AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Last 1024 days  ELOG logo
New entries since:Thu Feb 2 11:14:38 2023
Entry  Tue Aug 26 14:43:44 2025, JM, CB, EW, CARME on, background run  bias.png
Entry  Thu Jul 17 07:07:56 2025, CB, CARME off Capture.PNG2.PNG3.PNGCapture.PNG
Entry  Wed Jul 9 11:21:14 2025, EW, CB, CARME restarted - long background R98 32x
Entry  Sun Jul 6 11:35:28 2025, CB, Anydesk version updated 
Entry  Sat Jul 5 08:51:33 2025, EBM, anydesk connection settings anydesk_settings.png
Entry  Wed Jun 18 14:21:39 2025, CB, CARME off Screenshot_from_2025-06-18_15-18-31.png
Entry  Tue Jun 17 23:51:58 2025, TD, CB, JG, Run 96 - continued 23x
Entry  Tue Jun 17 19:10:07 2025, NH, PMH, Run 96 7x
Entry  Tue Jun 17 12:22:50 2025, CB EW JG AG SN, Run 94/95/96 G35Voltage.pdf
Entry  Tue Jun 17 12:14:30 2025, EW, CB, AG, Run 93- Background with beam 150keV Screenshot_from_2025-06-17_13-16-52.pngScreenshot_from_2025-06-17_13-16-49.pngScreenshot_from_2025-06-17_13-16-45.pngScreenshot_from_2025-06-17_13-16-43.png
Entry  Tue Jun 17 08:04:09 2025, EW, AG, CB, Run 92- Background with beam 90keV Screenshot_from_2025-06-17_09-03-43.pngScreenshot_from_2025-06-17_09-03-38.pngScreenshot_from_2025-06-17_09-03-34.pngScreenshot_from_2025-06-17_09-03-29.png
Entry  Mon Jun 16 22:06:00 2025, CB, AR, EW, RUN 90-91 14x
Entry  Mon Jun 16 21:58:00 2025, CB AR, Runs 84-89 
Entry  Mon Jun 16 11:12:22 2025, JG, AK, AR, EH, run 83 8x
Entry  Mon Jun 16 10:46:11 2025, CB JM JG AK, Run82 
Entry  Mon Jun 16 08:17:41 2025, JG, D2 consumption 
Entry  Sun Jun 15 10:46:35 2025, EW, EM, AR, AB, CB, JG, AK, Run 81 30x
Entry  Sun Jun 15 07:01:37 2025, EW, EM, Run 80 Screenshot_from_2025-06-15_08-09-05.pngScreenshot_from_2025-06-15_08-09-00.pngScreenshot_from_2025-06-15_08-08-05.pngScreenshot_from_2025-06-15_08-07-56.pngScreenshot_from_2025-06-15_09-55-36.png
Entry  Fri Jun 13 19:41:32 2025, JG, SHB, JM, AR, EW, OF, Run 77, 78, 79 17x
Entry  Fri Jun 13 16:39:18 2025, JG, SHB, Run 76 7x
Entry  Fri Jun 13 14:45:58 2025, JG, SS, JM, CB, EW, AR, Run 75 Screenshot_from_2025-06-13_16-01-44.png2025-06-13_15-59-53_YRT1_CRYRING_2025_D_Bruno_90keV.C1.txt
Entry  Thu Jun 12 15:33:17 2025, CB, JM, EM, JG, TD, AB, CF, AR, Run 74 27x
Entry  Thu Jun 12 14:22:27 2025, JM, CB, TD, CF, JG, EM, Run 73 Screenshot_from_2025-06-12_15-23-37.pngScreenshot_from_2025-06-12_15-23-51.pngScreenshot_from_2025-06-12_15-29-14.pngScreenshot_from_2025-06-12_15-31-19.png
Entry  Thu Jun 12 14:08:42 2025, JM, CB, Run 72 - pulser walkthrough Screenshot_from_2025-06-12_15-33-03.png
Entry  Thu Jun 12 06:20:50 2025, JM, Run 68,69 - background Screenshot_from_2025-06-12_07-01-00.pngScreenshot_from_2025-06-12_07-20-26.png
Entry  Wed Jun 11 10:13:42 2025, EW, CB, PJW, AR, JM, Run 67 14x
Entry  Wed Jun 11 09:16:55 2025, CB, ASIC Control Settings 17x
Entry  Wed Jun 11 08:37:48 2025, CB, PJW, Run 66 Screenshot_from_2025-06-11_10-21-30.pngScreenshot_from_2025-06-11_10-21-44.png
Entry  Tue Jun 10 22:38:59 2025, JM, CB, PJW, Run 65 7x
Entry  Tue Jun 10 16:46:39 2025, JM, CB, EW, AY, PC, 150 keV - Run64 42x
Entry  Tue Jun 10 13:29:23 2025, EW, CB, JM, Thresholds changed  Screenshot_from_2025-06-10_14-35-07.pngScreenshot_from_2025-06-10_14-34-59.pngScreenshot_from_2025-06-10_14-34-49.pngScreenshot_from_2025-06-10_14-34-17.png
Entry  Tue Jun 10 09:57:50 2025, CB, JM, PJW, YuL, JG, Run 62 
Entry  Tue Jun 10 09:44:33 2025, JG, MBS not running for a week 
Entry  Tue Jun 10 09:44:30 2025, JG, MBS not running for a week 
Entry  Tue Jun 10 09:44:20 2025, JG, MBS not running for a week 
Entry  Sun Jun 8 11:55:00 2025, EM, PC, JM, CB, EW, AY, CB, PJW, YuL, Run 58,59,60, 61 50x
Entry  Sun Jun 8 10:05:30 2025, EM, PC, JM, Run57 
Entry  Sun Jun 8 09:07:22 2025, EM, PC, JM, Run56 Screenshot_from_2025-06-08_10-10-06.pngScreenshot_from_2025-06-08_10-15-01.png
Entry  Sat Jun 7 10:23:26 2025, JM, CB, carme-gsi rebooted  
Entry  Sat Jun 7 10:06:27 2025, JM, EM, CB, DB, AY, PC, CB, Run 54 50x
Entry  Fri Jun 6 17:27:03 2025, AY, ST, JM, EM, DB, Run 53 11x
Entry  Fri Jun 6 16:49:59 2025, CB, AY, ST, Beam overlap results for 200keV and 250keV 2025_06_06_17_46_56_Greenshot.png
Entry  Thu Jun 5 16:54:18 2025, EW, ST, CB, Run 52 - 0.3 MeV/A 14x
Entry  Thu Jun 5 08:50:00 2025, JM, CF, CB, EW, Run 51 - background Screenshot_from_2025-06-05_09-38-05.pngScreenshot_from_2025-06-05_09-46-08.pngScreenshot_from_2025-06-05_09-51-43.png
Entry  Wed Jun 4 10:44:36 2025, EW, CB, JM, OF, JG, ST, Run 50 - 0.35 MeV/A 13x
Entry  Wed Jun 4 00:10:39 2025, JM, Run 49 - beam only 6x
Entry  Tue Jun 3 14:54:29 2025, PMH, ST, Run 48 6x
Entry  Tue Jun 3 11:16:07 2025, EW, EM, JM, Run 47, beam only background Screenshot_from_2025-06-03_12-20-25.pngScreenshot_from_2025-06-03_12-19-36.png
Entry  Mon Jun 2 20:03:43 2025, JG, AG, CB, EW, EM, Run 45/46, 0.5 MeV/A 13x
Entry  Mon Jun 2 17:48:07 2025, JG, AG, Run 44 scraper tests Screenshot_from_2025-06-02_18-51-24.pngScreenshot_from_2025-06-02_19-27-31.png
Entry  Mon Jun 2 17:25:31 2025, JG, AG, Run 43 scraper tests 
Entry  Mon Jun 2 16:35:35 2025, EW, AG, Run 42 and scraper tests Screenshot_from_2025-06-02_17-44-07.pngScreenshot_from_2025-06-02_17-44-50.png
Entry  Mon Jun 2 09:30:38 2025, JM, EW, ST, Run 41 6x
Entry  Sun Jun 1 15:33:50 2025, EW, JM, CB, Run 40 10x
Entry  Sun Jun 1 07:46:34 2025, JM, EM, CB, Run 39 7x
Entry  Sat May 31 10:46:42 2025, TD, Run 38 - remote monitoring 21x
Entry  Sat May 31 09:58:21 2025, JM, Run 38 10x
Entry  Fri May 30 21:49:08 2025, JM, NP, CB, Run 37 Screenshot_from_2025-05-31_00-56-32.pngScreenshot_from_2025-05-31_00-58-40.pngScreenshot_from_2025-05-31_06-16-50.png
Entry  Fri May 30 20:47:47 2025, JM, CB, NP, Run 36 Screenshot_from_2025-05-30_22-45-48.pngScreenshot_from_2025-05-30_22-46-48.png
Entry  Fri May 30 20:06:48 2025, JM, CB, NP, Run35 8x
Entry  Fri May 30 07:27:41 2025, CB LB JM NP EM, Waiting for deuterium 8x
Entry  Thu May 29 18:04:47 2025, LB, CB, PMH, JM, Run 32,33,34 7x
Entry  Thu May 29 14:39:52 2025, CB LB PMH, Run 31 9x
Entry  Wed May 28 16:40:48 2025, EH, SN, LB, OF, EBM, CB, Run 28/29/30 - 1.88 MeV/A 37x
Entry  Wed May 28 10:54:14 2025, LB, Run 27 Screenshot_from_2025-05-28_15-45-13.pngScreenshot_from_2025-05-28_15-46-07.pngScreenshot_from_2025-05-28_15-48-27.pngScreenshot_from_2025-05-28_15-48-38.pngScreenshot_from_2025-05-28_15-49-09.png
Entry  Tue May 27 22:20:11 2025, CB, LB,PW, Run 25 - 1.99/2.02 MeV/A 27x
Entry  Tue May 27 15:18:46 2025, JG, CN, JM, run 24 7x
Entry  Tue May 27 12:49:48 2025, ML, Ion beam / electron beam settings so far. 2025-05-27_13-46-30-866.png2025-05-27_13-47-04-130.png2025-05-27_13-47-23-173.png2025-05-27_13-47-52-384.png2025-05-27_13-50-26_YRT1_CRYRING_2025_Li_Marsh.C1.txt
Entry  Tue May 27 08:38:29 2025, TD, [How To] Recover DAQ when one FEE64 stops sending data - short(er) version  
Entry  Tue May 27 05:24:05 2025, LB,SN, L. Cs. P. J. W., Run 22, 23 - 1.95 MeV/A 8x
Entry  Tue May 27 05:03:41 2025, JM, DAQ restart 7x
Entry  Mon May 26 18:37:17 2025, LC, AG, LB, SN, Run 21 12x
Entry  Mon May 26 08:56:56 2025, EM,LB, Run20 8x
Entry  Sat May 24 18:27:55 2025, EM, LC, Background runs continued R17-R19 36x
Entry  Sat May 24 08:28:14 2025, TD, EM, Background runs R13-R16 29x
Entry  Fri May 23 09:19:40 2025, SN, TD, Target wait, switch lithium oven 18x
Entry  Thu May 22 06:41:10 2025, JG, TD, R6 - R11 scrapers test / pulser walk 33x
Entry  Wed May 21 14:38:22 2025, JM, TD, R4 and R5 - background 7x
Entry  Tue May 20 19:38:36 2025, JM, CARME restart 6x
Entry  Sat May 17 11:19:06 2025, JM, Shifter intructions 2025 
Entry  Tue May 13 15:07:42 2025, JM, Online monitoring code Screenshot_from_2025-05-13_15-14-12.pngScreenshot_from_2025-05-13_15-14-38.pngScreenshot_from_2025-05-13_15-28-48.png
Entry  Mon May 12 13:25:09 2025, JG, MBS DAQ - overview 
Entry  Sat Apr 26 22:01:37 2025, CB, Proxy bridge 
Entry  Wed Apr 23 11:08:34 2025, TD, JM, Background Run 11x
Entry  Tue Apr 22 06:44:02 2025, TD, Tuesday 22 April Screenshot_from_2025-04-22_07-40-45.pngScreenshot_from_2025-04-22_07-41-10.pngScreenshot_from_2025-04-22_07-47-25.png1.png2.png
Entry  Sun Apr 20 07:30:29 2025, CB, DSSD leakage currents over Easter Screenshot_2025-04-20_083007.pngScreenshot_2025-04-20_193226.pngScreenshot_2025-04-21_085130.png
Entry  Fri Apr 18 16:18:33 2025, JM, D+D BBN energies test 16x
Entry  Fri Apr 18 08:17:38 2025, JM, More testing 15x
Entry  Thu Apr 17 08:51:29 2025, JM, Grounding cont. 29x
Entry  Wed Apr 16 08:20:05 2025, JM, Grounding  14x
Entry  Tue Apr 15 12:23:10 2025, JM, Leakage current / CARME issues 18x
Entry  Thu Apr 10 10:53:14 2025, TD, Thursday 10 April 8x
Entry  Thu Apr 10 07:02:12 2025, CB (remotely), Current logging enabled - sort of 
Entry  Wed Apr 9 10:02:21 2025, TD, CARME equipment in CRYRING area moved 20250409_102115.jpg20250409_101705.jpg
Entry  Wed Apr 9 02:40:04 2025, TD, Wednesday 9 April 11x
Entry  Tue Apr 8 10:46:13 2025, TD, Tuesday 8 April 27x
Entry  Mon Apr 7 08:59:41 2025, TD, Monday 7 April 8x
Entry  Sun Apr 6 14:21:53 2025, TD, [How To] Startup CARME 
Entry  Sun Apr 6 11:40:48 2025, TD, Options DB reconstructed Screenshot_from_2025-04-06_12-59-39.png
Entry  Sun Apr 6 10:17:49 2025, TD, Sunday 6 April 15x
Entry  Sat Apr 5 16:15:04 2025, TD, FEE64 power interlock installed 11x
Entry  Sat Apr 5 16:13:32 2025, TD, Saturday 5 April 7x
Entry  Fri Apr 4 10:17:16 2025, TD, Friday 4 April 
Entry  Mon Mar 10 15:47:27 2025, TD, Analysis data files G22-201 R79_10 & R79_24 R79_10.txtR79_24.txt
Entry  Tue Jul 2 17:43:32 2024, TD, Offline analysis G22-201/R89 9x
Entry  Wed Jun 19 12:11:22 2024, CB, RSS, CARME status 
Entry  Wed Jun 19 12:08:34 2024, CB + various, Run 101-105 
Entry  Wed Jun 19 12:06:50 2024, CB, OF, SS, Run 98/99/100 - higher energy 
Entry  Wed Jun 19 12:04:02 2024, CB + OF, SS, Run 96/97 
Entry  Wed Jun 19 12:01:29 2024, TD, 23:00-07:00 Wednesday 19 June 23x
Entry  Wed Jun 19 12:00:56 2024, CB, Run 93/94/95 - background 6x
Entry  Wed Jun 19 11:54:26 2024, CB, Run 91/92 - moving detectors Screenshot_from_2024-06-18_03-07-50.pngScreenshot_from_2024-06-18_03-53-51.pngScreenshot_from_2024-06-18_04-20-15.pngScreenshot_from_2024-06-18_04-20-18.pngScreenshot_from_2024-06-18_04-20-21.png
Entry  Mon Jun 17 23:10:08 2024, CB, Run 90 Screenshot_from_2024-06-18_01-21-47.pngScreenshot_from_2024-06-18_01-21-55.png
Entry  Mon Jun 17 16:26:00 2024, JM, RSS, CB, Run 89 19x
Entry  Mon Jun 17 06:26:45 2024, JM, OF, AK, CB, Change to 5+ beam 7x
Entry  Mon Jun 17 05:47:35 2024, JM, Run 86 
Entry  Mon Jun 17 04:01:16 2024, JM, Run 85 
Entry  Mon Jun 17 02:05:37 2024, JM, Run 84 
Entry  Mon Jun 17 00:05:13 2024, JM, Run 83 
Entry  Sun Jun 16 22:49:22 2024, JM, Run 82 
Entry  Sun Jun 16 22:40:11 2024, JM, Target overlap test - R81 Beam-overlap-updated2.png
Entry  Sun Jun 16 19:01:30 2024, ML, EM, Run 80 
Entry  Sun Jun 16 13:51:11 2024, CB EM ML, Run 79 7x
Entry  Sun Jun 16 13:29:05 2024, RSS CB, Run 78 
Entry  Sun Jun 16 06:02:31 2024, RSS, Run 77 20x
Entry  Sat Jun 15 21:14:56 2024, JM, JS, LC, Run 76 Screenshot_from_2024-06-15_22-16-53.png
Entry  Sat Jun 15 13:30:18 2024, JM, JS, Run 75 Screenshot_from_2024-06-15_15-53-57.pngScreenshot_from_2024-06-15_15-54-30.pngScreenshot_from_2024-06-15_15-54-55.png
Entry  Sat Jun 15 06:10:21 2024, EM, PMH, Run 74 6x
Entry  Sat Jun 15 00:46:45 2024, TD, CRYRING hall temperature transient Capture.PNG
Entry  Fri Jun 14 22:18:18 2024, RSS, CB, US, Run 73 20x
Entry  Fri Jun 14 19:59:14 2024, US, LC, CB, New run with name of 72 is started due to target issue Screenshot_from_2024-06-14_21-08-22.pngScreenshot_from_2024-06-14_21-08-22.png
Entry  Fri Jun 14 14:52:02 2024, JM, Beam-Target Overlap Scan 20240614_153532.jpgBeam-overlap-updated.png
Entry  Fri Jun 14 14:48:02 2024, CB NP ML, [How To] Change target pressure. EMERGENCY ONLY! 20240614_142435.jpg20240614_142440.jpg
Entry  Fri Jun 14 14:46:54 2024, LC, JM, CB, TD, US, Run 71 - beam on target  Screenshot_from_2024-06-14_16-35-44.pngScreenshot_from_2024-06-14_16-36-06.pngScreenshot_from_2024-06-14_16-36-28.pngScreenshot_from_2024-06-14_19-49-02.png
Entry  Fri Jun 14 13:45:21 2024, JM, JS, CB, TD, EH, Run 70 - beam on target 7x
Entry  Fri Jun 14 10:21:24 2024, JS, TD, Run 68 9x
Entry  Thu Jun 13 23:01:07 2024, RSS, JS, EH, Run 67 - Night shift 20x
Entry  Thu Jun 13 21:07:30 2024, LCS, US, Run 67- beam on target 7x
Entry  Thu Jun 13 14:46:17 2024, TD, R66 beam overlap test 
Entry  Thu Jun 13 09:48:25 2024, TD, LCS, Run 65 - beam on target 14x
Entry  Thu Jun 13 06:21:53 2024, TD, LCS, Run 64 - contd 13x
Entry  Thu Jun 13 00:50:33 2024, JM, JS, Run 64 - beam on target 
Entry  Wed Jun 12 07:16:47 2024, RSS, YL, JM, TD, CB, Status 6x
Entry  Tue Jun 11 21:16:50 2024, TD, Run 63 continued 17x
Entry  Tue Jun 11 20:10:25 2024, JM, Run 63 - Beam only background 
Entry  Tue Jun 11 19:44:48 2024, OF, SS, Target out and at He 
Entry  Tue Jun 11 12:26:07 2024, RSS, JS, JM, CB, Run 62 - Beam optimization + Target change 
Entry  Tue Jun 11 08:34:50 2024, JM, RSS, JS, Run 61 - beam on target Screenshot_from_2024-06-11_11-47-57.pngScreenshot_from_2024-06-11_11-48-20.pngScreenshot_from_2024-06-11_11-48-32.pngScreenshot_from_2024-06-11_11-48-44.png
Entry  Tue Jun 11 04:36:17 2024, CB, RSS, JS, Run 60 - as 59, left servo in 11x
Entry  Mon Jun 10 20:31:12 2024, JM, AK, EH, CB, Run 59 Beam on target 18x
Entry  Mon Jun 10 18:22:47 2024, JM, Electron cooler calculations space-charge-2.pngspace-charge-1.pngBeamCalc.png
Entry  Mon Jun 10 14:26:52 2024, EH, AK, Run 58 8x
Entry  Mon Jun 10 12:49:56 2024, RSS, DB, CB, JM, R58 Space Charge Test Screenshot_from_2024-06-10_13-52-45.pngScreenshot_from_2024-06-10_13-53-04.pngScreenshot_from_2024-06-10_13-53-17.pngScreenshot_from_2024-06-10_13-53-28.png
Entry  Mon Jun 10 07:40:47 2024, RSS, DB, Beam 
Entry  Mon Jun 10 05:24:49 2024, TD, RSS, DB, R57 16x
Entry  Sun Jun 9 22:14:23 2024, TD, PM, AG, Run 56 - Data taking 31x
Entry  Sun Jun 9 13:45:24 2024, CB PMH AG, Run 55 - Data taking 18x
Entry  Sun Jun 9 09:45:27 2024, JM, CB, Beam-Target Overlap Beam-overlap.png
Entry  Sun Jun 9 08:30:49 2024, JM, CB, Run 54 - beam on target 7x
Entry  Sat Jun 8 20:32:17 2024, LB, JM, Run 52 - beam on target Screenshot_from_2024-06-08_22-56-26.pngScreenshot_from_2024-06-09_00-17-44.pngScreenshot_from_2024-06-09_00-18-46.pngScreenshot_from_2024-06-09_01-50-54.pngScreenshot_from_2024-06-09_01-51-27.png
Entry  Sat Jun 8 17:46:12 2024, TD, [How To] Cycle Left DSSSDs 
Entry  Sat Jun 8 14:49:14 2024, TD, R51 - contd 30x
Entry  Sat Jun 8 10:13:52 2024, CB, JM, TD, Run 50/51 - data taking 8x
Entry  Sat Jun 8 06:13:21 2024, CB, Run 47/48/49 - target issues & tests Screenshot_from_2024-06-08_07-15-27.pngScreenshot_from_2024-06-08_07-15-33.pngScreenshot_from_2024-06-08_10-13-16.pngScreenshot_from_2024-06-08_10-13-23.pngScreenshot_from_2024-06-08_10-13-26.png
Entry  Sat Jun 8 00:14:39 2024, LB, Run 46 - background with beam 22x
Entry  Fri Jun 7 22:33:13 2024, LB, Run 45 - tests on beam-target overlap Screenshot_from_2024-06-07_23-11-06.pngScreenshot_from_2024-06-07_23-12-17.pngScreenshot_from_2024-06-07_23-32-22.pngScreenshot_from_2024-06-07_23-43-43.pngScreenshot_from_2024-06-07_23-50-54.png
    Reply  Fri Jun 7 15:53:35 2024, TD, DSSD leakage current increase - temperature increase in CRYRING hall Capture.PNG
Entry  Fri Jun 7 14:09:04 2024, JM, CB, DR, CN, LB, Run 44 - 15N Data Taking 
Entry  Fri Jun 7 10:05:40 2024, CB, Run 41/42/43 - 15N data taking start 8x
Entry  Thu Jun 6 16:23:10 2024, LB CB JM, Run 39 - Run 40 15N 15x
Entry  Thu Jun 6 05:44:45 2024, DR YL DB LB CB JM, Run 38 - 15N Tests 8x
Entry  Wed Jun 5 13:34:02 2024, JM, Run 37 - Change in thresholds Screenshot_from_2024-06-05_14-36-44.png
Entry  Wed Jun 5 13:21:45 2024, JM, CB, Run 36 - pulser walkthrough Screenshot_from_2024-06-05_14-20-18.pngScreenshot_from_2024-06-05_14-21-26.pngScreenshot_from_2024-06-05_14-27-43.pngScreenshot_from_2024-06-05_14-25-44.png
Entry  Wed Jun 5 08:34:04 2024, JM. DB, PC, Target nozzle change 
Entry  Tue Jun 4 19:19:26 2024, TD, [How To] Recover DAQ when one FEE64 stops sending data 
Entry  Tue Jun 4 18:08:04 2024, Boudefla Dounia - CB - LB - SD, Run 34 19x
Entry  Tue Jun 4 15:25:36 2024, BD US CB, Run 33 Screenshot_from_2024-06-04_18-33-23.pngScreenshot_from_2024-06-04_18-33-38.pngScreenshot_from_2024-06-04_18-35-26.pngScreenshot_from_2024-06-04_18-36-55.png
Entry  Tue Jun 4 14:13:17 2024, JM, CB, DB, US, Run 32- beam only background 
Entry  Tue Jun 4 06:56:02 2024, DFF, PC, LB, JM,NP,AB, Run 31 contd Screenshot_from_2024-06-04_10-53-58.pngScreenshot_from_2024-06-04_10-58-02.png
Entry  Tue Jun 4 00:04:39 2024, DR, EH, Run 31 
Entry  Mon Jun 3 21:37:20 2024, CN, EM, CB, Run30 Screenshot_from_2024-06-03_23-15-37.pngScreenshot_from_2024-06-03_23-16-18.pngScreenshot_from_2024-06-03_23-17-16.png
Entry  Mon Jun 3 15:17:41 2024, CN, EM, CB, Run29  Screenshot_from_2024-06-03_18-04-47.pngScreenshot_from_2024-06-03_18-05-11.pngScreenshot_from_2024-06-03_18-06-09.pngScreenshot_from_2024-06-03_18-06-40.pngScreenshot_from_2024-06-03_20-35-00.png
Entry  Mon Jun 3 15:10:12 2024, CN, EM, CB, Run28 Screenshot_from_2024-06-03_16-12-44.pngScreenshot_from_2024-06-03_16-13-11.pngScreenshot_from_2024-06-03_16-14-11.pngScreenshot_from_2024-06-03_16-16-37.png
Entry  Mon Jun 3 11:46:07 2024, SD, SHB, JM, CN, EM, Run 27 12x
Entry  Mon Jun 3 08:43:22 2024, SD, SHB, Run 26 8x
Entry  Sun Jun 2 23:38:17 2024, JM, EM, Run 25  32x
Entry  Sun Jun 2 22:46:47 2024, JM, EM, NP, Run24 Screenshot_from_2024-06-02_23-53-00.pngScreenshot_from_2024-06-02_23-53-47.pngScreenshot_from_2024-06-02_23-56-22.png
Entry  Sun Jun 2 14:30:16 2024, TD, Offline analysis G22-201/R22_0 - R22_11 8x
Entry  Sun Jun 2 13:04:41 2024, JM, AG, CB, DR, Run 23 - vertical beam position and beam lifetime tests Screenshot_from_2024-06-02_14-04-55.png
Entry  Sun Jun 2 08:47:01 2024, CB, AG, Run 22 - longer rung with 20 min storage Screenshot_from_2024-06-02_09-47-53.pngScreenshot_from_2024-06-02_09-48-06.pngScreenshot_from_2024-06-02_11-21-59.pngScreenshot_from_2024-06-02_11-22-27.pngScreenshot_from_2024-06-02_13-02-31.png
Entry  Sun Jun 2 06:41:00 2024, CB, AG, Run 21 - tests 10x
Entry  Sat Jun 1 21:56:17 2024, JM, EM, EM, TY, CB, AG, Run 20 18x
Entry  Sat Jun 1 16:38:13 2024, TD, Offline analysis G22-201/R17 8x
Entry  Sat Jun 1 13:33:50 2024, TD, Offline analysis APR24/R3 (alpha background)  9x
Entry  Sat Jun 1 07:16:15 2024, CB, AB, EM, JM, Run 19 - beam target overlap 19x
Entry  Fri May 31 21:53:20 2024, CB EM, JM,EM AB, Overnight beam tests 17x
Entry  Fri May 31 21:03:21 2024, CB, EM, Run14 Screenshot_from_2024-05-31_22-05-57.pngScreenshot_from_2024-05-31_22-07-01.pngScreenshot_from_2024-05-31_22-07-49.png
Entry  Fri May 31 19:12:01 2024, CB, EM, Run 13 - test with beam Screenshot_from_2024-05-31_20-13-46.pngScreenshot_from_2024-05-31_20-27-58.pngScreenshot_from_2024-05-31_20-32-59.png
Entry  Fri May 31 06:01:55 2024, JM, TY, PW, EM, CB, Run 12 - beam on target 12x
Entry  Thu May 30 13:31:01 2024, JM, CB, PW, YL, Run 11 - beam on target overlap Screenshot_from_2024-05-30_14-33-19.pngScreenshot_from_2024-05-31_02-09-35.pngScreenshot_from_2024-05-31_06-57-12.png20240531_073828.jpg
Entry  Thu May 30 09:30:33 2024, CB, PW, YL, TD, Run 10 13x
Entry  Thu May 30 08:33:21 2024, CB, PW, YL, Run 8 & 9- detector motion tests 7x
Entry  Thu May 30 07:25:53 2024, Yuri, Phil, Nikos, Gas target 
Entry  Thu May 30 06:00:51 2024, Yuri Nikos ..., Open the cave 
Entry  Wed May 29 17:42:06 2024, TD, Offline analysis APR24/R2 (pulser walkthrough) 17x
Entry  Wed May 29 16:46:21 2024, NP, AB, PM, Run7 - Measurements only with ion beam. Screenshot_from_2024-05-29_21-49-57.pngScreenshot_from_2024-05-29_21-50-14.png
Entry  Wed May 29 09:49:35 2024, JM, CB, Threshold changes / D+ beam Screenshot_from_2024-05-29_11-00-20.pngScreenshot_from_2024-05-29_11-01-30.pngScreenshot_from_2024-05-29_11-01-47.pngScreenshot_from_2024-05-29_11-02-03.png
Entry  Wed May 29 08:10:32 2024, JM, Run4 - alpha background 
Entry  Tue May 28 15:25:21 2024, TD, JM, CB, Pulser tests Screenshot_from_2024-05-28_16-14-56.pngScreenshot_from_2024-05-28_16-15-43.pngScreenshot_from_2024-05-28_16-16-18.pngScreenshot_from_2024-05-28_16-20-05.pngScreenshot_from_2024-05-28_16-28-46.png
Entry  Tue May 28 12:38:31 2024, TD, JM, CB, Run 2 - Alpha background run Screenshot_from_2024-05-28_13-35-03.pngScreenshot_from_2024-05-28_13-34-30.pngScreenshot_from_2024-05-28_13-33-19.pngScreenshot_from_2024-05-28_13-36-30.pngScreenshot_from_2024-05-28_13-37-16.png
Entry  Mon May 27 15:25:08 2024, JM, Startup 
Entry  Fri May 10 21:23:35 2024, TD, CB, JM, 20Ne7+ test beam 18x
Entry  Sun Apr 28 23:12:11 2024, TD, Monday 28 April 21x
Entry  Sat Apr 27 23:16:02 2024, TD, Sunday 28 April 37x
Entry  Fri Apr 26 23:41:16 2024, TD, Saturday 27 April 37x
Entry  Fri Apr 26 07:05:01 2024, TD, Friday 26 April 19x
Entry  Thu Apr 25 02:31:25 2024, TD, Thursday 25 April 39x
Entry  Wed Apr 24 13:18:09 2024, TD, Examples of poor CARME cable management/routing 20240424_125858.jpg20240424_125929.jpg
Entry  Wed Apr 24 12:48:35 2024, TD, Wednesday 24 April 21x
Entry  Tue Apr 23 17:44:41 2024, TD, Tuesday 23 April 12x
Entry  Fri Apr 19 02:47:59 2024, TD, Friday 19 April 12x
Entry  Thu Apr 18 13:34:06 2024, TD, JG, Thursday 18 April 13x
Entry  Wed Mar 6 10:47:11 2024, JG, TD, Wednesday 6 March - PEXARIA5 WR test temps.PNGstats_1.PNGstats_2.PNGwr_0949.PNG
Entry  Wed Feb 21 07:38:32 2024, TD, Wedneday 21 February 24x
Entry  Tue Feb 20 14:12:32 2024, JM, Shutdown Screenshot_from_2024-02-20_15-11-40.png
Entry  Tue Feb 20 13:20:44 2024, OF, AG, JG, ML, R48 status check Screenshot_from_2024-02-20_14-22-05.pngScreenshot_from_2024-02-20_14-22-49.pngScreenshot_from_2024-02-20_14-29-39.pngScreenshot_from_2024-02-20_14-34-55.png
Entry  Tue Feb 20 09:57:57 2024, OF, AG, ML, Run 48 status check Screenshot_from_2024-02-20_11-06-48.pngScreenshot_from_2024-02-20_11-08-05.pngScreenshot_from_2024-02-20_11-12-26.pngScreenshot_from_2024-02-20_11-13-58.png2024-02-20_11-37-46-304.png
Entry  Tue Feb 20 09:51:37 2024, JM, Run 48 beam on target 
Entry  Tue Feb 20 08:41:08 2024, OF, AG, still no beam CRYRING 
Entry  Tue Feb 20 07:50:10 2024, JM, DAQ restart 
Entry  Mon Feb 19 21:46:32 2024, EH, EM, CB, Run 45 + end of late shift 14x
Entry  Mon Feb 19 08:45:22 2024, JM, JG, SHB, EM, EH, Run 44 - cooled beam on target 35x
Entry  Mon Feb 19 06:01:17 2024, SHB, JM, JG, Run 42 morning shift 6x
Entry  Mon Feb 19 05:10:48 2024, TD, Run 42 night shift contd. 6x
Entry  Sun Feb 18 22:03:56 2024, TD, Run 42 night shift 47x
Entry  Sun Feb 18 13:58:33 2024, AR, OF, JM, Run 42 - cooled beam on target 27x
Entry  Sun Feb 18 13:10:18 2024, TD, Sunday 18 February - DSSSD 0 aida01 and aida04 *.*.L spectra Screenshot_from_2024-02-18_13-58-29.pngScreenshot_from_2024-02-18_13-59-55.pngScreenshot_from_2024-02-18_14-01-19.pngScreenshot_from_2024-02-18_14-08-36.pngScreenshot_from_2024-02-18_14-09-44.png
Entry  Sun Feb 18 07:53:51 2024, HW AG, Run 40 Morning Shift 27x
Entry  Sun Feb 18 00:16:55 2024, JM CB, Run 40 - night shift 15x
Entry  Sat Feb 17 14:29:03 2024, JM, CB, AR, AB, Run 40 - cooled beam on target 31x
Entry  Sat Feb 17 13:21:44 2024, JM, CB, Beam on target - motors tests Screenshot_from_2024-02-17_14-33-51.pngScreenshot_from_2024-02-17_14-36-27.pngScreenshot_from_2024-02-17_14-39-38.png
Entry  Sat Feb 17 06:19:27 2024, JM, CB, Run 35 - contd Screenshot_from_2024-02-17_07-20-01.pngScreenshot_from_2024-02-17_07-21-27.pngScreenshot_from_2024-02-17_09-09-35.pngScreenshot_from_2024-02-17_09-13-44.pngScreenshot_from_2024-02-17_09-14-35.png
Entry  Fri Feb 16 22:03:27 2024, TD, Run 35 - night shift 49x
Entry  Fri Feb 16 10:02:41 2024, JM, OF, CB, AR, EM, Run 35 - cooled beam on target 27x
Entry  Thu Feb 15 21:07:00 2024, JM, AB, AR, OF, Run33 - cooled beam on target 22x
Entry  Thu Feb 15 13:18:30 2024, JG, MBS DAQ: target & ring values 2024_jet_daq.txt
Entry  Thu Feb 15 12:40:52 2024, JM. CB, AR, AB, Run30 - uncooled beam on target 29x
Entry  Thu Feb 15 10:39:50 2024, JM, JG, ML, AG, CB, Run29 - beam optimisation 
Entry  Wed Feb 14 16:52:46 2024, JM, AR, CB, JG, Run28 - beam on target  42x
Entry  Wed Feb 14 14:59:13 2024, JM, CB, NP, ML, AG, AB, Run 27 -Beam on target optimisation Target-overlap-scan-optimized.pdf
Entry  Wed Feb 14 14:06:28 2024, CB AR JM, Pulser Walkthrough 
Entry  Wed Feb 14 08:44:32 2024, CB AR JM, Motors test and turbo ON 11x
Entry  Tue Feb 13 17:19:43 2024, JM, AR, NP, AB, RSS, Run22 - cooled beam on target (definitely maybe) 48x
Entry  Tue Feb 13 08:34:44 2024, Hw, JM, AR, CB, NP, AB, RSS, Status of DAQ - beam overlap 10x
Entry  Mon Feb 12 01:40:48 2024, TD, JM, CB, AR, RSS, Run17 - Run20  49x
Entry  Sun Feb 11 13:28:46 2024, JM, CB, TD, Run16 - beam on target 30x
Entry  Sun Feb 11 07:03:34 2024, TD, Sunday 11 February 20x
Entry  Sat Feb 10 17:05:13 2024, TD, Run 15 - background 20x
Entry  Sat Feb 10 10:00:44 2024, AR RSS JM CB, Run 13, 14 23x
Entry  Fri Feb 9 17:04:39 2024, JM, AR, CB, NH, Run12 - Background 
Entry  Fri Feb 9 11:58:04 2024, TD + CB, JM, AR, NH, AB, Run10 contd, Run11 27x
Entry  Fri Feb 9 07:57:38 2024, AR, CB, AB, JM, Run10 - First cool beam on target 27x
Entry  Thu Feb 8 17:11:50 2024, CB, EH, Pulser walkthrough 4.png3.png
Entry  Thu Feb 8 14:59:59 2024, JM, TD, Change p+n FEE64 settings 
Entry  Thu Feb 8 11:22:28 2024, JM, Shifters instruction 2024 
Entry  Wed Feb 7 13:50:20 2024, Elena Hanu, Carlo Bruno, Michael Lestinsky, Afternoon shift Screenshot_from_2024-02-07_14-53-36.pngScreenshot_from_2024-02-07_14-56-37.pngScreenshot_from_2024-02-07_14-51-21.png
Entry  Wed Feb 7 10:09:14 2024, CB, JG, EM, Morning Shift  Screenshot_from_2024-02-07_11-10-08.pngScreenshot_from_2024-02-07_11-10-59.pngScreenshot_from_2024-02-07_11-15-53.pngScreenshot_from_2024-02-07_11-20-38.png
Entry  Tue Feb 6 09:39:54 2024, CB, Detector bias tests 13x
Entry  Mon Feb 5 20:15:31 2024, CB, TD, Detector move in/out signals 20240205_174307.jpg
Entry  Mon Feb 5 19:43:52 2024, CB, TD, ML, BuTIS reference for VETAR2 20240205_173029.jpg20240205_172957.jpgScreenshot_from_2024-02-05_16-43-18.png
Entry  Mon Feb 5 12:48:50 2024, CB TD, Pulser walkthough - Run4 Screenshot_from_2024-02-05_14-04-33.pngScreenshot_from_2024-02-05_14-05-16.png
Entry  Mon Feb 5 05:45:26 2024, CB TD, Run3 - end 47x
Entry  Sun Feb 4 08:40:04 2024, CB TD, Run3 - contd 22x
Entry  Sat Feb 3 15:05:10 2024, CB, TD, [How To] Restart Anydesk 
Entry  Sat Feb 3 00:13:03 2024, CB TD, Run1 end - R3 start 50x
Entry  Fri Feb 2 09:58:58 2024, TD, TapeServer not writng data to disk - plus fix  7x
Entry  Fri Feb 2 08:59:36 2024, JM, TD, CB, Run1 start - pulser widths spreadsheet 20x
Entry  Thu Feb 1 14:45:09 2024, JM, CB, NewMerger setup 
Entry  Thu Feb 1 10:04:11 2024, JM, CB, Shaping time testing 31x
Entry  Wed Jan 31 09:49:38 2024, JM, TD, Optimising - Wednesday 31 25x
Entry  Tue Jan 30 14:04:30 2024, NH, [HowTo] Update MACB Firmware xusbdfwu.rulesxilinx.tar.gzxc2c128.mapmacb_apr20.jed
Entry  Tue Jan 30 09:14:50 2024, JM, TD, Tuesday 30 January 32x
Entry  Mon Jan 29 15:32:08 2024, TD, JM, Monday 29 January contd. 16x
Entry  Mon Jan 29 08:52:07 2024, TD JM, Monday 29 January 32x
Entry  Sat Jan 27 20:38:15 2024, PJCS, [INFO] Steps to diagnose White Rabbit problems 
Entry  Mon Jan 22 16:29:31 2024, TD, Saturday 20 January 30x
Entry  Fri Jan 19 11:17:50 2024, JG, TD, Friday 19 January 18x
Entry  Thu Jan 18 17:21:00 2024, TD, Thursday 18 January Capture.PNG
Entry  Wed Jan 17 19:21:20 2024, TD, AIDA spares 
Entry  Wed Jan 17 19:15:47 2024, TD, Wednesday 17 January 
Entry  Wed Jan 17 10:31:05 2024, TD, Remote control of CAEN N1419ET from nnrpi1 Capture.PNG
Entry  Tue Jan 16 16:01:48 2024, TD, Change CARMEraspberrypi to nnrpi1 Capture.PNG
Entry  Tue Jan 16 14:36:30 2024, TD, CARME configuration dhcpd.confOptionsSettingsstartup.tclrfs
Entry  Tue Jan 16 08:57:44 2024, JG, DR, TD, Tuesday 16 January 8x
Entry  Mon Jan 15 18:51:28 2024, JG, DR, TD, Monday 15 January 
Entry  Sun Jan 14 12:31:32 2024, JM, CB, FEE positions mac addresses CARME-FEEs.jpg
Entry  Sat Jan 13 14:32:21 2024, CB, JM, Leaky manifold and cable management 20240112_111838.jpg20240112_105936.jpg20240113_183019.jpg
Entry  Sat Jan 13 14:25:05 2024, CB, JM, Bias tests with all FEEs connected Screenshot_2024-01-13_15-24-40.png20240113_150158.jpg
Entry  Thu Jan 11 19:57:20 2024, CB, JM, All FEE holders mounted 
Entry  Wed Jan 10 19:27:08 2024, CB, JM, Manifold and more bias tests 
Entry  Wed Jan 10 10:22:41 2024, CB, JM, Some FEEs mounted - issues with Det#2 (bottom left) Screenshot_2024-01-10_11-59-39.pngScreenshot_2024-01-10_12-56-36.png
Entry  Mon Jan 8 19:29:57 2024, CB, JM, Manifold repaired + fee assembly in bench  20240108_164756.jpg20240108_163218.jpg20240108_163916.jpg20240108_164010.jpg
Entry  Mon Jan 8 19:27:36 2024, CB, JM, Leak current tests overnight  Screenshot_2024-01-08_09-56-20.png
Entry  Sun Jan 7 15:38:57 2024, CB, JM, Manifolds mostly assembled + bias overnight check Screenshot_2024-01-07_16-38-26.png
Entry  Fri Jan 5 12:29:10 2024, JM, CB, Further bias tests 
Entry  Thu Jan 4 13:15:10 2024, CB, JM, Tent removed - bias test Bias.png
Entry  Wed Oct 18 16:47:36 2023, JG, CB, Power outage 
Entry  Tue Oct 17 08:43:47 2023, CB, NEG activation -2 Screenshot_2023-10-17_09-45-23.pngScreenshot_2023-10-17_11-04-09.pngScreenshot_2023-10-17_14-56-55.pngScreenshot_2023-10-17_17-58-24.pngScreenshot_2023-10-17_17-58-51.png
Entry  Mon Oct 16 08:28:02 2023, CB, NEG activation -1 Screenshot_2023-10-16_17-17-30.png
Entry  Sun Oct 15 09:35:03 2023, CB, Starting ramp down Screenshot_2023-10-15_10-35-47.pngScreenshot_2023-10-15_17-56-00.png
Entry  Tue Oct 3 08:48:36 2023, TD, Tuesday 3 October 1000007432.jpg1000007431.jpg1000007434.jpg
Entry  Mon Oct 2 08:41:43 2023, TD, Monday 2 October 6x
Entry  Sun Oct 1 10:24:50 2023, TD, Sunday 1 October 12x
Entry  Sat Sep 30 10:58:14 2023, TD, Saturday 30 September 9x
Entry  Fri Sep 29 08:54:29 2023, TD, Friday 29 September 11x
Entry  Thu Sep 28 09:19:50 2023, TD, Thursday 28 September 1000007142.jpg1000007143.jpg
Entry  Wed Sep 27 15:56:41 2023, TD, Wednesday 27 September 1000007129.jpg1000007127.jpg1000007128.jpg
Entry  Tue Sep 26 10:13:14 2023, TD, ELOTECH PID Temperature Controller R4000 manual ( German and English ) BA-Isoheat_R4000-XX-X-000-X-X_DE_V1.03.pdfR4000-XX-X-000-X-X_EN_V1.30.pdf
Entry  Tue Sep 26 08:08:42 2023, TD, Tuesday 26 September 7x
Entry  Mon Sep 25 16:33:32 2023, TD, Removed tape from heaters TC 1000007072.jpg1000007067.jpg1000007070.jpg
Entry  Fri Sep 22 12:35:46 2023, JM, Bakeout plots Heater-chamber-temps.pngpressure-chamber-temp.pngHeater-power-chamber-temp.pngHeater-power-temp.png
Entry  Wed Sep 13 15:00:39 2023, ML, Vacuum and Heater temperature plots from Grafana Screenshot_2023-09-13_15-56-34.pngScreenshot_2023-09-13_15-58-06.pngScreenshot_2023-09-13_15-59-37.pngScreenshot_2023-09-13_15-59-01.pngScreenshot_2023-09-13_15-58-31.png
Entry  Sat Sep 2 10:04:55 2023, CB, Turbo GV closed  
Entry  Fri Sep 1 08:11:40 2023, CB, NEG activation - 2 
Entry  Thu Aug 31 08:36:34 2023, CB, NEG activation  
Entry  Wed Aug 30 10:28:36 2023, CB, Preparing for pumps on 
Entry  Wed Aug 30 09:33:13 2023, CB, OG, NEG cables repaired  20230830_102519.jpg20230830_102514.jpg
Entry  Mon Aug 14 09:22:56 2023, JM, Bakeout 20230814_150430.jpg20230815_094400.jpgHeater-power.pngHeater-ITC-temp.pngPressure-ITC-temp.png
Entry  Sat Aug 12 15:06:51 2023, JM, Initial bakeout tests 20230813_114600.jpg20230813_132550.jpg20230813_170829.jpg20230813_205613.jpg20230813_210238.jpg
Entry  Sat Aug 12 11:57:51 2023, JM, Updated thermocouple positions and heater channel layouts 6x
Entry  Thu Aug 10 07:51:43 2023, JM, Baking tent and heater testing 8x
Entry  Thu Jul 27 09:43:56 2023, RSS, Thermocouples connected -2 IMG_9920.jpgIMG_9919.jpg
Entry  Wed Jul 26 08:28:09 2023, RSS, Building tent IMG_9897.jpgIMG_9899.jpgIMG_9901.jpgIMG_9902.jpg
Entry  Tue Jul 25 09:12:15 2023, RSS, Building tent BD01C0C8-5181-49B8-8751-AD4C99A459CC.jpeg7B3836F1-8A7E-491B-AFDC-46033BF84760.jpeg
Entry  Mon Jul 24 10:40:14 2023, RSS, TD, Pump down continues vacplot.pngvacplot24.png
Entry  Sun Jul 23 10:13:48 2023, RSS, TD, Building tent DBE0DA2E-2F69-469C-B645-3E33E3D82138.jpeg857185AC-3571-41E9-88AE-9F624445135B.jpegE69ED1D1-444E-478A-A3B4-481023B4024D.jpeg610048A3-25F5-459C-9EF1-83EFEFDE51C9.jpeg
Entry  Sat Jul 22 09:19:59 2023, RSS, TD, Thermocouples connected 10x
Entry  Fri Jul 21 08:21:54 2023, TD, RSS, Baking tent manual CARME-baking-guide_(1).pdf
Entry  Thu Jul 20 08:29:26 2023, TD, Installing tent. Two NEG power cable broken. 11x
Entry  Wed Jul 19 08:17:26 2023, TD, Leak testing 
Entry  Tue Jul 18 08:16:28 2023, TD, Pumping down. Issues found with one detector. 
Entry  Mon Jul 17 08:45:11 2023, TD, Closing CARME again 20230717_093106.jpg
Entry  Fri Jul 14 08:27:17 2023, TD, CARME open - inspecting seal 
Entry  Thu Jul 13 08:46:44 2023, TD, Replacing wire seal 20230713_135351.jpg20230713_135416.jpg
Entry  Thu Jul 13 00:12:45 2023, JM, CB, CARME closed Bias110723.pngfullyin.jpgfullyin-measured.jpg
Entry  Thu Jul 13 00:12:19 2023, JM, CB, Bellow replaced 20230705_164523.jpg
Entry  Thu Jul 6 15:26:39 2023, JM, Leak update pumping.png
Entry  Wed Jul 5 19:27:13 2023, JM, Pump down and leak test pumping_1.pngpumping-zoom.pngsignal-2023-07-05-15-13-30-512.jpg
Entry  Tue Jul 4 17:08:08 2023, JM, Leak test and venting 20230704_135455.jpg20230704_174524.jpg
Entry  Mon Jun 26 14:49:05 2023, JM, TD, CARME vented 
Entry  Sun Jun 25 14:30:06 2023, JM, TD, Motors bias test 
Entry  Sun Jun 25 10:08:30 2023, JM, TD, Pump-down  Figure_1.png20230625_120640.jpg20230625_120648.jpgpump-down.png
Entry  Sun Jun 25 09:41:06 2023, JM, TD, Normal turbo-pump operation 6x
Entry  Sat Jun 24 10:38:42 2023, JM, TD, Section 9 closed, begin pumping  23-06-23-VI.png24-06-23-VI.png
Entry  Thu Jun 22 18:58:02 2023, JM, TD, Slide back onto ring 20230622_112534.jpg20230622_112827.jpg20230622_120307.jpg
Entry  Wed Jun 21 18:47:36 2023, JM, TD, Closing CARME 20230621_104911.jpg20230621_104918.jpg20230621_110010.jpg21-06-23-VI.png
Entry  Fri May 26 09:08:06 2023, JM, CB, Detector movement  20230525_135756.jpgdetector-movement-in.mp4
Entry  Fri May 26 08:53:54 2023, JM, CB, Strain reliefs (flange side) installed strain-relief-flange-side.jpgstrain-relief1_(1).mp420230526_140923.jpgV-I-plot.png
Entry  Wed May 24 09:54:56 2023, JM, CB, Maximum detector positions 9x
Entry  Wed May 24 08:35:12 2023, JM, CB, Strain reliefs (detector side) installed 20230524_092010.jpg20230524_092017.jpg20230524_092101.jpg20230524_093000.jpg20230524_092159.mp4
Entry  Mon May 15 07:34:22 2023, TD, Monday 15 May 
Entry  Sun May 14 11:55:12 2023, TD, Sunday 14 May 
Entry  Sat May 13 11:34:25 2023, TD, RSS, Saturday 13 May 
Entry  Fri May 12 16:24:20 2023, RSS, TD, V-I test 8x
Entry  Thu May 11 21:22:54 2023, RSS, TD, V-I test 7x
Entry  Wed May 10 19:06:18 2023, RSS, TD, V-I test detector_1.pngdetector_2.pngdetector_3.pngdetector_4.png
Entry  Tue May 2 15:02:09 2023, CB, JM, All detectors and harnesses mounted  20230502_153410.jpg20230502_153503.jpg20230502_153509.jpg20230502_153511.jpg
Entry  Mon May 1 18:21:18 2023, CB, JM, All detectors mounted  20230501_191533.jpg20230501_191511.jpg20230501_145740.jpg
Entry  Mon May 1 08:26:09 2023, CB, JM, Left hand detectors remounted  
Entry  Sun Apr 30 10:01:39 2023, CB, JM, Left hand detectors unmounted  26x
Entry  Sat Apr 29 10:12:58 2023, CB, JM, CARME opened 8x
Entry  Thu Apr 27 19:43:23 2023, CB, JM, Preparing to open  20230427_123456.jpg20230427_161602.jpg
Entry  Wed Apr 26 16:49:28 2023, CB, JM, CARME dolly mostly built  20230426_152121.jpg20230426_162619.jpg20230426_162627.jpg
Entry  Tue Apr 25 13:22:19 2023, JM, CARME venting  20230425_134119.jpg20230425_132944.jpg
Entry  Mon Apr 24 21:24:26 2023, JM, Preparation for CARME dismount 20230424_155635.jpg20230424_155607.jpg20230424_150526.jpg
Entry  Wed Mar 22 16:33:32 2023, TD, NIM WR source 8x
ELOG V3.1.3-7933898