AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, all entries  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue Nov 20 16:06:09 2018, dk, Projected Inventory of ISOLDE 
(To be confirmed / finalized)

==Rack Electronics==
Entry  Tue Nov 20 14:07:37 2018, dk, Blue Loan Book Scan loan-book-scan.pdf
Scan is attached, including all items denoted in the loan book as being taken to ISOLDE.

This will be useful for a complete compilation of our inventory.
Entry  Mon Nov 12 11:25:58 2018, CBH, Expected Proton Energy Plots  ti_6.00um_2.8MeVu.pngti_3um_1.88MeVu.pngal_12.5_2.8MeVu.pngMargerin2014elog.png
Attached are the plots from MC simulations of the energies the detected particles are to have, with the top plot showing the dE-E plot and the bottom
plot showing the total energy of the particles.

Please note the height of the peaks is not indicative of the counts expected and there is a low proton background expected between the entrance
Entry  Sat Nov 10 18:48:04 2018, dk, Travel schedule spreadsheet 
https://docs.google.com/spreadsheets/d/1kvCWF13RMH83fssuN2_JLZXJwNL4rUGSEeKOWAIHUi0/edit#gid=0

or
Entry  Thu Nov 8 10:01:32 2018, CBH, DK, New Struts Installation 8x
Struts arrived and were installed on Wednesday. The holes on one side of each of the struts to connect the wheels to were slightly too wide (11.5
cm vs 10.5 cm).
We've taken away part of the wheel holders and now they seem to be fitting in.
Entry  Wed Nov 7 14:27:45 2018, CBH, DK, Beam Plan for Miguel and Alberto (ISOLDE beam operators) 





Presently, we are scheduled for 9 days: 
  Nov 26-28
are three (3) days nominally for beam development
  Nov 29-Dec 4 are six (6) days nominally for physics data taking
  Dec 5-6: Shutdowns and important
tests are planned by ISOLDE team
  Dec 7th - power gets shut off to ISOLDE

==Run Plan==
1 day for ion source and 2.8 MeV/u beam dev
1 day for High
Entry  Mon Nov 5 16:26:34 2018, DK, CBH, Draft run plan 
Please see https://elog.ph.ed.ac.uk/ISOLDE/203 for the E_cm calculations.

Presently, we are scheduled for 9 days: 
Entry  Mon Nov 5 13:52:46 2018, CBH, CoM energies for 44Ti(alpha,p) reaction for different entrance windows and beam energies 
Assuming 200 Torr helium target., elastic and reaction peaks do not have signifcant overlap unless stated:

3um Ti, 1.88 MeV/u beam: Ecm=4.27-4.58 MeV

3um Ti, 2.2 MeV/u beam: Ecm=5.50-5.80 MeV
Entry  Fri Nov 2 17:01:16 2018, DK, Inventory going to CERN by easyJet 
Conor will take:

==Black clicker case==
Entry  Wed Oct 31 16:01:33 2018, DK, Measuring foil thickness DOC_(4).PDFDOC_(5).PDF
A couple scans from my notes which may be useful.

One discusses alpha energy loss in nominal kitchen foil (~12 um) and also introduces my technique to calibrate a thin (~20 um) SSD.  Sorry I forget which
Entry  Wed Oct 31 14:50:36 2018, DK, Strut shipping info 
http://www.dhl.com/en/express/tracking.html?AWB=1647723055&brand=DHL
Entry  Thu Oct 25 13:25:16 2018, KG, Current gas cell status 
(Wrapped up)

    Cell b : 15um Al exit, 12.5um Al entrance.  L/R ~0.4Torr/hr overnight (in vacuum)
Entry  Wed Oct 10 10:57:33 2018, DK, Chamber wheel bolt spacing WhatsApp_Image_2018-10-10_at_09.14.43.jpeg
From Ruchi's friend Rob.
Entry  Tue Oct 9 14:25:54 2018, DK, Au foil request to STFC NPG_-_Online_Target_Request.pdf
http://npg.dl.ac.uk/TargetRequests/

https://www.technologysi.stfc.ac.uk/Pages/Target-frames.aspx
Entry  Tue Oct 9 10:40:13 2018, DK, To-do Meeting Notes: July, August, September, October 6x
Each month's notes are attached.  Unfinished business naturally carries over to the next month.

This elog will be updated with new notes as necessary.
Entry  Mon Oct 8 17:02:47 2018, DK, Target ladder photo from previous experiment IMG_1274.jpg
From Alex, attached.
Entry  Mon Oct 8 12:07:18 2018, DK, Gas cell check with He sniffer 
Notes from an email:

Tested the chamber with the leak checker.  We got 3.7 x 10^-6 mbar
Entry  Mon Oct 8 12:05:25 2018, DK, PB, Gas cell supports gas_cell_support.PDF
These are used to connect the gas cell to the target ladder.  We only had the one, and it would be more convenient if each gas cell has its own, to avoid
swapping them back and forth.
Entry  Thu Oct 4 13:07:33 2018, KG, Schematics for gas-cell tests in_atmosphere.pngFeedthrough.png
in_atmosphere.png : schematic for testing gas-cell in atmosphere

Feedthrough.png : feed through schematic for testing vacuum chamber and gas cell
Entry  Thu Sep 27 12:41:06 2018, DK, Strut measurement request edinburgh-chamber-query.pdf
For posterity

==========
Entry  Thu Sep 27 11:14:34 2018, CBH, Photos and Measurements from August CERN Trip 20180823_082444199_iOS.jpg20180823_082445833_iOS.jpg20180823_082457574_iOS.jpg20180823_082505693_iOS.jpg
Chamber frame width=65cm
Chamber frame height=146cm
Chamber frame length=230cm
Entry  Mon Sep 24 14:44:48 2018, DK, ISOLDE vacuum schematic isolde-vacuum-schematic.pdfisolde-vacuum-schematic.dia
Attached.  PDF is produced with Gnome Dia -- source file attached as well.

Bellow near GV is not depicted.  None of SEC components are depicted (as they would be irrelevant with the GV in place).
Entry  Thu Aug 30 15:14:50 2018, DK, Gate Valve image007.jpgS12.1_DN16-50_IOMI.PDFgv_smaller.jpg
Some notes on the broken gate valve that should go between SEC and our chamber at XT03.
Entry  Thu Aug 23 18:57:15 2018, DK, What daid is taking from ISOLDE to Edinburgh 
1 bolt for chamber stand structure, for reference for new struts.

2 target ladders: spare 1/2 style ladder, ladder from inside chamber, including the bits to connect to actuator
Entry  Thu Aug 23 18:23:27 2018, DK, Where to find (our) stuff at ISOLDE edinburgh-notices-daid.pdf
=Overview=

Shoes, hard hats, 'underpants', spiders, etc: Cardboard box "R", Garage entry of ISOLDE, shelf opposite turnstyle.
Entry  Thu Nov 23 13:16:56 2017, CLW, Beam energies 
Beam energy measurements can be found in the electronic logbook for ISO-REX-HIE

https://op-webtools.web.cern.ch/elogbook/

measurements for all energies were:
Entry  Thu Nov 16 16:24:29 2017, RG CLW MD, Run 173 Pulse Walkthrough HI n-side  
Header: Pulser walkthrough, HI n-side, trigger on HI detector this time
Ender: Change to digital pulser to check as non-linearity was observed at low amplitudes. 
====================================================
Entry  Thu Nov 16 16:14:04 2017, RG CLW MD, Run 172 Pulse Walkthrough HI n-side  
Header: Pulser walkthrough, HI n-side
Ender: Change to digital pulser to check as non-linearity was observed at low amplitudes. 
====================================================
Entry  Thu Nov 16 16:06:07 2017, RG CLW MD, Run 171 Pulse Walkthrough HI n-side  
Header: Pulser walkthrough, HI n-side
Ender: negative pulser, rise time 0.05 us, fall time 1ms, delay .5 us,ref INT, width 0.5 us,  Amplitude: 9 on
dial, no attenuation, in steps of 1 , 250 Hz
Entry  Thu Nov 16 15:57:29 2017, RG CLW MD, Run 170 Pulse Walkthrough HI p-side  
Header: Pulser walkthrough, HI p-side
Ender: positive pulser, fall time 1ms, delay 250 ns, 10 V in steps of 1, 250 Hz
====================================================
Entry  Thu Nov 16 15:43:48 2017, RG CLW MD, Run 169 Pulse Walkthrough E n-side  
Header: Pulser walkthrough, E n-side
Ender: negative pulser, rise time 0.05 us, fall time 1ms, delay .5 us,ref INT, width 0.5 us,  Amplitude: 6 on
dial, no attenuation, in steps of 1 , 250 Hz
Entry  Thu Nov 16 15:37:35 2017, RG, MD, CLW, Run 167 JUNK 
 
Entry  Thu Nov 16 15:33:24 2017, RG CLW MD, Run 168 Pulse Walkthrough E p-side  
Header: Pulser walkthrough, E p-side
Ender: positive pulser, fall time 1ms, delay 250 ns, 6 V in steps of 0.5, 250 Hz
====================================================
Entry  Thu Nov 16 15:24:42 2017, RG CLW MD, Run 166 Pulse Walkthrough dE n-side  
Header: Pulser walkthrough, dE n-side
Ender: negative pulser, rise time 0.05 us, fall time 1ms, delay .5 us,ref INT, width 0.5 us,  Amplitude: 7 on
dial, att. 5, in steps of 1 , 250 Hz
Entry  Thu Nov 16 15:14:39 2017, RG CLW MD, Run 165 Pulse Walkthrough dE p-side  
Header: Pulser walkthrough, dE p-side
Ender: positive pulser, fall time 1ms, delay 250 ns, 1.6 V in steps of 0.2, 250 Hz
====================================================
Entry  Thu Nov 16 11:20:51 2017, RG CLW MD, Run 162 -HI det calibration 
Header: 4alpha source - Heavy Ion detector calibration
Ender: 
====================================================
Entry  Wed Nov 15 16:24:35 2017, RG CLW, Run 160 - strip numbering E detector 
Header: 4alpha source off center (to the top)
Ender: 
====================================================
Entry  Wed Nov 15 16:05:25 2017, RG CLW, Run 159 - E detector calibration 
Header: 4alpha source run for E det calubration
Ender: 
====================================================
Entry  Wed Nov 15 15:41:41 2017, RG CLW, Run 157 - EJunk 
Header: 4alpha source
Ender: 
====================================================
Entry  Wed Nov 15 14:18:30 2017, DK, Issues and problems encountered 
Objective log on perceived issues.  (As a benchmark, I enumerated 17 such issues on my previous RIB experiment March 2017.)

In no particular order...
Entry  Wed Nov 15 11:33:31 2017, RG CLW, Run 155 - calibration del E 
Header: 4alpha source run for delE detector calibration
Ender: 
====================================================
Entry  Wed Nov 15 07:39:26 2017, MD, DK, CLW, End of beamtime, modules reading before turning off 
Header: end of beamtime - modules reading
Ender: 
==================================================== 
Entry  Wed Nov 15 05:26:46 2017, DK, MD, CLW, Run 153 
Header: Continue with CH2 and 5.0 MeV/u
Ender: end of beam time
====================================================
Entry  Wed Nov 15 03:25:08 2017, MD,DK, Run 152 
Header: Continue with 5.0 MeV/u on CH2_33+10+01
Ender: End
====================================================
Entry  Wed Nov 15 01:02:59 2017, DK, MD, Run 151 171115_protonquickdrop.jpg
Header: Continue with 5.0 MeV/
Ender: 
====================================================
Entry  Tue Nov 14 23:07:06 2017, MD, DK, Run 150 
Header: 5.0 MeV/u wit CH2
Ender: End
====================================================
Entry  Tue Nov 14 20:56:33 2017, SL, MB, DK, MD, Run 149 
Header: 5 MeV/u on CH2_33+10+01
Ender: End
====================================================
Entry  Tue Nov 14 20:13:10 2017, SL, MB, DK, Run 148 
Header: 5 MeV/u on empty frame
Ender: 
====================================================
Entry  Tue Nov 14 18:35:59 2017, SL, MB, Run 147 
Header: 5 MeV/u on C_09 
Ender: 
====================================================
Entry  Tue Nov 14 18:30:11 2017, SL, MB, Run 146 
Junk
Entry  Tue Nov 14 16:00:29 2017, CLW, MB, SJL,RG, Run 145 
Header: 5 MeV/u on CH2 33,10,01
Ender:  End to allow laser cleaning
====================================================
Entry  Tue Nov 14 15:59:42 2017, CLW, Run 144 JUNK 
valve closed
Entry  Tue Nov 14 14:30:51 2017, SL, Photos inside chamber (detectors, IRIS, etc) OneDrive-2017-11-14_2.zip
 
Entry  Tue Nov 14 08:09:31 2017, CLW, Run 142 
Header: Protons are back, continue 3.6 MeV/u on CH2
Ender: 
====================================================
Entry  Tue Nov 14 07:04:13 2017, DK, MD, CL, Run 140 
Header: Protons are back, continue 3.5 MeV/u on CH2
Ender: 
====================================================
Entry  Tue Nov 14 06:22:29 2017, DK, MD, Run 139 
Header: Continue at 3.5 MeV/u w/ CH2
Ender: No protons are coming to ISOGPS
====================================================
Entry  Tue Nov 14 06:18:32 2017, MD, DK, Run 137, 138 - Junk 
The newly started runs were stopped by MIDAS - bad clicking mouse...
Entry  Tue Nov 14 04:16:18 2017, MD, DK, Run 136 

Header: CH2_33+10+01 with 3.5 MeV/u
Ender: 
Entry  Tue Nov 14 02:16:10 2017, DK, MD, Run 135 
Header: Back to CH2 with 3.5 MeV/u
Ender: 
====================================================
Entry  Tue Nov 14 01:41:17 2017, MD, DK, Run 134 

Header: 3.5 MeV/u on Empty frame
Ender: Stop
Entry  Tue Nov 14 00:41:22 2017, MD, DK, Run 133 

Header: 3.5 MeV/u on C_09
Ender: 
Entry  Mon Nov 13 23:12:50 2017, MD, DK, Run 132 
Header: Continue CH2 with 3.5 MeV/u
Ender: 
====================================================
Entry  Mon Nov 13 20:52:03 2017, SL RG DK, Run 131 

Header: CH2 #33_10_01, beam energy 3.5 MeV/u
Ender: 
====================================================
Run number : 131
Date : 13/11/17
Start
time : 21:53:18
Stop time : 23:37:07
Trigger rate (MIDAS)         : 7
Blocks written         : 489
——————————————————————————————
Run
Scalers (approx rates)
0- Ungated                      : 5
1- Gated                        : 5
2- dE                           : 128835
3- E      
Entry  Mon Nov 13 19:09:53 2017, SL RG, Run 129 
Junk - double pressed stop acquisition
Entry  Mon Nov 13 19:05:20 2017, SL RG, Run 130 

Header: CH2 #33_10_01, beam energy 3.5 MeV/u
Ender: 
====================================================
Run number : 130
Date : 13/11/17
Start
time : 20:20:37
Stop time : 21:52:39
Trigger rate (MIDAS)         : 5
Blocks written         : 429
——————————————————————————————
Run
Scalers (approx rates)
0- Ungated                      : 5
1- Gated                        : 5
2- dE                           : 128571
3- E      
Entry  Mon Nov 13 17:23:16 2017, RG SL, Run 128 
Header: CH2 #33_10_01, beam energy 3.5 MeV/u
Ender: Stop for laser optimisation
====================================================
Entry  Mon Nov 13 15:06:09 2017, MB, CLW, SJL, Run 127 

Header: CH2 #33+10+01, beam energy 3.6
Ender: 
Entry  Mon Nov 13 14:25:20 2017, MB, CLW, SJL, Run 126 

Header: CH2 #33+10+01, beam energy 3.6
Ender: no beam at the start, so start afresh with run with continuour beam (hopefully)
Entry  Mon Nov 13 12:10:18 2017, MB, CLW, SJL, Run 125 

Header: CH2 #33+10+01, beam energy 3.6
Ender: 
Entry  Mon Nov 13 10:10:52 2017, MB, CLW, SJL, PJW, Run 124 

Header: CH2 #33+10+01, beam energy 3.6
Ender: 
Entry  Mon Nov 13 10:01:39 2017, MB, CLW, SJL, PJW, Run 123 JUNK 
JUNK
Entry  Mon Nov 13 07:23:23 2017, MB, CLW, Run 122 

Header: CH2 #16, beam energy 4.4
Ender: 
Entry  Mon Nov 13 06:08:52 2017, MD, RG, Run 121 

Header: CH2 #16, beam energy 4.4
Ender: 
Entry  Mon Nov 13 06:06:23 2017, MD, RG, Run 120 - junk 
Double klick on stopp, so it jumped to 121. R120 file should be empty or non existing.
Entry  Mon Nov 13 03:52:48 2017, MD, RG, Run 119 

Header: CH2 #16, beam energy 4.4
Ender: 
Entry  Mon Nov 13 02:59:37 2017, RG MD, Run 118 - short 
Header: CH2 #16, beam energy 4.4
Ender: IHS tripped (third time tonight)
====================================================
Entry  Mon Nov 13 00:57:24 2017, MD, DK, RG, Run 117 
Header: 4.4 MeV/u on @ CH2
Ender: 
====================================================
Entry  Mon Nov 13 00:12:24 2017, RG MD DK, Run 116 
Header: CH2 #16, beam energy 4.4 MeV/u
Ender: Run stopped short - IHS tripped
====================================================
Entry  Sun Nov 12 23:52:10 2017, DK, MD, RG, Run 115 - short 
Header: Continue 4.4 MeV / u @ CH2
Ender: Run stopped short as the IHS tripped
====================================================
Entry  Sun Nov 12 23:51:34 2017, MD, DK, RG, Run 114 - Junk 
Double clicked the start / stop so it is blank.
Entry  Sun Nov 12 21:27:23 2017, DK, MB, Run 113 
Header: Continue 4.4 MeV/u on CH2
Ender: End
====================================================
Entry  Sun Nov 12 18:32:52 2017, MB DK , run 112 
Header: 4.4 MeV/u CH2_16 sample
Ender: 
====================================================
Entry  Sun Nov 12 17:44:49 2017, MB DK RG, run 111 
Header:  empty target, 4.4 MeV/u
Ender: End
====================================================
Entry  Sun Nov 12 15:34:39 2017, DK, MB, Run 110 
Header: Carbon target at 4.4 MeV/u
Ender: End
====================================================
Entry  Sun Nov 12 13:24:51 2017, CLW, PJW, Run 109 
Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender: End
====================================================
Entry  Sun Nov 12 11:19:06 2017, CLW, PJW, Run 108 
Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender:
====================================================
Entry  Sun Nov 12 09:17:49 2017, CLW, PJW, TD, Run 107 
Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender:
====================================================
Entry  Sun Nov 12 09:16:01 2017, CLW, PJW, TD, Run 106 
junk - ignore
Entry  Sun Nov 12 06:23:36 2017, RG MB, Run 105 
Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: run ends OK to change beam energy from 4.0MeV/u to 4.29MeV/u
====================================================
Entry  Sun Nov 12 04:22:57 2017, RG MB, Run 104 
Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: 
====================================================
Entry  Sun Nov 12 01:46:23 2017, RG MB, Run 103 
Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: Run stopped as the beam went off. Noticed on the HI det scalar
====================================================
Entry  Sun Nov 12 01:28:26 2017, RG MB, Run 102 - Junk 
Header: CH2 #30+25, Beam energy 4.0 MeV/u
Ender: Run stopped short as the RF cavity tripped
====================================================
Entry  Sat Nov 11 23:30:25 2017, RG MB, Run 101 

Header: CH2 #30+25, Beam energy 4.0 MeV/u
Ender: 
====================================================
Run number : 101
Date : 12/11/2017
Start
time : 00:27
Stop time : 02:29
Trigger rate (MIDAS)         : 6
Blocks written         : 484
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 4
1- Gated                        : 4
2- dE                           : 146151
3- E      
Entry  Sat Nov 11 20:27:28 2017, TD, DK, RG, MB, Run 100 
Header: Continue CH2 at 4.0 MeV/u
Ender: 
====================================================
Entry  Sat Nov 11 19:35:28 2017, TD, MIDAS DAQ configuration & MIDAS logs 1-11.11.17 16x
 
Entry  Sat Nov 11 18:31:10 2017, TD, DK, Run 99 
Header: 4.0MeV/u 59Cu20+ + (CH2)n, Laser #2 *on*
Ender: Normal run stop
====================================================
Entry  Sat Nov 11 18:06:42 2017, TD, DK, Run 98 
Header: CH2 target in, Laser #2 off, 4.0 MeV/u
Ender: ends OK
====================================================
Entry  Sat Nov 11 17:45:10 2017, DK, TD, ASM, RG, MD, Run 97 
Header: CH2 target in, Laser #2 off, 4.0 MeV/u
Ender: Stopped run to modify DAQ trigger 
====================================================
Entry  Sat Nov 11 17:36:54 2017, ASM, more halflife stuff Screen_Shot_2017-11-11_at_18.38.37.png
Fitting those half life data more reasonably... fitted the decay curve with y=a*exp(-b*t)+c to all the data points, comes up with t1/2=(85.8+/-2.6)s
Entry  Sat Nov 11 17:19:54 2017, ASM, CL, TD..., halflife Screen_Shot_2017-11-11_at_18.25.54.png
Placed a hand held rad monitor near the faraday cup and took rate readings every 20 seconds, right after inserting the gate valve in front of SEC:

seconds counts/s

0    590
Entry  Sat Nov 11 17:08:50 2017, RG, DK, CL, TD, AM, MD, Run 96 
Header: Continue with 4.0 MeV/u Empty Frame
Ender: 
====================================================
Entry  Sat Nov 11 15:17:24 2017, CLW, PJW, RG, TD, MD, DK, Run 95 
Header: Continue with 4.0 MeV/u on Carbon after laser cleaning
Ender: 
====================================================
Entry  Sat Nov 11 14:15:12 2017, CLW, PJW, RG, Run94 
Header: 3.99 MeV/u and C_25. 
Ender: We stop because the lasers are being cleaned, and we saw the scalars drop.  See Comment below.
====================================================
Entry  Sat Nov 11 12:16:28 2017, CLW, PJW, RG, Run 93 

Header: 3.99 MeV/u and CH2_30+25. Beam is back
Ender: 
Entry  Sat Nov 11 11:21:22 2017, CLW, PJW, RG, Run 92 

Header: 3.99 MeV/u and CH2_30+25. Beam is back
Ender: 
Entry  Sat Nov 11 09:20:56 2017, CLW, MD, PJW, Run 91 

Header: 3.99 MeV/u and CH2_30+25. Beam is back
Ender: 
Entry  Sat Nov 11 07:45:34 2017, Claudia, Checking Laser quality 
There is an option to see when the beam is gone if it is due to lasers or due to the accelerator.

- window next to proton requestion switch

- put middle faraday cup in
Entry  Sat Nov 11 07:44:16 2017, MD, CLW, PJW, Run 90 171111_0858_Laser_optimizedcondition.jpg

Header: 3.99 MeV/u and CH2_30+25. Beam is back
Ender: 
Entry  Sat Nov 11 06:57:14 2017, MD, CLW, PJW, Run 89 171111_0828_beamisback.jpg

Header: 3.99 MeV/u and CH2_30+25. Continue after Laser update (cleaning), but still no real beam
Ender: 
Entry  Sat Nov 11 05:49:00 2017, AM & MD, run 88 
Header: 3.99 MeV/u and CH2_30+25.
Ender: 
====================================================
Entry  Sat Nov 11 03:58:58 2017, MD, ASM, Run 87 171111_0638_beamcurrentdown.jpg

Header: 3.99 MeV/u and CH2_30+25.
Ender: 
Entry  Sat Nov 11 01:40:48 2017, MD, DMK, ASM, Run 86 171111_0344_Beamcurrent.jpg171111_0435_Beamcurrent.jpg171111_0440_Laser_02.jpg171111_0440_Laser_03.jpg171111_0441_Laser_04.jpg

Header: 3.99 MeV/u and CH2_30+25. Continue after reheat the primary target (GPS) between 02:20 and 02:30
Ender: 
Entry  Sat Nov 11 00:24:19 2017, MD, ASM, DMK, Run 85 

Header: 3.99 MeV/u and CH2_30+25.
Ender: primary target current (RED) down to 5V... 
Entry  Sat Nov 11 00:01:41 2017, Daid. Mirco, Trigger and scalars for 4.0 MeV/u 
Tom et al. tuned the trigger this evening, before we began the runs.  (Run 82, or Run 83??)

===TRIGGER===
Entry  Fri Nov 10 21:59:05 2017, SL, MD, Run 84 

Header: 3.99 MeV/u and CH2_30+25.
Ender: 
====================================================
Run number : 84
Date : 10/11 to 11/11
Start
time : 23:03
Stop time : 01:22:11
Trigger rate (MIDAS)            :  
Blocks written                  : 48 
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      :  
1- Gated                        :  
2- dE                           :  
3- E           
Entry  Fri Nov 10 20:30:57 2017, SL, Run 83 
 


Header: 3.99 MeV/u and CH2_30+25.
Ender: Recompiling sort code.
====================================================
Run number : 83
Date :
10/11
Start time : 21:30
Stop time : 22:59
Trigger rate (MIDAS)            :  
Blocks written                  : 150
——————————————————————————————
Run
Entry  Fri Nov 10 19:57:49 2017, SL, Run 82 

Header: 3.99 MeV/u and CH2_30+25.
Ender: 
====================================================
Run number : 82
Date : 10/11
Start time :
21:03
Stop time : 21:30
Trigger rate (MIDAS)            :  
Blocks written                  : 
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      :  
1- Gated                        :  
2- dE                           :  
3- E           
Entry  Fri Nov 10 19:01:13 2017, SL, Run 81 
 


Header: 3.99 MeV/u and CH2_30+25.
Ender: Stopped to check E hardware.
====================================================
Run number :
81
Date : 10/11
Start time : 20:20
Stop time : 20:50
Trigger rate (MIDAS)            :  
Blocks written                  : 70
——————————————————————————————
Run
Entry  Fri Nov 10 16:32:19 2017, Claudia, RAL Amplitude Thresholds 
Thresholds of RAL amplifiers set to: dE 30mV; E 20 mV, HI 20 mV
Entry  Fri Nov 10 14:48:22 2017, TD, Calibration 18x

ADC offsets calculated using data files R42-r47
Entry  Fri Nov 10 10:46:54 2017, SL, Investigation of E detector thickness 
While changing HI degrader foil to 10um Al, the E detector was investigated, due to previously observed alpha punch-through.
On visual inspection, the E detector appeared to be 1mm in thickness, leading us to believe that instead we were not fully depleting the detector.

The bias supply was investigated, and was found to be supplying a lower voltage (on all channels) than was shown on the display (14V -> 2V
Entry  Fri Nov 10 08:31:06 2017, TD, CAEN V767 TDC trigger/channel 0 logic change 
Approximately 5-10% of events overnight were 'bad' i.e. missing TDC data

Checked the CAEN V767 trigger/channel 0 logic (without beam) this morning
Entry  Fri Nov 10 07:00:14 2017, MD, CLW, ASM, TD, Run 80 171110_only2of4cycles_problemRing2.jpg171110_0821_beamstop_6hours_nobeam.jpg

Header: 4.7 MeV/u and CH2_30+25.
Ender: beam stop at PS (6 hour interruption)
Entry  Fri Nov 10 04:53:34 2017, MD, ASM, Run 79 171110_only2of4cycles_problemRing2.jpg
Header: 4.7 MeV/u and CH2_30+25.
Ender: 
====================================================
Entry  Fri Nov 10 04:18:41 2017, MD, ASM, Run 78 
Header: 4.7 MeV/u and Empty frame.
Ender: 
====================================================
Entry  Fri Nov 10 02:12:06 2017, MD, ASM, DK, Run 77 

Header: 4.7 MeV/u and C_09. continue after fixing IHS Cavity (part of normal conducting linac)
Ender: 
Entry  Fri Nov 10 01:29:51 2017, ASM, MD, DK, run 75 
Header: 4.7 MeV/u and C_09. PS back, but need to check how much beam actually there was before next issue
Ender: no beam at our sample; IHS cavity (part of normal conducting linac) tripped
====================================================
Entry  Thu Nov 9 23:10:38 2017, MD, preparation for Carbon C_09 (Run 75) 
10/11/17: 00:03

switch target ladder to Pos #5: 82.44 mm
Entry  Thu Nov 9 21:31:16 2017, SL, Run 74 Screen_Shot_2017-11-09_at_22.35.20.pngScreen_Shot_2017-11-09_at_22.38.49.pngScreen_Shot_2017-11-10_at_13.54.40.png

Header: 4.7 MeV/u and CH2_30+25. 
Ender: STOP due to PSB fire.
====================================================
Run number : 74
Date :
09/11
Start time : 22:33
Stop time : 23:42
Trigger rate (MIDAS) : 
Blocks written : 422
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 
1- Gated                        : 
2- dE                           : 
3- E              
Entry  Thu Nov 9 20:46:29 2017, SL, Run 73 Screen_Shot_2017-11-09_at_22.38.49.png

Header: 4.7 MeV/u and CH2_30+25.
Ender: NO BEAM FROM PSB - called CCC and stopped run.
====================================================
Run
number : 73
Date : 09/11
Start time : 21:44
Stop time : 22:25
Trigger rate (MIDAS) : 
Blocks written : 263
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 
1- Gated                        : 
2- dE                           : 
3- E              
Entry  Thu Nov 9 19:06:08 2017, SL, Run 68-71 
JUNK
Entry  Thu Nov 9 18:56:13 2017, SL, Run 72 

Header: 4.7 MeV/u and CH2_30+25.
Ender: 
====================================================
Run number : 72
Date : 09/11
Start time :
20:14
Stop time : 21:41
Trigger rate (MIDAS) : 
Blocks written : 570
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 12
1- Gated                        : 10
2- dE                           : 59
3- E        
Entry  Thu Nov 9 17:35:32 2017, RG, Run 67 

Header: 4.7 MeV/u and CH2_30+25. 
Ender: 
====================================================
Run number : 67
Date : 09/11
Start time :
18:30
Stop time : 19:57 
Trigger rate (MIDAS) : 10 
Blocks written : 463
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 10
1- Gated                        : 9
2- dE                           : 48
3- E         
Entry  Thu Nov 9 17:01:49 2017, TD, CAEN V560 Scalers added to datastream 
CAEN V560 Scaler channels #0-7 have been added to the EbyE datastream by adding
per event readout of defined VME registers identified as group 31, items 0-15
Entry  Thu Nov 9 16:30:15 2017, SL, Run 66 

Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (p+n E OR p+n HI (with 2^8 prescaler))
Ender: 
====================================================
Run
number : 66
Date : 9 / 11
Start time : 18:09
Stop time : 18:30
Trigger rate (MIDAS)         : 
Blocks written         : 84
——————————————————————————————
Run
Scalars
0- Ungated                      : 14
1- Gated                        : 12
2- dE                           : 51
3- E                       
Entry  Thu Nov 9 15:55:56 2017, SL, Run 65 

Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (E - corrected, not HI, now ~50% live time)
Ender: 
====================================================
Run
number : 65
Date : 9 / 11
Start time : 16:56
Stop time : 17:27
Trigger rate (MIDAS)         : 
Blocks written         : 179
——————————————————————————————
Run
Scalars
0- Ungated                      : 10
1- Gated                        : 10
2- dE                           : 50
3- E                       
Entry  Thu Nov 9 15:34:14 2017, SL, Run 64 

Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (JUST E, not HI, now ~50% live time)
Ender: Stopping as trigger seems slightly off
====================================================
Run
number : 64
Date : 9 / 11
Start time : 16:38
Stop time : 16:56
Trigger rate (MIDAS)         : 
Blocks written         : 102
——————————————————————————————
Run
Scalars
0- Ungated                      : 10
1- Gated                        : 10
2- dE                           : 75
3- E                       
Entry  Thu Nov 9 15:03:21 2017, SL, Run 63 

Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (dE+E, not HI, now ~50% live time)
Ender: 
====================================================
Run
number : 63
Date : 9 / 11
Start time : 16:03
Stop time : 16:33
Trigger rate (MIDAS)         : 
Blocks written         : 270
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 56
1- Gated                        : 34
2- dE                           : 43
3- E        
Entry  Thu Nov 9 12:15:33 2017, SL, TIMBER: Faraday Cup Measurements 
Faraday Cup (at end of Edinburgh chamber) measurements recorded in TIMBER (from approx 10.00 9/11/17).
Entry  Thu Nov 9 12:14:05 2017, SL, Run 62 

Header: 4.7 MeV/u and CH2_30+25. 
Ender: 
====================================================
Run number : 62
Date : 9 / 11
Start time :
13:55
Stop time : 16:03
Trigger rate (MIDAS)         : 50
Blocks written         : 1299
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 
1- Gated                        : 
2- dE                           : 
3- E              
Entry  Thu Nov 9 10:15:38 2017, Sarah Lonsdale, Run 61 

Header: 5.0 MeV/u and Carbon (C_25). 
Ender: 
====================================================
Run number : 61
Date : 9 / 11
Start
time : 11:19
Stop time : 12:04
Trigger rate (MIDAS)         : 1205
Blocks written         : 482
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 500
1- Gated                        : 100
2- dE                           : 5
3- E       
Entry  Thu Nov 9 09:49:03 2017, Sarah Lonsdale, Run 60 

Header: 5.0 MeV/u and Empty Frame.  Tuned beam to lower scatter, solved dE counting issue. Pulser scaler has been added.
Ender: 
====================================================
Run
number : 60
Date : 9 / 11
Start time : 10:50
Stop time : 11:14
Trigger rate (MIDAS)         : 20
Blocks written         : 180
——————————————————————————————
Beam
energy : 5.0 MeV/u
Beam intensity         : 1.5 to 2.0 epA **
Target : #7 Empty Frame
Ladder position         : 52.09 mm
HI Degrader foil (um) :
Entry  Thu Nov 9 08:20:21 2017, Claudia, Restarting Target Current & Line Current 
0) If target or line drop, STOP THE BEAM!!

1) If you SEE target or line current go down (top right window of monitors next to the corridor): 

Use Knobs open application (monitor below); remember set value; type 0 in set window; click Mode - Reset; click Mode - On. increase current in
Entry  Thu Nov 9 07:15:49 2017, MD, Tips for Babysitting ISOLDE during shifts Babysitting_ISOLDE_from_the_CCC.pdf
from ISOLDE webpage
Entry  Thu Nov 9 06:30:35 2017, Daid, Mirco, Spectra (Shift 1) 12x
Screen shots for accumulated data before the target went down.  Should be (at least) runs 53 & 54 inclusive, possibly back to the start of RI beam on CH2
target.
Entry  Thu Nov 9 06:02:41 2017, Daid. Mirco, Run 57 
Header: Continue with 5.0 MeV/u and CH2.  Laser back on.
Ender: 
====================================================
Entry  Thu Nov 9 05:35:44 2017, Daid. Mirco, Run 56 

Header: 5.0 MeV/u CH2, Laser 2 is turned off on purpose to check background.
Ender: Could not see many real events beside pulser and current was very low
Entry  Wed Nov 8 23:46:32 2017, Daid, Charge State Distributions  charge-state-distribution-3.6.jpgcharge-state-distribution-4.0.jpgcharge-state-distribution-4.4.jpgcharge-state-distribution-4.7.jpgcharge-state-distribution-5.0.jpg
Faraday cup readout at the end of our chamber should change based on whether or not the target is in and also the 59Cu beam energy.

The effect could be as much as 10 to 20%.  At some point, we should check the Faraday cup reading with the CH2 target and with the empty target.
    Reply  Thu Nov 9 05:33:50 2017, TD, Charge State Distributions  
> Faraday cup readout at the end of our chamber should change based on whether or not the target is in and also the 59Cu 
beam energy.
Entry  Thu Nov 9 03:32:55 2017, Daid. Mirco, Run 55 gps-r55.jpgpsb-run55.jpg
Header: Continue 5.0 MeV/u with CH2 after target re-heating
Ender: End
====================================================
Entry  Thu Nov 9 01:24:01 2017, Daid. Mirco, Run 54 
Header: Continue with 5.0 MeV/u and CH2
Ender: Checked control room, about 2:40.  Target current is 2 A (low...should be 430 A).  No beam seen at our FC, although MIDAS seemed to have events.
NB: You can monitor the target current on any network computer via: https://op-webtools.web.cern.ch/Vistar/vistars.php?usr=GPS 
Entry  Wed Nov 8 23:14:38 2017, Daid, Ruchi, Mirco, Run 53 
Header: Restart 5.0 MeV/u w/ CH2 after PS comes back (3 rings until the morning)
Ender: End
====================================================
Entry  Wed Nov 8 23:06:48 2017, Daid, Ruchi, Run 52 (junk) 
(Junk -- see comments)
====================================================
Run number : 52
Entry  Wed Nov 8 22:21:35 2017, Ruchi, Beam transmission 
By the end of beam tuning (around 6pm), beam transmission between Faraday cups at the end of SEC and at end of Edinburgh chamber:
~100% through 10mm collimator (empty target frame)
> 50% thought 3mm collimator
Entry  Wed Nov 8 22:08:55 2017, Daid, Run 51 
Header: Restart 5.0 MeV/u CH2 with 3 PS rings.
Ender: Stop run.  We want good data with a smaller file size for fast analysis, as well as to get on a 2 hour schedule.
====================================================
Entry  Wed Nov 8 22:00:00 2017, daid, Scalars 
Present scalars:
0: Ungated
1: Gated
Entry  Wed Nov 8 21:21:31 2017, Ruchi Garg, Daid, RunLogTemplate 
Header:
Ender: 
====================================================
Entry  Wed Nov 8 20:46:23 2017, Daid, Ruchi, Run 50 
Header: First run with irises open.  30 min run.
Ender: Call from PS-Booster.  Stop run.
Entry  Wed Nov 8 20:40:33 2017, Daid, Ruchi, Run 49 
Header: First test with RIB.  Irises closed.
End: End
Entry  Wed Nov 8 17:12:01 2017, TD, MIDAS logs snoop.logvmecpu.log
Attachment 1 - snoop -d bge1 log following MVME CPU reset

Attachment 2 - VME CPU system console
Entry  Tue Nov 7 14:38:25 2017, Ruchi Garg, Target ladder configuration TargetLadder.pdf
 
Entry  Mon Nov 6 16:12:47 2017, Peter Black, chamber drawings FullAssemb2.PDFsection.PDF
work in progress. 
Entry  Mon Nov 6 10:52:58 2017, Peter Black, alignment hardware drawings ladder_alignment_block.PDFS2_alignment_bar.PDFalignment_plug_70mm.PDFalignment_plug.PDF
 
Entry  Mon Nov 6 10:50:33 2017, Peter Black, foil mount drawings SiPD_foil_mount.PDFfOIL_HOLDER.PDF
 
Entry  Mon Nov 6 10:46:53 2017, Peter Black, Faraday cup drawings Farady_cup.PDFcup.PDFsupressor.PDFFarady_cup_main.PDF
Note that the removal of the supressor reqires the special allen key.
Entry  Sun Nov 5 20:25:10 2017, Ruchi, Circuit diagram and cable mapping Cabling.pdfPreampsPCBs.pdfCircuit.pdf
 
Entry  Sat Nov 4 14:10:20 2017, daid, Julabo chiller operation 
This log entry contains a basic instruction on how to operate the Julabo liquid flow chiller.

There are 5 buttons (left to right): Up/Down, Enter, 1/0.  
Entry  Sat Nov 4 06:29:03 2017, TD, MIDASsort online sort programs, spectrum titles, calibration s/w & READMEs IS607.tar.gzCalibration.tar.gzREADMEs.tar.gz
 
Entry  Mon Oct 30 09:46:04 2017, Peter Black, Notes on iris install/operation 
The iris mounts have 2 superimposed constellations of 3mm mounting holes on them that correspond to those of the S2 detector, however the 85x85 square
is missing one hole and the 110x40 rectangle is rotated by 45°. Either constellation may be used. Fixing is intended with M3x16 bolts into 10mm standoffs
used to attach the detector to its mount.
Entry  Tue Oct 24 09:27:24 2017, Peter Black, DK, Safety words  


Plate 1.  Contents of chamber

Entry  Thu Oct 19 14:41:19 2017, daid, heavy ion degrader foil - full / new 8x
See entry https://elog.ph.ed.ac.uk/ISOLDE/28 for a full description, but editing the same elog is altering attachment numbers etc.

Here I've added 20 um foil as well as 5.3 MeV/u (~313 MeV) 59Cu beam.
Entry  Thu Oct 19 10:55:54 2017, Claudia, Meeting 19.10. 
CERN-Edinburgh Liaison


FC at end of SEC: manual
Network access: port free.
N2 gas ? 
-date for connection of SEC to our
chamber: week 30. October, 2nd November alignment. 
collimator in front of chamber ?? contact Jorge Alberto about beam tuning in general
Entry  Thu Oct 12 12:45:54 2017, Claudia, Meeting 12.10.17 
Email sent to Karl and Olof about 


FC at end of SEC
Gain resistor package
Network access
N2 gas
date for connection of SEC to
our chamber
collimator in front of chamber ?


Next week call Karl. Daid will look at old Olof emails
Entry  Thu Oct 5 11:34:34 2017, Claudia, Meeting 5.10.17 
POINTS FOR DISCUSSION

 


Email sent to Karl and Olof about 
FC at end of SEC
Gain resistor package
Network access
N2
Entry  Wed Oct 4 18:57:16 2017, dk, Digitized run notes from tests at CERN 
Transcription of paper logbook for runs.  Please check as I cannot read all the writing.

Wednesday 13/9/2017
Entry  Thu Sep 28 03:38:18 2017, dk, heavy ion degrader foil - updated 8x
--original email text--
Using Claudia's code, I added a layer of Al foil before the heavy ion
silicon detector.  The attached plots correspond to the heavy ion
Entry  Thu Sep 28 03:34:20 2017, dk, heavy ion degrader foil degrader.pdf

--text from email--
Using Claudia's code, I added a layer of Al foil before the heavy ion
Entry  Mon Sep 25 14:50:46 2017, dk, To do list before main exp. - update from meeting 28th September 
NB: This list may be incomplete!

CERN side: 
Entry  Thu Sep 21 14:54:00 2017, Claudia, Alpha Calibration Spectra Screenshot_from_2017-09-21_14-43-48.pngScreenshot_from_2017-09-21_14-43-17.png
Alpha Calibration Runs (need to check settings in logbook)

0-63: dE detector and 32-47 is n+n;  64-127 E detector and 96-111 is n+n; 128-191 HI detector

Run 13:  alpha source in fromt of dE detector (0-63). All detectors connected.
Entry  Tue Sep 19 14:54:47 2017, Claudia, Toby, Setup Photos 14x
 
Entry  Thu Sep 14 15:40:42 2017, TD, MSL type S2 bias data MSLtypeS2.txt
 
Entry  Thu Sep 14 14:07:21 2017, pb, alignment  2017.11.02_HISO_XT03_EdinburghChamber.pdf
Chat with survey team

1. mauf plugs for both ends of chamber with concentric 8mmH7 holes, with nylon tipped grub screws/clamp bars

2. Manuf of target with 8mmH7 hole
Entry  Thu Sep 14 10:29:25 2017, Claudia, Alpha Calibration 
Run 1-10 Test

14 September 2017

Run 11 Start 18:16 (CERN time)
Entry  Thu Sep 14 10:24:34 2017, Claudia, Detector - ADC connection 
ADC#1 0-31: p+n dE

ADC#2 32-48: n+n dE

ADC#2 49-64: p+n dE
Entry  Thu Sep 14 09:47:02 2017, dk, discussion with beam operators 
CERN side
     Faraday cup at the end of SEC, ideally with automated control to insert and remove
Entry  Thu Sep 14 08:37:27 2017, Claudia, Detector installation 8x
dE detector: 2083-9, 74 um thick, V_depletion=12V; V_operating=24 V

E detector:  3080-23, 1012 um thick, V_d=110; V_o=350 V

HI detector: 2410-23, 65 um; V_d=7 ; V_o=14 V
Entry  Wed Sep 13 15:28:18 2017, ,  
Discussion with ISOLDE staff -> things to sort out:

1) Removable Faraday Cup between Scattering Chamber and our Chamve
Entry  Sat Sep 9 09:39:38 2017, Claudia, Vacuum Readings at ISOLDE Hall 
Thursday, 7th September:

Vaccum after pumping all night preamps off, chiller off


09:37: IMG1 2.3E-5 mbar, Chamber 7.5 E-5 mbar; Julabo off;
09:38: IMG1 2.1E-5 mbar; Chamber 6.6E-5 mbar; Julabo 20 Celsius
09:41:
Entry  Fri Sep 8 19:12:19 2017, TD, MIDAS DAQ configuration 7x

MIDAS DAQ configuration files from directories w26:/MIDAS/experiments/daq
and w26:/MIDAS/TapeServer/SunOS
Entry  Fri Sep 8 19:03:23 2017, TD, w26 network configuration 12x

Network configuration files for workstation w26 (Sun Ultra 45)
Entry  Wed Aug 16 15:30:04 2017, DK, MD, Shipping Inventory 
==BOX A==  59kg - 600mm x 600mm x 800mm

VME crate, with power cable
Entry  Wed Aug 16 15:29:57 2017, DK, Shipping Inventory 
==BOX A==
VME crate
26 ribbon cables
Entry  Wed Aug 16 12:53:43 2017, DK, To do / missing 
Photodiode
     Electronics
     Foil mount (12 um Al seems okay, but check more carefully)
Entry  Thu Jun 1 13:09:38 2017, DK, Testing email header, part II 
Checking some server settings for the elog system regarding the email notification.

And testing updating an elog.
Entry  Wed May 24 16:18:22 2017, MD, Notes from visit of ISOLDE at 23rd May 2017 XT03_beamline_corner-panorama.jpgscattering_chamber-not_in_place.jpgcorner-possible_offline_setup-1.jpgpower_supply_near_beam-1.jpg
Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall)
Entry  Wed May 24 16:09:10 2017, MD, Notes from visit of ISOLDE at 23rd May 2017 XT03_beamline_corner-panorama.jpgscattering_chamber-not_in_place.jpg
Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall)
Entry  Wed May 24 15:21:37 2017, MD, Notes from visit of ISOLDE at 23rd May 2017 
Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall)
Entry  Wed Apr 26 12:10:04 2017, DK, Testing email header 
I asked IT about putting the elog name into the email subject line (useful for those of us subscribed to more than one elog).  They said they enabled it
for ISOLDE.  Let's test 
to see!
Entry  Tue Apr 18 11:05:43 2017, Mirco / Claudia, Setup Preparation ISOLDE_-_chamber_status070417.pdfISOLDE_-_chamber_status210417.pdf
status of the setup - 07/04/2017

status of the setup - 21/04/2017
Entry  Tue Mar 14 10:57:20 2017, Claudia , Meeting Edinburgh 14 March 10 am 2017 
1) DAQ

We have 192 channels to DAQ working. Mirco will test the silicon detectors with an alpha source in the next 2 weeks. 

2) Vacuum
Entry  Sun Feb 19 12:22:16 2017, td, md, Vacuum and detector test 
------17.2.17 ------------------------------------------------------

closing chamber 
Entry  Fri Jan 27 11:33:10 2017, DK, Testing email server 
Tinkering with configs for SYMPA email server to see if the elog info is sent to the mailing list or not

Normally it is sent by ELog@jast.ph.ed.ac.uk and I changed it to "restricted to local domain and subscribers" from "restricted to subscribers" under Edit
Entry  Fri Jan 27 11:02:03 2017, DK, PB, Notes from visit to CERN 
Here I am simply digitizing my notes from our visit to CERN 17~18 January 2017.  They may not be perfectly linear or organized, but may be searchable.

==ISOLDE Hall Info==
ELOG V3.1.4-unknown