946
|
Wed Apr 10 16:45:59 2024 |
TD | AIDA interlock |
Honeywell HSS DPS sensor information https://elog.ph.ed.ac.uk/AIDA/932
|
|
945
|
Fri Mar 29 08:39:18 2024 |
TD, PJCS | Unable to start MIDAS DAQ with 1x FEE64 ( aida04 ) | >
> At AIDA test station T9, STFC DL unable
to start MIDAS DAQ with 1x FEE64 ( aida04 |
|
944
|
Thu Mar 28 15:43:47 2024 |
TD | Unable to start MIDAS DAQ with 1x FEE64 ( aida04 ) |
At AIDA test station T9, STFC DL unable to
start MIDAS DAQ with 1x FEE64 ( aida04 ) |
  |
943
|
Thu Mar 28 11:10:09 2024 |
TD | Test of 4x FEE64s at AIDA test station, T9, STFC DL | Test of 4x FEE64s at AIDA test station, T9,
STFC DL
|
22x |
942
|
Wed Mar 13 14:50:04 2024 |
NH | [HowTo] Backup and Restore Raspberry Pi SD Cards | Micro SD cards used by the raspberry pis are
cheap but prone to failing
|
|
941
|
Tue Jan 30 14:18:16 2024 |
NH | [HowTo] Update MACB Firmware | https://elog.ph.ed.ac.uk/CARME/482 |
|
940
|
Thu Dec 14 10:53:27 2023 |
NH, MP, CC, GA | Snout Removed | Snout removed from S4
All detectors removed
|
|
939
|
Mon Dec 11 23:56:36 2023 |
TD | Tuesday 12 December | 00.55 Observe high frequency noise in aida02
& aida04 ( n+n FEE64s ) - attachments 1-5
and aida05 ( p+n FEE64 )
|
18x |
938
|
Mon Dec 11 11:05:27 2023 |
TD | WR timestamp fail aida05 & aida07 |
MACB config
1x level 0
|
11x |
937
|
Mon Dec 11 09:57:54 2023 |
TD | Monday 11 December | Water flow and temperature ( gauges outside
S4 entrance ) OK
|
27x |
936
|
Sun Dec 10 13:06:27 2023 |
TD | Sunday 10 December | 14.05 S4 closed
Water flow and temperature ( gauges outside |
14x |
935
|
Fri Dec 8 12:55:38 2023 |
TD, NH | FEE64 configuration |
FEE64 configuration for 1x MSL type BB18(DS)-1000
24cm x 8cm DSSSD
|
|
934
|
Fri Dec 8 11:32:44 2023 |
NH, CC, VP, TD | Friday 8 December |
Change n+n FEE64 aida04 d8:80:39:41:f6:b7
asic #1 faulty
|
18x |
933
|
Thu Dec 7 17:30:36 2023 |
NH, CC, VP, TD | Thursday 7 December |
Stack re-assembled - upstream to downstream
|
8x |
932
|
Wed Dec 6 16:32:03 2023 |
NH | Replacement of faulty Honeywell HSS-DPS sensor |
Honeywell HSS-DPS sensor is faulty - attachments
1 & 2
|
   |
931
|
Mon Dec 4 10:34:48 2023 |
NH | AIDA Todo for 11.12.23 | This is a short list of things todo or check
before the test beam time on 11.12.23
Updated after 15:00 CET meeting
|
|
930
|
Fri Nov 24 10:36:06 2023 |
NH | Friday 24 November | Pulser LEMOs removed from p+n fees
Pulser connected to n+n fees: aida02 and
aida04
|
   |
929
|
Thu Nov 23 10:00:16 2023 |
NH | Report - Cannot change per-ASIC Settings | > On ASIC settings page trynig to change the
settings for one ASIC (e.g. ASIC1 of aida09)
seems to cause all 4 ASIC settings to change
|
   |
928
|
Wed Nov 22 15:12:40 2023 |
TD | /tmp/log8015_error | |
|
927
|
Wed Nov 22 14:52:43 2023 |
NH | AIDA Pulser Calibration | Connect pulser to all p+n FEEs
Turn on pulser, 100 Hz (attachment 3 for |
   |
926
|
Wed Nov 22 13:44:36 2023 |
NH | Report - Cannot change per-ASIC Settings | On ASIC settings page trynig to change the
settings for one ASIC (e.g. ASIC1 of aida09)
seems to cause all 4 ASIC settings to change
|
|
925
|
Tue Nov 21 13:56:59 2023 |
NH, CC, HA, MP, AM, VP | Tuesday 21 November | Connect the BB7 on top of the snout to the
former aida05 (FEE above aida01)
Also remove copper busbar that is unused
|
8x |
924
|
Sat Nov 18 02:28:26 2023 |
TD, NH, JB | Saturday 18 November | 03.20 c. 3k per spill 13N beam to S4
Observe scatter of events at all energies
for LEC
|
10x |
923
|
Fri Nov 17 15:53:03 2023 |
TD, JB, JG | Friday 17 November contd. |
AIDA ASIC settuings 2023Nov16-18.55.20
low comparator p+n FEE64s 0xa, n+n 0xf
|
25x |
922
|
Fri Nov 17 09:19:41 2023 |
TD, CC, VP | AIDA test 17/11/2023 | We restarted AIDA (a10277ttachment 6) this
morning and checked rates (attachments 3/4)
and waveforms (attachments 1/2). Temperatures |
46x |
921
|
Thu Nov 16 17:43:25 2023 |
TD, JB, CC, VP | AIDA test 16/11/2023 cont. | Screenshot uploads as I hit the 50 image
upload limit. |
   |
920
|
Thu Nov 16 09:09:58 2023 |
TD, JB, CC, VP | AIDA tests 16/11/2023 | Viewing AIDA status on Thursday morning 16/11/2023.
|
48x |
919
|
Wed Nov 15 10:37:00 2023 |
TD | Wednesday 15 November |
11.36 Water flow, pressure & temperature
( 19 deg C ) OK
|
27x |
918
|
Tue Nov 14 17:19:11 2023 |
TD | TapeServer, Merger, NetVar etc status | |
   |
917
|
Tue Nov 14 17:08:49 2023 |
TD | Report - high - unable to change ASIC settings directory in Options |
Attempting to change the text string specifying
the ASIC settings directory ( 2023Nov14-15.25.24 |
 |
916
|
Tue Nov 14 16:52:54 2023 |
TD | Tuesday 14 November |
15.06 Quick test of AIDA 24cm x 8cm 'triple'
DSSSD before dismounting to install 1x bPlast |
 |
915
|
Mon Nov 6 17:30:44 2023 |
NH | Aida Alpha Analysis | Analysis of tape folder /TapeData/BG18OCT23
Using Go4 https://github.com/cej25/DESPEC_NOV23
|
   |
914
|
Wed Oct 25 12:42:18 2023 |
CC | AIDA test | Started AIDA at 1:41 pm, writing to disk:
file BG18OCT2/R6, stopped at 17:26
pict1: HV supply
|
   |
913
|
Tue Oct 24 10:54:14 2023 |
at 19:14NH, CC | AIDA test | Started AIDA at 11:54am, writing to disk:
file BG18OCT2/R5, stopped at 19:14
|
   |
912
|
Mon Oct 23 14:08:06 2023 |
NH, CC | AIDA test | Started AIDA at 3:05pm, writing to disk: file
BG18OCT2/R4, stopped 18.30
|
    |
911
|
Mon Oct 23 10:52:06 2023 |
NH, CC | AIDA test | Started AIDA at 11:50, writing to disk: file
BG18OCT2/R3, stopped around 3 pm
|
   |
910
|
Thu Oct 19 10:39:20 2023 |
NH | Thursday 19 October | Water Temp: 20 C - Flow felt on pipe
AIDA interlock OVERRIDE
|
10x |
909
|
Wed Oct 18 17:18:57 2023 |
TD | Wednesday 18 October | |
8x |
908
|
Thu Oct 12 16:40:21 2023 |
TD | background alpha |
start 14.55 |
13x |
907
|
Thu Oct 12 13:02:50 2023 |
TD | Thursday 12 October contd. |
ASIC settings 2021Apr29-13-16-00
slow comparator 0xa ( all p+n junction |
50x |
906
|
Thu Oct 12 09:12:34 2023 |
TD | Thursday 12 October | 10.10 Water flow & temp OK
Power ON
|
47x |
905
|
Wed Oct 11 16:53:20 2023 |
TD | Wednesday 11 October contd. | CAEN N1419ET ch 2 - all outputs non-floating
( internal LK fitted )
Standard coaxial HV cable chained to |
14x |
904
|
Wed Oct 11 09:37:30 2023 |
TD | Wednesday 11 October |
10.00 Water flow & temp OK
Power ON
|
48x |
903
|
Tue Oct 10 08:38:37 2023 |
TD | Tuesday 10 October |
09.38 Water flow & temp OK
Power ON
|
40x |
902
|
Mon Oct 9 14:29:12 2023 |
TD | Monday 9 October contd. |
15.20 aida10 LK4 ( front f/p -> gnd ) fitted
- investigate impact aida10 asic #4 edge |
|
901
|
Mon Oct 9 09:03:10 2023 |
TD | Monday 9 October | 09.55 Water pressure and temp OK
Power on
|
50x |
900
|
Sun Oct 8 14:51:59 2023 |
TD | Sunday 8 October contd. |
Slow comparator 0xf
|
28x |
899
|
Sun Oct 8 11:44:35 2023 |
TD | Sunday 8 October | 12.22 USB-controlled ac mains relay - interlock
overidden
Water flow OK. Water temp 19 deg C |
50x |
898
|
Tue Oct 3 10:16:06 2023 |
TD | nnrpi2 scripts | pi@raspberrypi:~ $ cat ./caen_screen.sh
if ! screen -list | grep -q "caenhv"; then
screen -f -S caenhv /dev/ttyACM0 9600
|
|
897
|
Tue Oct 3 09:14:59 2023 |
TD | Tuesday 3 October |
09.45 Power up
|
 |
896
|
Mon Oct 2 14:03:42 2023 |
TD | Monday 2 October |
15.00 DSSSD bias +60V +6.44uA - breakdown
above c. 60V, bias +100V leakage current |
  |
895
|
Sun Oct 1 12:38:56 2023 |
TD | Sunday 1 October | 12.50 Power up
All system wide checks OK
|
13x |
894
|
Sat Sep 30 16:37:06 2023 |
TD | Honeywell HSS-DPS fault |
The Honeywell HSS-DPS dew point sensor indicator
( red LED ) is flashing c. 0.5Hz indicating |
|
893
|
Sat Sep 30 12:14:52 2023 |
TD | Satuurday 30 September | 12.54 Power up
All system wide checks OK
|
10x |
892
|
Thu Sep 28 16:03:40 2023 |
TD | Thursday 28 September |
17.00 USB-controlled ac mains relay - no
water interlock ( yellow ) LED
|
10x |
891
|
Thu Aug 31 15:01:11 2023 |
TD | Test of CAEN N1419B - T9, STFC DL |
Noise test of CAEN N1419B in T9, STFC DL.
|
7x |
890
|
Wed Aug 30 15:30:50 2023 |
TD | Test of AIDA ASIC mezzanines with FEE64s - summary | Test of ( previously bench-tested OK ) AIDA
ASIC mezzanines using FEE64 nnlycca5 ( MAC
d8:80:39:41:d7:c3 )
|
13x |
889
|
Mon Aug 21 13:17:54 2023 |
TD | Silena 7710 HV test - JCMB 21.8.23 | Silena 7710 - see attachment 1
Bias -60V
|
11x |
888
|
Sun Aug 20 16:21:45 2023 |
TD | Silena 7710 HV test - JCMB 20.8.23 | Silena 7710 - see attachment 1
Bias -60V
|
6x |
887
|
Sat Aug 19 14:52:42 2023 |
TD | BNC PB-4 & BNC PB-5 pulser test - JCMB 18.8.23 | BNC PB-4 - see attachment 1
Amplitude 35,000
|
21x |
886
|
Wed Aug 9 14:40:28 2023 |
Carole, Nic, Jeroen | AIDA HV SUPPLY & PULSER TEST | Tests with the HV supply (CAEN N1419ET)
and Pulse Generator ( BNC PB-5 ) in the detector
lab on the crate behind the DEGAS detectors, |
    |
885
|
Fri Aug 4 10:04:58 2023 |
TD | Friday 4 August contd. |
10.45 Power cycle and reboot
|
17x |
884
|
Fri Aug 4 09:07:08 2023 |
TD | Friday 4 August |
07.00 DAQ stopped
Overnight run for background alphas
|
23x |
883
|
Thu Aug 3 14:16:12 2023 |
TD | Thursday 3 August contd. |
15.16 DSSSD bias +100V leakage current +8.415uA
|
21x |
882
|
Thu Aug 3 09:21:26 2023 |
TD | Thursday 3 August |
10.20 DSSSD bias +100V leakage current +6.565uA
- attachment 1
|
47x |
881
|
Wed Aug 2 15:39:52 2023 |
TD | Wednesday 2 August contd. | 16.22 Add LK1 to aida01
DSSSD bias -100V leakage current -7.950uA
|
11x |
880
|
Wed Aug 2 08:44:00 2023 |
TD | Wednesday 2 August |
09.40 Al snout electrically connected ( <
1 Ohm ) to Al gasket and Al base plate
|
48x |
879
|
Tue Aug 1 08:50:36 2023 |
TD | Tuesday 1 August |
09.50 DSSSD bias +100V leakage current +9.255uA
- attachment 2
|
30x |
878
|
Mon Jul 31 09:43:37 2023 |
TD | Monday 31 July |
10.43 DSSSD bias +100V leakage current +7.550uA
|
44x |
877
|
Mon Jul 24 08:54:48 2023 |
TD | Monday 24 July |
09.54 DSSSD#1 bias +100V leakage current
+9.065uA
|
17x |
876
|
Mon Jul 24 08:39:39 2023 |
TD | aida10 sys console output & aida10 options | Options and system cosnole disagree about
which version of the DataAcq program is in
use? |
 |
875
|
Sun Jul 23 08:50:48 2023 |
TD | Sunday 23 July | 09.50 Cooknell HV2
2x + polarity, grounded HV channels
|
19x |
874
|
Sat Jul 22 08:17:48 2023 |
TD | Saturday 22 July | 09.20 CAEN N1419ET
Floating outputs
Channel #3 + polarity, Channels #0-2 |
26x |
873
|
Sun Jul 16 14:20:31 2023 |
TD | Sunday 16 July contd. | 15.20 All ERNI pins of aida01 adaptor PCB
OK => FEE64 #1 ASIC #2 channel #5 issue faulty
test C? faulty ASIC channel?
|
27x |
872
|
Sun Jul 16 09:36:40 2023 |
TD | 15-16 July 2023 |
Saturday 15 July
|
40x |
871
|
Fri Jul 7 11:59:06 2023 |
TD | Test of AIDA FEE64 - summary | Test of AIDA FEE64s
ISOL test station STFC DL, T9
|
11x |
870
|
Fri Jul 7 10:52:34 2023 |
TD, PJCS | Test of AIDA FEE64 d8:80:39:42:0d:0b ( aida03 ) - ASIC mezzanine replaced |
Test of AIDA FEE64 d8:80:39:42:0d:0b ( aida03
) - ASIC mezzanine replaced
|
16x |
869
|
Fri Jul 7 10:15:09 2023 |
TD | Test of AIDA FEE64 d8:80:39:41:f6:ee ( aida01 ) - HDMI connector replaced |
Test of AIDA FEE64 d8:80:39:41:f6:ee ( aida01
) - HDMI connector replaced. Cooling plate |
17x |
868
|
Thu Jul 6 10:20:25 2023 |
TD | Unable to start Rly16 server |
Unable to start Rly16 server - see attachment
1
|
|
867
|
Wed Apr 12 12:32:13 2023 |
PJCS | ASIC power short problem | I have taken videos with an Infrared camera
of the power being supplied to one isolated
ASIC on a mezzanine. |
 |
865
|
Wed Mar 1 16:42:06 2023 |
Further results from Mezzanine bench tests | PJCS | Carried out some further work on failed
mezzanine modules.
Inspected them externally and removed |
 |
864
|
Thu Feb 23 16:15:31 2023 |
TD PJCS | Bench test of AIDA FEE64 mezzanines |
Attachments 2 & 7 AIDA FEE64 mezzanine with
1) adaptor PCB connected |
7x |
863
|
Mon Apr 19 15:10:55 2021 |
OH TD | Less HEC events than expected in DSSD3 | we are noticing we appear to see less implant
events in detector 3 than we expect. This
was first noticed in the xy spectra of the |
|
862
|
Tue Feb 9 11:44:21 2021 |
OH, TD, CA, LS | 9th Feb GSI Dry run | Database file - 2019Dec19-16.19.51
Current threshold at 0x64
|
16x |
861
|
Thu Nov 14 07:57:46 2019 |
TD | AIDA moved from in-beam position at F11 |
To make room for the installation of an MR-TOF
device at F11, AIDA and DTAS have been removed |
|
860
|
Fri Jun 21 09:57:15 2019 |
CG | B2F network cables | AIDA network cables in B2F disconnected, looped
and cable tied to hand rail, out of the way.
|
|
859
|
Fri Jun 21 01:08:35 2019 |
CA, CB | Friday 21 June | 09.08 all system wide checks okay *except*
naida7 fails adc calibration
mismatch between sync pulses received |
  |
858
|
Thu Jun 20 07:42:54 2019 |
CA, TD | AIDA shutdown checklist | stop the daq
pause merger
|
|
857
|
Thu Jun 20 07:35:46 2019 |
CA, TD | Bias & leakage current spreadsheet |
https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=1560332343 |
|
856
|
Thu Jun 20 02:37:55 2019 |
CA, CB, TD, CG, DK | Thursday 20 June | 10.37 Post - beam, AIDA & DTAS run only
DTAS stop run 164
AIDA file R2_1012
|
23x |
855
|
Wed Jun 19 08:30:36 2019 |
CG | Wed Jun 19 16.00 - end of run | 16.10 DAQ continues as before.
Merger rate ~700k items/s and ~5.3Kb/s
Individual FEE rates remain roughly |
|
854
|
Tue Jun 18 23:58:46 2019 |
CB | Wed Jun 19 8:00-16:00 | 08:00 Shift change
No change in settings
|
19x |
853
|
Tue Jun 18 16:14:03 2019 |
CA | Wednesday 19 June 00.00 - 08.00 shift | 00.00 Shift Change
DAQ continues ok
|
32x |
852
|
Tue Jun 18 08:03:20 2019 |
DK | Tuesday 18 June 16:00 - 24:00 | Shift change
16:00
|
15x |
851
|
Mon Jun 17 16:01:27 2019 |
CB, CG, OH, TD | Tuesday 18 June 00:00 - 16:00 | 00:00 New day. The DAQ continues OK
Beam setting 2 for enhanced yield of |
34x |
850
|
Mon Jun 17 08:03:37 2019 |
CA, CB, TD, OH | Mon Jun 17 16:00-24:00 | 16:04 DAQ continues running OK
All system-wide checks OK except nnaida7
ADC calibration fails
|
19x |
849
|
Mon Jun 17 03:01:04 2019 |
CA, TD, OH | PID plot and selected isotope implantation rates | PID plot produced from 2 hours of merged data
- attachment 1
|
|
848
|
Mon Jun 17 02:31:53 2019 |
CA, TD, OH | Monday 17 June 08.00-16.00 | 10.41 DAQ continues OK file RIBF147/R2_352
100Sn setting, no degrader
|
21x |
847
|
Sun Jun 16 16:00:58 2019 |
ML, CG, OH | Monday 17 June 2019 | It's a new day, it's a new log entry !!
01:25 DTAS run 46 started
|
17x |
846
|
Sun Jun 16 10:06:21 2019 |
TD, CG | FEE64 nnaida14 noise issues |
Attachments 1, 3, 5 & 7 *.L spectra log scale
|
16x |
845
|
Sun Jun 16 04:50:03 2019 |
CA | Tests of calibration on beta data | Analysis of RIBF148/R5_170_190, with 500 <
E < 1000 keV energy cut
|
25x |
844
|
Sun Jun 16 04:09:40 2019 |
CA, CB, ML, TD, CG | Sunday 16 June noon-midnight | 12.10 DAQ continues OK file RIBF147/R2_145
100Sn setting, no degrader
|
16x |
843
|
Sat Jun 15 16:53:22 2019 |
CB, OH, DK, ML | Sunday 16 June |
00.30 AIDA file R2_26
DTAS run 007
|
37x |
842
|
Sat Jun 15 01:05:41 2019 |
CA, CB, TD, CG, OH, DK, ML | Saturday 15 June | 09.05 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 75% M-H markers
|
47x |
841
|
Fri Jun 14 10:33:44 2019 |
OH, CA, TD, CG, CB, DK | Friday 14th June | Friday 14th June
Authors: TD, DK, CB
|
22x |
840
|
Thu Jun 13 05:49:37 2019 |
CA | Further tests of calibration on Alpha data | Alpha data used: /May19/{R1,R2,R7,R8,R9,R11}
(c. 380 hr.)
|
27x |
839
|
Thu Jun 13 00:30:17 2019 |
CA, CB, TD, CG, OH, DK | Thursday 13 June | 08.32 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 70% M-H markers + 0.5 |
18x |
838
|
Wed Jun 12 01:54:04 2019 |
OH, TD, CG, CB, CA | Wednesday 12 June | 09:54 DAQ Continues ok with merger running
at ~ 560k data items per second
|
11x |
837
|
Tue Jun 11 01:45:55 2019 |
CA, CB, TD, CG, OH, DK | Tuesday 11 June | 09:46 DAQ continues ok
all system wide checks OK *except* |
17x |
836
|
Mon Jun 10 07:39:35 2019 |
CA, CB, TD, CG, OH, DK | Varying per DSSSD slow comparator thresholds |
DSSSDs #1-6 slow comparator 0xa = 100keV
- attachments 1-4
|
32x |
835
|
Mon Jun 10 01:43:16 2019 |
CA, CB, TD, CG, OH, DK | Monday 10 June | 09:45 DAQ continues ok
all system wide checks OK *except* |
19x |
834
|
Sun Jun 9 03:43:00 2019 |
CB, TD, CG, OH | Sunday 9 June | 11.43 DAQ continues OK
ASIC settings 2019May19-17.54.03
|
28x |
833
|
Sat Jun 8 06:08:52 2019 |
CB, TD | Saturday 8 June | 14.14 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 70% M-H markers
|
13x |
832
|
Fri Jun 7 05:58:11 2019 |
TD | per FEE64 rate/20.48us versus slow comparator threshold |
per FEE64 rate/20.48us & 'good event' DAQ
statistics
|
10x |
831
|
Fri Jun 7 05:30:23 2019 |
TD | Friday 7 June | 14.05 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 70% M-H markers
|
17x |
830
|
Thu Jun 6 08:55:15 2019 |
TD | Thursday 6 June | 16.40 DAQ continues OK
ASIC settings 2019May19-17.54.03
|
13x |
829
|
Wed Jun 5 06:57:38 2019 |
TD | Wednesday 5 June | 14.50 DAQ continues OK
ASIC settings 2019May19-17.54.03
|
13x |
828
|
Tue Jun 4 07:10:27 2019 |
TD | Tuesday 4 June | 15.01 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 70% M-H markers - topup |
13x |
827
|
Mon Jun 3 05:40:19 2019 |
TD | Monday 3 June | 13.40 DAQ continues OK
ASIC settings 2019May19-17.54.03
|
25x |
826
|
Sun Jun 2 04:00:50 2019 |
TD | Sunday 2 June | 12.00 DAQ continues file May19/R15_169
ASIC settings 2019May19-17.54.03
|
21x |
824
|
Sat Jun 1 09:14:19 2019 |
TD | Screenshots miscellaneous AIDA Control & Merge tabs | |
22x |
823
|
Sat Jun 1 08:11:15 2019 |
TD | Saturday 1 June | 16.08 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 60% M-H markers - topup |
14x |
822
|
Fri May 31 03:31:54 2019 |
TD | Friday 31 May | 11.31 DAQ continues OK
ASIC settings 2019May19-17.54.03
|
14x |
821
|
Thu May 30 03:13:04 2019 |
TD | Thursday 30 May |
11.13 DAQ continues OK
|
16x |
820
|
Wed May 29 06:53:56 2019 |
TD | Report - medium - unable to monitor FEE64 logs using pi_monitor |
Unable to monitor FEE64 logs using pi_monitor
using instructions https://elog.ph.ed.ac.uk/AIDA/559
|
  |
819
|
Wed May 29 06:11:34 2019 |
TD | Wednesday 29 May | 14.10 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 75% M-H markers
|
12x |
818
|
Tue May 28 01:37:14 2019 |
TD | Monday 28 May | 09.30 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 75% M-H markers
|
8x |
817
|
Mon May 27 10:31:35 2019 |
TD | Updated /etc/hosts & /etc/dhcp/dhcpd.conf |
/etc/dhcp/dhcpd.conf updated to reflect actual
MAC and IP
|
 |
816
|
Mon May 27 08:51:04 2019 |
TD | Offline analysis of alpha background data files May19/R1, R2, R7, R8, R9, R11 | Offline analysis of alpha background data
files May19/R1, R2, R7, R8, R9, R11 ( c.
380h )
|
9x |
815
|
Mon May 27 08:29:02 2019 |
TD | AIDA position within DTAS |
AA informs me that the *centre* of the DTAS
detector system is 26.7cm downstream
|
|
814
|
Mon May 27 02:50:20 2019 |
TD | Monday 27 May | 10.50 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 60% M-H markers - topped |
30x |
813
|
Sun May 26 04:14:27 2019 |
TD | Sunday 26 May | 12.14 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 60% M-H markers
|
11x |
812
|
Sat May 25 06:27:12 2019 |
TD | Saturday 25 May | 14.32 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 60% M-H markers
|
12x |
811
|
Fri May 24 07:21:31 2019 |
TD | Offline analysis May19/R1, R2, R7, R8 & R9 |
Offline analysis of alpha background data
files May19/R1, R2, R7, R8, R9 ( c. 310h |
11x |
810
|
Fri May 24 03:04:26 2019 |
TD | Friday 24 May | 11.04 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 75% M-H markers
|
15x |
809
|
Wed May 22 07:36:08 2019 |
TD | Screenshots miscellaneous AIDA Control tabs | |
13x |
808
|
Wed May 22 06:08:29 2019 |
TD | Wednesday 22 May | 14.08 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 75% M-H markers
|
15x |
807
|
Mon May 20 02:16:58 2019 |
CA, TD | Monday 20 May 2019 | 10:18 DAQ Continues ok
Alpha run continues - Currently on
file R8_2
|
16x |
806
|
Sun May 19 02:28:07 2019 |
OH, TD, CA | Sunday 19 May | 10:28 DAQ Continues ok
Alpha run continues - Currently on
file R7_5
|
11x |
805
|
Sun May 19 02:21:43 2019 |
CA | Tests of low energy calibration on Alpha Data | 10.23 Low energy calibration program now produces
relative gain coefficients in a format that
can be used with AIDASort
|
25x |
804
|
Sat May 18 04:47:22 2019 |
TD | Saturday 18 May | 12.47 DAQ continues OK to file May19/R7_3
alpha background
|
17x |
803
|
Fri May 17 08:10:05 2019 |
TD | AIDA+DTAS @ BigRIPS F11 | |
10x |
802
|
Fri May 17 02:15:56 2019 |
CA, TD, OH | Friday 17 May | 10.18 DAQ continues OK to file May19/R5_1
alpha background
|
15x |
801
|
Thu May 16 02:13:10 2019 |
CA, OH, TD | Thursday 16th May | 10:13 all system wide checks OK *except* nnaida7
fails ADC calibration
|
16x |
800
|
Wed May 15 02:17:23 2019 |
CA, OH, TD | Wednesday 15 May | 10.18 DAQ continues OK to file May19/R2
alpha background
|
20x |
799
|
Tue May 14 02:19:20 2019 |
CA, OH, TD | Tuesday 14th May 2019 | 10.20 System wide checks ok (except naida07
ADC calibration failure)
|
11x |
798
|
Mon May 13 10:13:26 2019 |
TD | AIDA with 25MHz external clock does not work ... ! |
OH setup AIDA external clock using Tektronix
AFG3102 - settings as follows
|
|
797
|
Mon May 13 10:00:01 2019 |
TD | Report - low - SETUP/Perform Timestamp Resync produces error message |
AIDA@RIKEN
|
|
796
|
Mon May 13 03:43:08 2019 |
CA, TD, OH | Sunday 12 May |
19.12 all system wide checks OK *except*
nnaida7 fails ADC calibration
|
14x |
795
|
Mon May 13 03:23:58 2019 |
CA, TD, OH | Monday 13 May |
09.55 all system wide checks OK *except*
nnaida7 fails ADC calibration
|
18x |
794
|
Sat May 11 02:50:14 2019 |
CA, OH, TD | Saturday 11th May 2019 | 10:52 system wide checks ok, except naida07
fails ADC calibration
good event statistics, rates in naida19,20,23,24 |
  |
793
|
Fri May 10 05:58:01 2019 |
CA, OH, TD | Friday 10 May 2019 | 11.00 - chiller refilled and switched on
set to 20 degrees celsius
|
12x |
792
|
Tue Mar 26 14:02:59 2019 |
OH | Inventory to be shipped back | Inventory is currently packaged up under the
AIDA desk in B3F
|
|
791
|
Sun Nov 18 02:02:48 2018 |
TD | Latest detector bias & leakage current spreadsheet (URL and csv & xlsx files) | https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=1347508769 |
 |
790
|
Fri Nov 16 06:01:47 2018 |
CA | High Energy Channel Ex vs Ey for different degrader thicknesses | 15.04 Plots of X Energy vs Y Energy for each
detector, and for 4 different Al degrader
thicknesses, as indicated
|
   |
789
|
Fri Nov 16 04:47:39 2018 |
CA, TD, OH | Correlation analysis at different degrader Al thickness | 13.53 Correlation analysis plot of all detectors
with 3.3mm Al degrader thickness (attachment
1)
|
   |
788
|
Thu Nov 15 22:55:38 2018 |
CA, TD, OH, LS | Friday 16th November 08.00 - 16.00 | 07.56 DAQ continues - AIDA file RIBF148/R5_822
165Pm BigRIPS setting + 2.8mm Al degrader
|
42x |
787
|
Thu Nov 15 15:05:33 2018 |
LS | Friday 16 November 00.00 to 08.00 |
00.25 System wide checks ok * except nnaida
7 fails adc*
|
9x |
786
|
Thu Nov 15 06:52:09 2018 |
OH | Thursday 15th November 16:00 - 24:00 | 15:51 DAQ continues - AIDA file RIBF148/R5_664
165Pm BigRIPS setting + 2.8mm Al degrader
|
11x |
785
|
Wed Nov 14 22:54:11 2018 |
LS | Thursday 15th November 08:00 - 16:00 |
08.10 BRIKEN stop
AIDA file RIBF148/R5_587
|
10x |
784
|
Wed Nov 14 14:46:47 2018 |
CA | Thursday 15th November 00:00 - 08:00 | 23.58 DAQ continues ok (RIBF148/R5_505)
00.09 system wide checks ok, except nnaida7 |
25x |
783
|
Wed Nov 14 07:43:35 2018 |
TD | Wednesday 14 November 16:00 - 00:00 | 16.44 DAQ continues OK - AIDA file RIBF148/R5_432
165Pm BigRIPS setting + 2.8mm Al degrader
|
21x |
782
|
Tue Nov 13 22:58:49 2018 |
OH | Wednesday 14 November 08:00 - 16:00 | 08:01 BigRips and BRIKEN stop
AIDA on file R5_346
|
30x |
781
|
Tue Nov 13 14:27:38 2018 |
LS | Wednesday 14 November 00:00 to 08:00 |
00:00 BRIKEN stop AIDA file RIBF148/R5_269
|
9x |
780
|
Tue Nov 13 07:35:37 2018 |
CA, TD, OH | Tuesday 13 November 16:00 - 00:00 | 16.36 DAQ continues ok
AIDA file RIBF148/R5_198
BRIKEN file 37
|
20x |
779
|
Tue Nov 13 01:41:12 2018 |
TD | Offline analysis RIBF148/R5_130 to _139 |
10.41 FEE64 ADC data synchronised - attachment
1
|
  |
778
|
Mon Nov 12 23:03:53 2018 |
TD | Tuesday 13 November 08:00 - 16:00 |
08.03 DAQ continues - AIDA file RIBF148/R5_117
165Pm BigRIPS setting + 3mm Al degrader
|
23x |
777
|
Mon Nov 12 14:51:44 2018 |
OH | Tuesday 13 November 00:00 - 08:00 | 00:00 AIDA currently on file R5_38
BRIKEN on file 181112_2321_165Pm_019.dlt
(AIDA file at start R5_33)
|
12x |
776
|
Mon Nov 12 08:59:43 2018 |
LS, CA, TD | Monday 12 November 6pm onwards |
17:59 DAQ continues OK
|
28x |
775
|
Sun Nov 11 21:35:42 2018 |
CB, OH, CA, LS | Monday 12 November | 06:35 DAQ Continues ok
Stats ok - attachment 1
FEE Temps ok - attachment 2
|
20x |
774
|
Sat Nov 10 21:53:29 2018 |
CA, CB, TD, OH | Sunday 11 November | 06.53 DAQ continues OK - data transfer disabled
06.55 all system wide checks OK *except* |
21x |
773
|
Sat Nov 10 04:06:20 2018 |
TD | Less commonly recorded AIDA control tabs |
Some less commonly recorded AIDA control
tabs whilst DAQ going (data transfer disabled) |
20x |
772
|
Sat Nov 10 03:50:00 2018 |
CA, CB, TD, OH | Saturday 10 November |
12.35 DAQ continues OK - data transfer disabled
|
9x |
771
|
Fri Nov 9 02:26:58 2018 |
TD | Offline analysis R18, R27, R29 - alpha background | Offline analysis of Oct18/R18_0 to 2, R27_0,
4 & 9, R29_0, 7 & 30
|
8x |
770
|
Thu Nov 8 23:35:50 2018 |
OH, TD, CA, CB | Friday 9 November | 08:36 DAQ still running
Not writing data to disk
|
23x |
769
|
Thu Nov 8 00:55:18 2018 |
CA, CB, TD, OH | Thursday 8th November | 09.57 DAQ still running (R29_29)
System wide checks ok, except nnaida7
ADC calibration failure
|
14x |
768
|
Wed Nov 7 01:00:58 2018 |
CA, CB, TD, OH, PJW | Wednesday 7 November | 10.02 DAQ still running, on file Oct18/R27_9
Merger and TapeServer ok, no error
warnings in terminals
|
13x |
767
|
Tue Nov 6 00:13:00 2018 |
CB. PJW, TD, OH, CA | Tuesday 6 November | 09:13 DAQ still running R18_1
Merger and TapeServer OK
System wide checks ok, except for nnaida7 |
14x |
766
|
Mon Nov 5 10:02:52 2018 |
TD | Offline analysis R16 - beam background | Offline analysis of Oct18/R16_0 to 11
|
   |
765
|
Mon Nov 5 01:40:10 2018 |
CA, CB, TD, OH, PJW | Monday 5 November | 10.40 Lowered slow comparator threshold from
100 to 10
Good event statistics ok (attachment |
16x |
764
|
Sun Nov 4 04:31:49 2018 |
TD | Offline analysis R4 | Offline analysis of Oct18/R4_0 to _2
alpha background and pulser
|
28x |
762
|
Sun Nov 4 01:11:41 2018 |
CA, CB, TD, OH, PJW | Sunday 4 November | 10.03 DAQ continues OK - current file Oct18/R16_9
FEE64 LEC/MEC slow comparator threshold
0x64
|
20x |
761
|
Sat Nov 3 00:49:22 2018 |
TD | Offline analysis R15 - beam background | Offline analysis of Oct18/R15_0 to 7
|
    |
760
|
Sat Nov 3 00:37:29 2018 |
CA, CB, TD, OH | Saturday 3 November | 09.37 DAQ continues OK - data transfer disabled
FEE64 LEC/MEC slow comparator threshold
0xa
|
9x |
759
|
Fri Nov 2 01:56:00 2018 |
TD | [How To] Recover from unable to connect to nnaida ... |
If you obtain the 'unable to connect' from
one, or more, of the FEE64s try the
|
|
758
|
Fri Nov 2 01:19:49 2018 |
TD | Offline analysis R9 - alpha background |
Offline analysis of Oct18/R9_0 to 17 (c.
46h data)
|
7x |
757
|
Fri Nov 2 00:57:24 2018 |
CA, CB, TD, OH | Friday 2 November | 09.58 DAQ continues OK - current file Oct18/R15_6
alpha background run
|
14x |
756
|
Thu Nov 1 00:24:23 2018 |
TD, OH, CA | Thursday 1 November | 09.24 DAQ continues OK - current file Oct18/R12_116
alpha background run
|
19x |
755
|
Wed Oct 31 00:18:12 2018 |
TD, OH, CA | Wednesday 31 October | 09.18 DAQ continues OK - current file Oct18/R10_7
alpha background run
|
20x |
754
|
Mon Oct 29 23:40:41 2018 |
TD, OH, CA | Tuesday 30 October | 08.40 DAQ continues OK - current file Oct18/R9_15
08.42 all system wide checks OK *except* |
16x |
753
|
Sun Oct 28 23:34:28 2018 |
TD, OH, CA | Monday 29 October | 08.34 DAQ continues OK - current file Oct18/R9_6
08.37 all system wide checks OK *except* |
15x |
752
|
Sun Oct 28 01:33:34 2018 |
CA, OH | Sunday 28 October |
09:33 DAQ still running, file R4_11.
Bias/leakage ok (attachment 1)
|
    |
751
|
Sat Oct 27 01:22:43 2018 |
CA, OH | Saturday 27 October | 09:22 DAQ found crashed. Appears to have crashed
at 20:23 last night whilst writing R3_0 to
file.
|
   |
750
|
Fri Oct 26 03:28:10 2018 |
OH, CA | Friday 26 October | October 25th:
In anticipation of losing access in the evening
on arrival at RIKEN the following was done:
|
    |
749
|
Wed Oct 3 10:47:06 2018 |
OH | Analysis of R2_0 -> R2_37 Alpha Run | Data was analysed using offsets calculated
based on pulser walkthroughs carried out
in June 2018
|
  |
748
|
Wed Oct 3 07:09:03 2018 |
OH, TD | Current FEE Configuration Map October 3rd 2018 |
FEE Number
DSSD A B C D
|
|
747
|
Wed Oct 3 01:48:21 2018 |
OH, TD | Wednesday 3 October | 09.42 DAQ continues OK - current file Sep18/R2_36
09.42 all system wide checks OK *except* |
30x |
746
|
Tue Oct 2 01:55:11 2018 |
OH, TD | Tuesday 2 October | 09.54 DAQ continues OK - current file Sep18/R2_26
09.55 all system wide checks OK *except* |
10x |
745
|
Mon Oct 1 01:10:57 2018 |
OH, TD | Monday 1 October | 09.10 DAQ continues OK - current file Sep18/R2_16
09.15 all system wide checks OK *except* |
10x |
744
|
Sun Sep 30 01:48:27 2018 |
OH, TD | Current link to Google sheets leakage current log | https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit?pli=1#gid=282765719 |
|
743
|
Sun Sep 30 01:13:47 2018 |
OH, TD | Sunday 30 September | 09.10 DAQ continues OK - current file Sep18/R2_6
09.15 all system wide checks OK *except* |
8x |
742
|
Sat Sep 29 06:25:23 2018 |
OH, TD | Saturday 29 September | 14:25 Moved from 8x DSSD setup to 6x DSSD
Top two detectors removed.
Detector alignments in snout unchanged |
18x |
741
|
Fri Sep 28 02:08:07 2018 |
OH, TD | Friday 28 September | 10:08 Normal system restart ok
System currently in 8DSSD configuration
as was left in June 2018
|
6x |
740
|
Wed Aug 22 13:50:30 2018 |
OH, TD, Reply by PCS | AIDA GSI Setup Noise Tests | > Currently seems to be a problem with the
memory check in the system wide checks that
produces the message shown
|
|
739
|
Wed Aug 22 11:38:11 2018 |
OH, TD | AIDA GSI Setup Noise Tests | Currently seems to be a problem with the memory
check in the system wide checks that produces
the message shown
|
13x |
738
|
Wed Aug 22 09:10:28 2018 |
OH, TD | AIDA@DESPEC dhcpd.conf, dhcpd startup and log messages | >
> Attachment 1 - DHCP configuration file
/etc/dhcpd.conf
|
|
737
|
Tue Aug 21 12:29:44 2018 |
OH, TD | AIDA@DESPEC dhcpd.conf, dhcpd startup and log messages |
Attachment 1 - DHCP configuration file /etc/dhcpd.conf
|
  |
736
|
Tue Jul 3 02:24:45 2018 |
OH | Tuesday 3 July | 10:23 Bias and leakage currents ok - attachment
1
Fee temperatures ok - attachment 2
|
   |
735
|
Mon Jul 2 02:36:41 2018 |
OH | Monday 2 July | 10:35 Bias and leakage currents ok - attachment
1
FEE Temps ok - attachment 2
|
|
734
|
Sun Jul 1 08:25:24 2018 |
OH | Inventory | Attached is an updated inventory of the cables
and adapter boards we have in RIKEN. |
|
733
|
Sun Jul 1 02:26:50 2018 |
OH | Sunday 1st July | 10:25 Bias and leakage currents ok - attachment
1
FEE Temperatures ok
|
|
732
|
Sat Jun 30 03:05:36 2018 |
OH | Saturday 30 June | 11:05 Bias and leakage currents ok - attachment
1
FEE temperatures ok
|
    |
731
|
Fri Jun 29 02:26:34 2018 |
OH | Friday 29 June | 10:27 Bias and leakage currents ok - attachment
1
Fee temperatures ok - attachment 2
|
   |
730
|
Thu Jun 28 05:22:31 2018 |
OH | Analysis of R7 -> R9 | R7_0 -> R7_1 High Energy pulser run
R8_0 -> R8_1 Low energy puler run
R9_52 -> R9_62 Alpha run
|
    |
729
|
Thu Jun 28 02:19:30 2018 |
OH | Thursday 28th June | 10:18 Bias and leakage currents ok - attachment
1
FEE Temperatures ok
|
  |
727
|
Wed Jun 27 02:23:03 2018 |
OH | Wednesday 26 June | 10:20 Bias and leakage currents ok - attachment
1
FEE temperatures ok
|
  |
726
|
Tue Jun 26 05:44:44 2018 |
OH | Tuesday 26 June | 04:12 TD found the nnaida14 appeared to have
become noisy at some point. Biases/;eakages/temps
ok
|
 |
724
|
Mon Jun 25 01:56:08 2018 |
OH, TD | Monday 25th June | 09:55 Alpha run stopped
10:45 Investigating the large noise in FEE28
|
21x |
723
|
Sun Jun 24 09:08:03 2018 |
3OH, TD | June 2018 New Stack Configuration | Stack has been changed in configuration from
a 6 DSSD stack to 8 DSSD stack.
What was detectors 1-6 are now 3-8 with 2 |
 |
722
|
Sun Jun 24 01:40:08 2018 |
OH, TD | Sunday 24 June 2018 |
09.38 DAQ continues OK
|
15x |
721
|
Sat Jun 23 02:44:36 2018 |
OH, TD | Saturday 23 June 2018 |
DSSSD stack dismounted yesterday to
change configuration from 6x to 8x DSSSDs.
|
16x |
720
|
Sat Jun 23 02:28:13 2018 |
TD, OH | New fuses fitted to USB-controlled ac mains relay |
The input fuses of the USB-controlled ac
mains relay have been changed from 2x 5x20mm |
|
719
|
Fri Jun 22 02:50:37 2018 |
OH, TD | Friday 22 June 2018 | 10:50 Yesterday 4 FEE modules installed for
FEE64s 25-32
dhcpd.conf updated to reflect MAC addresses |
    |
718
|
Thu Jun 21 06:48:22 2018 |
TD, OH | DSSSD HV cabling | The DSSSD HV cabling has been changed in preparation
for configuration change
from 6x DSSSDs to 8x DSSSDs as follows:
|
 |
717
|
Thu Jun 21 05:23:16 2018 |
TD, OH | Offline analysis R1 - alpha background |
Analysis of overnight alpha background run
(June18/R1_0 ... _2) indicates that all FEE64s |
8x |
716
|
Thu Jun 21 02:31:49 2018 |
TD, OH | Thursday 21 June | 10.20 DAQ continues OK
10.29 DAQ stop June18/R1
|
    |
715
|
Wed Jun 20 03:33:06 2018 |
TD | Wednesday 20 June | 11.09 Julabo FL11006 recirculating chiller
- ON - water level OK (75%)
Tektronix AFG3102 - CH2 ON - amplitude |
14x |
713
|
Tue Jun 19 06:08:03 2018 |
TD | Tuesday 19 June 2018 | 13.00
Julabo FL11006 chiller
|
|
712
|
Thu Nov 23 01:12:33 2017 |
TD, CB | AIDA to safe shutdown state | 10.11 Detector bias OFF
FEE64 power OFF
BNC PB-4 OFF
|
|
710
|
Thu Nov 23 01:10:43 2017 |
TD, CB | Detector bias & leakage currents - October & November 2017 | https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=282765719 |
|
708
|
Thu Nov 23 00:41:43 2017 |
TD, CB | Thursday 23 November | 09.33 Detector biases & leakage currents OK
- see attachments 1 & 2
FEE64 Temperatures OK - see attachment |
10x |
707
|
Tue Nov 21 00:30:31 2017 |
TD, CB | Tuesday 21 November | 09.27 Detector biases & leakage currents OK
- see attachments 1 & 2
FEE64 Temperatures OK - see attachment |
20x |
706
|
Mon Nov 20 00:53:27 2017 |
TD, CB | Monday 20 November | 09.50 Detector biases & leakage currents OK
- see attachments 1 & 2
FEE64 Temperatures OK - see attachment |
9x |
704
|
Sun Nov 19 01:46:10 2017 |
CB, TD | Sunday 19 November | 10.45 Detector biases & leakage currents OK
- see attachments 1
FEE64 Temperatures OK - see attachment |
14x |
703
|
Sat Nov 18 04:25:16 2017 |
CB, TD | Saturday 18 November |
13.27 Detector biases & leakage currents
OK - see attachments 1 & 2
|
19x |
702
|
Sat Nov 18 03:53:43 2017 |
TD | Offline analysis Nov17/R2_8-R2_16 data | MIDASsort offline analysis Nov17/R2_8-R2_16
data
|
22x |
701
|
Sat Nov 18 03:37:46 2017 |
TD | Offline analysis RIBF128/R5_124-R5_148, Oct17/R17_31-R17_34 and Nov17/R2_8-R2_16 data | Offline analysis of
AIDA RIBF128/R5_124 to R5_148 data "130Ag |
   |
700
|
Fri Nov 17 10:03:25 2017 |
CB, TD | Friday 17 November | 19.03 DAQ started OK - data transfer not enabled
BNC PB-4
|
32x |
699
|
Fri Nov 17 03:32:31 2017 |
CB | Julabo FL11006 recirculating chiller refilled | 12:32 Chiller found almost empty &
still working at 20C. Refilled to overflow. |
|
698
|
Sat Nov 4 23:49:14 2017 |
OH | Sunday 5 November | 08.09 DAQ running OK - data transfer not enabled
BNC PB-4
|
6x |
697
|
Fri Nov 3 23:09:36 2017 |
TD, OH | Saturday 4 November | 08.09 DAQ running OK - data transfer not enabled
BNC PB-4
|
20x |
696
|
Thu Nov 2 22:57:53 2017 |
OH | Friday 3 November | 10.56 DAQ running OK - data transfer not enabled
BNC PB-4
|
  |
695
|
Thu Nov 2 01:56:18 2017 |
TD, OH | Thursday 2 November | 10.56 DAQ running OK - data transfer not enabled
BNC PB-4
|
16x |
694
|
Wed Nov 1 02:24:20 2017 |
OH | Wednesday 1 November | 11:24 DAQ running OK - data transfer not enabled
BNC PB-4
|
  |
693
|
Tue Oct 31 05:57:33 2017 |
TD | Offline analysis RIBF128/R5_124-R5_148 and Oct17/R31_17-R17_34 |
Offline analysis of the AIDA Oct17/R17_31
to R17_34 data "84Ge setting"
|
10x |
692
|
Tue Oct 31 00:34:10 2017 |
TD, OH | Tuesday 31 October | 09.34 DAQ running OK - data transfer not enabled
BNC PB-4
|
8x |
691
|
Mon Oct 30 01:10:28 2017 |
TD, OH | Monday 30 October | 10.10 DAQ running OK - data transfer not enabled
BNC PB-4
|
8x |
690
|
Sun Oct 29 05:16:35 2017 |
TD, OH | Sunday 29 October | 14.16 DAQ running OK - data transfer not enabled
BNC PB-4
|
14x |
689
|
Sat Oct 28 06:25:07 2017 |
TD | Waveforms |
For comparison with waveforms shown in https://elog.ph.ed.ac.uk/AIDA/665
and https://elog.ph.ed.ac.uk/AIDA/668
|
10x |
688
|
Sat Oct 28 06:09:44 2017 |
TD | Offline analysis Oct17/R17_31-R17_34 | |
20x |
687
|
Sat Oct 28 03:33:10 2017 |
TD, OH | Saturday 28 October | 11.33 DAQ running OK - date transfer not enabled
BNC PB-4
|
13x |
686
|
Fri Oct 27 08:35:33 2017 |
TD | Offline analysis Oct17/R17_31-R17_34 |
Offline analysis of High Energy Channel (HEC)
20GeV FSR data from AIDA data file Oct17/R17_31-R17_34
|
8x |
685
|
Fri Oct 27 01:58:44 2017 |
TD, OH | Friday 27 October | 09.56 DAQ stopped OK yesterday
BNC PB-4
|
12x |
684
|
Wed Oct 25 18:36:46 2017 |
TD, OH | Thursday 26 October | 02.37 DAQ stalled - USB-controlled ac mains
relay fuse blown
Not writing to disk
|
28x |
683
|
Wed Oct 25 03:26:55 2017 |
TD, OH | Wednesday 25 October | 11.27 DAQ continues
Not writing to disk
|
7x |
682
|
Tue Oct 24 03:16:07 2017 |
TD, OH | Tuesday 24 October | 11.16 DAQ continues
AIDA file Oct17/R8_107
|
20x |
681
|
Mon Oct 23 11:50:09 2017 |
TD, OH | Mon 23 Oct - further information please. | > 10:18 Leakage and bias ok - Attachment 1
> FEE temperatures ok - Attachment
2
|
|
680
|
Mon Oct 23 02:24:14 2017 |
TD, OH | Monday 23 October | 10:18 Leakage and bias ok - Attachment 1
FEE temperatures ok - Attachment 2
Statistics - Attachment 3
|
19x |
679
|
Sun Oct 22 02:10:03 2017 |
OH | Sunday 22 October | 10:10 DAQ found crashed
Stopped writing to file at 05:31
System wide checks ok
|
25x |
678
|
Sat Oct 21 02:48:17 2017 |
OH, TD | Saturday 21st October | 10:48 Adapter boards replaced for DSSD 1 &2
(FEEs 1,2,22 and 21)
Previous boards were Rev D new boards |
31x |
677
|
Fri Oct 20 01:43:40 2017 |
OH | Friday 20th October | 09:43 DAQ continues ok
System wide checks all ok
Detector bias and leakage ok - Attachment |
6x |
676
|
Thu Oct 19 11:32:29 2017 |
TD, OH | Thursday 19 October | >
> 09.40 DAQ continues OK
> File /TapeData/Oct17/R1_280
|
|
675
|
Thu Oct 19 01:40:35 2017 |
TD, OH | Thursday 19 October |
09.40 DAQ continues OK
File /TapeData/Oct17/R1_280
|
35x |
674
|
Wed Oct 18 03:57:37 2017 |
TD, OH | Wednesday 18 October | 11.57 Startup of AIDA following June 2017
shutdown
|
24x |
673
|
Mon Jun 19 08:58:00 2017 |
TD, Patrick | Report - high - 'zero all histograms' doesn't | >
> The DAQ Run Control 'zero all histograms'
function appears to have stopped working
|
|
672
|
Mon Jun 19 08:52:40 2017 |
TD | Report - high - 'zero all histograms' doesn't | >
> The DAQ Run Control 'zero all histograms'
function appears to have stopped working
|
|
671
|
Sun Jun 18 08:01:42 2017 |
TD | Seagate Backup Plus Hub 8Tb USB disk #2 | aidas1> df -h
Filesystem Size Used Avail Use%
Mounted on
|
|
670
|
Sun Jun 18 07:57:26 2017 |
TD | Seagate Backup Plus Hub 8Tb USB disk #3 |
N.B. data directory RIBF148 incomplete
|
|
669
|
Sun Jun 18 06:35:22 2017 |
TD | DSSSD bias & leakage current spreadsheet |
https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=808110721 |
|
668
|
Sun Jun 18 02:56:43 2017 |
TD | Sunday 18 June | 10.56 Detector biases & leakage currents OK
- see attachments 1 & 2
|
11x |
666
|
Sat Jun 17 11:00:55 2017 |
TD | Report - high - 'zero all histograms' doesn't |
The DAQ Run Control 'zero all histograms'
function appears to have stopped working
|
|
665
|
Sat Jun 17 05:47:58 2017 |
TD | Saturday 17 June | 13.47 DAQ continues
AIDA file RIBF148/R10_39
|
40x |
664
|
Fri Jun 16 02:38:36 2017 |
TD | Friday 16 June | 10.35 DAQ continues
AIDA file RIBF148/R10_14
|
28x |
663
|
Thu Jun 15 07:44:41 2017 |
OH | RIKEN Cable Inventory | List of the type and quantity of cables we
have at RIKEN that are not currently in use. |
|
662
|
Thu Jun 15 02:56:32 2017 |
TD, OH | Thursday 15 June | 10.52 DAQ continues
AIDA file RIBF148/R8_39
|
18x |
661
|
Wed Jun 14 07:01:34 2017 |
TD | Wednesday 14 June | 15.01 DAQ continues
AIDA file RIBF148/R8_22
|
21x |
660
|
Tue Jun 13 00:11:56 2017 |
TD,ZLIU | Tuesday 13 June 08:00-16:00 |
08.11 DAQ continues
|
17x |
659
|
Mon Jun 12 15:51:15 2017 |
OH | Tuesday 13 June 00:00-08:00 | 00:02 System wide checks ok
Good events - attachment 1
FEE temperatures - attachment 2
|
14x |
658
|
Mon Jun 12 08:02:01 2017 |
TD | Monday 12 June 16.00-24.00 | 16.01 DAQ continues
16.01 Detector biases & leakage currents |
26x |
657
|
Mon Jun 12 00:31:29 2017 |
ZLiu, TD, OH | Monday 12 June 08:00-16:00 | 09:00 Stop DAQ to tune the Sm beam, may
need 3 hours
AIDA file RIBF128/R9_319
|
11x |
656
|
Sun Jun 11 16:04:12 2017 |
DK | Monday 12 June 0:00 ~ 8:00 | 0:04 Biases and leak currents shown as
attachment #1, 12JunBias1.png
System-wide checks: nnaida13 fails |
10x |
655
|
Sun Jun 11 08:23:23 2017 |
PV | Sunday 11 June 16:00-00:00 | 16:40 beam lost - stripper foil problem
AIDA file RIBF128/R9_55
|
21x |
654
|
Sun Jun 11 00:07:24 2017 |
OH | Sunday 11 June 08:00-16:00 | 08:10 BRIKEN and BigRIPS stops DAQs
AIDA on file R7_1287
|
25x |
653
|
Sat Jun 10 15:56:31 2017 |
ZLiu | 0:00-8:00 11 June 2017 |
00:35 Stop DAQ
AIDA file
RIBF128/R7_1172
00:36 Start DAQ
AIDA file RIBF128/R7_1172
BRIKEN |
46x |
652
|
Sat Jun 10 09:24:45 2017 |
AE, TD | Saturday 19 June 16.00-24.00 | 17.25 Detector biases & leakage currents OK
- see attachments 1 & 2
FEE64 Temperatures OK - see attachment |
24x |
651
|
Sat Jun 10 02:40:18 2017 |
DK | Sat 10 June 8:00 ~ 16:00 | 10:40 Put lead wall in front of AIDA during
beam tuning.
|
|
650
|
Fri Jun 9 16:22:54 2017 |
PV | Saturday 10 June 00:00-08:00 | 00:21 BigRIPS and BRIKEN stop their DAQ
AIDA run file R7_826
|
28x |
649
|
Fri Jun 9 09:12:03 2017 |
ZLiu, AE | 17:00-24:00 | 17:06 BRIKEN and BigRIPS stop their DAQs
AIDA on file R7_723
|
    |
648
|
Fri Jun 9 04:53:24 2017 |
TD | Waveforms |
x-scale 1000ch = 2ms
y-scale expanded
|
28x |
647
|
Thu Jun 8 23:57:26 2017 |
ZLiu, TD | 9June2017 8:00-16:00 |
08:06 System wide checks all ok
implantation profile - attachment
1
count rate - attachment 2
|
32x |
646
|
Thu Jun 8 16:06:21 2017 |
OH | Friday 9 June 00:00-08:00 | 00:06 System wide checks all ok
Bias and leakage currents ok - attachment
1
|
9x |
645
|
Thu Jun 8 08:11:39 2017 |
NN, PV | Thursday 8 June 16:00 - 24:00 (evening shift) | 16:13 DAQ still running
16:34 BigRIPS and BRIKEN stop their DAQ
|
22x |
644
|
Thu Jun 8 00:54:26 2017 |
OH, PW | Thursday 8 June 00:00-16-00 | 08:54 DAQ still running
09:01 BRIKEN and BigRIPS stop daqs
|
6x |
643
|
Wed Jun 7 16:04:42 2017 |
ZL, DK | Thurs 8 June 0:00~8:00 | 00:05 Shift change.
Primary beam current ~4800 enA, 238U^86+
so 50 to 60 pnA.
|
13x |
642
|
Wed Jun 7 08:02:42 2017 |
OH, PV | Wednesday 7 June 16:00 - 24:00 | 16:02 System wide checks ok
Good Events statistics (No beam at
time!)- attachment 1
|
15x |
641
|
Wed Jun 7 00:10:24 2017 |
NN, TD | Wednesday 7 June 08:00 - 16:00 | 08:12 Analysis of file RIBF128/R6_438 -
zero timewarps, four MBS timewarps - see
attachment 1
|
30x |
640
|
Tue Jun 6 15:59:19 2017 |
DK | Wed 7 June night shift | 7 June 2017
00:05 All system-wide checks are passed
|
14x |
639
|
Tue Jun 6 15:26:44 2017 |
TD, ZL | Tuesday 06 June 16.00-24.00 | 15.53 Bias and leakage currents ok - attachments
1 & 2
FEE temperatures ok - attachment |
29x |
637
|
Tue Jun 6 07:44:19 2017 |
TD | Preamplifier waveforms | Preamplifier waveforms sampled by 50MSPS,
14 bit ADC
|
25x |
636
|
Tue Jun 6 00:57:49 2017 |
PJW, TD | Tuesday 6 June 08.00-16.00 | 08.57 Stop DAQ
AIDA file RIBF128/R6_24
|
16x |
634
|
Mon Jun 5 16:02:50 2017 |
OH, PV, AE | Tuesday 06 June 00.00-08.00 | 00:03 BigRIPS starts run 3007
BRIKEN starts run 007
AIDA on file R5_146
|
40x |
633
|
Mon Jun 5 08:43:24 2017 |
CB, TD, PW, DK | Monday 5 June 16:00 to 24:00 | 16:43 Leakage currents OK - see attachment
1
FEE64 temperatures OK - see attachment |
38x |
632
|
Sun Jun 4 23:50:24 2017 |
CB, PW, DK, TD | Monday 5 June 08:00 to 16:00 | 07:50 Leakage currents OK - attachment 1
FEE64 temperatures OK - attachment
2
|
24x |
631
|
Sun Jun 4 16:00:49 2017 |
NN, OH | Monday 5 June 00:00 to 08:00 | 23:59 BigRIPS and Briken stop their DAQ
AIDA run file R2_245
|
19x |
630
|
Sun Jun 4 08:13:10 2017 |
LHB, PV, NN | 4th June 16.00-00.00 | 16.25 *All* system wide checks OK *except*
ADC calibration of nnaida1, 21 and nnaida1
clock status (status=6)
|
28x |
629
|
Sun Jun 4 00:06:18 2017 |
OH, TD, PJW | Sunday 4 June 08.00-16.00 | 08:00 DAQ found stopped at around 04:49 -
Attachment 1
Time obtained from last file written |
32x |
628
|
Sat Jun 3 08:07:48 2017 |
OH, CB, AE | Saturday 3 June 16:00-24:00 | 16:26 DAQ continues OK
all system wide checks ok, *except*
nnaida1 clock status (6), nnaida1, 21 ADC |
    |
627
|
Sat Jun 3 05:32:09 2017 |
TD | Report - high - MBS correlation scaler anomalies |
The analysis of files RIBF127R1/R1_1478 to
R1_1486 is appended. This sequence of files |
|
626
|
Sat Jun 3 00:00:11 2017 |
LJB, PW, TD, OH | Saturday 3 June 08.00-16.00 | 08.29 BRIKEN 100; BigRIPS 1111 stopping run.
AIDA on run R1_1429
|
19x |
625
|
Fri Jun 2 16:02:37 2017 |
CB | Saturday 3 June 00:00-08:00 | 00:02 Noise in nnaida 1 and 2 appears to
be reduced.
However, some channels in nnaida1, |
28x |
624
|
Fri Jun 2 08:25:34 2017 |
LHB | 2nd June Evening Shift | 16.34 Beam is off
Aida R_1216, BRIKEN (83)/BigRIPS (1094)
continue to run for background data
|
20x |
623
|
Fri Jun 2 00:01:48 2017 |
OH, PW, CB | Friday 2 June 08:00-16:00 | 08:05 Briken and BigRIPS stopping daqs
AIDA on file R1_1099
|
9x |
622
|
Thu Jun 1 16:06:03 2017 |
NN | Friday 2 June 00:00-08:00 | 00:35 Beam is on
current AIDA file R1_996
|
14x |
621
|
Thu Jun 1 08:49:39 2017 |
LHB, PV | Thursday 1 June Evening Shift | 16.44 DAQ stop BigRIPS, BRIKEN
AIDA file RIBF127R1/R1_886
|
27x |
620
|
Thu Jun 1 00:00:25 2017 |
TD, PV, CB | Thusrday 1 June 08.00-16.00 | 07.57 run continues
BRIKEN start run 55
BigRIPS start run 1066
|
17x |
619
|
Wed May 31 16:48:54 2017 |
TD | Thursday 1 June 00.00-08.00 | 00.48 BigRIPS DAQ now running
BRIKEN start run 48
|
42x |
618
|
Wed May 31 16:43:52 2017 |
TD | Merger & TapeServer server startup scripts modified |
aidas1> cd /MIDAS/Merger/AIDA
aidas1> ls
|
 |
617
|
Wed May 31 08:00:26 2017 |
NN, CB | Wednesday 31 May 16:00 - 24:00 | 16:30 Check online data ok (R1_533) see attachment
1
|
15x |
616
|
Wed May 31 00:02:41 2017 |
VP, CB | Wednesday 31 May 08:00 - 16:00 | 08:02 BRIKEN starts run 1032
BigRIPS starts run 31
AIDA on file R1_423
|
10x |
615
|
Tue May 30 16:05:12 2017 |
OH | Wednesday 31 May 00:00 - 08:00 | 00:05 BigRIPS and BRIKEN stop their daqs
AIDA currently on file R1_312
|
9x |
614
|
Tue May 30 07:56:05 2017 |
CB, NN, OH, AE | Tuesday 30 May - evening shift | 16.00 Still no beam
Current run /RIBF127R1/R1_197
Found dropped channels on nnaida1, |
7x |
613
|
Tue May 30 00:58:10 2017 |
TD, CB | Tuesday 30 May - day shift | 08.58 DAQ continues OK
File RIBF127R1/R1_99
BigRIPS run 1009
|
27x |
611
|
Mon May 29 16:02:21 2017 |
OH, TD | Tuesday 30th May | 00:02 Bias and leakage currents ok - attachment
one
System wide check all ok
|
16x |
610
|
Mon May 29 07:05:06 2017 |
TD | Merger error messages and SEGV |
Overnight and earlier today Obtained the
following Merger error messages
|
   |
609
|
Mon May 29 05:26:39 2017 |
TD | Seagate Backup Plus Hub 8Tb USB disk #1 |
aidas1> df -h
Filesystem Size Used Avail Use% |
|
608
|
Mon May 29 00:59:27 2017 |
TD, PV, CB, NN, OH | Monday 29 May | 09.00 DAQ continues OK
Current file May2017/R32_239
|
10x |
607
|
Sun May 28 10:25:11 2017 |
TD | Analysis of RIBF123R1/R23 | |
|
606
|
Sun May 28 09:55:11 2017 |
PV | ADC offset value from pulser walkthrough run May2017/R28 R29 | ADC offset calculation using data from pulser
walkthrough runs, see:
https://elog.ph.ed.ac.uk/AIDA/603
|
   |
605
|
Sun May 28 09:20:29 2017 |
TD | Analysis of RIBF123R1/R21 | |
|
604
|
Sun May 28 02:16:04 2017 |
TD, CB | Sunday 28 May | 10.15 DAQ continues OK
Current file May2017/R31_239
|
16x |
603
|
Sat May 27 05:38:39 2017 |
CB, TD, OH | Saturday 27 May | 13.38 DAQ continues OK
Current file May2017/R27_49
|
9x |
602
|
Fri May 26 05:19:40 2017 |
TD | Offline analysis RIBF123R1/R23_44 to R23_70 |
Observe same noise structures to https://elog.ph.ed.ac.uk/AIDA/600
|
|
601
|
Fri May 26 02:20:42 2017 |
CB, OH, NN | Friday 26 May | 10.20 DAQ continues OK
Current file May2017/R27_22
|
15x |
600
|
Thu May 25 03:03:38 2017 |
TD | Offline analysis of R23_91 to R23_115 | Offline analysis of RIBF123R1_91 to R23_115
See https://elog.ph.ed.ac.uk/AIDA/583 & https://elog.ph.ed.ac.uk/AIDA/594
|
13x |
599
|
Thu May 25 02:11:04 2017 |
CB, TD | Thursday 25 May | 10.10 DAQ continues OK
Current file May2017/R26_17
|
10x |
598
|
Wed May 24 15:58:53 2017 |
Patrick Coleman-Smith | Examination of Console Logs -- and a couple of reminders |
|
|
597
|
Wed May 24 14:51:06 2017 |
Patrick Coleman-Smith | Examination of Console Logs -- and a couple of reminders |
|
|
595
|
Wed May 24 13:39:12 2017 |
Patrick Coleman-Smith | Examination of Console Logs -- and a couple of reminders | I have tarred and zipped all 24 logs and
shipped them back to the UK. Now I can browse
through them. |
|
594
|
Wed May 24 06:33:19 2017 |
TD | Analysis of RIBF123R1/R23_44, R23_91 & R25_142 |
Álvaro Tolosa Delgado reports observation
of c. 1s 'oscillations' in implant-decay |
   |
593
|
Wed May 24 06:12:48 2017 |
TD | Lead bricks removed from BRIKEN aperture for source tests - AIDA NOT SHIELDED FROM BEAM |
To install the 252Cf fission source to test
the 3He neutron counters, Pb bricks which
|
|
592
|
Wed May 24 03:20:35 2017 |
CB, TD | Wednesday 24 May | 11.00 Merger found stopped at 03:27 - current
file R24_7
Restarted Merge. Stopped Run control. |
8x |
590
|
Tue May 23 03:01:52 2017 |
CB, TD, NN, OH | Tuesday 23 May | 11.02 DAQ continues OK
Current file May2017/R22_192
|
19x |
589
|
Mon May 22 10:29:11 2017 |
TD | FEE64 system console to Raspberry pi /dev/ttyUSB mapping | ttyUSB0 => last host=nnaida24, => last addr=10.1.2.24,
; #panics => 0 ; Not Finished
ttyUSB1 => last host=nnaida23, => last addr=10.1.2.23, |
|
588
|
Mon May 22 10:21:29 2017 |
Patrick | Console mapping to FEE64 please | Please attach the list of ttyUSB to FEE64
console connection .
|
|
586
|
Mon May 22 09:12:56 2017 |
Patrick | Consoles reporting Options not available.... defaults operational ? | I have noticed from the console logs reports
concerning an inability to open the Options
CONTENTS files for the FEE64s and hence failure |
|
585
|
Mon May 22 08:53:42 2017 |
CB, TD, Patrick | Monday 22 May | > Concerning nnaida7 and the failure of calibration.....
have you tried to calibrate it using the
FADC Align & Control ?
|
|
584
|
Mon May 22 08:43:10 2017 |
CB, TD, Patrick | Monday 22 May | > 10.35 DAQ continues OK
> Current file May2017/R19_253
>
|
|
583
|
Mon May 22 08:29:26 2017 |
TD | Offline analysis R25_12 to R25_22 | Offline analysis of AIDA data files R25_12
to R25_22 using MIDASsort
|
21x |
582
|
Mon May 22 02:34:51 2017 |
CB, TD | Monday 22 May | 10.35 DAQ continues OK
Current file May2017/R19_253
|
16x |
581
|
Sun May 21 10:58:01 2017 |
TD | Julabo FL11006 recirculating chiller refilled | 18.55 Julabo FL11006 recirculating chiller
refilled to "H" marker of the filling level
indicator.
|
|
580
|
Sun May 21 02:54:22 2017 |
CB, TD, OH | Sunday 21 May | 10.54 DAQ continues OK
Current file May2017/R18_208
|
10x |
579
|
Sat May 20 02:39:06 2017 |
CB, OH | Saturday 20 May | 10.35 DAQ continues OK
Current file May2017/R16
|
9x |
578
|
Fri May 19 10:16:27 2017 |
CB, TD, OH | DAQ sever rebooted | 18:16 Finished rebooting DAQ server and acquisition.
All OK, except ADC calibration on #7.
Started run May2017/R16
|
|
577
|
Fri May 19 09:55:54 2017 |
CB, TD, OH | Logs from Raspberry Pi System Console | 17:50 Rebooted Server and FEE64. Connected
remotely to Ras Pi System Console. Repeated
USB connection procedure. All 24 modules |
|
576
|
Fri May 19 02:44:14 2017 |
TD, CB, OH | Friday 19th May | 10:44 System wide checks all ok
Leakages and biases all ok (see attachment
1)
|
  |
575
|
Thu May 18 15:20:44 2017 |
Patrick Coleman-Smith | [HowTo] Connecting a USB console interface to the FEE64 | The three attachments show the orientation
of the console cable pcb relative to the
FEE64 connectors. |
  |
574
|
Thu May 18 09:46:36 2017 |
TD, OH, CB | RasPi system console diagnostics |
> Can you let me know when you power-cycled
the FEEs please ? Or maybe just do a stop/go.
|
|
573
|
Thu May 18 09:29:50 2017 |
TD, OH, CB | RasPi system console diagnostics | > Connecting monitor to RasPi system console
diagnostics
>
|
|
572
|
Thu May 18 03:07:47 2017 |
TD, OH, CB | RasPi system console diagnostics | Connecting monitor to RasPi system console
diagnostics
|
  |
571
|
Thu May 18 02:16:05 2017 |
CB, TD, OH | Thursday 18 May | 10.10 DAQ continues OK
Current file May2017/R10_346
|
10x |
570
|
Wed May 17 05:28:19 2017 |
TD, OH | Wednesday 17 May | 11.11 DAQ found stopped
Most recent file May2017/R11_245 (last
accessed 06:09)
|
6x |
568
|
Tue May 16 03:18:46 2017 |
TD, OH | Tuesday 16 May | 11.19 DAQ continues OK
Current file May2017/R10_346
|
9x |
567
|
Mon May 15 02:01:02 2017 |
TD, OH | Monday 15 May | 10.01 DAQ continues OK
Current file May2017/R8_334
|
7x |
566
|
Sun May 14 01:52:49 2017 |
TD, OH | Sunday 14 May | 09.54 DAQ continues OK
Current file May2017/R7_292
|
16x |
565
|
Sat May 13 03:16:16 2017 |
TD | Analysis of May2017/R1_0 to May2017/ R1_79 |
See https://elog.ph.ed.ac.uk/AIDA/555
|
11x |
564
|
Sat May 13 02:35:53 2017 |
TD, OH | Saturday 13 May | 10.35 DAQ continues OK
Current file May2017/R6_246
|
17x |
563
|
Fri May 12 02:55:10 2017 |
TD, OH | Friday 12 May | 10.55 DAQ continues OK
Current file May2017/R6_181
|
6x |
562
|
Thu May 11 05:43:30 2017 |
TD, OH | Thursday 11 May | 13.43 DAQ continues OK
Current file May2017/R6_123
|
16x |
561
|
Wed May 10 02:55:13 2017 |
TD, OH | Wednesday 10 May | 10.55 DAQ continues OK
Current file May2017/R6_44
|
8x |
560
|
Tue May 9 02:25:04 2017 |
TD, OH | Tuesday 9 May | 10.25 DAQ continues OK
Current file May2017/R1_79
|
18x |
559
|
Mon May 8 10:00:02 2017 |
Patrick Coleman-Smith | [HowTo] Operating document for the Pi_Monitor FEE64 console logging equipment | The operating proceedure for the Raspberry
Pi FEE64 console monitor is attached.
Please let me know if more detail |
|
558
|
Mon May 8 02:11:37 2017 |
OH, TD | Monday 8 May | 10.11 DAQ continues OK
Current file May2017/R1_58
|
11x |
557
|
Sun May 7 01:29:50 2017 |
OH, TD | Sunday 7 May |
09.28 DAQ continues OK
Current file May2017/R1_36
|
13x |
556
|
Sat May 6 03:32:38 2017 |
OH, TD | Saturday 6 May |
11.30 Detector biases & leakage currents
OK - see attachments 1 & 2
|
8x |
555
|
Fri May 5 08:03:36 2017 |
OH, TD | Friday May 5th | Relatively painless start-up. Had an issue
with firefox where all bookmarks had been
forgotten.
|
10x |
554
|
Thu Apr 13 15:08:31 2017 |
CB | Card test | I tested the FWHM of a BNC PB-5 pulser
signal as a function of shaping time using
the first produced ISOL FEE64 card in Daresbury |
    |
553
|
Wed Apr 5 06:11:08 2017 |
OH | BigRIPS particle ID | I've been going through collecting the BigRIPS
root files with Phong and making sure they
are on AIDAs1.
|
|
Draft
|
Wed Apr 5 06:10:55 2017 |
OH | BigRIPS particle ID | |
|
551
|
Sun Apr 2 04:40:00 2017 |
DK | BigRIPS Summary Info | It is all saved locally file:///homes/npg/Documents/2017Ca/
Although, a little more hacking is required |
|
550
|
Sun Apr 2 03:32:30 2017 |
DK, OH | Pulser walkthrough | 11:32 Pulser walkthrough, 90k down to 10k,
10k steps, 1 min per step
R26
|
|
549
|
Sat Apr 1 16:16:05 2017 |
OH, CG | Sunday 2 April | 00:12 BigRips started run 0223 (Started at
00:12)
AIDA file R20_344
|
   |
548
|
Fri Mar 31 17:21:56 2017 |
CG, OH, DK | Saturday 1 April - Run status | 00.46 34Ne stopped for 36Ne setting (R19_37).
DAQ kept running as I was upstairs
getting some food.
|
9x |
547
|
Thu Mar 30 16:12:21 2017 |
DK, OH, CG | Friday, March 31 run status | 00:11 BigRIPS has started a new run at 00:10:42
run 0165.
AIDA subrun R16_357 was about halfway |
14x |
546
|
Wed Mar 29 18:02:12 2017 |
OH, TD, DK, CG | Thursday 30th March | 02:02 Recovered DAQ from crash. Merger became
clogged and the system required a full restart.
Raspberry pi also
|
31x |
545
|
Wed Mar 29 17:49:36 2017 |
DK | cshrc hacking w/ MIDAS | The ~/.cshrc was modified to change the MIDAS
path for a convenient analysis method, but
it should be done in a shell script instead, |
|
544
|
Wed Mar 29 13:38:38 2017 |
OH, DK, CG | First beam runs | For BigRIPS run numbers, they are available
online: http://bripscnt01.rarfadv.riken.jp/runsum/index.php
|
|
543
|
Wed Mar 29 13:02:17 2017 |
TD | Report - high - interaction between DHCP and FEE64 authenticated mount requests |
What has happened here?
|
|
542
|
Wed Mar 29 08:13:34 2017 |
DK, PV, JL, CG | Degrader, Pb wall opening | 16:21
Chris noticed that when the degraders that |
|
541
|
Wed Mar 29 05:08:04 2017 |
TD | Report - medium - delayed or missing authenticated mount requests following FEE64 power cycle | This is not, I think, a new observation.
Following FEE64 power cycles we sometimes |
|
540
|
Wed Mar 29 00:23:12 2017 |
TD | Analysis of Mar2017/R3 | Analysis of Mar2017/R3_0 ... R3_9 by MIDASsort
*** ENTRY finish
|
8x |
539
|
Wed Mar 29 00:02:49 2017 |
TD | Wednesday 29 March | 08.02 DAQ halted overnight
System checks OK *except* for nnaida1 |
21x |
538
|
Tue Mar 28 01:28:12 2017 |
TD, CG, OH, DK | Tuesday 28 March |
09.13 DAQ run R3 ends OK (final file R3_9)
|
15x |
537
|
Mon Mar 27 03:29:05 2017 |
OH, TD, DK, CG | Monday 27 March | 11:28 Biases and leakages okm (see attachment
1)
|
15x |
536
|
Mon Mar 27 03:28:53 2017 |
DK, TD, JA | Clock settings at the waveform generator stage | Clock settings for this experiment are slightly
different than in the previous case.
|
|
535
|
Sun Mar 26 03:53:43 2017 |
CG, OH | Sunday 26th March | 10.30 Left DAQ running overnight to look for
alphas in DSSDs.
DSSD bias still ok @ 23.3oC (see att. |
 |
534
|
Thu Mar 23 10:56:29 2017 |
CG, OH | Thursday 23rd March - DSSD replacement + move |
10.00 Investigating DSSD2 (MSL BB18-1000
3058-9) missing channels, found broken bond |
7x |
533
|
Tue Mar 21 08:04:43 2017 |
CG, OH | Tuesday 21 March - AIDA checks | 10.00 Powered system on and biased.
Bias voltages and leakage currents
ok (see att. 1). Ambient temp @23.1oC.
|
    |
532
|
Thu Feb 2 13:44:02 2017 |
OH | T9 Test Bench | T9 test setup at Daresbury was powered up
and noise levels were checked using a pulser
peak.
|
  |
531
|
Wed Feb 1 16:54:40 2017 |
CG | NP1306 run summary | |
|
530
|
Wed Jan 18 14:16:47 2017 |
Patrick Coleman-Smith | Repaired Modules returning to RIKEN | Five modules are being returned to RIKEN
after repair.
The MAC addresses are :- |
|
529
|
Tue Dec 6 06:38:46 2016 |
TD, Updated Patrick | CAEN N1419 HV output common mode noise |
There appears to be significant common mode
noise on the output of the
|
9x |
528
|
Tue Dec 6 02:30:35 2016 |
TD | Report - low - significant variation in FEE64 boot times |
Not something we were not aware of already
but /var/log/messages illustrate the issue.
|
|
527
|
Tue Dec 6 02:20:29 2016 |
TD | Tuesday 6 December | 11.20 DSSSD bias & leakage currents OK - see
attachments 1 & 2
FEE64 temperatures OK - see attachment |
   |
525
|
Mon Dec 5 11:53:26 2016 |
TD | MACB test |
MACB configuration can be found at https://elog.ph.ed.ac.uk/AIDA/357
|
42x |
524
|
Mon Dec 5 10:51:08 2016 |
TD | Monday 5 December | 19.50 DSSSD bias & leakage currents OK - see
attachments 1 & 2
FEE64 temperatures HIGH - see attachment |
    |
523
|
Sun Dec 4 05:46:42 2016 |
TD | SyncCheck RIBF03R1 & RIBF123R1 commissioning tests archived |
The SyncCheck etc software used for the RIBF123R1
and RIBF03R1 commissioning
|
|
522
|
Sun Dec 4 04:05:24 2016 |
TD | Report - low - DAQ SETUP sometimes produces Javascript error |
DAQ SETUP sometimes produces Javascript error
instead of a pop-up displaying
|
|
521
|
Sun Dec 4 03:44:12 2016 |
TD | Sunday 4 December | 12.45 DSSSD bias & leakage currents OK - see
attachments 1 & 2
FEE64 temperatures OK - see attachment |
16x |
520
|
Sat Dec 3 10:49:36 2016 |
TD | Saturday 3 December | 19.48 DSSSD bias & leakage currents OK - see
attachments 1 & 2
FEE64 temperatures OK - see attachment |
  |
519
|
Fri Dec 2 09:58:54 2016 |
DK | Simple PID with LISE++ | I wrote this LISE++ file based on the Takechi
.lpp modified by AE for 77Ni, 78Ni, 76Ni.
|
  |
518
|
Fri Dec 2 09:47:58 2016 |
DK | F8 targets | F8 target measurements, for posterity.
Plastic: ~39 to 40 mm
|
|
517
|
Fri Dec 2 09:47:45 2016 |
DK | F8 targets | F8 targets, for posterity.
Plastic: 39~40 mm
|
|
516
|
Fri Dec 2 08:23:28 2016 |
TD | Offline analysis of R48_9 | Analysis of background, pulser off
S O R T C O M P L E T E ..... Fri Dec |
   |
515
|
Fri Dec 2 06:41:25 2016 |
DK | Benchmarks for compression | R45_17 as the test file, which was closed
at 9.02 AM Friday, December 2nd at the end
of the official parasitic
|
|
514
|
Thu Dec 1 16:01:10 2016 |
CG, PV | Friday 2 December | 00.07 BigRIPS data file 1135
01.07 BigRIPS data file 1136.
|
14x |
513
|
Thu Dec 1 10:58:54 2016 |
PV, TD, Liu | Implantation profile in AIDA , after switch back to the previous ZDS setting (AIDA 43_63 to 43_71, bigrips run 1129) | |
  |
512
|
Thu Dec 1 09:46:06 2016 |
TD | Offline analysis of R43_59 | Variable degrader setting is now #2 +
#3: 0.3 mm W + 1.0 mm W [+2 mm Al]
Centre ZDS @ 40Mg
|
9x |
511
|
Thu Dec 1 08:13:06 2016 |
PV,Liu, TD | Implantation profile in AIDA , after changing the ZDS setting to center at 41Al, AIDA 43_ 33 to 43 | Bigrips run 1127
AIDA run 43_ 33 to 43 |
  |
510
|
Thu Dec 1 02:25:41 2016 |
DK | Offline analysis of R42_32 | Offline analysis of AIDA R42_32.
Degrader condition of F11 is with the same |
6x |
509
|
Thu Dec 1 00:21:08 2016 |
DK | Offline analysis of R42_7 | Checking that the implantation is still
reasonable after LN2 fill recovery.
Degrader condition is 8. + 0.2 |
    |
508
|
Wed Nov 30 21:26:52 2016 |
CG, DK, TD | Thursday 1 December | 00.51 BigRIPS data file 1112.
01.50 BigRIPS data file 1113.
|
10x |
507
|
Wed Nov 30 11:36:32 2016 |
TD | Offline analysis of R41_2 | Degrader (8mm Al) fixed + ( 0.3mm W/1mm Al
+ 0.5mm/1mm Al + 1mm W/1m Al) variable
|
8x |
506
|
Wed Nov 30 11:10:10 2016 |
TD | Correlation_Check.c | cd /TapeData/RIBF03R1
~/td/a.out R31 10000 > /tmp/R31.out
~/td/a.out R31 24 > /tmp/R31-2.out
|
  |
505
|
Wed Nov 30 08:41:37 2016 |
PV, TD, RCF, Liu | Implantation profile in AIDA R39 37 to 46, after changing degrader at 16:23 |
Degrader setting:
Variable degrader:
0.5
mm W + 1 mm Al : in
0.3 mm W + 1 mm Al :
in
1 mm W + 1 mm Al : in
Fix degrader:
20mm |
  |
504
|
Wed Nov 30 06:42:01 2016 |
TD | Offline analysis of R39_26 | Following degrader change to (8mm Al) fixed
+ ( 0.3mm W/1mm Al + 0.5mm/1mm Al + 1mm W/1m
Al) variable
|
8x |
503
|
Wed Nov 30 06:33:52 2016 |
TD | Offline analysis R36_30 |
Following target change from (CH2)n to C
|
8x |
502
|
Wed Nov 30 06:31:04 2016 |
PV, TD, RCF, Liu | Implantation profile in AIDA R39 2 to 9, after changing degrader at 13:30 | Degrader setting was:
Variable degrader:
0.5 mm W + 1 mm Al : in
|
  |
501
|
Wed Nov 30 05:30:20 2016 |
TD | Offline analysis R39_6 |
Degrader 8mm Al fixed + ( 0.5mm W/1mm Al
+ 1mm W/1mm Al) variable
|
8x |
500
|
Wed Nov 30 04:56:40 2016 |
TD | Offline analysis R38_33 |
Degrader 8mm Al fixed + ( 0.3mm W/1mm Al
+ 1mm W/1mm Al) variable
|
9x |
499
|
Tue Nov 29 19:07:35 2016 |
AE, CG, ATS, AT | F11 conditions after change to C target in F8 [light particles?] | The main experiment changed to a carbon
reaction target at F8 (similar thickness
of CH2 previously used), and retuned the |
    |
498
|
Tue Nov 29 15:12:33 2016 |
CG, AE, TD, DK | Wednesday 30 November | 00.11 Beam stopped for target @F8 change.
R35 stopped at R35_62.
BRIKEN file 161129_1951 155->159
|
13x |
497
|
Tue Nov 29 12:21:35 2016 |
TD | Offline analysis R35_1 |
S O R T C O M P L E T E ..... Tue Nov |
8x |
496
|
Tue Nov 29 05:18:50 2016 |
TD | Offline analysis of R31 | Offline analysis of AIDA data files from R31_0
to c. R31_5 (elapsed time 1120.45s)
|
10x |
494
|
Mon Nov 28 18:07:14 2016 |
CG, TD, AE, DK | Tuesday 29 November | 01:39 : Attachment 26 (R30_70to72) shows a
gradual change in the hit pattern for DSSD2
(at the lower left
|
42x |
493
|
Mon Nov 28 15:53:39 2016 |
AE, AT, RG, CG | DAQ synchronization | We noticed a peculiar feature in the time-stamp
synchronization monitor. The spectra of timestamp
difference between pairs of DAQ systems show, |
7x |
492
|
Mon Nov 28 13:12:31 2016 |
PV, AE, Liu | Implantation profile in AIDA with 8mm Al replacing 3 mm Pb | Data for ~3 hrs: Nov 28th, 20:06 to 23:16
Bigrips run 1060 to 1062
AIDA run R30_ 2 to R30_40 |
    |
491
|
Mon Nov 28 11:55:20 2016 |
TD | Offline analysis R30_2 | Degrader (8mm Al) fixed + ( 0.3mm W/1mm Al
+ 1mm W/1mm Al)
|
  |
490
|
Mon Nov 28 06:49:04 2016 |
DK | Offline analysis R27_1 | Conditions: One Pb wall with empty windows.
3mm Pb degrader closer to AIDA, on the front
of PE wall
|
  |
489
|
Mon Nov 28 05:38:39 2016 |
DK | Offline analysis R28_14 | Conditions: Two Pb walls with empty windows.
3mm Pb degrader between MUSIC 1 and MUSIC
2.
|
  |
488
|
Sun Nov 27 22:35:37 2016 |
Liu, PV, AE | Ion hit pattern in AIDA after degrader changing | After changing degrader to optimize 40Mg,
hit pattern in AIDA is shown in figure below.
The implantation position changed |
|
487
|
Sun Nov 27 19:33:00 2016 |
Liu, PV, AE | F11 degrader setting (night Nov27-Nov28) | Analysis of files for two more settings of
F11 degrader to optimize implantation of
40Mg.
|
   |
486
|
Sun Nov 27 16:29:51 2016 |
CG, AE, DK | Monday 28 November | 01.28 Beam stopped temporarily.
~750MB into R26_38.
Bias and leakage currents ok, as are |
12x |
485
|
Sun Nov 27 12:53:04 2016 |
TD | Offline analysis R24_3 |
S O R T C O M P L E T E ..... Sun Nov |
   |
484
|
Sun Nov 27 12:30:41 2016 |
AE, PV | Energy loss in Degraders and Implantation for runs 1028 and 1033 | Implantation profile in AIDA
BigRIPS file 1028
(Attachment run1028.png): Degrader |
6x |
483
|
Sun Nov 27 06:35:47 2016 |
TD, DK, AE | Sunday 27 November - part 2 | 14.15 BigRIPS run number is now 1029
15.22 BigRIPS run number is now 1030
|
14x |
482
|
Sun Nov 27 05:30:51 2016 |
TD | Offline analysis of R12 | Offline analysis of R12 LEC -> MEC setting
S O R T C O M P L E T E ..... Sun Nov |
   |
480
|
Sun Nov 27 03:25:20 2016 |
TD | [How to] AIDA discriminator thresholds | The function and setting of the AIDA discriminators
is as follows:
|
|
479
|
Sun Nov 27 02:46:54 2016 |
DK | Offline analysis of R18_2 | Run R18_2: 3 mm Pb, 0.5 mm W (+1 mm Al)
and 0.3 mm W (+1 mm Al)
|
  |
478
|
Sat Nov 26 20:26:06 2016 |
Liu, AE | Analysis of implantation profile in AIDA | Here we show the PID plot and implantation
depth in AIDA from BigRIPS file 40Mg1012
(1 hr of data from 20:30 in Nov 26th), merged |
 |
477
|
Sat Nov 26 17:14:47 2016 |
TD | Visual scaler inputs | Visual scaler inputs
1 F11
|
|
476
|
Sat Nov 26 15:32:38 2016 |
TD, AE, CG, DK | Sunday 27 November | 00.33 DSSSD bias & leakage currents OK - see
attachments 1 & 2
FEE64 temperatures OK - see attachment |
19x |
475
|
Sat Nov 26 12:18:25 2016 |
AE | Saturday 26 November, Part III | 19:30 Power cycled of AIDA reuired after Ge
filling
|
6x |
474
|
Sat Nov 26 09:17:42 2016 |
AE, TD, DK | Offline analysis of R9_24 |
R9_24 3mm Pb + 0.3mm W (+1mm Al) +
1.0mm W (+1mm Al)
*** data items: 261088000 |
  |
473
|
Sat Nov 26 07:45:48 2016 |
TD, DK, AE | Offline analysis of R7_45 | R7_45 3mm Pb + 0.5mm W (+1mm Al) only (at
start of run) changing to 1.5mm W (+2mm Al)
|
  |
472
|
Sat Nov 26 07:26:51 2016 |
TD | [How to] Desktop application launchers for Httpd for Data Acquisition & Merge/TapeServer, Merger & TapeServer |
Type: Application in Terminal
Name: Httpd for Data Acquisition
|
|
471
|
Sat Nov 26 07:11:34 2016 |
TD, DK, AE | Saturday 26 November, Part II | 16.11 The cyclotron and BigRIPS condition
are now restored and we have good beam
Count |
|
470
|
Sat Nov 26 06:57:36 2016 |
DK, TD | Offline analysis of R7_37 |
R7_37 3mm Pb + from 0 to 1.8mm W (+ up to
3mm Al, 1mm per W layer - 0.3mm W, 0.5mm |
   |
469
|
Fri Nov 25 22:28:13 2016 |
TD | [How to] Start MIDASsort |
aidas1> setenv MIDASBASE /MIDAS@aidas.240215
aidas1> setenv PATH $MIDASBASE/bin_Linux64:$PATH
|
|
468
|
Fri Nov 25 15:56:36 2016 |
CG, DK | Saturday 26 November | 00.55 Bias and leakage currents ok (attachments
1+2).
Temps ok (attachment 3).
|
11x |
467
|
Fri Nov 25 07:33:44 2016 |
TD | Friday 25 November | 16.35 DSSSD bias & leakage currents OK - see
attachments 1 & 2
note - the significant increase observed |
9x |
466
|
Thu Nov 24 01:07:14 2016 |
TD, CG | Thursday 24 November | 10.05 DSSSD bias & leakage currents OK - see
attachments 1 & 2
note - the significant increase observed |
29x |
465
|
Wed Nov 23 14:50:59 2016 |
Patrick Coleman-Smith | [ Info ] What does the System Wide Clock check mean when it fails. | The System Wide check called "Check
Clock Status" reads the status
register from the FEE64 units in the system |
|
464
|
Wed Nov 23 01:47:28 2016 |
TD, CG | Wednesday 23 November | 10.45 DSSSD bias & leakage currents - see
attachments 1 & 2
note - significant increase in leakage |
6x |
463
|
Tue Nov 22 12:24:48 2016 |
TD | Analysis of R25_11 to R25_23 | Offline analysis of AIDA data files R25_11
to R25_23 using MIDASsort
|
20x |
462
|
Mon Nov 21 21:22:04 2016 |
TD | Tuesday 22 November | 05.59 M7.3 Fukushima-ken Oki (locally 4) http://www.jma.go.jp/en/quake/20161122060517493-220559.html
06.20 DSSSD bias & leakage currents OK - |
6x |
461
|
Mon Nov 21 02:12:45 2016 |
CG & TD | Monday 21 November |
11.10 DSSSD bias & leakage currents OK -
see attachments 1 & 2
|
12x |
460
|
Sun Nov 20 02:24:53 2016 |
CG | Sunday 20 November | 11.20 FEE temps and bias leakages ok (attachments
1-3).
However, stats screen shows no SYNCs |
8x |
459
|
Sat Nov 19 02:46:09 2016 |
TD, CG | Saturday 19 November |
11.45 DSSSD bias & leakage currents OK -
see attachments 1 & 2
|
7x |
458
|
Sat Nov 19 02:43:39 2016 |
TD | Thursday 17 November |
10.15 DSSSD bias & leakage currents OK -
see attachments 1 & 2
|
   |
457
|
Wed Nov 16 06:47:02 2016 |
TD | Analysis of data files R25_11 to _13 | Offline analysis of R25_11 to _13 see http://ribf-exp.riken.jp/elog/RIBF123/141
"F5 C target F7 no F11 C 6mm
|
    |
456
|
Wed Nov 16 03:13:25 2016 |
CG | Wednesday 16 November | 11.30 Leakage currents and FEE temps ok (attachments
1-3) |
  |
455
|
Tue Nov 15 02:22:25 2016 |
TD | Tuesday 15 November | 11.20 DSSSD bias & leakage currents OK - see
attachments 1 & 2
FEE64 temperatures OK - see attachment |
7x |
454
|
Mon Nov 14 05:51:36 2016 |
TD | Monday 14 November |
14.51 DSSSD bias & leakage currents OK -
see attachments 1 & 2
|
  |
453
|
Sat Nov 12 01:45:00 2016 |
TD | Saturday 12 November | 10.45 DSSSD bias & leakage currents OK - see
attachments 1 & 2
FEE64 temperatures OK - see attachment |
6x |
452
|
Fri Nov 11 00:50:00 2016 |
TD | Friday 11 November | 10.00 DAQ continues (R33) in no storage mode
DSSSD bias & leakage currents OK - |
11x |
451
|
Thu Nov 10 12:02:24 2016 |
TD, OH, CG | Thursday 10 November |
21.17 DAQ starts (R30)
|
   |
450
|
Thu Nov 10 11:57:35 2016 |
TD | Data directory NP1412 renamed as RIBF123R1 |
Data directory NP1412 renamed as RIBF123R1
|
|
449
|
Thu Nov 10 09:56:20 2016 |
TD, OH, ML | NP1412 R26 R27 | start 18.55 10.11.16
stop
AIDA filename R26_0
|
8x |
448
|
Wed Nov 9 22:16:11 2016 |
CG, DK, TD, ML | NP1412 R24 R25 | 07.15 R24 started. BRIKEN run 33.
76~78Ni beam setting.
F5 C target out. F7 CH2 in. F11 C out.
|
34x |
447
|
Wed Nov 9 11:07:14 2016 |
TD, CG, DK | NP1412 R22 R23 | DAQ start (R22) failed - merger remained in
'want first sync' state, no output to TapeServer
-> soft reset OK
|
6x |
446
|
Wed Nov 9 09:50:50 2016 |
TD | NP1412 R20, R21 |
DAQ start (R20) failed - nnaida5 dropped
data transfer #1 link
|
   |
445
|
Wed Nov 9 08:47:03 2016 |
OH, TD | NP1412 R16, R17 and R18 | start 17:44
stop 17:49
AIDA filename R16
|
 |
444
|
Wed Nov 9 07:16:59 2016 |
OH, TD | NP1412 R15 | Run 15
start 16:14
|
6x |
443
|
Wed Nov 9 02:14:08 2016 |
OH, TD | NP1412 R14 | 11.13 Still waiting to get beam back got access
so took temp measurement.
T=25.6 DP=0.0 H=18.1
|
   |
442
|
Wed Nov 9 00:49:03 2016 |
TD, OH | NP1412 R13 | 09.50 Run 13 Start
Thick C target (6mm) removed from F11.
All variable Al degraders put in place
|
 |
441
|
Tue Nov 8 23:36:56 2016 |
DK, TD | NP1412 R12 | Takechi team changes the condition: F5
carbon; F7 empty; F11 carbon
F11 Plastic is 1.1kHz |
10x |
440
|
Tue Nov 8 23:16:15 2016 |
DK, TD | NP1412 R11 | Recovered AIDA after power cycle (unknown
cause of crash from the end of R10)
Corresponding run in BRIKEN: 161109_0814_747576Ni_012 |
 |
439
|
Tue Nov 8 22:04:21 2016 |
DK | NP1412 R10 | Put the variable Al degraders all back
in for safety (was 4.4 mm, now 5.4 mm)
Takechi team switches the condition: |
 |
438
|
Tue Nov 8 21:01:40 2016 |
CG, DK | NP1412 R9 | 06.02 R9 started with Takechi group C target
out and all variable degraders in.
F5 C in. F7 empty. F11 empty.
|
|
437
|
Tue Nov 8 18:52:32 2016 |
CG, DK | NP1412 R7 R8 | 03.50 74-76Ni beam delivered to F11.
F11 plastic rate ~1kHz.
F5 C target in. F7 empty. F11 C target |
   |
436
|
Tue Nov 8 15:10:16 2016 |
CG, TD, DK, OH | NP1412 R5 R6 | 00.15 Setting changed to 71,72,73Ni. All variable
degraders in.
Will remove while watching rates to |
 |
435
|
Tue Nov 8 14:29:34 2016 |
TD, OH, DK | NP1412 Run 4 | 23:28 Run 4 Start
Thick 6mm C target in beam
|
|
434
|
Tue Nov 8 14:22:16 2016 |
TD, OH, DK | NP1412 R3 | 11:21 Run 3 Started
Degrader moved upstream. AIDA moved
to centre of BRIKEN. Fixed degrader moved |
|
433
|
Tue Nov 8 13:37:06 2016 |
TD, OH, DK | NP1412 R2 | 10:36 Run 2 Start
Degraders (5.4mm Al) in at start and
all removed once started.
|
6x |
432
|
Tue Nov 8 13:06:18 2016 |
DK, TD, CG, OH | NP1412 Run 1 | AIDA run with Takechi experiment. 71~73
Ni beam setting
F5 carbon target is: |
|
431
|
Tue Nov 8 00:52:59 2016 |
OH, TD | FEE Settings and Options files | Used a program to sort through the settings
files located in /MIDAS/DB/EXPERIMENTS/AIDA/Settings_FIle_Name/nnaider1,2,3...
and /MIDAS/DB/EXPERIMENTS/AIDA/Options.
|
|
430
|
Tue Nov 8 00:12:56 2016 |
TD | Report - medium - TapeServer changes volume name following request for existing filename |
When you request a filename that already
exists and select OK to the prompt
|
|
429
|
Mon Nov 7 23:15:14 2016 |
TD, CG, OH | Tuesday 8 November | 08.15 DAQ found stalled
Soft reset OK
|
12x |
428
|
Mon Nov 7 02:13:05 2016 |
CG, OH, TD, DK | Monday 7 November | 11.10 DAQ found stopped. No storage mode so
can't tell when, but presumably at 06.30
during LN2 fill cycle.
|
10x |
427
|
Sun Nov 6 05:16:22 2016 |
OH | Update | Leakage current spreadsheet has now been uploaded
to google docs for ease of access.
|
|
425
|
Sun Nov 6 01:34:15 2016 |
TD, OH, CG | Sun 6th November | 10:34 Detector Bias a leakage currents all
ok. (Attachments 1 and 2)
Temperatures all ok (Attachment 3)
|
18x |
424
|
Sat Nov 5 09:40:02 2016 |
OH | Updated Leakage Current Spreadsheet | Attached is the updated leakage current spreadsheet
(Attachment 1) as pf 5/11/2016 it is
up to date with the elog.
|
  |
423
|
Sat Nov 5 01:55:15 2016 |
CG, TD, OH | Saturday 5th November | 10.55 DAQ found to have stopped at 06:47 during
LN fill cycle.
|
20x |
422
|
Fri Nov 4 08:10:46 2016 |
CG | Pb bricks upstream | Stack of Pb bricks upstream of AIDA+BRIKEN
to protect from incoming beam. |
|
421
|
Fri Nov 4 04:35:03 2016 |
TD, CG, DK | Friday 4 November part 2 | 13.35 Swapped HDMI cables from master MACB
to MACB #3 & #7
for HDMI cables from MACB #7 ports |
36x |
419
|
Thu Nov 3 17:42:37 2016 |
TD, CG, DK | Friday 4 November |
00.40-02.30 Discussion with PJCS
|
32x |
418
|
Thu Nov 3 02:29:45 2016 |
TD | [How To] Startup AIDA (October 2016) | Assumes 3-phase ac power (to Julabo FL11006
recirculating chiller) and single-phase ac
power
|
29x |
417
|
Thu Nov 3 01:25:30 2016 |
TD, CG | Thursday 3 November | 10.20 DAQ found stalled
DSSSD bias & leakage current OK - see |
11x |
416
|
Tue Nov 1 23:55:33 2016 |
TD, CG | Wednesday 2 November | 08.56 DAQ continues OK
DSSSD bias & leakage current OK - see |
12x |
415
|
Tue Nov 1 02:24:05 2016 |
TD | Tuesday 1 November | 11.24 DAQ found stalled
Most recent file R95_168 last accessed
06.31
|
8x |
414
|
Mon Oct 31 04:50:59 2016 |
TD | [How to] Monitor AIDA (October 2016) |
All AIDA operations are controlled from the
Dell T410 Workstation aidas1 using web browsers.
|
|
413
|
Mon Oct 31 04:02:11 2016 |
TD | [How To] Stop Runs (October 2016) |
All AIDA operations are controlled from the
Dell T410 Workstation aidas1 using web browsers.
|
    |
412
|
Mon Oct 31 02:26:32 2016 |
TD | [How To] Start Runs (October 2016) | All AIDA operations are controlled from the
Dell T410 Workstation aidas1 using web browsers.
|
12x |
411
|
Mon Oct 31 02:00:01 2016 |
TD | Monday 31 October | 11.00 DAQ continues OK
DAQ STOP OK
Most recent files R91_568 last accessed |
11x |
410
|
Sun Oct 30 04:37:31 2016 |
TD | Spectrum layouts created | The following spectrum layouts have been created
1 All Rate spectra
|
8x |
409
|
Sun Oct 30 03:26:55 2016 |
TD | Report - medium - cannot restore layout if currently displaying >16 galleries |
Cannot restore layout if currently displaying
>16 galleries
|
|
408
|
Sun Oct 30 01:53:13 2016 |
TD | Sunday 30 October | 10.53 DAQ found stalled
Most recent files R89_102 last accessed
07.17
|
9x |
407
|
Sat Oct 29 07:26:59 2016 |
TD | AIDA ADC & disc data synchronisation check |
Following analysis of AIDA ADC & disc readout
( see https://elog.ph.ed.ac.uk/AIDA/404 )
|
14x |
406
|
Sat Oct 29 03:31:03 2016 |
TD | Saturday 29 October |
11.30 DAQ continues (R87)
System-wide checks OK *except* SYNC |
11x |
405
|
Fri Oct 28 06:12:50 2016 |
TD | Friday 28 October | 14.12 DAQ stalled as expected
Most recent file R86_245 last accessed
06.26
|
12x |
404
|
Thu Oct 27 10:57:49 2016 |
TD | AIDA data readout |
Developing real-time AIDA data synchronisation
test using MIDASsort
|
  |
403
|
Thu Oct 27 10:54:14 2016 |
TD | Thursday 27 October | 14.20 DSSSD bias & leakage currents OK - see
attachments 1 & 2
FEE64 temperatures OK - see attachment |
  |
402
|
Tue Oct 25 02:06:34 2016 |
TD | Tuesday 25 October | 10.10 DAQ found stopped
Most recent file R81_169, last accessed
06.26
|
13x |
401
|
Mon Oct 24 02:46:57 2016 |
TD | Monday 24 October | 10.47 DAQ found stopped, no merger error messages
Most recent file R78_281, last accessed
06.46
|
19x |
400
|
Sun Oct 23 10:22:36 2016 |
TD | Report - high - merger SEGV |
Merger crashed during operation - see https://elog.ph.ed.ac.uk/AIDA/399 |
|
399
|
Sun Oct 23 02:34:12 2016 |
TD | Sunday 23 October | 10.34 DAQ found stopped, no merger error messages
Most recent file R74_296, last accessed
06.31
|
    |
398
|
Sat Oct 22 02:32:37 2016 |
TD | Saturday 22 October | 10.32 DAQ found stopped, no merger error messages
Most recent file R70_315, last accessed
06.46
|
15x |
397
|
Fri Oct 21 01:41:54 2016 |
TD | Friday 21 October |
09.38 DAQ (R66) continues OK
|
14x |
396
|
Thu Oct 20 20:00:14 2016 |
CG | Returned module tests @ DL | Original system configuration before my arrival:
nnaida11 - 2b:22:6e
|
7x |
395
|
Thu Oct 20 01:30:10 2016 |
TD | Thursday 20 October | 09.30 DAQ found stopped, no merger error messages
Most recent file R63_291, last accessed
06.46
|
12x |
394
|
Wed Oct 19 01:14:10 2016 |
TD | Wednesday 19 October | 09.13 DAQ found stopped, no merger error messages
Most recent file R55_10, last accessed
19.17
|
8x |
393
|
Tue Oct 18 06:56:52 2016 |
TD | DAQ status |
From the installation of the RG58 cable for
the 50MHz TTL clock from BRIKEN DAQ
|
|
391
|
Tue Oct 18 01:43:04 2016 |
TD | Tuesday 18 October | 09/42 DAQ found stopped, no merger error messages
Most recent file R52_211, last accessed
06.30
|
33x |
390
|
Mon Oct 17 04:10:30 2016 |
TD | Monday 17 October | 12.05 DAQ found stopped
Most recent file R49_226, last accessed
06.26
|
7x |
388
|
Sun Oct 16 03:14:41 2016 |
TD | Sunday 16 October | 11.12 DAQ start (R47)
Detector bias and leakage currents |
16x |
387
|
Sat Oct 15 03:27:31 2016 |
TD | Saturday 15 October | 11.27 DAQ found stopped
Most recent file R42_164, last accessed
07.18
|
10x |
385
|
Thu Oct 13 16:12:06 2016 |
TD & CG | Friday 14 October |
DAQ continues (R33)
|
14x |
384
|
Thu Oct 13 06:07:43 2016 |
TD & CG | Thursday 13 October |
11.40 Power cycle AIDA FEE64s
Set TS_SYNC_PHASE 0
|
    |
383
|
Wed Oct 12 02:58:19 2016 |
TD & CG | Wednesday 12 October | 10.50 Merger & TapeServer found stopped
connect errors - see attachment 1
|
    |
382
|
Tue Oct 11 03:34:02 2016 |
CG & TD | Tuesday 11 October | 10.40 DAQ found stopped
All FEE64 AIDA SYNC rates zero, AIDA |
16x |
381
|
Mon Oct 10 03:15:59 2016 |
CG & TD | Monday 10 October |
10.30 DAQ found stopped
|
25x |
380
|
Sun Oct 9 11:47:34 2016 |
CG, TD | Sunday 9th October |
12.30 Following scheduled power outages of
October 8
|
9x |
379
|
Fri Oct 7 02:43:47 2016 |
TD & CG | Analysis of Sept2016/R13_47 | Analysis of R13_47 - the data file that was
being written when DAQ stalled
yesterday evening - see https://elog.ph.ed.ac.uk/AIDA/371
|
|
378
|
Fri Oct 7 02:29:19 2016 |
TD & CG | Friday 7 October | 10.29 DAQ left running overnight
Histograms only - no data transfer
to Merger & TapeServer
|
22x |
377
|
Thu Oct 6 13:22:24 2016 |
TD | Images of setup at F11 - 4 | |
|
375
|
Thu Oct 6 13:20:34 2016 |
TD | Images of setup at F11 - 3 | |
  |
373
|
Thu Oct 6 13:09:50 2016 |
TD | Images of setup at F11 - 2 | |
  |
372
|
Thu Oct 6 12:39:14 2016 |
TD | Images of setup at F11 | |
  |
371
|
Thu Oct 6 11:16:40 2016 |
CG & TD | Thursday 6 October |
DSSSD bias voltages and leakage currents
OK - see attachments 1 & 2
|
9x |
370
|
Wed Oct 5 07:29:29 2016 |
CG & TD | Wednesday 5 October (inc AIDA+BRIKEN photos) | 14.30 Adjusted and checked insertion of AIDA
snout into BRIKEN (CH2)n moderator.
up-down AIDA snout appears centred |
11x |
369
|
Sun Oct 2 15:03:11 2016 |
CG, TD | Problems compiling AIDAsort program on aidas1 |
I have been trying to compile the sort program
I have been working on in Edinburgh so I |
  |
368
|
Sun Oct 2 06:12:54 2016 |
TD | Sunday 2 October |
14.15 DSSSD bias/leakage current OK - see
attachments 1-2
|
16x |
367
|
Sat Oct 1 09:34:23 2016 |
TD | Installing latest (16 April 2015) MACB firmware | Installed Xilinx 14.7 LabTools + (free) WebPack
license
|
|
366
|
Sat Oct 1 07:48:48 2016 |
CG & TD | Saturday 1 October | 11.00 Moved detector stack forward several
cm. 1st DSSD now ~6cm from end of snout.
Middle of stack now ~47cm from
|
14x |
365
|
Sat Oct 1 01:57:56 2016 |
TD & PJCS | Latest MACB firmware - 16 April 2015 | |
|
364
|
Fri Sep 30 07:52:56 2016 |
TD | Report - low - AIDA correlation L/M/H statistics count 3x |
The AIDA correlation L, M & H statistics
count 3x for each correlation trigger,
|
|
363
|
Fri Sep 30 03:35:12 2016 |
TD | Friday 30 September | 11.37 Attempt to use external 50MHz clock
for Master MACB (w/ 50MHz front panel label)
|
    |
362
|
Thu Sep 29 03:20:38 2016 |
TD & CG | Thursday 29 September | 11.20 R1 stops
DSSSD bias/leakage current OK - see |
15x |
361
|
Wed Sep 28 07:51:45 2016 |
TD & CG | New spectrum display software installed |
Spectrum display software updated
maximum number of galleries increased |
|
360
|
Wed Sep 28 06:40:40 2016 |
TD & CG | Wednesday 28 September | 14.40 AIDA power up
Julabo FL11006 set point +20 deg C
|
   |
359
|
Wed Sep 7 16:11:25 2016 |
Patrick Coleman-Smith | Updated layout.txt file in aidas1 | Used the layout reported in ELOG357 and
updated the layout.txt file used in the "Layout
and Status" browser window. |
|
358
|
Mon Sep 5 06:54:02 2016 |
TD | Monday 5 September | 14.20 R17 continues
DSSSD bias/leakage current OK - see |
16x |
357
|
Sun Sep 4 04:35:42 2016 |
TD | FEE64 & MACB configuration |
|
  |
356
|
Sun Sep 4 04:26:23 2016 |
TD | Sunday 4 September | 14.20 R13 continues
DSSSD bias/leakage current OK - see |
20x |
355
|
Sat Sep 3 05:54:14 2016 |
TD | Saturday 3 September | 14.20 R13 continues
DSSSD bias/leakage current OK - see |
16x |
354
|
Fri Sep 2 06:22:26 2016 |
TD | Friday 2 September | 14.20 R11 continues
DSSSD bias/leakage current OK - see |
17x |
353
|
Thu Sep 1 03:45:34 2016 |
TD | Thursday 1 September | 13.33 R11 starts
ASIC settings 2016Aug20-15.34.53
|
28x |
352
|
Tue Aug 30 08:26:33 2016 |
TD | Tuesday 30 August | 16.18 R10 stops
ASIC settings 2016Aug20-15.34.53
|
28x |
351
|
Mon Aug 29 08:53:55 2016 |
TD | nnaida19 restored |
nnaida19 restored to configuration - /MIDAS/Aida/tclhttpd/aidas1/startup.tcl
- see attachment 1
|
|
350
|
Mon Aug 29 06:57:32 2016 |
TD | Monday 29 August |
Per the instructions provided by https://elog.ph.ed.ac.uk/AIDA/331
added Servisol Heat Sink Compound
|
7x |
349
|
Fri Aug 26 02:10:31 2016 |
TD | Friday 26 August | 10.11 R9 continues
ASIC settings 2016Aug20-15.34.53
|
28x |
348
|
Thu Aug 25 02:10:10 2016 |
TD | Thursday 25 August | 11.40 R9 continues
ASIC settings 2016Aug20-15.34.53
|
21x |
347
|
Wed Aug 24 03:43:44 2016 |
TD | Wednesday 24 August | 11.40 R8 continues
B2F/FF temp +25 deg C, d.p. +14 deg |
32x |
346
|
Tue Aug 23 01:49:01 2016 |
TD | Tuesday 23 August |
09.50 DAQ found stopped
No error messages merge/tapeserver |
18x |
344
|
Mon Aug 22 13:37:30 2016 |
TD | Monday 20 August | > 11.00 Restore power to AIDA following Saturday's
shutdoen in preparation for the planned maintenance
> outage on Sunday.
|
|
343
|
Mon Aug 22 11:45:07 2016 |
Patrick Coleman-Smith | Software updated in Aida | Logged into aidas1, installed AidaExecV8
with a test of the time difference between
SYNC data items. Failure to be 0x40000 clocks |
|
342
|
Mon Aug 22 10:35:31 2016 |
TD | Monday 20 August | 11.00 Restore power to AIDA following Saturday's
shutdoen in preparation for the planned maintenance
outage on Sunday.
|
17x |
341
|
Mon Aug 22 10:35:06 2016 |
TD | Saturday 20 August | |
|
340
|
Fri Aug 19 12:41:43 2016 |
TD, VP, reply PJCS | Friday 19 August | > > >
> > > 14.00 Both AIDA NIM bins U/S
> > > Upper NIM bin - BNC PB-4, Ortec |
|
339
|
Fri Aug 19 11:07:44 2016 |
TD, VP, reply PJCS | Friday 19 August | > >
> > 14.00 Both AIDA NIM bins U/S
> > Upper NIM bin - BNC PB-4, Ortec |
|
338
|
Fri Aug 19 09:43:27 2016 |
TD, VP, reply PJCS | Friday 19 August | >
> 14.00 Both AIDA NIM bins U/S
> Upper NIM bin - BNC PB-4, Ortec 433, |
|
337
|
Fri Aug 19 07:42:22 2016 |
TD, PV | Friday 19 August |
14.00 Both AIDA NIM bins U/S
Upper NIM bin - BNC PB-4, Ortec 433, |
6x |
336
|
Wed Aug 17 14:44:52 2016 |
Patrick Coleman-Smith | [HowTo] start acquisition using the new "Start ASIC Readout" button | Due to sometimes operating with very noisy
systems, both at Daresbury and RIKEN, I have
installed a change to the startup of the |
|
335
|
Wed Aug 17 14:10:05 2016 |
Patrick Coleman-Smith | Linux Memory problem solutions for FEE64 | The problem indicated by "page allocation
failure" and the kernal subsequently
"killing" the AidaExecV8 process |
|
334
|
Mon Aug 15 09:55:08 2016 |
Patrick Coleman-Smith | Found a candidate for DAQ failure. | The problem :-
The DAQ stops working and can only
be fixed by a reboot of the FEE64s. |
|
333
|
Mon Aug 1 11:30:07 2016 |
Patrick Coleman-Smith | First time remotely power up HV in RIKEN from Daresbury | Logged into aidas1 and opened the nnrpi1
relay control window ... powered up the FEE64s.
seperatly connected to ribfdaq and |
|
332
|
Sun Jul 31 09:38:07 2016 |
TD | Analysis of AIDA75_1 | Attachment 2 - analysis from *end* of file
AIDA75_1
|
   |
331
|
Thu Jul 28 11:35:58 2016 |
Patrick Coleman-Smith | [HowTo] Apply Thermal paste to FPGA | |
|
330
|
Mon Jul 25 08:38:56 2016 |
TD | Analysis of R4 | |
|
329
|
Wed Jul 20 18:41:55 2016 |
DK | AIDA topped up on water | I actually topped off the chiller
with water tonight as I am returning to Scotland
(and then off to CERN) within hours. |
|
328
|
Mon Jul 18 12:00:16 2016 |
Patrick Coleman-Smith | Report of remote operation of Aida at RIKEN 11/7 to 14/7 |
Normal
0
|
|
327
|
Thu Jul 14 16:55:32 2016 |
Patrick Coleman-Smith | Changes to AIDA software | An updated copy of the merger has been
downloaded ( merger64.AD ) with a copy of
/MIDAS/Merger/AIDA/Startup. |
|
326
|
Fri Jul 8 18:54:47 2016 |
TD | Analysis July2016/R1 data |
See https://elog.ph.ed.ac.uk/AIDA/324
|
   |
325
|
Thu Jul 7 17:16:11 2016 |
Patrick Coleman-Smith | Install & Run new firmware with diagnostics for the SYNC | Connected to aidas from daresbury.
Started Firefox with windows for Rpi, Merge,
Runcontrol.
|
|
324
|
Tue Jul 5 13:43:02 2016 |
DK, PV | Pulser Test Run after AIDA is moved | Needed to run startx and start the TcLHttpd
server on rpi
Following along here: https://elog.ph.ed.ac.uk/AIDA/242 |
10x |
323
|
Tue Jul 5 10:26:11 2016 |
DK | AIDA relocation pictures | Here are some pictures after AIDA's relocation.
In principle, it can stay here, but
probably after the tests we will push it |
6x |
322
|
Tue Jul 5 09:39:27 2016 |
DK | Rly16 is not online | AIDA was relocated, and now I want to power
it on to do some tests. However, I
cannot get the Rly16 service running. |
|
321
|
Sat Jun 18 14:35:31 2016 |
TD | AIDA photographs - June 2016 - 4 | |
    |
320
|
Thu Jun 16 08:18:50 2016 |
TD | AIDA photographs - May 2016 | |
 |
319
|
Thu Jun 16 08:12:51 2016 |
TD | AIDA photographs - June 2016 - 3 | |
  |
318
|
Thu Jun 16 08:07:37 2016 |
TD | AIDA photographs - June 2016 - 2 | |
   |
317
|
Thu Jun 16 08:00:10 2016 |
TD | AIDA photographs - June 2016 - 1 | |
   |
316
|
Thu Jun 16 03:40:43 2016 |
TD | Thursday 16 June 2016 | 10.40 DAQ stalled AIDA75_30 c. 01.36
SYNC errors since baseline (start of |
    |
315
|
Wed Jun 15 01:43:47 2016 |
TD | Wednesday 15 June 2016 | 09.19 DAQ stalled AIDA72_87 c. 01.25
SYNC errors since baseline (start of |
6x |
314
|
Tue Jun 14 01:42:56 2016 |
TD | Tuesday 14 June 2016 | 09.35 AIDA67 stalled AIDA67_43 (c. 01.27)
DAQ stopped and file closed 09.32
|
7x |
313
|
Mon Jun 13 03:45:15 2016 |
TD | Monday 13 June 2016 | 10.20 AIDA62 found stalled - no SYNCs, no
data transfer
All FEE64s pass all system-wide tests |
20x |
312
|
Sun Jun 12 19:19:22 2016 |
DK | Machine Time End | 3:13 operators call to tell us the machine
time is over. No more EURICA!
|
|
311
|
Sun Jun 12 03:05:37 2016 |
TD, AE, CG, MA | Sunday 12 June 2016 part 2 |
BigRIPS switched from 60Ti to 64V
|
11x |
310
|
Sat Jun 11 17:24:11 2016 |
DK, TD | Sunday 12 June 2016 | Runs 41 and 42 are quite short. Run
41 was interrupted by the beam dropping (operators
called), and run 42 we are just trying to |
14x |
309
|
Sat Jun 11 16:06:16 2016 |
TD | [How To] Monitor per FEE64 Activity |
Launch terminal and enter commands
|
|
308
|
Sat Jun 11 15:48:49 2016 |
TD | [How To] Monitor Pause-Resume Times | The basic GREAT data format analyser will
report per FEE cumulative
pause-resume times which should be << timestamp |
|
307
|
Sat Jun 11 13:57:09 2016 |
laura | How to monitor and check synchronisation of FEES | Alfredo has written a program to check
the synchronisation of the FEES, which need
to be checked regularly |
   |
306
|
Sat Jun 11 10:29:16 2016 |
AE, TD, LHB | synchronization between different FEEs | file AIDA10_20: stopped on June 10, 14:59
file AIDA10_40: stopped on June 10, 16:16
|
  |
305
|
Fri Jun 10 21:07:52 2016 |
AE, DK, TD, ML, MA | Saturday 11 June 2016 | 04.51 Start run AIDA18. Beam is back
from the operators.
Scalers are shown as attachment 1
|
8x |
304
|
Fri Jun 10 14:14:56 2016 |
TD | nnaida19 |
See attachments 1 and 2 and spot the difference
...
|
  |
303
|
Fri Jun 10 14:02:17 2016 |
TD (courtesy VFEP) | [How to] Avoid Power-Cycling/Rebooting FEE64s |
If you obtain the 'unable to connect' from
one, or more, of the FEE64s try the
|
|
302
|
Fri Jun 10 12:51:19 2016 |
TD | ADC offsets - pass 1 -18.15 3 June 2016 |
Column order:
|
|
301
|
Fri Jun 10 08:04:11 2016 |
YS | Leakage Currents Spread Sheet | Leakage Currents Spread Sheet and Chart |
 |
300
|
Fri Jun 10 02:52:02 2016 |
TD, ML & YS | Friday 10 June 2016 | 10.50 SyncCheck ... EURICA server refusing
connection
|
16x |
299
|
Fri Jun 10 02:25:45 2016 |
TD, ML & YS | DAQ State of Play - Friday 10 June 2016 |
10.25 Screenshots showing DAQ state of play
during NP1512 |
6x |
298
|
Wed Jun 8 20:56:28 2016 |
CG | Thurs 9th June | 04.45 Lowered slow comp threshold on all FEEs
bar nnaida24 to 8 (nnaida24 @ 12).
Fast comp thresh @ 6 on all nnaida.
|
6x |
297
|
Wed Jun 8 09:29:55 2016 |
TD | DAQ state of play |
17.25 State of play
|
9x |
296
|
Wed Jun 8 05:00:53 2016 |
TD | Analysis of R1229 |
Files R1229_0 ... R1229_3 (written by TapeServer
without data compression)
|
   |
295
|
Wed Jun 8 04:24:04 2016 |
TD | aidas1 disk statistics (without data compression) | aidas1> iostat -xn
Linux 2.6.32-504.8.1.el6.x86_64 (aidas1)
06/08/2016 _x86_64_ (16 CPU)
|
|
294
|
Wed Jun 8 03:57:59 2016 |
TD | Analysis of R1222 | Timestamp data per FEE per 10s (i.e. 1 ch
= 10s)
|
   |
293
|
Wed Jun 8 03:46:51 2016 |
TD & ML | TapeServer compression disabled |
CHnaged TapeServer configuration file to
disable data compression
|
|
292
|
Wed Jun 8 02:31:20 2016 |
TD | aidas1 disk statistics |
DAQ running to disk at relatively low rate
(merger ~600k item/s, tapeserver ~4700kb/s)
|
|
291
|
Tue Jun 7 19:19:34 2016 |
CG, TD, DK, AE | Wednesday 8th June | (4 mm Al mask was put upstream of AIDA
near 20:20 on 7 June)
|
27x |
290
|
Tue Jun 7 10:59:20 2016 |
TD | merge stats | Let me which merge stats for all data links
would be most useful and I will upload screenshots.
|
 |
289
|
Tue Jun 7 10:36:14 2016 |
TD | nnaida19 | aidas1> cat var/log/dmesg
Using Xilinx Virtex440 machine description
Linux version 2.6.31 (nf@nnlxb.dl.ac.uk) |
|
288
|
Tue Jun 7 05:48:13 2016 |
TD, AE, ML & PJW | HEC spectra & implant profile |
DSSSD#1 and DSSSD#6 ADC hit patterns (profile)
and 1*H (ASIC#1 20GeV FSR) energy spectra |
  |
287
|
Mon Jun 6 19:26:38 2016 |
CG, DK, BM, AE | Tues 7th June | 02.08 Tried updating AIDA SYNC on stats
page and got this message.
|
28x |
286
|
Mon Jun 6 15:57:51 2016 |
TD, ML & YS | R1121 (AIDA) |
R1120 stalled shortly after DAQ GO
'unable to connect' etc
|
 |
285
|
Mon Jun 6 15:06:22 2016 |
1TD, ML & YS | R1119 | R1118 ended OK
R1119 DAQ GO, check AIDA SYNCs OK, toggle |
 |
284
|
Mon Jun 6 14:24:07 2016 |
TD, ML & YS | R1118 (AIDA) | 22.14 R1118 starts
aidas1 has been rebooted
|
10x |
283
|
Mon Jun 6 13:52:10 2016 |
TD, ML & YS | FEE64 power-cycle, FEE64 & aidas1 reboot |
21.40 toggled merge input pause state -
merge pause stopped at link 18 (nnaida19 |
|
282
|
Mon Jun 6 13:46:45 2016 |
TD, ML & YS | /var/log/messages | aidas1 log |
|
281
|
Mon Jun 6 11:17:30 2016 |
TD, ML & YS | Re-configure merger to ignore nnaida19 |
19.00 Power-cycled and rebooted AIDA FEE64s
|
 |
280
|
Mon Jun 6 08:57:34 2016 |
GL,PW, YS, TD, ML | AIDA run 1112 - Sync problem | After starting run 1112, we noticed that
the merge program was waiting for a first
sync. It then turned out that all syncs had |
|
279
|
Mon Jun 6 08:51:50 2016 |
TD | Change of set point for Julabo FL11006 recirculating chiller |
The Julabo FL11006 recirculating chiller
set point has been changed from +20.0 deg |
 |
278
|
Sun Jun 5 17:09:49 2016 |
CG, DK, AE | Monday 6th June | 00.45 Run R1100 started on n-rich setting
(EURICA run_1100, BigRIPS run 1165)
|
20x |
277
|
Sun Jun 5 02:14:10 2016 |
TD, AE, CG & DK | Sunday 5 June 2016 | 10.10 Detector biases & leakage currents -
OK - see attachments 1-2
|
8x |
276
|
Sun Jun 5 01:32:44 2016 |
TD, DK, GL, AE, PJW | First RIB implantation: Run 67 | We restarted the merger (Stop, Setup &
Configure, Go, Pause) and then we could restart
the DAQ as normal. Rate is ~500 Hz. |
|
275
|
Sun Jun 5 01:20:39 2016 |
DK, AE, GL, PJW | Merger wants first SYNC | Trying to start the AIDA DAQ now that the
RI beam is (nearly) ready. However,
we cannot get merging to work. But |
|
274
|
Sat Jun 4 08:46:20 2016 |
TD | AIDA noise - state of play 2 |
Attachments 1-23 AIDA FEE64s nnaida1-nnaida23
ASIC #1 waveforms
|
27x |
273
|
Sat Jun 4 04:53:25 2016 |
TD, AE, CG, DK, GL YL & PJW (Team AIDA) | Saturday 4 June 2016 | 12.27 DAQ run R61 started 01.30
Appears to have stopped abruptly at
~06.55
|
8x |
272
|
Fri Jun 3 03:10:55 2016 |
TD, AE, CG & DK | Friday 3 June 2016 | 11.00 Detector biases and leakage currents
- see attachments 1-2
|
12x |
271
|
Thu Jun 2 09:04:57 2016 |
TD | [How to] Monitor AIDA | Every 4h
1) Record DSSSD #1 = #6 detector bias voltages |
|
270
|
Thu Jun 2 01:33:13 2016 |
TD, AE, CG & DK | Thursday 2 June 2016 |
09.30 DAQ left running overnight
AIDA SYNCs on all FEE64s this morning |
    |
269
|
Wed Jun 1 13:58:48 2016 |
TD - Reply PJCS | Wednesday 1 June 2016 |
> Check the Local Controls for the setting
of the LMK3200 control rgister.
|
   |
268
|
Wed Jun 1 12:14:08 2016 |
Patrick Coleman-Smith | [HowTo] React to "Check Clock Status => FEE64 Failure" | If there are more than one failures then check
how they map to the MACB HDMI connections.
Are they all connected to the just one MACB |
|
267
|
Wed Jun 1 09:00:13 2016 |
TD - Reply PJCS | Wednesday 1 June 2016 | > 09.30 Detector biases and leakage currents
- ambient temp +24.9 deg C - attachments
1-2
|
|
266
|
Wed Jun 1 07:49:45 2016 |
TD | Detector noise - state of play | Screenshots of ASIC#1 waveforms for each side
of each of the DSSSD #1 - #6 are attached.
|
10x |
265
|
Wed Jun 1 01:33:58 2016 |
TD | Wednesday 1 June 2016 | 09.30 Detector biases and leakage currents
- ambient temp +24.9 deg C - attachments
1-2
|
9x |
264
|
Wed Jun 1 01:32:04 2016 |
TD | Co/Bi source run (R19) |
09.18 R19 (AIDA) stopped
AIDA SYNC lost for most (but not all) |
 |
263
|
Tue May 31 16:03:24 2016 |
AE. VP | Co/Bi source run (R17) | Set discriminator mask for DSSD2 through DSSD6
(see attachments). Fast comparator threshold
set to 9 for all DSSDs.
|
8x |
262
|
Tue May 31 08:06:43 2016 |
TD, AE & CG | Tuesday 31 May 2016 |
Attachment 3 - AIDA discriminator with pulser
~5Hz
|
7x |
261
|
Mon May 30 22:57:58 2016 |
AE | Co/Bi source run (R7) | > Some comments regarding source run for beta-gamma
calibration, to complement EURICA16 elog
entry:
|
|
260
|
Mon May 30 18:29:54 2016 |
AE | Co/Bi source run (R7) | Some comments regarding source run for beta-gamma
calibration, to complement EURICA16 elog
entry:
|
    |
259
|
Mon May 30 09:03:07 2016 |
TD, AE & CG | timstamping - state of play |
Current error messages and status - see attachments |
11x |
258
|
Mon May 30 08:43:10 2016 |
CG, TD - PJCS reply | MACB settings |
|
|
257
|
Mon May 30 08:18:48 2016 |
CG, TD - PJCS reply | MACB settings |
|
|
256
|
Mon May 30 06:03:51 2016 |
CG, TD | MACB settings | 14.00 MACB settings (from left -> right)
|
|
255
|
Mon May 30 03:58:10 2016 |
TD | peakfind not working on aidas1 |
Peakfind appears not to be working on aidas1
- example spectrum attached
|
|
254
|
Mon May 30 02:50:19 2016 |
CG | Monday 30th May | 10.30 Pulser walkthrough carried out 90,000
- 10,000 @ 10,000 step
|
 |
253
|
Mon May 30 00:07:56 2016 |
TD, AE & CG - reply PJCS | Sunday 29 May 2016 | > > > >
> > > > > > 22.05 nnaida17 ASIC parameters
not loading
|
|
252
|
Mon May 30 00:01:23 2016 |
TD, AE & CG - reply PJCS | Sunday 29 May 2016 | > > >
> > > > > 22.05 nnaida17 ASIC parameters
not loading
|
    |
251
|
Sun May 29 23:55:15 2016 |
TD, AE & CG - reply PJCS | Sunday 29 May 2016 | > >
> > > > 22.05 nnaida17 ASIC parameters not
loading
|
    |
250
|
Sun May 29 23:28:56 2016 |
TD, AE & CG - reply PJCS | Sunday 29 May 2016 | >
> > > 22.05 nnaida17 ASIC parameters not
loading
|
|
249
|
Sun May 29 22:35:25 2016 |
TD, AE & CG - reply PJCS | Sunday 29 May 2016 |
> > 22.05 nnaida17 ASIC parameters not loading
> > power cycle & reboot
|
  |
248
|
Sun May 29 20:06:15 2016 |
TD, AE & CG - reply PJCS | Sunday 29 May 2016 | > Throughout day:
> DSSD2 (3058-25) would not bias, either
short circuit or suspiciously low leakage |
|
247
|
Sun May 29 14:06:31 2016 |
TD, AE & CG | Sunday 29 May 2016 | Throughout day:
DSSD2 (3058-25) would not bias, either
short circuit or suspiciously low leakage |
    |
246
|
Sun May 29 10:31:59 2016 |
TD | nnaida19 'H' histogramming enabled indicator dispappears following DAQ start | 18.30 Options for nnaida19 and a.n.other (working)
FEE (nnaida18) |
 |
245
|
Sun May 29 10:11:07 2016 |
TD, CG & reply by PJCS | Saturday 8 May 2016 - reply about 'H' and "X" | > 15.20 DAQ histogramming & data transfer
#1 enabled
> Merger configured, started, input |
|
244
|
Sat May 28 07:31:07 2016 |
Saturday 8 May 2016 | TD, CG | 15.20 DAQ histogramming & data transfer #1
enabled
Merger configured, started, input paused
|
9x |
243
|
Fri May 27 11:16:40 2016 |
TD | [How To] Start and Stop Runs | All AIDA operations are controlled from the
Dell T410 Workstation aidas1 using web browsers.
|
7x |
242
|
Fri May 27 11:10:37 2016 |
TD | [How To] Startup AIDA | 1) Start Julabo FL11006 Recirculating Chiller
See manual (page 19) http://www2.ph.ed.ac.uk/~td/AIDA/Information/Julabo%20FL11006.pdf |
34x |
241
|
Fri May 27 06:38:27 2016 |
TD, AE & CG | Friday 27 May 2016 | 14.30 DSSSD stack moved upstream to position
DSSSD#3 at centre of EURICA.
|
13x |
240
|
Thu May 26 14:19:13 2016 |
Patrick Coleman-Smith | [HowTo] Access AIDA documentation | The latest version of the FEE64 software Interface
document ( May 2016 ) is available as a .pdf
from
|
|
239
|
Thu May 26 10:03:11 2016 |
Patrick Coleman-Smith | [HowTo] Specification Document for MACB including suggested setup. | Attached is the specification for the MACB
with the settings currently available. |
|
238
|
Thu May 26 03:46:41 2016 |
TD, AE & CG | Thursday 26 May 2016 | 11.45 AIDA discriminator rates - see attachment
1
Today's rates similar to yesterday's |
 |
237
|
Thu May 26 01:44:45 2016 |
Patrick Coleman-Smith | [HowTo] Use the Multiplicity Trigger Firmware, V8.18, and update the files |
Done. Awaiting test. See attachments 1-2.
|
 |
236
|
Wed May 25 18:51:54 2016 |
Patrick Coleman-Smith | [HowTo] Use the Multiplicity Trigger Firmware, V8.18, and update the files | The attached firmware file, FEE_GF_Feb16_18.bin,
should be saved to /MIDAS/Aida and the FlashPgm.csh
file edited
|
  |
235
|
Wed May 25 02:10:51 2016 |
TD, CG | Wednesday 25 May 2016 | 10.05 Recirculating chiller on
FEE power on
Detector bias on - ambient temp +23 |
  |
234
|
Tue May 24 08:28:28 2016 |
Patrick Coleman-Smith | [HowTo] Save power if not using the Waveforms and restart the Waveforms | The USB controlled power Relays are near their
AC fuse operating limit which has caused
some Fuse failures.
|
|
233
|
Tue May 24 07:12:30 2016 |
TD | 3x WDC WD30EFRX ATA 3Tb disks added to aidas1 LVM configuration |
The 3x WDC WD30EFRX ATA 3Tb disks installed
in aidas1 in April 2015 (formerly /data20, |
9x |
232
|
Tue May 24 06:39:17 2016 |
TD, CG | per FEE64 waveforms |
Attachments 1-30 per FEE64 ASIC #1 waveforms
|
30x |
231
|
Tue May 24 00:06:26 2016 |
TD | 24 May 2016 | Overnight. DAQ stopped. Detector bias off.
FEE power and recirculating chiller on.
|
    |
230
|
Mon May 23 17:21:29 2016 |
Patrick Coleman-Smith | [HowTo] A solution to the problem of no SYNCs | When starting Aida some FEE64 fail to provide
SYNC data , or any data for that matter,
on the ASIC data stream.
|
|
229
|
Mon May 23 09:17:55 2016 |
Patrick Coleman-Smith | Multiplicity Trigger Specification | Please read and comment on the attached
specification. |
|
228
|
Mon May 23 07:28:38 2016 |
TD | 23 May 2016 | 12.45 Rly16 'Sequence ALL On' operational
15.20 Startup remote control of CAEN N1419 |
25x |
227
|
Sat May 14 11:27:09 2016 |
AE, VP | [How To] DAQ correlation monitor (June16 campaign) | The program for online monitoring the correlation
of the DAQ systems (AIDA-EURICA-BigRIPS)
through a common scaler is SyncCheck (J. |
   |
226
|
Fri May 13 13:27:50 2016 |
patrick Coleman-Smith | Power supply changes and blowing fuses ! | Reading about the power supply changes
and the requirement to replace fuses leads
me to be concerned. |
|
225
|
Fri May 13 13:24:42 2016 |
Patrick Coleman-Smith | An idea that might help when everything grinds to a halt | When using the T9 system and running with
too much rate in one FEE64 so the system
is unbalanced. |
|
224
|
Fri May 13 06:18:53 2016 |
AE, VP, BM | Friday May 13th | 11 am: Changed configuration of power source
for AIDA PSU (see paper logbook). Now both
cables with power for
|
9x |
223
|
Thu May 12 16:55:37 2016 |
AE, VP, BM | Thursday May 12 | Continued work on beta-trigger for EURICA.
However the system seems to have different
noise condition than before, which
|
7x |
222
|
Thu May 12 15:50:48 2016 |
Patrick | System Checks and firmware update | Added two checks to the System wide checks.
Modified
the Firmware so the checks work properly.
One
check reads the status of the FEE64 clocks |
 |
221
|
Wed May 11 11:24:09 2016 |
Patrick | Correlation Controls | Please note that the Force Trigger and Reset
buttons in the Correlation Browser only
have meaning if the FEE64
|
|
220
|
Wed May 11 06:37:32 2016 |
AE, VP, BM | Wednesday 11 May | *2:30 pm*: changed power source of USB-controlled
power supply for FEEs. Now one of the power
cables is connected
|
  |
219
|
Wed May 11 06:01:16 2016 |
AE, VP, BM | Beta trigger | Please find attached the best diagram of the
beta trigger logic circuit for EURICA campaign
2016 |
|
218
|
Wed May 11 06:00:56 2016 |
AE, VP, BM (Byul Moon) | FEE64 <-> MACB trigger mapping | Here is the mapping of the trigger output
of MAC-B modules to FEE64 modules
|
|
217
|
Wed May 11 05:49:51 2016 |
AE | VHDL update to FEE_GF_Feb16_16 | The firmware of all FEEs was updated to the
version in FEE_GF_Feb16_16.bin (https://elog.ph.ed.ac.uk/AIDA/215).
This provides a 25 MHz clock output from |
  |
216
|
Tue May 10 16:03:50 2016 |
TD & VFEP | Latest version of Rly16 |
Do not forget to backup the current versions
of the attached files before
|
  |
215
|
Mon May 9 16:46:30 2016 |
Patrick | Update for FEE64 VHDL and Correlation browser windows | The attached VHDL file should be saved to
/MIDAS/Aida and the FlashPgm.csh file edited
to load "FEE_GF_Feb16_16.bin"
Use the |
 |
214
|
Thu May 5 14:44:48 2016 |
Patrick | Trigger selection explanations | Please request more information if the
attached is not clear. |
|
213
|
Thu May 5 11:10:36 2016 |
CG,PV,TD | Thursday 5 May 2016 | Detector configuration - see https://elog.ph.ed.ac.uk/AIDA/193
Ribbon cable to nnaida19 FEE adaptor PCB |
8x |
212
|
Thu May 5 09:52:20 2016 |
TD | MERGE test OK |
Slow comparator 0x10 -> 0x20
Fast comparator LEC/MEC 0x10 -> 0xff
|
7x |
211
|
Thu May 5 08:47:49 2016 |
TD | [How To] Mask Fast Discriminators | From the 'AIDA Control' tab select 'Discriminator
control'
|
|
210
|
Thu May 5 08:30:00 2016 |
TD | [How To] Set MACB Trigger Output Mode |
From the 'AIDA Control' tab select 'Local
Controls'
|
|
209
|
Thu May 5 08:12:14 2016 |
TD | Current AIDA settings and options |
Current AIDA settings DB Key: 2016May03-20.44.33
|
|
208
|
Thu May 5 07:55:32 2016 |
TD | [How To] Mount SAS and USB disks |
*******************************************************************************************************
UPDATE 24 May 2016
|
 |
207
|
Wed May 4 14:45:09 2016 |
TD | merge/tapeserver issues |
TapeServer issue fixed - disk incorrectly
mounted following reboot
|
|
206
|
Wed May 4 14:33:34 2016 |
TD | merge/tapeserver issues |
Reboot aidas1
Power cycle FEE64s
|
   |
205
|
Wed May 4 07:04:12 2016 |
TD | WAVE statistics |
AIDA wave statistics
|
13x |
204
|
Wed May 4 06:35:08 2016 |
TD | [How To] Save AIDA Settings & Options |
From 'Control' tab select 'Save/Restore Settings'
|
|
203
|
Wed May 4 03:01:15 2016 |
TD | Wednesday 4 May 2016 |
10.30 Power up.
Normal DAQ startup.
|
11x |
202
|
Tue May 3 16:11:57 2016 |
TD | MIDAS updates - problems | With help from Patrick Coleman-Smith & Vic
Pucknell most of the issues identified
appear to be related to one (or more) of |
   |
201
|
Tue May 3 15:45:17 2016 |
TD | AIDA Temperatures Log |
AIDA temperatures (ASIC, Virtex, PSU) are
recorded in the file:
|
|
200
|
Tue May 3 08:46:25 2016 |
TD | MIDAS updates - problems | 1) Unable to enable data transfer
From RunControl unable to 'Enable #1 All' |
8x |
199
|
Tue May 3 08:37:50 2016 |
TD | MIDAS updates | MIDAS updated per instructions of VFEP (I
append the new and old versions of startup.tcl
and aidacommon)
|
   |
198
|
Tue May 3 07:51:04 2016 |
TD | Tuesday 3 May 2016 | 32x FEE64 re-programmed from version 7 to
version 8 per instructions
|
  |
197
|
Mon May 2 12:13:25 2016 |
CG,PV,TD | Monday 2 May 2016 | |
22x |
196
|
Mon May 2 09:10:53 2016 |
TD | MIDAS_MIDASsort_160316 installed | The latest (and greatest!) version of MIDASsort
has been installed.
|
|
195
|
Mon May 2 07:37:03 2016 |
TD | AIDA FEE layout |
UP
|
|
194
|
Mon May 2 07:27:26 2016 |
TD | aidas1 /etc/dhcp/dhcpd.conf updated | aidas1 /etc/dhcp/dhcpd.conf update
to install two scratch FEE modules assembled |
|
193
|
Sun May 1 07:59:08 2016 |
CG,PV,TD | AIDA Detector Configuration |
UPSTREAM
|
|
192
|
Sat Apr 30 16:27:50 2016 |
TD | Saturday 30 April 2016 photographs |
Attachments 1-4 MSL type 2977-2- adaptor
PCB configurations (looking downstream) L, |
6x |
191
|
Sat Apr 30 07:46:47 2016 |
CG,PV,TD | Saturday 30 April 2016 | MSL type BB18 serial # 2977-20 bias +100V
I_L +12.45uA T=23 deg C
(biased by nnaida # 3 & 5 )
|
11x |
190
|
Fri Apr 29 11:11:20 2016 |
CG,PV,TD | Friday 29 April |
MSL type BB18 serial # 2977-20 bias +100V
I_L +12.0uA T=23 deg C
|
6x |
189
|
Thu Apr 28 07:42:11 2016 |
TD | [How To] Change the AIDA Acquisition Server Configuration |
Edit the file /MIDAS/config/TclHttpd/aidas1/startup.tcl
and change the definition of variables
|
|
188
|
Tue Apr 26 10:06:59 2016 |
CG, PV & TD | Tuesday 26 April |
2 (of 3) WD 3Tb ATA disk drives are not currently
mounted on aidas1.
|
|
187
|
Tue Apr 26 07:10:56 2016 |
TD | Seagate Backup Plus 8Tb USB disk installed | I have installed a Seagate Backup Plus 8Tb
(nominal) USB disk for data backup and
transfer to the UK
|
|
186
|
Tue Apr 26 06:13:00 2016 |
TD | aidas1: updated /etc/fstab file |
The aidas1 /etc/fstab file contained commented
out entries for 2 (of 3) WD 3Tb disks
|
|
185
|
Mon Apr 25 10:11:40 2016 |
CG, KM, PV & TD | Monday 25 April |
AIDA stand, Julabo FL11006 recirculating
chiller (with 110VAC/50Hz - 240VAC/50Hz 3ph |
|
184
|
Mon Apr 25 08:58:25 2016 |
TD | Report - high? - aidas1 - Binding NIS service FAILED | During a reboot of aidas1 the message
Binding NIS service FAILED
|
|
183
|
Thu Apr 14 13:56:17 2016 |
PJCS | Updating the FEE64 firmware. | To update the FEE64 firmware:-
Power-up the FEE64 modules
that you wish to update.
Identify |
|
182
|
Tue Mar 22 10:59:52 2016 |
TD : PJCS | Tuesday 22 March | MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.515uA, ambient temperature
+19.8 deg C
|
7x |
181
|
Mon Mar 21 14:37:41 2016 |
PJCS | Vernier Timing document for comment | Here is a document about the FEE64 waveform
Vernier Timing.
Please comment/criticise/offer advice. |
|
180
|
Thu Mar 17 10:46:30 2016 |
TD | Analysis of R45 | See https://elog.ph.ed.ac.uk/AIDA/179
207Bi source, no pulser
|
8x |
179
|
Tue Mar 15 11:15:42 2016 |
TD | Tuesday 15 March | MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.845uA, ambient temperature
+19.8 deg C
|
    |
178
|
Mon Mar 14 11:27:47 2016 |
PJCS | ASIC_clock synchronisation across the system | During 'SETUP' the ASIC readout clock (
500KHz ) is synchronised to the SYNC pulse
in V8.10 and later versions of the VHDL. |
|
177
|
Fri Mar 11 15:31:53 2016 |
TD | Analysis of R34_0 | lancre> ./analyser R34_0
*** GREAT format 3.2.0 analyser - TD - May
2014
|
    |
176
|
Thu Mar 10 16:35:39 2016 |
TD : PJCS | Report - high - AIDA timestamps | > Version 8 firmware
>
> Analysing R37_* data files (see https://elog.ph.ed.ac.uk/AIDA/160)
|
|
175
|
Wed Mar 9 17:31:58 2016 |
TD | Report - high - LEC/MEC fast comparator issues | >
> Fast comparator rate spectra and statistics
do not appear to working as expected. See |
|
174
|
Wed Mar 9 16:18:01 2016 |
TD | nndhcp021 AIDA server Httpd/TapeServer/Merger startup | Starting Httpd for the TapeServer/Merger,
TapeServer and Merger for AIDA produces
three terminal windows which will display |
|
173
|
Wed Mar 9 12:16:01 2016 |
TD | Wednesday 9 March | MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.505uA, ambient temperature
+19.8 deg C
|
|
172
|
Tue Mar 8 16:29:07 2016 |
TD | Report - high - AIDA timestamps | Version 8 firmware
Analysing R37_* data files (see https://elog.ph.ed.ac.uk/AIDA/160)
|
|
171
|
Tue Mar 8 15:40:57 2016 |
TD | Tuesday 8 March | MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.705uA, ambient temperature
+19.8 deg C
|
|
170
|
Tue Mar 8 15:32:53 2016 |
TD | Report - low - run control frame issue with multiple streams | The run control frame does not appear to update
the data transfer 'X' tag
for all FEE modules after selecting 'Enable |
|
169
|
Tue Mar 8 15:09:49 2016 |
TD | Report - high - LEC/MEC fast comparator issues |
Fast comparator rate spectra and statistics
do not appear to working as expected. See |
6x |
168
|
Tue Mar 8 12:11:56 2016 |
CG, AE | RIKEN maintenance progress |
|
|
167
|
Tue Mar 8 06:00:45 2016 |
CG, AE | RIKEN maintenance progress | 07/03/16
The new snout doesn't fit due to
the screw holes being misaligned. I am going |
|
166
|
Wed Mar 2 11:59:48 2016 |
PJCS | First data with two streams merged from one FEE64 | The Fail bit is used to indicate The Timing
Vernier word.
I'll post a seperate Elog entry to explain |
|
165
|
Thu Feb 25 12:47:43 2016 |
PJCS | First data with two streams merged from one FEE64 |
My GREAT data analyser program reports that
the 'fail' bit is set ?
|
|
164
|
Wed Feb 24 16:13:24 2016 |
PJCS | First data with two streams merged from one FEE64 |
|
|
163
|
Wed Feb 24 15:46:11 2016 |
PJCS | OR64 - OR of all the ASIC discriminator channels after application of a mask | Firmware version8 number 8 has an OR64
added which can be routed, using the Local
control, to the Trigger output and hence |
|
162
|
Wed Feb 24 14:53:41 2016 |
PJCS | First data with two streams merged from one FEE64 | nnaida2 running Version 8 Firmware and
data acquisition software outputting both
and ASIC data stream and a Waveform data |
|
161
|
Wed Feb 24 13:54:53 2016 |
TD | Report - low - FEE temperature plot displays incorrect dates |
See Attachment 1
|
|
160
|
Wed Feb 24 10:25:35 2016 |
TD | Wednesday 24 February 2016 | MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.770uA, ambient temperature
+19.8 deg C
|
   |
159
|
Tue Feb 23 12:16:08 2016 |
TD | Tuesday 23 February 2016 | MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.570uA, ambient temperature
+19.8 deg C
|
|
158
|
Mon Feb 22 16:47:28 2016 |
PJCS | Version 8 in nnaida2 outputting and merging two streams | nnaida2 , the bare test FEE64 in T9, is
successfully running with two streams connected
to nndhcp177 ( a Linux64 computer ) |
|
157
|
Mon Feb 22 15:19:52 2016 |
PJCS | T9 System changed to version 8 | I have changed the T9 system to be using
Version 8.
Tests using the detector and pulser |
|
156
|
Fri Feb 19 10:23:31 2016 |
TD | 19 February 2016 | MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.070uA, ambient temperature
+20.2 deg C
|
|
155
|
Thu Feb 18 13:23:03 2016 |
TD | Report: high: MERGE error messages | During R30 ( see https://elog.ph.ed.ac.uk/AIDA/154
) obtain the following merger error messages
(rate ~ 10 per minute) with merger rate ~100-200k |
|
154
|
Thu Feb 18 10:23:48 2016 |
TD | Thursday 18 February | MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.200uA, ambient temperature
+20.1 deg C
|
19x |
153
|
Wed Feb 17 11:54:50 2016 |
CG, TD | 17 February 2016 | File R17 -> pulser walkthrough.
- Started ~10.00
- Pulser peak amplitude taken from 9.0V |
6x |
152
|
Tue Feb 16 17:32:21 2016 |
CG, TD | 16 February 2016 | MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.150uA, ambient temperature
+20.1 deg C
|
|
151
|
Wed Feb 10 10:56:02 2016 |
CG, TD | 9-10 February 2016 | MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.540uA, ambient temperature
+19.9 deg C
|
7x |
150
|
Tue Feb 9 17:27:12 2016 |
CG, TD | Ribbon cable + coupler tests at DL 8-9th Feb | 08/02/16
Spoke to PJC-S -> Ethernet cables
from FEEs to switch are all 4m Cat6. |
    |
149
|
Wed Feb 3 15:34:30 2016 |
CG, TD | Ribbon cable + coupler tests at DL 1st-2nd Feb | 01/02/16
Started up system. Biased det to
+200V |
|
148
|
Tue Feb 2 17:32:46 2016 |
CG, TD | Tuesday 2 February 2016 | Bias +200V, I_L +6.955uA, ambient temp +20.2
deg C
|
9x |
147
|
Tue Feb 2 14:08:44 2016 |
CG, TD | Report: Low - No SYNCs from FEEs | Currently running with a source, and everything
seems to be running fine in terms of histograms
doing what we expect, no error messages etc. |
|
146
|
Thu Jan 28 13:53:29 2016 |
CG, TD | Ribbon cable + coupler tests at DL - 25-26th Jan | 25/01/16
On start up, received error when
trying to access spectrum browser (attachment |
15x |
145
|
Wed Jan 27 14:54:48 2016 |
TD, CG | Wednesday 27 January 2016 | MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +8.110uA, ambient temperature
+20.2 deg C
|
 |
144
|
Wed Jan 20 17:02:47 2016 |
CG, TD | Ribbon cable + coupler tests at DL | 18/01/16
Set up as last week but with 8us
shaping time. |
17x |
143
|
Wed Jan 20 16:44:02 2016 |
TD | Report - LOW - spectrum browser x/y expand |
Spectrum Browser
|
|
142
|
Wed Jan 20 12:00:19 2016 |
CG, TD | Wednesday 20 January 2016 | 11.58 Repeat yesterday's test - no significant
change observed
|
6x |
141
|
Tue Jan 19 18:09:53 2016 |
CG, TD | Tuesday 19 january 2016 |
18.00 Swapped input cables to nnaida11 and
nnaida14
|
   |
140
|
Fri Jan 15 16:50:09 2016 |
CG, TD | Ribbon cable + couple tests at DL | 12/01/16 (Attachments
1-8)
FEEs set up as per ELOG entry 136 |
20x |
139
|
Thu Jan 7 16:04:44 2016 |
CG, PJCS | PCS Reply to RIKEN progress - 15/12/15 (late) |
|
|
138
|
Thu Jan 7 13:55:24 2016 |
CG | RIKEN progress - 15/12/15 (late) | Tues 15/12/15
Swapped previously tripped detector
(3131-11) on to kaptons already in place |
 |
137
|
Wed Jan 6 16:06:32 2016 |
CG, TD, PJCS | Report: Low - RPi power cable can't be fully inserted due to case conflict - solved |
|
|
136
|
Tue Dec 15 11:17:05 2015 |
TD | STFC DL tests - 14-15.12.15 | BNC PB-5 Pulser
Fall time 1.0ms
|
13x |
135
|
Mon Dec 14 19:25:35 2015 |
AE, CG ,Phong | Merger/TapeServer trouble report | Sat. 12/12/15
Working with a 8-FEE setup (as in https://elog.ph.ed.ac.uk/AIDA/133). |
    |
134
|
Mon Dec 14 07:56:27 2015 |
CG | RIKEN progress | 13/12/15
Current jumper setup:
- detector |
10x |
133
|
Sat Dec 12 03:30:50 2015 |
Alfred, Chris, Phong | change configuration of NNAIDA modules in setup | We want to reduce the configuration of
the setup to 4 FEE cards (8 NNAIDA modules),
so we only have to isolate 4 of them from |
|
132
|
Sat Dec 12 02:12:17 2015 |
CG, AE, VH | RIKEN progress | Stripped down contents of AIDA NIM bins
to only what is required by AIDA.
Now have BNC PB-5 pulser, sum and |
9x |
131
|
Thu Dec 10 04:56:08 2015 |
CG, AE | RIKEN progress - first day and a half | 08/12/15 - Day 0.5
Test fitted new snout to snout base
- the holes |
 |
130
|
Thu Dec 3 16:28:46 2015 |
CG, TD | New Kapton cable tests at DL | Spent whole day trying to isolate mezzanines
from cooling crate.
Finally managed to increase resistance |
18x |
129
|
Thu Dec 3 10:12:08 2015 |
CG, TD | Report: Low - RPi power cable can't be fully inserted due to case conflict | The RPi power cable cannot sit fully in
the connector, and the lock pins can't engage,
because the case gets in the way of the plastic |
|
128
|
Wed Dec 2 18:39:44 2015 |
CG | New Kapton cable tests at DL | Powered on system ok.
Electrical connection between crate
and mezzanines still persists, but only to |
  |
127
|
Thu Nov 26 16:32:52 2015 |
CG, TD | New Kapton cable tests at DL | Powered on system without issue. biased
detector to -200V. Leakage current not stable,
bouncing around between ~3.66 - 3.74uA. Room |
9x |
126
|
Wed Nov 25 19:24:39 2015 |
CG, TD, PJCS | New Kapton cable tests at DL | Powered system on and biased to +200V at
room temp of 22.4oC. Leakage current of 3.37uA.
Waveforms very noisy and spectra |
6x |
125
|
Fri Nov 20 16:29:49 2015 |
CG | New Kapton cable tests at DL | Powered system up from state it was left
in last night. Biased to +200V with leakage
current 3.9uA @ room temp 23.3oC. |
|
124
|
Thu Nov 19 17:31:24 2015 |
CG, TD | New Kapton cable tests at DL | Powered system on from the state it was
in last night. Biased to +200V with leakage
current 3.9uA at room temp 22.8oC. |
 |
123
|
Thu Nov 19 12:23:03 2015 |
CG, TD | Report: Low - Error message when selecting Act on all FEE64s for FADC calibrate | When trying to calibrate FADCs in FADC
Align and Control page, ticked 'Act on ALL
FEE64 modules'. |
|
122
|
Thu Nov 19 12:19:15 2015 |
CG, TD | Report: Low - nnaida12 ASIC4 not functioning | Current nnaida12 (MAC address 2b:09:e8)
has several noisy channels in ASICs 1-3,
whilst ASIC4 does not work at all. |
 |
121
|
Wed Nov 18 18:18:26 2015 |
CG, TD | New Kapton cable tests at DL | Note: kapton #7 may have broken pins next
to (deliberately) broken ground pin. Unclear,
but should not be used for bias until certain. |
    |
120
|
Sat Nov 14 20:19:43 2015 |
CG, TD, PJCS | 13 Nov 2015 - new Kapton cable tests at DL |
|
|
119
|
Fri Nov 13 16:17:14 2015 |
CG, TD | 13 Nov 2015 - new Kapton cable tests at DL | Powered system up with 4 bare 45cm kaptons
connected and nothing seems to have changed
from where we left last night |
6x |
118
|
Thu Nov 12 18:28:41 2015 |
CG, TD | 12 Nov 2015 - new Kapton cable tests at DL | This morning PC-S changed firmware and
DAQ software to that of the RIKEN setup
Firmware |
23x |
117
|
Wed Nov 11 17:36:19 2015 |
CG, TD | 11 Nov 2015 - new Kapton cable tests at DL | Upon starting system with nothing connected
beyond adapter PCBs, observed pulser peak
FWHM of ~12-15ch in nnaida13+14 and ~15-18ch |
18x |
116
|
Thu Nov 5 16:28:05 2015 |
CG, TD | 5 Nov 2015 - New kapton cable tests @ DL | New Kapton PCB design (2x 0.45m + inter-connecting
PCB, no ground plane layers) under
test with small system in T9. |
11x |
115
|
Fri Jul 17 17:28:35 2015 |
AE | [Data Analysis] Correlation Scaler 100Kr data (go4_30**.root) | Plots of corr-scaler vs event number in Root
files for 100Kr(?) setting: go4_40XX.root.
|
    |
114
|
Fri Jul 17 16:00:38 2015 |
CG | Run summary for Apr-May 2015 |
A table summarising the run information
within the lab book and ELog for Apr-May. |
|
113
|
Thu Jul 16 15:10:34 2015 |
Patrick Coleman-Smith | [DAQ and VHDL] Changes to the Discriminator Information data item | I have attached a document describing
the new format of the Discriminator Information
data item used in Version 8 |
|
112
|
Tue Jul 14 18:06:54 2015 |
AE, CG | [Data Analysis] Correlation Scaler timestamp in PID data (go4_30**.root) | The attached plots show the time-stamp data
in the EURICA files with PID information
(EventInfo.timestamp). The
|
10x |
111
|
Wed Jul 1 16:42:39 2015 |
Patrick Coleman-Smith | Testing Version 8 | I have installed Version 8 of the AidaExec
program and FEE_GF_Feb15_6.bin for the VHDL
on the system in T9. |
|
110
|
Fri May 22 11:58:02 2015 |
TD | 22 May 2015 |
MSL type BB18 serial 2998-22
|
6x |
109
|
Fri May 22 11:26:43 2015 |
TD | Internal Server Error - attempting to save settings to /MIDAS/DB/EXPERIMENTS/AIDA/2015May22-11.19.38 | Got the error Server Internal Error
while trying to obtain /AIDA/SaveRestore/SaveRestore.tml.
|
|
108
|
Fri May 22 11:14:21 2015 |
TD | AIDA T9 test bed - nnaida11 DAQ stall | AIDA T9 test bed
nnaida11 DAQ stall (0 AIDA SYNCs) at DAQ |
|
107
|
Sat May 9 23:40:49 2015 |
TD | Network cabling & Raspberry Pi configuration | Hi Tom,
Please could you photo the power
supply cabling and the MACBs. |
|
106
|
Sat May 9 11:47:40 2015 |
TD | Network cabling & Raspberry Pi configuration | |
   |
105
|
Sat May 9 11:28:32 2015 |
TD | AIDA DSSSD dis-assembly | AIDA DSSSD #1-3 stack disassembled without
problem. DSSSDs returned to boxes
in the
BF3 AIDA storage area.
Attachments 1 & |
 |
104
|
Sat May 9 03:50:56 2015 |
TD & CG | Saturday 9 May 2015 |
Gzip'd tar file of /MIDAS/DB - attachment
1
|
 |
103
|
Fri May 8 01:05:18 2015 |
JA, TD, AE & CG | Friday 8 May 2015 | 08.50 FEE64 temperatures (attachment 1)
09.03 R70 ends OK
|
|
102
|
Thu May 7 01:32:39 2015 |
JA, TD, AE, CG & JLT | Thursday 7 May 2015 | 09.25 R69 continues
100Kr setting, degrader 4mm + 0.4mm
(variable) Al
|
|
101
|
Tue May 5 16:40:23 2015 |
JA, TD, AE, CG & JLT | Wednesday 6 May 2015 | 00.00 Degrader changed to 4mm + some of variable
(need to confirm)
Extra 1mm removed.
|
|
100
|
Mon May 4 18:09:42 2015 |
JA, TD, AE, CG & JLT | Tuesday 5 May 2015 | 02.09 R61 starts
nnaida1, 2, 6, 10, 13 & 14 fast discs
disabled
|
|
99
|
Mon May 4 12:10:35 2015 |
AE | online monitor and data transfer | Online monitor program for AIDA is in
/homes/npg/AIDAonline
|
  |
98
|
Mon May 4 02:32:29 2015 |
VFEP & TD | How to fix DAQ stalls at GO | It has been observed that when starting the
AIDA data acquisition (select 'GO' from the
'Data Acquisition Run
|
|
97
|
Mon May 4 02:03:24 2015 |
TD | Unable to obtain Data Acqusition Statistics frame |
|
|
96
|
Mon May 4 01:27:56 2015 |
JA, TD, AE, CG & JLT | Monday 4 May 2015 |
09.18 SN changed degrader to 5.7mm Al (4mm
+ all variable degraders + additional 1mm)
|
16x |
95
|
Mon May 4 01:23:48 2015 |
TD | Unable to obtain Data Acqusition Statistics frame | Got the error Server Internal Error
while trying to obtain /DataAcquisitionControl/DataAcquisitionStats.tml.
|
|
94
|
Sun May 3 01:32:18 2015 |
JA, TD, AE, CG, VP & JLT | Sunday 3 May 2015 |
09.19 Beam off on arrival, now back
R51 running
|
|
93
|
Sat May 2 19:20:59 2015 |
AE | run R51 online spectra | Online spectra to monitor condition during
run R51.
|
    |
92
|
Sat May 2 19:17:25 2015 |
AE | time-stamp for event reconstruction | Some first analysis of building events to
look for implants and decays
|
    |
91
|
Sat May 2 14:41:20 2015 |
JA, TD, AE, CG, VP & JLT | MUSIC detector signals | Adjusted setting of MUSIC detector signals
during break
|
 |
90
|
Sat May 2 02:04:50 2015 |
JA, TD, AE, CG, VP & JLT | Saturday 2 May 2015 | 0055: Degrader changed. 1mm removed.
1.4mm total |
50x |
89
|
Thu Apr 30 20:21:20 2015 |
Patrick Coleman-Smith | High Energy Spectra from LYCCA with pulser | > I have an eight FEE64 system now in place
on the LYCCA chamber with a PB-5 pulser going
into the adapter cards
|
|
88
|
Thu Apr 30 17:43:36 2015 |
Patrick Coleman-Smith | High Energy Spectra from LYCCA with pulser | I have an eight FEE64 system now in place
on the LYCCA chamber with a PB-5 pulser going
into the adapter cards
|
|
87
|
Thu Apr 30 16:20:54 2015 |
JA, LHB, TD, AE, CG & VP | Friday 1 May 2015 | diode link threshold 0xca -> 0xb6
0x11 -> 0x2c
|
|
86
|
Thu Apr 30 15:28:25 2015 |
Patrick Coleman-Smith | High Energy Spectra from LYCCA with pulser | I have an eight FEE64 system now in place
on the LYCCA chamber with a PB-5 pulser going
into the adapter cards test input. The test |
|
85
|
Thu Apr 30 03:00:48 2015 |
TD | Degrader changes |
From 20.00 29.4.15
|
|
84
|
Thu Apr 30 02:11:19 2015 |
TD | Example waveforms with heavy-ion beam |
1 - nnaida1 DSSSD#3 p+n (pulser?)
2 - nnaida1 DSSSD#3 p+n heavy ion
|
7x |
83
|
Thu Apr 30 01:06:44 2015 |
JA, LHB, TD, AE, CG & VP | Thursday 30 April 2015 | Overnight
Degrader OUT
DAQ ran OK - data file R22
|
16x |
82
|
Wed Apr 29 18:12:02 2015 |
AE | online analysis code | A first online analysis code is running now
in Desktop 4 aidas1
|
8x |
81
|
Wed Apr 29 11:34:09 2015 |
Patrick Coleman-Smith | Fast Trigger timings against Pulser Input and LEC/MEC Fast Comparator threshold setting | I have tried the latest version ( 26 )
of the FEE64 code and carried out some measurements
of the Fast Trigger delay from the Pulser |
|
80
|
Wed Apr 29 11:00:29 2015 |
TD | Wednesday 29 April 2015 - R20 screenshots | 1230: Attachments
19.00 Screenshots taken during R20 |
10x |
79
|
Wed Apr 29 10:01:27 2015 |
Patrick Coleman-Smith | Fast Trigger output fault in FEE64 FPGA logic | The Fast Trigger output of the FEE64
is formed from the OR of the four OR16 signals
( one from each of the ASICs. |
|
78
|
Wed Apr 29 01:03:41 2015 |
JA, LHB, TD, AE, CG & VP | Wednesday 29 April 2015 | Overnight
Beam tuning, PID tests - beam stopped
in scintilator detector + 1" thick Pb bricks |
16x |
77
|
Tue Apr 28 11:22:25 2015 |
VP | RPI | replace RPI with model B+. 4 USB
ports + 4 port switch
|
|
76
|
Tue Apr 28 06:25:13 2015 |
JA, LHB, TD, AE & CG | Tuesday 28th April progress | 28/04/15
1420: Carried out ASIC optimisation
tests to find best shaping time. Chose system |
6x |
75
|
Tue Apr 28 05:59:48 2015 |
AE | "beta" trigger from MACB Trigger outputs | We've constructed a beta trigger with the
signals from the p-side of the three DSSDs
(OR of all fast
|
6x |
74
|
Mon Apr 27 04:54:02 2015 |
VFEP & TD | [How To] Remote control of CAEN N1419 Programmable HV Power Supply |
@ CAEN N1419
|
 |
73
|
Mon Apr 27 01:48:59 2015 |
JA, LHB, TD, VP, AE & CG | Monday 27 April 2015 | DSSSD #1 +100V, +3.8uA
DSSSD #2 +100V, +5.5uA
|
8x |
72
|
Sun Apr 26 02:28:59 2015 |
JA, LHB, TD, AE & CG | Sunday 26 April 2015 |
Upstream, 207Bi source
|
33x |
71
|
Sat Apr 25 03:56:44 2015 |
JA, LHB, TD, AE & CG | Saturday 25 April 2015 |
1130: Rotated forward water inlet connection
to point towards rear of AIDA stand to remedy |
   |
70
|
Fri Apr 24 08:11:04 2015 |
CG, AE & TD | Thursday 23 April 2015 contd |
Image of interior of closed EURICA array
with AIDA inserted. |
|
69
|
Thu Apr 23 10:27:59 2015 |
CG, AE, TD | Thursday 23rd April progress | 23/04/15
1800: Spent majority of the day moving
AIDA forward and into EURICA. |
   |
68
|
Thu Apr 23 09:02:57 2015 |
TD, Patrick | FEE64 Fast Discriminator OR o/p via MACB | > Illustration of the trigger timing of the
AIDA FEE64 fast discriminator OR output via
the
|
|
67
|
Thu Apr 23 03:21:48 2015 |
TD | MSL type BB18(DS)-1000 | MSL type BB18
Serial Thickness Depletion Date Note Location
|
|
66
|
Wed Apr 22 08:50:59 2015 |
CG, AE, TD | Wednesday 22nd April progress | 22/04/15
1230: Solved problem (empty spectra
despite changing modules) with nnaida5 noted |
   |
65
|
Wed Apr 22 07:28:25 2015 |
AE (PM) | Mechanical setup instructions: AIDA+EURICA at F11 | Attached are Paul Morrall's instructions on
how to move new AIDA support table into place,
for a setup with
|
|
64
|
Wed Apr 22 03:33:01 2015 |
TD | FEE64 Fast Discriminator OR o/p via MACB | Illustration of the trigger timing of the
AIDA FEE64 fast discriminator OR output via
the
|
 |
63
|
Tue Apr 21 09:39:00 2015 |
AE | LISE estimates for implantation setup [updated] | [UPDATED 22/4: initial LISE file had incorrect
thickness for MACi plastic]
|
 |
62
|
Tue Apr 21 06:01:50 2015 |
CG, TD | Tuesday 21 April 2015 | 21/04/15
1325: Recabled the MACB distribution
tree as per PC-S instruction yesterday. |
8x |
61
|
Mon Apr 20 09:45:38 2015 |
CG, TD, Patrick Coleman-Smith | Progress 20th April + RPi procedure + reply ++ |
|
|
60
|
Mon Apr 20 09:38:15 2015 |
CG, TD, Patrick Coleman-Smith | Progress 20th April + RPi procedure + reply |
|
|
59
|
Mon Apr 20 09:07:59 2015 |
CG, TD, Patrick Coleman-Smith | Progress 20th April + RPi procedure + reply |
|
|
58
|
Mon Apr 20 07:39:49 2015 |
CG, TD | Rasberry Pi : USB ac mains switch + USB serial link to FEE64 console |
It would appear that you cannot reliably
startup the Raspberry Pi (nnrpi1)
|
|
57
|
Mon Apr 20 06:53:24 2015 |
CG, TD | Progress 20th April + RPi procedure | 20/04/15
1200: Complete all points on first
part of check list, except checking the PSU |
7x |
56
|
Sat Apr 18 09:30:11 2015 |
CG | To do list 19/04/15 - 21/04/15 | To do (roughly in order):
Move shipped boxes
down from Gabor's office to the experimental |
|
55
|
Mon Mar 9 16:51:26 2015 |
TD | AIDA adaptor PCB configuration - RIKEN - Feb 2015 | |
6x |
54
|
Mon Mar 9 16:45:35 2015 |
TD | Julabo FL11006 Recirculating Chiller: connection to 3ph ac mains |
3ph 100VAC/50Hz to Julabo FL11006 3ph 230VAC/50Hz
via local transformer |
7x |
53
|
Mon Mar 9 13:59:32 2015 |
TD | New AIDA support frame for F11/F12 @ RIKEN | |
|
52
|
Mon Mar 9 09:02:03 2015 |
Patrick Coleman-Smith | Adding Filters to the AIDA PSU. | This guide is to help with the filter
pcb assembly and installation into the AIDA
power supply. |
|
51
|
Thu Mar 5 12:11:44 2015 |
TD | To Do list - March 2015 | A draft 'to do' list in preparation for further
AIDA tests at RIKEN from mid-April.
|
|
50
|
Wed Mar 4 17:38:06 2015 |
CG | Log book for Feb 2015 tests | 04/03/15
Please find attached a scan of the
log book for the Feb 2015 AIDA tests at RIKEN. |
|
49
|
Wed Feb 25 09:59:28 2015 |
CG, AE | Weds 25th Feb progress | 25/02/15
1200: Swapped out old green power
switch for new one from UoE (having previously |
  |
48
|
Tue Feb 24 03:04:59 2015 |
CG, TD | Tues 24th Feb progress | 24/02/15
1200: Update the FEE firmware on
nnaida1-16 without problem. |
9x |
47
|
Mon Feb 23 11:10:44 2015 |
TD | Outline test plan - RIKEN - Feb 2015 |
With the exception of one AIDA FEE64 PSU
configuration test (5) and the upgrades
|
|
46
|
Mon Feb 23 07:23:08 2015 |
J. Agramunt, H. Baba, A. Estrade | DAQ correlation test | The attached figure shows the configuration
used to test the synchronization of the DAQ
systems using a
|
   |
45
|
Mon Feb 23 07:03:10 2015 |
TD, AE & CG | Monday 23 February 2015 | 14.30 Saved nnaida1-16 ASIC + Waveform
configurations to directory (Data Base Key)
|
|
44
|
Sun Feb 22 06:47:23 2015 |
CG, AE, TD | Sunday 22 February 2015 | 22/02/15
am Testing various
grounding configurations for the connection |
|
43
|
Sat Feb 21 06:37:52 2015 |
CG, AE, TD | Sat 21st Feb progress | 21/02/15
1230: Developing the software to
check synchronisation between DAQs. Below |
6x |
42
|
Fri Feb 20 10:48:09 2015 |
TD | How To Connect the FEE64 System Console Using PuTTY |
Set permissions for the USB-serial device
using the command
|
|
41
|
Fri Feb 20 10:04:29 2015 |
CG, AE, TD | Fri 20th progress | 20/02/15
1400: Measured leakage current as
function of bias V for the Caen 1419B high |
 |
40
|
Thu Feb 19 08:21:33 2015 |
CG, AE, TD | Thrus 19th Feb progress | 19/02/15
1000: Check system gives same resolution
as yesterday, removing only the Cu braiding |
39x |
39
|
Wed Feb 18 11:25:54 2015 |
Patrick Coleman-Smith | Investigations into removing HV noise | With the system in T9 and a Keithley
Source Meter supplying HV to the detector.
The source meter supplies 200V and |
|
38
|
Wed Feb 18 05:49:29 2015 |
CG, AE, TD, PJC-S | Wed 18th Feb progress | 18/02/15
1300: Error seen when trying to check
ASIC settings. See Attachment #1. Power cycle |
15x |
37
|
Tue Feb 17 08:03:32 2015 |
Patrick Coleman-Smith | [How To] Set up the Raspberry Pi for PuTTY |
|
|
36
|
Tue Feb 17 06:32:24 2015 |
CG, AE, TD | Tues 17th Feb progress | 17/02/15
1515: Installed detector BB18 2977-7
with 3 modified kapton cables, one unmodified |
22x |
35
|
Mon Feb 16 12:17:21 2015 |
Patrick Coleman-Smith | MACB update for 50Mhz external clock | This version of the MACB has an additional
selection at 5 for a ROOT module.
This will operate the Correlation |
|
34
|
Mon Feb 16 09:41:45 2015 |
Patrick Coleman-Smith | [How To] Set up the Raspberry Pi for PuTTY | When logged in and before opening PuTTY
open a cmdtool window.
cd /dev |
|
33
|
Mon Feb 16 06:17:31 2015 |
TD, AEV & CG | Monday 16th Feb progress | 16/02/2015
1500: AIDA moved into operational
position. |
10x |
32
|
Sun Feb 15 22:30:48 2015 |
TD | Julabo FL11006 Operating Manual | |
|
31
|
Sun Feb 15 06:12:00 2015 |
TD, AEV & CG | How to mount USB disk with NTFS |
Mount external USB expansion disk with NTFS
filesystems
|
|
30
|
Tue Feb 10 16:01:50 2015 |
Chris Griffin, Alfredo Estrade | High data rate - Pause/Resume | 06/02/15
A look at the data rate at
which Pause/Resumes start to cause missing |
6x |
29
|
Mon Feb 9 11:52:52 2015 |
Patrick Coleman-Smith | [ How To ] Integrating AIDA with other systems | This document details how to integrate
AIDA with other systems. |
|
28
|
Fri Jan 30 15:27:35 2015 |
Alfredo Estrade | [Analysis] 207Bi source (R61): check of monitor spectra |
A first look at the data from the 207Bi source
(run described in previous elog entry, ID |
7x |
27
|
Fri Jan 30 13:02:35 2015 |
Alfredo Estrade | [Data] R61 (207Bi source) and R62-R65 (pulser walk-through) | Jan 22, 2015
R61: 207Bi source spectra accumulated during |
|
26
|
Thu Jan 29 15:57:01 2015 |
Patrick Coleman-Smith | [How To] AIDA power supply alteration document | I've added the power supply change
document.
Please have a look and let me know |
|
25
|
Wed Jan 28 16:19:05 2015 |
Patrick Coleman-Smith | [How To] Loading new firmware into a FEE64 | Log into the FEE64 module using telnet.
use root
enter => /usr/sbin/flash_unlock |
|
24
|
Wed Jan 28 16:12:52 2015 |
Tom Davinson | AIDA Tests at STFC DL - 27-28.1.15 - TD & PCS | MSL type BB18-1000 2998-22 bias +200V I_L
+3.52uA
|
  |
23
|
Thu Jan 22 14:26:10 2015 |
Alfredo and Tom | [DATA] R49: alpha background radioactivity | Jan20-21, 2015
|
    |
22
|
Thu Jan 22 13:50:33 2015 |
Alfredo and Tom | Further measurements with filtered PSU | Jan 20, 2015
Test settings: DSSD biased at 100V, with |
|
21
|
Wed Jan 14 15:29:01 2015 |
Patrick | Filtered switch mode PSU performance | Trying the AIDA format power supply with
the simple filters installed.
The detector is attached and HV of |
|
20
|
Wed Dec 3 12:13:03 2014 |
Alfredo Estrade | IV curve with CAEN N1419 | Measured IV curve for BB18 DSSD with new CAEN
HV supply. Settings as in previous elog entry:
|
|
19
|
Thu Nov 20 14:05:21 2014 |
Tom Davinson | AIDA Tests at STFC DL - PCS, TD |
Configuration per Elog entries:
|
20x |
18
|
Fri Oct 24 16:02:26 2014 |
Alfredo Estrade | bench tests with pulser | Performed pulser measurements with test
setup at Daresbury lab, with main purpose
of remembering how to operate the system! |
   |
17
|
Fri Oct 24 15:05:28 2014 |
Patrick and Alfredo | new VHDL: FEE_Riken_Apr14_21.bin | New VHDL loaded in NNAIDA#11,#12,#13,#14:
/MIDAS/Aida/FEE_Riken_Apr14_21.bin
The code introduces |
|
16
|
Sun Oct 5 22:42:56 2014 |
Chris Griffin | DL tests on 02/10/14 | A late entry for the work I carried
out on Thursday.
With the Emco box providing the HV, |
17x |
15
|
Thu Oct 2 15:23:38 2014 |
Patrick Coleman-Smith and Chris Griffin | Trial with Filtered AIDA PSU | Assembled three more of the filter boards
and installed them in the AIDA PSU with the
first, wired to use the switchmode power |
|
14
|
Wed Oct 1 18:37:42 2014 |
Chris Griffin | 01/10/2014 Tests @ DL | Kept largely the same settings at the entry https://elog.ph.ed.ac.uk/AIDA/4
Same ASIC
settings |
11x |
13
|
Wed Oct 1 15:41:07 2014 |
Patrick Coleman-Smith | Power supply filters #3 | Measuring the signal at the FEE64
end.
+5v , -6v , +7v, +7v |
    |
12
|
Wed Oct 1 15:15:32 2014 |
Patrick Coleman-Smith | Power supply filters | 2.0.L FWHM:14.26
2.15.L ( 270pF ) FWHM : 119.04
(ooops found the 'scope channel was |
14x |
11
|
Wed Oct 1 13:28:03 2014 |
Patrick Coleman-Smith | Power supply filters | The new pcb for the power supply filter
arrived.
I assembled the components ( after |
 |
10
|
Thu Sep 25 11:53:34 2014 |
Patrick Coleman-Smith | Backup a step to check ASICs | Disconnected the adaptors with the detector.
Added the adaptors with the kapton
cables only attached. |
|
9
|
Thu Sep 25 11:35:18 2014 |
Patrick Coleman-Smith | Removing the MACB from the system | I have been wondering if the 0v path from
the FEE64s to the MACB where they are joined
is a possible problem. |
|
8
|
Mon Sep 22 09:34:37 2014 |
Patrick Coleman-Smith | Clue to difference between ASICs 1&2 and 3&4 | While investigating a VHDL conundrum I
have noticed that the Mux ADC serial readout
clock has a 'FAST' slew rate on ASICs 1&2 |
|
7
|
Thu Sep 18 11:18:46 2014 |
Patrick Coleman-Smith | Trying the Liverpool HV supply | The SY1527 supply was delivered with three
modules.
A cable has been made with LEMO00 |
|
6
|
Mon Sep 15 13:51:28 2014 |
Patrick | Odd spectra from running nnaida2 for 3 hours | I'm running nnaida2 with the PB-5
and an old adaptor.(1pF)
I've seen spectra like this before |
|
5
|
Thu Sep 11 17:29:59 2014 |
Tom Davinson | AIDA Tests at STFC DL - To Do list |
In no particular order of priority:
|
|
4
|
Thu Sep 11 16:12:06 2014 |
Tom Davinson and photos by Patrick | AIDA Tests at STFC DL - PCS, SLT, TD |
Changes from configuration described by Elog
entry https://elog.ph.ed.ac.uk/AIDA/3
|
19x |
3
|
Thu Sep 11 10:16:57 2014 |
Tom Davinson | AIDA Tests at STFC DL - PCS, SLT, TD | MSL type BB18-1000 2998-22 bias +200V I_L
+3.27uA
|
19x |
2
|
Wed Sep 10 09:27:43 2014 |
Patrick | Elog appreciation | This is very interesting. Look forward
to many happy interactions. |
|
1
|
Wed Sep 10 08:42:03 2014 |
Tom Davinson | Welcome to the AIDA Elog | The AIDA Elog is now operational and can be
found at
|
|