8.2E-06mbar
FL601 set point -5.0 deg C, actual -2.0 deg C
Adding alcohol and water to cooling reservoir up to limit (full reservior), temperature went up due to room
temperature of added liquids
14.44 temp -0.6 deg C
14.49 temp -2.7 deg C
14.52 temp -3.6 deg C
added more alcohol! (one small bottle and a bit of the rest in IPA bottle)
15.00 temp -3.8 deg C
15.01 Turbo @ 42kRPM, 0.7A, 13W, 33 deg C
Pressure 7.9E-06mbar
FL601 set point -5.0 deg C, actual -4.1 deg C
15.12 Turbo @ 42kRPM, 0.7A, 13W, 33 deg C
Pressure 7.4E-06mbar
FL601 set point -5.0 deg C, actual -5.3 deg C
15.14 set point to -10.0 deg C
15.22 Turbo @ 42kRPM, 0.7A, 13W, 33 deg C
Pressure 7.3E-06mbar
FL601 set point -10.0 deg C, actual -6.3 deg C
16.03 Turbo @ 42kRPM, 0.6A, 12W, 33 deg C
Pressure 6.9E-06mbar, p_back = 9.1E-02mbar, leak rate 6.2E-11 mbar *l/s
FL601 set point -10.0 deg C, actual -9.9 deg C
17.00 Turbo @ 42kRPM, 0.6A, 12W, 33 deg C
Pressure 6.7E-06mbar
FL601 set point -15.0 deg C, actual -10.3 deg C
17.38 Turbo @ 42kRPM, 0.6A, 12W, 33 deg C
Pressure 6.7E-06mbar, p_back = 9.1E-02mbar
FL601 set point -15.0 deg C, actual -10.2 deg C
--> reach minimum temp due to not enough alcohol --> set point to -10.0 deg C
17.41 Turn +/-15V preamp power ON
17.46 Turbo @ 42kRPM, 0.6A, 12W, 32 deg C
Pressure 7.2E-06mbar, p_back = 9.1E-02mbar, leak rate 8.3E-11 mbar *l/s
FL601 set point -10.0 deg C, actual -8.6 deg C
18.17 Turbo @ 42kRPM, 0.7A, 14W, 32 deg C
Pressure 1.0E-05mbar, p_back = 9.2E-02mbar, leak rate 2.3E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -8.0 deg C
18.44 Turbo @ 42kRPM, 0.8A, 15W, 33 deg C
Pressure 1.1E-05mbar, p_back = 9.2E-02mbar, leak rate 2.4E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -7.7 deg C
18.45 Turn +/-15V preamp power OFF
19.35 Turbo @ 42kRPM, 0.6A, 12W, 33 deg C
Pressure 7.1E-06mbar, p_back = 9.1E-02mbar, leak rate 1.7E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -9.8 deg C
------07.03.17 ----------------------------------------------
12.13 Turbo @ 42kRPM, 0.7A, 12W, 32 deg C
Pressure 6.5E-06mbar, p_back = 9.1E-02mbar, leak rate 1.2E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -10.0 deg C
12.15 Turn +/-15V preamp power ON
12.31 Turbo @ 42kRPM, 0.7A, 14W, 32 deg C
Pressure 8.6E-06mbar, p_back = 9.1E-02mbar, leak rate 1.3E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -8.6 deg C
13.22 Turbo @ 42kRPM, 0.8A, 15W, 32 deg C
Pressure 1.0E-05mbar, p_back = 9.2E-02mbar, leak rate 1.8E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -6.8 deg C
13.41 Turbo @ 42kRPM, 0.8A, 15W, 32 deg C
Pressure 1.0E-05mbar, p_back = 9.2E-02mbar, leak rate 1.9E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -6.9 deg C
14.35 Turbo @ 42kRPM, 0.8A, 15W, 33 deg C
Pressure 1.0E-05mbar, p_back = 9.2E-02mbar, leak rate 1.7E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -7.3 deg C
15.24 Turbo @ 42kRPM, 0.8A, 14W, 33 deg C
Pressure 1.0E-05mbar, p_back = 9.2E-02mbar, leak rate 1.8E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -7.3 deg C
16.05 Turbo @ 42kRPM, 0.8A, 14W, 33 deg C
Pressure 1.0E-05mbar, p_back = 9.2E-02mbar, leak rate 1.8E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -7.4 deg C
17.56 Turbo @ 42kRPM, 0.8A, 14W, 33 deg C
Pressure 1.0E-05mbar, p_back = 9.2E-02mbar, leak rate 1.7E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -7.6 deg C
18.14 Turn +/-15V preamp power OFF
18.18 Turbo @ 42kRPM, 0.7A, 14W, 33 deg C
Pressure 9.1E-06mbar, p_back = 9.2E-02mbar, leak rate 1.6E-10 mbar *l/s
(decreased after a big outgasing (E-09) just shortly after turning preamp power)
FL601 set point -10.0 deg C, actual -7.5 deg C
------08.03.17 --------------------------------------------------------------
12.00 Turbo @ 42kRPM, 1.0A, 18W, 34 deg C
Pressure 6.2E-06mbar, p_back = 9.1E-02mbar, leak rate 7.9E-11 mbar *l/s
FL601 set point -10.0 deg C, actual -9.7 deg C
Power on Turbo pump higher than usual, although pressure is at its lowest since.
Checked cycle time = 8261 min = 137.68 hours = 5.74 days
pump life = 31107 h
Release a bit of coolant to check the concentration in chemistry lab:
density of mixture = 0.965 g/cm3 at temperature of 19.3 degree
concentration of alcohol: x = (density_mixture - density_water)/(density_ethanol - density_water)
= (0.965 - 0.998)/(0.79 - 0.998)
= 0.159
around 16% alcohol --> freezing temp should be around -7 to -8 degree C
13.46 Turbo @ 42kRPM, 1.0A, 18W, 35 deg C
Pressure 6.1E-06mbar, p_back = 9.1E-02mbar, leak rate 8.6E-11 mbar *l/s
FL601 set point -10.0 deg C, actual -9.2 deg C
15.30 Turbo @ 42kRPM, 0.8A, 15W, 35 deg C
Pressure 6.1E-06mbar, p_back = 9.1E-02mbar, leak rate 9.3E-11 mbar *l/s
FL601 set point -10.0 deg C, actual -9.6 deg C
15.37 Turn +/-15V preamp power ON
16.38 Turbo @ 42kRPM, 0.8A, 17W, 35 deg C
Pressure 9.4E-06mbar, p_back = 9.1E-02mbar, leak rate 1.5E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -7.0 deg C
16.39 Turn +/-15V preamp power OFF
------09.03.17 --------------------------------------------------------------
11.21 Turbo @ 42kRPM, 0.7A, 15W, 35 deg C
Pressure 6.1E-06mbar, p_back = 9.1E-02mbar, leak rate 8.6E-11 mbar *l/s
FL601 set point -10.0 deg C, actual -9.6 deg C (fluctuations between -10.0 and -9.3 degree C)
11.22 Turn +/-15V preamp power ON
14.18 Turbo @ 42kRPM, 0.8A, 17W, 35 deg C
Pressure 9.3E-06mbar, p_back = 9.1E-02mbar, leak rate 1.7E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -7.4 deg C
14.39 Turbo @ 42kRPM, 0.9A, 17W, 35 deg C
Pressure 9.4E-06mbar, p_back = 9.1E-02mbar, leak rate 1.6E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -7.4 deg C
14.40 Turn +/-15V preamp power OFF
14.50 Turbo @ 42kRPM, 0.8A, 16W, 35 deg C
Pressure 7.4E-06mbar, p_back = 9.1E-02mbar, leak rate 1.2E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -8.3 deg C
15.00 Turbo @ 42kRPM, 0.8A, 16W, 35 deg C
Pressure 6.9E-06mbar, p_back = 9.1E-02mbar, leak rate 1.3E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -9.2 deg C
17.14 Turbo @ 42kRPM, 0.8A, 15W, 35 deg C
Pressure 6.1E-06mbar, p_back = 9.1E-02mbar, leak rate 9.9E-11 mbar *l/s
FL601 set point -10.0 deg C, actual -10.0 deg C
17.58 Turbo @ 42kRPM, 0.8A, 15W, 34 deg C
Pressure 6.0E-06mbar, p_back = 9.1E-02mbar, leak rate 4.2E-10 mbar *l/s (did some Helium leak checking)
FL601 set point -10.0 deg C, actual -9.9 deg C
------10.03.17 --------------------------------------------------------------
10.55 Turbo @ 42kRPM, 0.8A, 15W, 35 deg C
Pressure 6.0E-06mbar, p_back = 9.1E-02mbar, leak rate 1.0E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -10.2 deg C
12.01 Turbo @ 42kRPM, 0.7A, 15W, 35 deg C
Pressure 5.9E-06mbar, p_back = 9.1E-02mbar, leak rate 1.1E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -10.0 deg C
12.07 leak rate dropped to 3.0E-12 just occasionly
13.07 Turbo @ 42kRPM, 0.7A, 15W, 34 deg C
Pressure 5.8E-06mbar, p_back = 9.1E-02mbar, leak rate 3.5E-10 mbar *l/s (after leak check - suspious about UP
and DOWN ribbon cable flanges)
FL601 set point -10.0 deg C, actual -10.1 deg C
13.07 Turn +/-15V preamp power ON
14.56 Turbo @ 42kRPM, 0.8A, 17W, 34 deg C
Pressure 9.0E-06mbar, p_back = 9.1E-02mbar, leak rate 6.3E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -7.2 deg C
14.56 Turn +/-15V preamp power OFF
17.10 Turbo @ 42kRPM, 0.8A, 15W, 34 deg C
Pressure 5.9E-06mbar, p_back = 9.1E-02mbar, leak rate 2.9E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -10.1 deg C
17.40 Turbo @ 42kRPM, 0.8A, 15W, 34 deg C
Pressure 5.7E-06mbar, p_back = 9.1E-02mbar, leak rate 7.4.9E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -10.2 deg C
------13/03/17 ---------------------------------------------------------------
11.40 Turbo @ 42kRPM, 0.8A, 15W, 34 deg C
Pressure 6.3E-06mbar, p_back = 9.1E-02mbar, leak rate 9.4E-11 mbar *l/s
FL601 set point -10.0 deg C, actual -10.1 deg C
--> pressure went up over the weekend??????????????? (Room temperature can be the reason)
15.53 Turbo @ 42kRPM, 0.8A, 15W, 34 deg C
Pressure 6.1E-06mbar, p_back = 9.1E-02mbar, leak rate 1.5E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -10.1 deg C
------14/03/17 ---------------------------------------------------------------
09.38 Turbo @ 42kRPM, 0.7A, 15W, 35 deg C
Pressure 6.3E-06mbar, p_back = 9.1E-02mbar, leak rate 1.1E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -9.9 deg C
09.39 Turn +/-15V preamp power ON
11.14 Turbo @ 42kRPM, 0.8A, 17W, 35 deg C
Pressure 8.9E-06mbar, p_back = 9.1E-02mbar, leak rate 1.8E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -7.1 deg C
11.30 Turbo @ 42kRPM, 0.8A, 17W, 35 deg C
Pressure 8.7E-06mbar, p_back = 9.1E-02mbar, leak rate 1.8E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -6.8 deg C
11.30 Turn +/-15V preamp power OFF
Adding same silicone vacuum leak sealant (Aerosol) to the Upstream cable connections (suspious leak)
13.30 Turbo @ 42kRPM, 0.8A, 15W, 34 deg C
Pressure 6.2E-06mbar, p_back = 9.1E-02mbar, leak rate 1.0E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -9.8 deg C
------15/03/17 ---------------------------------------------------------------
10.50 Turbo @ 42kRPM, 0.7A, 15W, 35 deg C
Pressure 6.2E-06mbar, p_back = 9.1E-02mbar, leak rate 1.2E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -10.0 deg C
Fluke Thermometer(thermocoupling to preamp board) = 0.3 deg C
13.30 Turbo @ 42kRPM, 0.8A, 15W, 35 deg C
Pressure 5.9E-06mbar, p_back = 9.1E-02mbar, leak rate 9.9E-11 mbar *l/s
FL601 set point -10.0 deg C, actual -10.1 deg C
13.48 Leak test of lower 2/3 of BNC connections, when leak risen slowly from 2E-10 to 3E-09 in like 10minutes.
At same time p(TC1) raised for some second up to 9E-06mbar, which could indicate a huge outgasing)
14.04 Turbo @ 42kRPM, 0.7A, 15W, 35 deg C
Pressure 6.0E-06mbar, p_back = 9.1E-02mbar, leak rate 3.4E-09 mbar *l/s
FL601 set point -10.0 deg C, actual -9.7 deg C
16.36 Turbo @ 42kRPM, 0.7A, 15W, 34 deg C
Pressure 5.9E-06mbar, p_back = 9.1E-02mbar, leak rate 5.9E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -9.9 deg C
------16/03/17 ---------------------------------------------------------------
11.49 Turbo @ 42kRPM, 0.8A, 15W, 34 deg C
Pressure 6.1E-06mbar, p_back = 9.1E-02mbar, leak rate 1.8E-10 mbar *l/s
FL601 set point -10.0 deg C, actual -10.1 deg C
13.11 Turbo @ 42kRPM, 0.8A, 15W, 34 deg C
Pressure 6.0E-06mbar, p_back = 9.1E-02mbar, leak rate 1.4E-08 mbar *l/s (leak test Toby - found bad o-ring
connection back side downstream end)
FL601 set point -10.0 deg C, actual -9.7 deg C
----- Switched off TP 15.34 (peter changed Fan of TP controller, new Targetholder did not fit perfectly, so still with
old one, investigation on o-ring leak --> maybe small dust particle)
15.53 chamber close, Roughing pump with bigger pipe ON, 16.02 Turn on TP (Soft start)
16.30 Pressure 1.1E-03mbar (Turbo @ 15kRPM, 0.6A, 10W, 34 deg C)
16.55 Pressure 5.2E-04mbar (Turbo @ 27kRPM, 0.6A, 17W, 35 deg C)
17.32 Pressure 2.8E-04mbar (Turbo @ 42kRPM, 0.6A, 27W, 37 deg C)
18.21 Pressure 2.2E-04mbar (Turbo @ 42kRPM, 0.6A, 20W, 38 deg C)
18.23 pressure = 2.E-04 --> start FL601set point -10.0 deg C, actual -6.5 went up to - 1.5 deg C (start equilibrium)
18.27 Pressure 1.6E-04mbar (Turbo @ 42kRPM, 0.9A, 19W, 38 deg C)
FL601 set point -10.0 deg C, actual -2.2 deg C
18.40 Pressure 1.3E-04mbar (Turbo @ 42kRPM, 0.9A, 19W, 39 deg C)
FL601 set point -10.0 deg C, actual -5.5 deg C
(temperature of TP could have indicated a leak...)
------17/03/17 Friday---------------------------------------------------------------
09.37 Pressure 1.2E-04mbar (Turbo @ 42kRPM, 0.9A, 15W, 40 deg C)
FL601 set point -10.0 deg C, actual -9.6 deg C
LEAK? (screws on targetholder were not secured enough)
09.43 Pressure 5.4E-05mbar (Turbo @ 42kRPM, 0.6A, 13W, 40 deg C)
FL601 set point -10.0 deg C, actual -9.6 deg C
10.40 Pressure 5.5E-05mbar (Turbo @ 42kRPM, 0.7A, 13W, 40 deg C)
FL601 set point -10.0 deg C, actual -9.7 deg C
Helium test: o-ring (downstream end) front top part 10^-9 to 10^-5 (big leak --> no pressure improvement)
11.06 Turn off FL601
14.35 Turn off TP
###################################################################################
OPEN CHAMBER: Removed pre amp board U1-U4.
over weekend close chamber with roughing pump (~5.0E-01mbar)
------20/03/17 Monday---------------------------------------------------------------
CHANGED/SWITCHED UP and DOWN board inside the chamber.
New UP (1-8) and new DOWN (5-8)
Distance measurements:
------17/03/17 Friday---------------------------------------------------------------
09.37 Pressure 1.2E-04mbar (Turbo @ 42kRPM, 0.9A, 15W, 40 deg C)
FL601 set point -10.0 deg C, actual -9.6 deg C
LEAK? (screws on targetholder were not secured enough)
09.43 Pressure 5.4E-05mbar (Turbo @ 42kRPM, 0.6A, 13W, 40 deg C)
FL601 set point -10.0 deg C, actual -9.6 deg C
10.40 Pressure 5.5E-05mbar (Turbo @ 42kRPM, 0.7A, 13W, 40 deg C)
FL601 set point -10.0 deg C, actual -9.7 deg C
Helium test: o-ring (downstream end) front top part 10^-9 to 10^-5 (big leak --> no pressure improvement)
11.06 Turn off FL601
14.35 Turn off TP
###################################################################################
OPEN CHAMBER: Removed pre amp board U1-U4.
over weekend close chamber with roughing pump (~5.0E-01mbar)
------20/03/17 Monday---------------------------------------------------------------
CHANGED/SWITCHED UP and DOWN board inside the chamber.
New UP (1-8) and new DOWN (5-8)
Distance measurements:
New UPstream: (metal frame stand off = 10mm)
Position (to end of chamber): 738 - 40 (pos from target) - 32 (plastic standoff) + 10 = 676 (to end of board)
Orientation:
4
3
6 2
5 1
7
8
New DOWNstream: (metal frame stand off = 20mm)
Position (to end of chamber): 738 - 400 (pos from target) - 14 (plastic standoff) + 20 = 344 (to end of board)
Orientation:
6
5
7
8
***note: 24/03/17: took short standoff for UPstream hold (only ~40mm to targetholder)
remeasured short standoffs: 12.5mm
Checked: Cooling (changed circle with one preamp board less), cabling (preamp power signal),
position, cleaning, test preamp
CABLING changed 16-x19 to D5-8
14.30 close chamber, start roughing pump
15.24 p(TC2) = 4.4E-01 mbar --> soft start big Turbo Pump
15.39 p = 1.6 E-03mbar (0.7A, 11W, 11kRPM, 27 deg C)
16.11 p = 5.9 E-04mbar (0.6A, 14W, 23kRPM, 29 deg C)
16.33 p = 3.4 E-04mbar (1.3A, 38W, 34kRPM, 31 deg C)
17.41 p = 1.7 E-04mbar (0.9A, 18W, 42kRPM, 35 deg C)
Turn on FL601 cooling, set point to -5.0 deg C, actual temp starts at 22 deg C
19.12 Pressure 5.9E-05mbar (Turbo @ 42kRPM, 0.6A, 10W, 35 deg C)
FL601 set point -5.0 deg C, actual -4.6 deg C
--> changed set point to -10.0 deg C
------21/03/17 Tuesday---------------------------------------------------------------
10.52 p = 1.9 E-05 mbar
--> switch on small Turbo pump (TP2)
11.05 Pressure 1.3E-05mbar (Turbo @ 42kRPM, 0.5A, 10W, 35 deg C; TP2 @ 75kRPM, 0.25A, 13W, 32 deg C)
FL601 set point -10.0 deg C, actual -5.5 deg C
--> Turn ア15V preamp power ON
Testing DAQ
11.45 Pressure 2.0E-05mbar (Turbo @ 42kRPM, 0.5A, 10W, 35 deg C; TP2 @ 75kRPM, 0.26A, 13W, 39 deg C)
FL601 set point -10.0 deg C, actual -3.9 deg C
12.17 Turn ア15V preamp power OFF
Pressure 1.9E-05mbar (Turbo @ 42kRPM, 0.5A, 10W, 35 deg C; TP2 @ 75kRPM, 0.26A, 13W, 43 deg C)
FL601 set point -10.0 deg C, actual -4.0 deg C
14.18 Pressure 1.2E-05mbar (Turbo @ 42kRPM, 0.5A, 10W, 35 deg C; TP2 @ 75kRPM, 0.25A, 13W, 45 deg C)
FL601 set point -10.0 deg C, actual -5.6 deg C
added some alcohol(mixing takes a short heat up), switch to helium leak tester (DONT MOVE WHILE IT IS ON)
added FAN for small Turbopump
15.40 Pressure 1.1E-05mbar (Turbo @ 42kRPM, 0.5A, 9W, 35 deg C; TP2 @ 75kRPM, 0.24A, 12W, 33 deg C)
FL601 set point -10.0 deg C, actual -6.0 deg C
17.05 Pressure 1.0E-05mbar (Turbo @ 42kRPM, 0.5A, 9W, 34 deg C; TP2 @ 75kRPM, 0.24A, 12W, 34 deg C)
FL601 set point -10.0 deg C, actual -7.6 deg C
17.05 Turn ア15V preamp power ON
18.51 Pressure 1.6E-05mbar (Turbo @ 42kRPM, 0.5A, 9W, 34 deg C; TP2 @ 75kRPM, 0.24A, 12W, 34 deg C)
FL601 set point -10.0 deg C, actual -5.3 deg C
18.51 Turn ア15V preamp power OFF
------22/03/17 Wednesday---------------------------------------------------------------
10.55 Pressure 7.9E-06mbar (Turbo @ 42kRPM, 0.5A, 8W, 35 deg C; TP2 @ 75kRPM, 0.22A, 11W, 33 deg C)
p_back = 9.2E-02mbar, leak rate 10E-11 - 10E-12 mbar*l/s
FL601 set point -10.0 deg C, actual -7.7 deg C
14.05 pressure 7.7E-06mbar
OPEN CHAMBER FOR ALIGNMENT
------23/03/17 Thursday---------------------------------------------------------------
Si-Detectors: measures- DeltaE-E (65オm - 1000オm) and Downstream E (74オm)
HANDLE WITH CARE, NO TENSION --> THIN LAYERS.
Voltage supply: 24V for 74オm. BIAS cable is 4th row and 2nd place
Cabled to U1-4. DONT FLAT THE CHAMBER WITH LOTS OF AIR, use valve at TP.
------24/03/17 Friday---------------------------------------------------------------
Testing Preamps (with Si-"capacitor" - no BIAS) under atmosphere with 5 deg C cooling
Normal resolution with pulser and without Si-Detector = 2-3 channel
Without BIAS:
#1 adc 0-13: FWHM ~10ch
#1 adc 14,15: Broken
#1 adc 16-31: FWHM ~7ch
#2 adc 0-6: FWHM ~27ch
#2 adc 7,8: FWHM ~5-6ch only
#2 adc 9-14: FWHM ~30ch (2peaks each; low peak coming from wrong pulser signal.)
#2 adc 13: FWHM ~90ch
#2 adc 15: FWHM ~27ch
#2 adc 16-31: 8-10ch
except from #2 adc 22,28: ~27ch
Quad BIAS Supply:
0V - 0.20オA
5V - 0.82オA
10V - 0.95オA
15V - 1.07オA
20V - 1.17オA
24V - 1.25オA
With BIAS:
#1 adc 0-31(14,15 broken): FWHM 4-6ch
#2 adc 0-15: FWHM ~ 7ch
except from #2 adc 3,4,7,8,12 with lower tail: FWHM ~7-10ch
#2 adc 16-31: FWHM ~4-6ch
except 22,38: FWHM ~10ch
except 13: FWHM ~25ch
Targetholder (alignment) marker on scale
pos-1: 34.54 (bottom on ladder)
pos-2: 94.05 (middle)
pos-3: bottom.8 (almost maximum, top on ladder)
New run with alpha source P32 R9344 mixed (only Gold sealing --> wear Cloves)
(Pu-239, - 5.155MeV
Am-241, - 5.486MeV
Cm-244, - 5.805MeV)
17.15 Close Chamber, roughing pump
17.28 p = 9.9E-01mbar --> Start TP (big)
17.48 p = 2.0E-03mbar (TP @ 11kRPM, 0.7A, 12W, 28 deg C
------25/03/17 Saturday---------------------------------------------------------------
15.00 Pressure 4.6E-05mbar (Turbo @ 42kRPM, 0.6A, 11W, 34 deg C)
--> start small TP2 and open valve (quick soft start in 1 minute) - TP2 @ 75kRPM, 0.24A, 12W, 26 deg C)
start FL601 set point -10.0 deg C, actual 20.7 deg C
15.05 p = 3.8E-05 mbar
15.07 p = 3.4E-05 mbar
------27/03/17 Monday---------------------------------------------------------------
12.17 Pressure 6.2E-06mbar (Turbo @ 42kRPM, 0.8A, 14W, 36 deg C; TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
FL601 set point -10.0 deg C, actual -8.4 deg C
12.21 Turn ア15V preamp power ON
14.05 Pressure 8.7E-06mbar (Turbo @ 42kRPM, 0.8A, 13W, 36 deg C; TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
FL601 set point -10.0 deg C, actual -5.0 deg C
14.43 Pressure 8.7E-06mbar (Turbo @ 42kRPM, 0.8A, 13W, 36 deg C; TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
FL601 set point -10.0 deg C, actual -5.1 deg C
14.44 Turn ア15V preamp power OFF
16.25 Pressure 6.1E-06mbar (outgazing still ongoing, saw peak up to 2.3E-05mbar at a glimpse)
(Turbo @ 42kRPM, 0.8A, 13W, 36 deg C; TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
FL601 set point -10.0 deg C, actual -7.3 deg C
------28/03/17 Tuesday---------------------------------------------------------------
13.06 Pressure 5.7E-06mbar (Turbo @ 42kRPM, 0.8A, 14W, 35 deg C; TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
FL601 set point -10.0 deg C, actual -9.4 deg C
13.09 Turn ア15V preamp power ON
16.15 Pressure 7.8E-06mbar (Turbo @ 42kRPM, 0.8A, 13W, 35 deg C; TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
FL601 set point -10.0 deg C, actual -5.8 deg C
16.16 Turn ア15V preamp power OFF
18.36 Pressure 6.1E-06mbar (Turbo @ 42kRPM, 0.7A, 13W, 35 deg C; TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
FL601 set point -10.0 deg C, actual -8.5 deg C
------29/03/17 Wednesday---------------------------------------------------------------
13.15 Pressure 5.9E-06mbar (Turbo @ 42kRPM, 0.7A, 13W, 35 deg C; TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
FL601 set point -10.0 deg C, actual -9.5 deg C
13.25 Turn ア15V preamp power ON for alpha measurement
14.30 Pressure 7.3E-06mbar (Turbo @ 42kRPM, 0.7A, 13W, 35 deg C; TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
FL601 set point -10.0 deg C, actual -7.6 deg C
15.41 Pressure 7.9E-06mbar (Turbo @ 42kRPM, 0.7A, 13W, 35 deg C; TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
FL601 set point -10.0 deg C, actual -6.6 deg C
16.31 Pressure 7.8E-06mbar (Turbo @ 42kRPM, 0.7A, 13W, 35 deg C; TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
FL601 set point -10.0 deg C, actual -6.4 deg C
good vacuum condition of ~8E-06mbar with preamps on
16.31 Turn ア15V preamp power OFF
17.46 Pressure 6.1E-06mbar (Turbo @ 42kRPM, 0.7A, 12W, 35 deg C; TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
FL601 set point -10.0 deg C, actual -8.7 deg C
------30/03/17 Thursday---------------------------------------------------------------
12.15 Pressure 6.3E-06mbar (Turbo @ 42kRPM, 0.7A, 13W, 35 deg C; TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
FL601 set point -10.0 deg C, actual -9.8 deg C
shut off TP + TP2 --> spinning down
13.05 p = 3.1E-05mbar, turn off FL601, bringing down to atmosphere takes about 30 minutes.
###########################
13.35 OPEN CHAMBER, longer cable done for detector, Peter add block (15.8mm) the target holder (due to pos 3)
put stand off on DOWNstream
Test #3,#4 under atmosphere WITHOUT BIAS:
#3 adc 0 lower xmean ~ 1550, FWHM ~20ch
#19 low xmean ~450, FWHM ~3ch
rest of #3: xmean 2400-2600, FWHM ~10ch
#4 xmean more or less between 2000-3000, most ~2400.
#4 adc 4: double peak, FWHM > 30ch
#4 adc 0 - 15: FWHM ~ 30ch, except of
#4 adc 7: FWHM ~8ch.
#4 adc 16-31: FWHM ~12-13ch, right tail
except #4 adc 16: FWHM ~7ch
#4 adc 18: FWHM 15ch
#4 adc 25: FWHM ~20ch
BIAS up to 24 V 1.38オA leak current (while ramp <3オA)
alpha source inside chamber on new middle position: 94.05 -15.8 = 78.25
chamber close after 2h
WITH BIAS:
#3 0-31: 4-6ch FWHM
except #3 adc 1: ~10ch FWHM
#3 adc 19: ~3ch FWHM (lower mean)
left tail: adc 0-23 and right tail: adc 24-31
#4 adc 0-15: broader: adc 0-4: ~7ch FWHM
adc 5: ~3ch FWHM
adc 6,13: 11ch FWHM
adc 7,15: ~5,6ch FWHM
adc 8-12,14: ~7,8ch FWHM
#4 adc 16-31: 5-8ch FWHM right tail
##############################################
################################closed chamber
16.10 Roughing pump slowly pump down (open value stepwise)
16.25 p = 1.1 mbar --> start TP
16.30 p = 1.3E-01 mbar (TP @ 7kRPM, 1.0A, 15W, 28 deg C)
17.21 p = 7.8E-04 mbar (TP @ 27kRPM, 0.6A, 17W, 31 deg C)
18.08 p = 3.3E-04 mbar (TP @ 42kRPM, 1.1A, 22W, 34 deg C)
--> start TP2 (1min) --> TP2 @ 75kRPM, 0.26A, 13W, 26 deg C)
18.12 p = 2.7E-04 mbar
18.16 start FL601 set to -10.0 deg C, starts at ~ +4.0 deg C
18.18 p = 2.0E-04 mbar
18.54 p = 8.8E-05 mbar (TP @ 42kRPM, 0.8A, 17W, 35 deg C; TP2 @ 75kRPM, 0.25A, 13W, 32 deg C)
FL601 set point -10.0 deg C, actual -5.5 deg C
------31/03/17 Friday---------------------------------------------------------------
10.35 p = 1.5E-05mbar
12.15 p = 1.4E-05 mbar (TP @ 42kRPM, 0.6A, 12W, 35 deg C; TP2 @ 75kRPM, 0.22A, 11W, 32 deg C)
FL601 set point -10.0 deg C, actual -6.2 deg C
12.30 Turn ア15V preamp power ON (for Outgazing and alpha measurement)
13.40 p = 2.2E-05 mbar; leak rate: 1.6E-09 mbar l /S
14.15 p = 2.1E-05 mbar; T = -4.5 deg C
TURN BIAS on 24V, 1.16オA
14.17 DAQ started
#3 -19: low peak 181 with Amplitude of 478 (14.33), FWHM 4-5ch --> Area ~ 5500counts
rest #3 0-31: xmean ~ 1000, FWHM 8-12 ch
#4 adc 6 and 7: no signal
--> adc 6 could be preamp problem
--> adc 7 could be Si-Det issue, because it was observed with #2adc7 before
#4 adc 5: low xmean = 134, FWHM 2.5ch
rest of #4 adc 0-15: (14.40) ~500-800 Amplitude, xmean ~ 1000, FWHM ~12ch
#4 adc 16-31: A~200-250, xmean ~ 950-1050; FWHM ~7-8ch
14.45 p = 2.1E-05 mbar; Temp = -4.8 deg C; leak rate: 8.0E-10 mbar l /S
14.46 Turn ア15V preamp power OFF, switch off Amps and BIAS
16.10 p = 1.3E-05 mbar; T = -6.2 deg C
18.23 p = 1.2E-05 mbar; T = -6.2 deg C
------
------03/04/17 Monday ------------------- Peter testing ----------------
15.49 p = 7.6E-06 mbar;
------04/04/17 Tuesday -------------------
14.05 p = 7.1E-06 mbar;
TP Off
------05/04/17 Wednesday -------------------
########################################
##### chamber open, alpha source out ###
10.25 chamber close, start pumping
12.10 large TP ON
13.55 p = 9.4E-05 mbar
15.30 p = 5.7E-05 mbar
------06/04/17 Thursday -------------------
09.50 p = 1.5E-05 mbar
15.30 p = 1.0E-05 mbar
------07/04/17 Friday -------------------
09.25 p = 9.1E-06 mbar (TP @ 42kRPM, 0.5A, 9W, 35 deg C; no TP2)
FL601 set point -10.0 deg C, actual -9.7 deg C
09.25 Turn ア15V preamp power ON
12.02 p = 1.2E-05 mbar
T = -6.9 deg C
Turn ア15V preamp power OFF
12.13 p = 1.0E-05 mbar
T = -7.5 deg C
12.54 p = 9.0E-06 mbar
T = -8.5 deg C
15.04 p = 9.0E-06 mbar
T = -9.1 deg C
16.47 p = 8.6E-06 mbar
T = -9.3 deg C
##########################
ACCIDENT Registered on Sunday 09/04/17 ~10 am:
Power went down due to wiring problem
Tom C. closed valves, but chamber was probably already vented to atmosphere.
During power shut down roughing and turbo pump slowed down and turbo probably deaccelerate against atmosphere.
Possible back flows.
------11/04/17 Tuesday -----------------
OPEN CHAMBER 16.05: readjust Downstream plate to 326mm, cause we changed to longer stand-off
Downstream --> 74オm Si-Det
Upstream --> 500オm Si-Det
Check DAQ/FWHM of spectra without BIAS on under atmosphere and only PULSER signal:
BIAS up (500オm):
Voltage[V] Leak current[オA]
0 0.14
5 0.6
10 0.73
20 0.93
30 1.11
40 1.22
50 1.27
60 1.32
70 1.34
80 1.38
90 1.42
100 1.44
110 1.48
120 1.49
130 1.52 --> 1.44 (after 5 min)
Check DAQ/FWHM of spectra with BIAS on under atmosphere and only PULSER signal:
CLOSING CHAMBER
18.03 Start roughing pump
18.06 p = 1.0E+03 mbar
18.11 p = 2.0E+01 mbar
18.14 p = 3.8E+00 mbar
18.16 p = 1.9E+00 mbar
18.19 p = 1.1E+00 mbar --> start TP (and close valve at TP2)
18.22 p = 5.0E-01 mbar
18.25 p = 9.0E-02 mbar (took a while for next stage of acceleration... very slow start)
18.34 p = 2.6E-03 mbar
18.40 p = 2.2E-03 mbar
18.44 p = 1.6E-03 mbar
19.02 p = 1.0E-03 mbar
19.12 p = 8.2E-04 mbar
19.18 p = 7.6E-04 mbar
19.21 p = 7.0E-04 mbar
19.30 p = 5.7E-04 mbar
20.00 p = 3.7E-04 mbar (full speed at TP @ 42 kRPM)
20.04 TURN ON TP2
20.06 p = 3.0E-04 mbar
20.10 p = 2.9E-04 mbar (TP @ 42kRPM, 0.9A, 18W, 34 deg C; TP2 @ 75kRPM, 0.28A, 15W, 28 deg C)
------12/04/17 Wednesday -----------------
9.33 p = 6.1E-05 mbar
10.27 p = 5.9E-05 mbar
Turn on FL601 chiller set to -5.0 deg C; T_start = 18.7 deg C
10.44 p = 2.9E-05 mbar; T = 4.8 deg C
stop chiller to remove 500ml of Coolant and replace it with ~375ml IPA
10.54 p = 2.7E-05 mbar; T = 3.4 deg C
11.08 p = 2.1E-05 mbar; T = -5.0 deg C (set to -10.0 deg C)
11.15 Turn ア15V preamp power ON
11.29 p = 2.4E-05 mbar; T = -5.8 deg C
11.50 p = 2.5E-05 mbar; T = -5.1 deg C
BIAS up for UPSTREAM (500オm - 130 V) and DOWNSTREAM (74オm - 24 V)
11.51 DAQ started for testing Si-det with triple alpha source
12.10 p = 2.4E-05 mbar; T = -5.1 deg C
12.17 p = 2.5E-05 mbar; T = -5.2 deg C
13.12 p = 2.3E-05 mbar; T = -5.2 deg C
15.08 p = 2.1E-05 mbar; T = -5.1 deg C
15.50 p = 2.0E-05 mbar; T = -5.1 deg C
15.58 DAQ stopped; ramp down BIAS, switch off amp+preamps
Turn ア15V preamp power OFF
16.02 p = 2.0E-05 mbar; T = -5.2 deg C
16.35 p = 1.5E-05 mbar; T = -6.0 deg C
17.04 p = 1.5E-05 mbar; T = -6.0 deg C
17.05 Turn ア15V preamp power ON
17.19 p = 1.7E-05 mbar; T = -1.4 deg C (set to -2.0)
17.19 Turn ア15V preamp power OFF
17.40 p = 1.5E-05 mbar; T = -5.7 deg C (after set to -10.0 deg C)
18.14 p = 1.4E-05 mbar; T = -5.8 deg C
------13/04/17 Thursday -----------------
11.37 p = 1.0E-05 mbar; T = -6.2 deg C
Turn ア15V preamp power ON
13.21 p = 1.4E-05 mbar; T = -4.5 deg C
Turn ア15V preamp power OFF
add ~300ml IPA, set point to +5.0 deg C
13.44 p = 1.3E-05 mbar; T = 4.1 deg C
14.33 p = 1.4E-05 mbar; T = 5.0 deg C
14.38 FL601 turn OFF, peter test cooling pipes with Helium (~4bar He --> leak rate up to 10^{-6} or 10^{-5} mbar*l/s
Test chiller in close circle: 15.05 T = -8.3 deg C
open cooling pipe --> chamber without cooling:
14.50 p = 2.0E-05 mbar
15.05 p = 2.9E-05 mbar
15.35 p = 4.0E-05 mbar (leak rate 5 * 10^{-5} mbar*l/s)
15.50 reconnect cooling to chamber
15.55 p = 1.5E-05 mbar; T = -5.8 deg C; leak rate 2.0E-05 mbar*l/s
16.55 p = 1.7E-05 mbar; Cooling was off by Daid to test temperature influence
17.00 p = 1.1E-05 mbar; T = -5.7 deg C (chiller back on)
17.50 p = 1.0E-05 mbar; T = -6.6 deg C
18.18 p = 1.0E-05 mbar; T = -6.8 deg C
------14/04/17 Friday -----------------
11.09 p = 8.5E-06 mbar; T = -7.1 deg C
11.15 Turn ア15V preamp power ON
12.10 p = 1.2E-05 mbar; T = -5.2 deg C switch to Helium leak pump: rate ~ 4.3E-09 mbar*l/s
12.29 p = 1.1E-05 mbar; T = -5.2 deg C
Turn ア15V preamp power OFF
14.20 p = 8.5E-06 mbar; T = -7.2 deg C
14.50 Turn ア15V preamp power ON
15.05 p = 9.4E-06 mbar; T = -6.6 deg C; leak rate 5*10^{-09} mbar*l/s
15.30 p = 1.0E-05 mbar; T = -5.7 deg C; leak rate 6.3*10^{-09} mbar*l/s
15.50 p = 1.1E-05 mbar; T = -5.6 deg C; leak rate 7*10^{-09} mbar*l/s
16.33 p = 1.1E-05 mbar; T = -5.5 deg C; leak rate 7.6*10^{-09} mbar*l/s |
|
2
|
Fri Jan 27 11:33:10 2017 |
DK | Testing email server | Tinkering with configs for SYMPA email server to see if the elog info is sent to the mailing list or not
Normally it is sent by ELog@jast.ph.ed.ac.uk and I changed it to "restricted to local domain and subscribers" from "restricted to subscribers" under Edit List Config > Who can
send messages. |
|
1
|
Fri Jan 27 11:02:03 2017 |
DK, PB | Notes from visit to CERN | Here I am simply digitizing my notes from our visit to CERN 17~18 January 2017. They may not be perfectly linear or organized, but may be searchable.
==ISOLDE Hall Info==
*Safety shoes and hard hats are required for everyone. We need to buy our own in the future and bring them with us.
The 'general purpose scattering chamber' seems to in fact be named the Scattering Experiments Chamber (SEC).
Contact Joakim Cederkall at Lund University in Sweden joakim.cederkall@cern.ch (DK has collaborated with him before in 2012)
Secondary contact olof.tendblad@cern.ch
2 meters downstream of SEC we see the SAND neutron detector array.
Contact Ismael Martel at University of Huelva in Spain ismael.martel.bravo@cern.ch
Array structure is on wheels, but needs to be moved before our experiment, presumably by someone from that collaboration
Of course, we don't know after the SEC relocation from station 2 to station 3 that SAND will be installed in the same relative position or not
SEC has eight (8) transverse ports evenly spaced about its circumference
We need adapters to connect to this
The nominal ISOLDE beamline pipe is 50 mm diameter
Chamber itself is about 1 meter in diameter, about 70 cm tall. Shape is a cylindrical prism with hemispheres on top and bottom
Calculated volume about 0.55 cubic meters
Support structure is about 1 x 1 square meter footprint, about 125 cm tall
2 large-volume pumps in parallel.
TMP: PTM 5400 ALCATEL CORP x2
Oil roughing pumps Edwards 12 x2
According to Karl, its pressure is in the low 10^-6 mbar region, but everything seemed off when we visited so cannot confirm precise value
Presumably it requires the overhead crane to open it
Not many people have the license
Although we don't need to access it very often if at all
Karl said they are arguing to install a small fixed crane for that purpose after relocation which wouldn't need a license
SEC is being disconnected over the weekend (21~22 Jan)
Alignment in ISOLDE Hall (not very sensible to write w/o diagram)
POT1, POT2 are on the wall downstream of the beam lines
POT3 and POTREX are on the beam-right side before it is turned and delivered to the target stations
Geodetic survey points -- though we don't really know how they are used
Downstream of station 3 (under construction) is XT03 which is a crosshair on the wall
Presume it was used for alignment of the steering magnet base
Bases are installed but the quadrupoles are still off to the side
There is no port on the station 2 bending magnet to offer a straight line of sight down to the target station
How was the alignment performed?
We assume station 3 will be installed in a similar manner, unfortunately.
Station 3
Expected to be complete by the end of February
Station 2
HELIOS-type device will be installed at station 2
This is presently called ISS and is mainly being done by the Swedish group (Lund?)
Footprints were drawn on the ground downstream of the present SEC point
How much space will the fence to prohibit near-approach for B-field safety be?
Distances around the stations
From the target positions to the far wall is over 10m, though a lot of equipment and storage lines the wall area
Beam-right wall from station beam-line 3 is about 180 cm
7 m to station 2 -> ~5 m between station 2 and 3
End of station #2 to the end of the SEC including the beam pipe is ~210 cm
At some point, we must provide a list of items ot be imported and used so it can be approved by the CERN Safety groups
==Meeting notes with Karl Johnston==
HIE-ISOLDE may begin physics around the last week of June (say 24~25th)
A MINIBALL experiment is usually prioritized first, given the track record and existing infrastructure and experience.
From the end of April there will be about 2 months of commissioning, ideally
Though, in years past, the timeline was too tight and commissioning was basically not performed during this period
They will start the cryogenics on Tuesday, 24th January
ISS will start to be installed in May for about 3 weeks (? hand writing and detail of notes is poor on this point)
Anytime in mid-March should be okay for the Edinburgh group to ship
59Cu is a candidate for an early run this year
As soon as early July perhaps in an ideal world |
|