  946   Wed Apr 10 16:45:59 2024 TDAIDA interlock
Honeywell HSS DPS sensor information https://elog.ph.ed.ac.uk/AIDA/932
 cynergy3-fsvplc-v3.pdf 
  945   Fri Mar 29 08:39:18 2024 TD, PJCSUnable to start MIDAS DAQ with 1x FEE64 ( aida04 )
> At AIDA test station T9, STFC DL unable
to start MIDAS DAQ with 1x FEE64 ( aida04
  
  944   Thu Mar 28 15:43:47 2024 TDUnable to start MIDAS DAQ with 1x FEE64 ( aida04 )
At AIDA test station T9, STFC DL unable to
start MIDAS DAQ with 1x FEE64 ( aida04 )
 Screenshot_from_2024-03-28_15-43-28.pngScreenshot_from_2024-03-28_15-43-08.pngScreenshot_from_2024-03-28_15-47-49.png 
  943   Thu Mar 28 11:10:09 2024 TDTest of 4x FEE64s at AIDA test station, T9, STFC DLTest of 4x FEE64s at AIDA test station, T9,
STFC DL
 22x 
  942   Wed Mar 13 14:50:04 2024 NH[HowTo] Backup and Restore Raspberry Pi SD CardsMicro SD cards used by the raspberry pis are
cheap but prone to failing
  
  941   Tue Jan 30 14:18:16 2024 NH[HowTo] Update MACB Firmware https://elog.ph.ed.ac.uk/CARME/482  MACB_GSI_Simple.jed 
  940   Thu Dec 14 10:53:27 2023 NH, MP, CC, GASnout RemovedSnout removed from S4

All detectors removed
  
  939   Mon Dec 11 23:56:36 2023 TDTuesday 12 December00.55 Observe high frequency noise in aida02
& aida04 ( n+n FEE64s ) - attachments 1-5
      and aida05 ( p+n FEE64 )
 18x 
  938   Mon Dec 11 11:05:27 2023 TDWR timestamp fail aida05 & aida07
MACB config 
1x level 0
 11x 
  937   Mon Dec 11 09:57:54 2023 TDMonday 11 DecemberWater flow and temperature ( gauges outside
S4 entrance ) OK
 27x 
  936   Sun Dec 10 13:06:27 2023 TDSunday 10 December14.05 S4 closed

Water flow and temperature ( gauges outside
 14x 
  935   Fri Dec 8 12:55:38 2023 TD, NHFEE64 configuration
FEE64 configuration for 1x MSL type BB18(DS)-1000
24cm x 8cm DSSSD
  
  934   Fri Dec 8 11:32:44 2023 NH, CC, VP, TDFriday 8 December
Change n+n FEE64 aida04 d8:80:39:41:f6:b7
 asic #1 faulty
 18x 
  933   Thu Dec 7 17:30:36 2023 NH, CC, VP, TDThursday 7 December
Stack re-assembled - upstream to downstream
 8x 
  932   Wed Dec 6 16:32:03 2023 NHReplacement of faulty Honeywell HSS-DPS sensor
Honeywell HSS-DPS sensor is faulty - attachments
1 & 2
 Honeywell_HSS-DPS_63-2711.pdf1000008603.jpg1000008604.jpg1000008605.jpg 
  931   Mon Dec 4 10:34:48 2023 NHAIDA Todo for 11.12.23This is a short list of things todo or check
before the test beam time on 11.12.23 
Updated after 15:00 CET meeting
  
  930   Fri Nov 24 10:36:06 2023 NHFriday 24 NovemberPulser LEMOs removed from p+n fees
Pulser connected to n+n fees: aida02 and
aida04 
 Screenshot_from_2023-11-24_11-47-29.pngScreenshot_from_2023-11-24_11-47-39.pngScreenshot_from_2023-11-24_11-48-14.pngScreenshot_from_2023-11-24_12-00-33.png 
  929   Thu Nov 23 10:00:16 2023 NHReport - Cannot change per-ASIC Settings> On ASIC settings page trynig to change the
settings for one ASIC (e.g. ASIC1 of aida09)
seems to cause all 4 ASIC settings to change
 Screenshot_from_2023-11-23_10-58-30.pngScreenshot_from_2023-11-23_10-58-57.pngScreenshot_from_2023-11-23_10-59-12.pngScreenshot_from_2023-11-23_10-59-24.png 
  928   Wed Nov 22 15:12:40 2023 TD/tmp/log8015_error   log8015_error 
  927   Wed Nov 22 14:52:43 2023 NHAIDA Pulser CalibrationConnect pulser to all p+n FEEs

Turn on pulser, 100 Hz (attachment 3 for
 Screenshot_from_2023-11-22_15-18-08.pngScreenshot_from_2023-11-22_15-31-43.pngScreenshot_from_2023-11-22_15-21-34.pngScreenshot_from_2023-11-22_16-05-33.png 
  926   Wed Nov 22 13:44:36 2023 NHReport - Cannot change per-ASIC SettingsOn ASIC settings page trynig to change the
settings for one ASIC (e.g. ASIC1 of aida09)
seems to cause all 4 ASIC settings to change
  
  925   Tue Nov 21 13:56:59 2023 NH, CC, HA, MP, AM, VPTuesday 21 NovemberConnect the BB7 on top of the snout to the
former aida05 (FEE above aida01)
Also remove copper busbar that is unused
 8x 
  924   Sat Nov 18 02:28:26 2023 TD, NH, JBSaturday 18 November03.20 c. 3k per spill 13N beam to S4
      Observe scatter of events at all energies
for LEC
 10x 
  923   Fri Nov 17 15:53:03 2023 TD, JB, JGFriday 17 November contd.
AIDA ASIC settuings 2023Nov16-18.55.20
     low comparator p+n FEE64s 0xa, n+n 0xf
 25x 
  922   Fri Nov 17 09:19:41 2023 TD, CC, VPAIDA test 17/11/2023We restarted AIDA (a10277ttachment 6) this
morning and checked rates (attachments 3/4)
and waveforms (attachments 1/2). Temperatures
 46x 
  921   Thu Nov 16 17:43:25 2023 TD, JB, CC, VPAIDA test 16/11/2023 cont.Screenshot uploads as I hit the 50 image
upload limit.
 Screenshot_from_2023-11-16_16-37-22.pngScreenshot_from_2023-11-16_16-36-25.pngScreenshot_from_2023-11-16_16-35-51.pngScreenshot_from_2023-11-16_16-35-30.png 
  920   Thu Nov 16 09:09:58 2023 TD, JB, CC, VPAIDA tests 16/11/2023Viewing AIDA status on Thursday morning 16/11/2023.

 48x 
  919   Wed Nov 15 10:37:00 2023 TDWednesday 15 November
11.36 Water flow, pressure & temperature
( 19 deg C ) OK
 27x 
  918   Tue Nov 14 17:19:11 2023 TDTapeServer, Merger, NetVar etc status   Screenshot_from_2023-11-14_18-18-51.pngScreenshot_from_2023-11-14_18-18-45.pngScreenshot_from_2023-11-14_18-18-34.pngScreenshot_from_2023-11-14_18-18-29.png 
  917   Tue Nov 14 17:08:49 2023 TDReport - high - unable to change ASIC settings directory in Options
Attempting to change the text string specifying
the ASIC settings directory ( 2023Nov14-15.25.24
 Screenshot_from_2023-11-14_18-07-27.pngScreenshot_from_2023-11-14_18-07-56.png 
  916   Tue Nov 14 16:52:54 2023 TDTuesday 14 November
15.06 Quick test of AIDA 24cm x 8cm 'triple'
DSSSD before dismounting to install 1x bPlast
 Screenshot_from_2023-11-14_15-37-10.pngScreenshot_from_2023-11-14_15-37-41.png 
  915   Mon Nov 6 17:30:44 2023 NHAida Alpha AnalysisAnalysis of tape folder /TapeData/BG18OCT23

Using Go4 https://github.com/cej25/DESPEC_NOV23
 alpha_hit.pngalpha_energy.pngalpha_energy_xy.pngalpha_strip_v_energy.png 
  914   Wed Oct 25 12:42:18 2023 CCAIDA testStarted AIDA at 1:41 pm, writing to disk:
file BG18OCT2/R6, stopped at  17:26
pict1: HV supply
 Screenshot_from_2023-10-25_13-42-54.pngScreenshot_from_2023-10-25_13-43-10.pngScreenshot_from_2023-10-25_13-44-00.pngScreenshot_from_2023-10-25_13-43-46.png 
  913   Tue Oct 24 10:54:14 2023 at 19:14NH, CCAIDA testStarted AIDA at 11:54am, writing to disk:
file BG18OCT2/R5, stopped at 19:14
 Screenshot_from_2023-10-24_11-54-48.pngScreenshot_from_2023-10-24_11-55-08.pngScreenshot_from_2023-10-24_11-55-46.pngScreenshot_from_2023-10-24_11-55-33.png 
  912   Mon Oct 23 14:08:06 2023 NH, CCAIDA testStarted AIDA at 3:05pm, writing to disk: file
BG18OCT2/R4, stopped 18.30
 Screenshot_from_2023-10-23_15-08-59.pngScreenshot_from_2023-10-23_15-09-16.pngScreenshot_from_2023-10-23_15-10-01.pngScreenshot_from_2023-10-23_15-09-36.pngScreenshot_from_2023-10-23_18-20-13.png 
  911   Mon Oct 23 10:52:06 2023 NH, CCAIDA testStarted AIDA at 11:50, writing to disk: file
BG18OCT2/R3, stopped around 3 pm
 Screenshot_from_2023-10-23_11-53-28.pngScreenshot_from_2023-10-23_11-53-59.pngScreenshot_from_2023-10-23_11-54-43.pngScreenshot_from_2023-10-23_11-54-54.png 
  910   Thu Oct 19 10:39:20 2023 NHThursday 19 OctoberWater Temp: 20 C - Flow felt on pipe
AIDA interlock OVERRIDE 
 10x 
  909   Wed Oct 18 17:18:57 2023 TDWednesday 18 October   8x 
  908   Thu Oct 12 16:40:21 2023 TDbackground alpha
start 14.55
 13x 
  907   Thu Oct 12 13:02:50 2023 TDThursday 12 October contd.
      ASIC settings 2021Apr29-13-16-00
      slow comparator 0xa ( all p+n junction
 50x 
  906   Thu Oct 12 09:12:34 2023 TDThursday 12 October10.10 Water flow & temp OK
      Power ON
 47x 
  905   Wed Oct 11 16:53:20 2023 TDWednesday 11 October contd.      CAEN N1419ET ch 2 - all outputs non-floating
( internal LK fitted )
      Standard coaxial HV cable chained to
 14x 
  904   Wed Oct 11 09:37:30 2023 TDWednesday 11 October
10.00 Water flow & temp OK
      Power ON
 48x 
  903   Tue Oct 10 08:38:37 2023 TDTuesday 10 October
09.38 Water flow & temp OK
      Power ON
 40x 
  902   Mon Oct 9 14:29:12 2023 TDMonday 9 October contd.
15.20 aida10 LK4 ( front f/p -> gnd ) fitted
- investigate impact aida10 asic #4 edge
 Screenshot_from_2023-10-09_15-40-36.png 
  901   Mon Oct 9 09:03:10 2023 TDMonday 9 October09.55 Water pressure and temp OK
      Power on
 50x 
  900   Sun Oct 8 14:51:59 2023 TDSunday 8 October contd.
Slow comparator 0xf
 28x 
  899   Sun Oct 8 11:44:35 2023 TDSunday 8 October12.22 USB-controlled ac mains relay - interlock
overidden
      Water flow OK. Water temp 19 deg C
 50x 
  898   Tue Oct 3 10:16:06 2023 TDnnrpi2 scriptspi@raspberrypi:~ $ cat ./caen_screen.sh
if ! screen -list | grep -q "caenhv"; then
screen -f -S caenhv /dev/ttyACM0 9600
  
  897   Tue Oct 3 09:14:59 2023 TDTuesday 3 October
09.45 Power up
 Screenshot_from_2023-10-03_11-49-17.pngScreenshot_from_2023-10-03_12-22-30.png 
  896   Mon Oct 2 14:03:42 2023 TDMonday 2 October
15.00 DSSSD bias +60V +6.44uA - breakdown
above c. 60V, bias +100V leakage current
 Screenshot_from_2023-10-02_15-03-02.pngScreenshot_from_2023-10-02_15-02-55.pngScreenshot_from_2023-10-02_15-02-46.png 
  895   Sun Oct 1 12:38:56 2023 TDSunday 1 October12.50 Power up

      All system wide checks OK
 13x 
  894   Sat Sep 30 16:37:06 2023 TDHoneywell HSS-DPS fault
The Honeywell HSS-DPS dew point sensor indicator
( red LED ) is flashing c. 0.5Hz indicating
  
  893   Sat Sep 30 12:14:52 2023 TDSatuurday 30 September12.54 Power up

      All system wide checks OK
 10x 
  892   Thu Sep 28 16:03:40 2023 TDThursday 28 September
17.00 USB-controlled ac mains relay - no
water interlock ( yellow ) LED
 10x 
  891   Thu Aug 31 15:01:11 2023 TDTest of CAEN N1419B - T9, STFC DL
Noise test of CAEN N1419B in T9, STFC DL.
 7x 
  890   Wed Aug 30 15:30:50 2023 TDTest of AIDA ASIC mezzanines with FEE64s - summaryTest of ( previously bench-tested OK ) AIDA
ASIC mezzanines using FEE64 nnlycca5 ( MAC
d8:80:39:41:d7:c3 )
 13x 
  889   Mon Aug 21 13:17:54 2023 TDSilena 7710 HV test - JCMB 21.8.23 Silena 7710 - see attachment 1

Bias -60V
 11x 
  888   Sun Aug 20 16:21:45 2023 TDSilena 7710 HV test - JCMB 20.8.23Silena 7710 - see attachment 1

Bias -60V
 6x 
  887   Sat Aug 19 14:52:42 2023 TDBNC PB-4 & BNC PB-5 pulser test - JCMB 18.8.23BNC PB-4 - see attachment 1

Amplitude 35,000
 21x 
  886   Wed Aug 9 14:40:28 2023 Carole, Nic, JeroenAIDA HV SUPPLY & PULSER TESTTests with the HV supply (CAEN N1419ET)
and Pulse Generator ( BNC PB-5 ) in the detector
lab on the crate behind the DEGAS detectors,
 AIDA_PulserTest_0908_FullPulse.pngAIDA_PulserTest_09.08_5mV_10us_HVOFF.pngAIDA_PulserTest_0908_10mV_10us_50HV.pngHV_0V_090823_1500_wPulser.pngHV_-50V_090823_1500_wPulser.png 
  885   Fri Aug 4 10:04:58 2023 TDFriday 4 August contd.
10.45 Power cycle and reboot
 17x 
  884   Fri Aug 4 09:07:08 2023 TDFriday 4 August
07.00 DAQ stopped
      Overnight run for background alphas
 23x 
  883   Thu Aug 3 14:16:12 2023 TDThursday 3 August contd.
15.16 DSSSD bias +100V leakage current +8.415uA
 21x 
  882   Thu Aug 3 09:21:26 2023 TDThursday 3 August
10.20 DSSSD bias +100V leakage current +6.565uA
- attachment 1
 47x 
  881   Wed Aug 2 15:39:52 2023 TDWednesday 2 August contd.16.22 Add LK1 to aida01
      DSSSD bias -100V leakage current -7.950uA
 11x 
  880   Wed Aug 2 08:44:00 2023 TDWednesday 2 August
09.40 Al snout electrically connected ( <
1 Ohm ) to Al gasket and Al base plate
 48x 
  879   Tue Aug 1 08:50:36 2023 TDTuesday 1 August
09.50 DSSSD bias +100V leakage current +9.255uA
- attachment 2
 30x 
  878   Mon Jul 31 09:43:37 2023 TDMonday 31 July
10.43 DSSSD bias +100V leakage current +7.550uA
 44x 
  877   Mon Jul 24 08:54:48 2023 TDMonday 24 July
09.54 DSSSD#1 bias +100V leakage current
+9.065uA
 17x 
  876   Mon Jul 24 08:39:39 2023 TDaida10 sys console output & aida10 optionsOptions and system cosnole disagree about
which version of the DataAcq program is in
use?
 sys_console_aida10.txtScreenshot_from_2023-07-24_09-48-03.png 
  875   Sun Jul 23 08:50:48 2023 TDSunday 23 July09.50 Cooknell HV2
      2x + polarity, grounded HV channels
 19x 
  874   Sat Jul 22 08:17:48 2023 TDSaturday 22 July09.20 CAEN N1419ET 
      Floating outputs
      Channel #3 + polarity, Channels #0-2
 26x 
  873   Sun Jul 16 14:20:31 2023 TDSunday 16 July contd.15.20 All ERNI pins of aida01 adaptor PCB
OK => FEE64 #1 ASIC #2 channel #5 issue faulty
test C? faulty ASIC channel?
 27x 
  872   Sun Jul 16 09:36:40 2023 TD15-16 July 2023
Saturday 15 July
 40x 
  871   Fri Jul 7 11:59:06 2023 TDTest of AIDA FEE64 - summaryTest of AIDA FEE64s 

ISOL test station STFC DL, T9
 11x 
  870   Fri Jul 7 10:52:34 2023 TD, PJCSTest of AIDA FEE64 d8:80:39:42:0d:0b ( aida03 ) - ASIC mezzanine replaced
Test of AIDA FEE64 d8:80:39:42:0d:0b ( aida03
) - ASIC mezzanine replaced
 16x 
  869   Fri Jul 7 10:15:09 2023 TDTest of AIDA FEE64 d8:80:39:41:f6:ee ( aida01 ) - HDMI connector replaced
Test of AIDA FEE64 d8:80:39:41:f6:ee ( aida01
) - HDMI connector replaced. Cooling plate
 17x 
  868   Thu Jul 6 10:20:25 2023 TDUnable to start Rly16 server
Unable to start Rly16 server - see attachment
1
 Screenshot_from_2023-07-06_10-18-59.png 
  867   Wed Apr 12 12:32:13 2023 PJCSASIC power short problemI have taken videos with an Infrared camera
of the power being supplied to one isolated
ASIC on a mezzanine.
 Mezzanine_Under_test_Wider_view_resized.jpgMezzanine_Under_test_resized.jpg 
  865   Wed Mar 1 16:42:06 2023 Further results from Mezzanine bench testsPJCSCarried out some further work on failed
mezzanine modules.

Inspected them externally and removed
 mezz_cap_gone_resized.jpgmezz_resistors_resized.jpg 
  864   Thu Feb 23 16:15:31 2023 TD PJCSBench test of AIDA FEE64 mezzanines
Attachments 2 & 7 AIDA FEE64 mezzanine with
                  1) adaptor PCB connected
 7x 
  863   Mon Apr 19 15:10:55 2021 OH TDLess HEC events than expected in DSSD3we are noticing we appear to see less implant
events in detector 3 than we expect. This
was first noticed in the xy spectra of the
 Capture.PNG 
  862   Tue Feb 9 11:44:21 2021 OH, TD, CA, LS9th Feb GSI Dry runDatabase file - 2019Dec19-16.19.51
Current threshold at 0x64
 16x 
  861   Thu Nov 14 07:57:46 2019 TDAIDA moved from in-beam position at F11
To make room for the installation of an MR-TOF
device at F11, AIDA and DTAS have been removed
  
  860   Fri Jun 21 09:57:15 2019 CGB2F network cablesAIDA network cables in B2F disconnected, looped
and cable tied to hand rail, out of the way.
  
  859   Fri Jun 21 01:08:35 2019 CA, CBFriday 21 June09.08 all system wide checks okay *except*
naida7 fails adc calibration
      mismatch between sync pulses received
 21junSync.png20june_2319_temps.png21jun_bias.png 
  858   Thu Jun 20 07:42:54 2019 CA, TDAIDA shutdown checkliststop the daq

pause merger
  
  857   Thu Jun 20 07:35:46 2019 CA, TDBias & leakage current spreadsheet
https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=1560332343
 AIDA_leakage_current(1).xlsx 
  856   Thu Jun 20 02:37:55 2019 CA, CB, TD, CG, DKThursday 20 June10.37 Post - beam, AIDA & DTAS run only
      DTAS stop run 164
      AIDA file R2_1012
 23x 
  855   Wed Jun 19 08:30:36 2019 CGWed Jun 19 16.00 - end of run16.10 DAQ continues as before.
      Merger rate ~700k items/s and ~5.3Kb/s
      Individual FEE rates remain roughly
 AIDAimplants.png 
  854   Tue Jun 18 23:58:46 2019 CBWed Jun 19 8:00-16:00 08:00 Shift change
      No change in settings
 19x 
  853   Tue Jun 18 16:14:03 2019 CAWednesday 19 June 00.00 - 08.00 shift00.00 Shift Change

      DAQ continues ok 
 32x 
  852   Tue Jun 18 08:03:20 2019 DKTuesday 18 June 16:00 - 24:00Shift change

16:00 
 15x 
  851   Mon Jun 17 16:01:27 2019 CB, CG, OH, TDTuesday 18 June 00:00 - 16:0000:00 New day. The DAQ continues OK

      Beam setting 2 for enhanced yield of
 34x 
  850   Mon Jun 17 08:03:37 2019 CA, CB, TD, OHMon Jun 17 16:00-24:0016:04  DAQ continues running OK
       All system-wide checks OK except nnaida7
ADC calibration fails
 19x 
  849   Mon Jun 17 03:01:04 2019 CA, TD, OHPID plot and selected isotope implantation ratesPID plot produced from 2 hours of merged data
- attachment 1
 2hrPID.pdf 
  848   Mon Jun 17 02:31:53 2019 CA, TD, OHMonday 17 June 08.00-16.0010.41 DAQ continues OK file RIBF147/R2_352

      100Sn setting, no degrader
 21x 
  847   Sun Jun 16 16:00:58 2019 ML, CG, OHMonday 17 June 2019It's a new day, it's a new log entry !!

01:25 DTAS run 46 started
 17x 
  846   Sun Jun 16 10:06:21 2019 TD, CGFEE64 nnaida14 noise issues
Attachments 1, 3, 5 & 7 *.L spectra log scale
 16x 
  845   Sun Jun 16 04:50:03 2019 CATests of calibration on beta dataAnalysis of RIBF148/R5_170_190, with 500 <
E < 1000 keV energy cut
 25x 
  844   Sun Jun 16 04:09:40 2019 CA, CB, ML, TD, CGSunday 16 June noon-midnight12.10 DAQ continues OK file RIBF147/R2_145

      100Sn setting, no degrader
 16x 
  843   Sat Jun 15 16:53:22 2019 CB, OH, DK, MLSunday 16 June
00.30 AIDA file R2_26
      DTAS run 007
 37x 
  842   Sat Jun 15 01:05:41 2019 CA, CB, TD, CG, OH, DK, MLSaturday 15 June09.05 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 75% M-H markers
 47x 
  841   Fri Jun 14 10:33:44 2019 OH, CA, TD, CG, CB, DKFriday 14th JuneFriday 14th June 

Authors: TD, DK, CB
 22x 
  840   Thu Jun 13 05:49:37 2019 CAFurther tests of calibration on Alpha dataAlpha data used: /May19/{R1,R2,R7,R8,R9,R11}
(c. 380 hr.)
 27x 
  839   Thu Jun 13 00:30:17 2019 CA, CB, TD, CG, OH, DKThursday 13 June08.32 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 70% M-H markers + 0.5
 18x 
  838   Wed Jun 12 01:54:04 2019 OH, TD, CG, CB, CAWednesday 12 June09:54 DAQ Continues ok with merger running
at ~ 560k data items per second
 11x 
  837   Tue Jun 11 01:45:55 2019 CA, CB, TD, CG, OH, DKTuesday 11 June09:46 DAQ continues ok

      all system wide checks OK *except*
 17x 
  836   Mon Jun 10 07:39:35 2019 CA, CB, TD, CG, OH, DKVarying per DSSSD slow comparator thresholds
DSSSDs #1-6 slow comparator 0xa = 100keV
- attachments 1-4
 32x 
  835   Mon Jun 10 01:43:16 2019 CA, CB, TD, CG, OH, DKMonday 10 June09:45 DAQ continues ok 

      all system wide checks OK *except*
 19x 
  834   Sun Jun 9 03:43:00 2019 CB, TD, CG, OHSunday 9 June11.43 DAQ continues OK

      ASIC settings 2019May19-17.54.03
 28x 
  833   Sat Jun 8 06:08:52 2019 CB, TDSaturday 8 June14.14 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 70% M-H markers
 13x 
  832   Fri Jun 7 05:58:11 2019 TDper FEE64 rate/20.48us versus slow comparator threshold
per FEE64 rate/20.48us & 'good event' DAQ
statistics 
 10x 
  831   Fri Jun 7 05:30:23 2019 TDFriday 7 June14.05 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 70% M-H markers
 17x 
  830   Thu Jun 6 08:55:15 2019 TDThursday 6 June16.40 DAQ continues OK

      ASIC settings 2019May19-17.54.03
 13x 
  829   Wed Jun 5 06:57:38 2019 TDWednesday 5 June14.50 DAQ continues OK

      ASIC settings 2019May19-17.54.03
 13x 
  828   Tue Jun 4 07:10:27 2019 TDTuesday 4 June15.01 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 70% M-H markers - topup
 13x 
  827   Mon Jun 3 05:40:19 2019 TDMonday 3 June13.40 DAQ continues OK

      ASIC settings 2019May19-17.54.03
 25x 
  826   Sun Jun 2 04:00:50 2019 TDSunday 2 June12.00 DAQ continues file May19/R15_169

      ASIC settings 2019May19-17.54.03
 21x 
  824   Sat Jun 1 09:14:19 2019 TDScreenshots miscellaneous AIDA Control & Merge tabs    22x 
  823   Sat Jun 1 08:11:15 2019 TDSaturday 1 June16.08 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 60% M-H markers - topup
 14x 
  822   Fri May 31 03:31:54 2019 TDFriday 31 May11.31 DAQ continues OK

      ASIC settings 2019May19-17.54.03
 14x 
  821   Thu May 30 03:13:04 2019 TDThursday 30 May
11.13 DAQ continues OK
 16x 
  820   Wed May 29 06:53:56 2019 TDReport - medium - unable to monitor FEE64 logs using pi_monitor
Unable to monitor FEE64 logs using pi_monitor
using instructions https://elog.ph.ed.ac.uk/AIDA/559
 10.png11.png12.png 
  819   Wed May 29 06:11:34 2019 TDWednesday 29 May14.10 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 75% M-H markers
 12x 
  818   Tue May 28 01:37:14 2019 TDMonday 28 May09.30 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 75% M-H markers
 8x 
  817   Mon May 27 10:31:35 2019 TDUpdated /etc/hosts & /etc/dhcp/dhcpd.conf
/etc/dhcp/dhcpd.conf updated to reflect actual
MAC and IP 
 hostsdhcpd.conf 
  816   Mon May 27 08:51:04 2019 TDOffline analysis of alpha background data files May19/R1, R2, R7, R8, R9, R11Offline analysis of alpha background data
files May19/R1, R2, R7, R8, R9, R11 ( c.
380h )
 9x 
  815   Mon May 27 08:29:02 2019 TDAIDA position within DTAS
AA informs me that the *centre* of the DTAS
detector system is 26.7cm downstream
  
  814   Mon May 27 02:50:20 2019 TDMonday 27 May10.50 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 60% M-H markers - topped
 30x 
  813   Sun May 26 04:14:27 2019 TDSunday 26 May12.14 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 60% M-H markers
 11x 
  812   Sat May 25 06:27:12 2019 TDSaturday 25 May14.32 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 60% M-H markers
 12x 
  811   Fri May 24 07:21:31 2019 TDOffline analysis May19/R1, R2, R7, R8 & R9
Offline analysis of alpha background data
files May19/R1, R2, R7, R8, R9 ( c. 310h
 11x 
  810   Fri May 24 03:04:26 2019 TDFriday 24 May11.04 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 75% M-H markers
 15x 
  809   Wed May 22 07:36:08 2019 TDScreenshots miscellaneous AIDA Control tabs   13x 
  808   Wed May 22 06:08:29 2019 TDWednesday 22 May14.08 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 75% M-H markers
 15x 
  807   Mon May 20 02:16:58 2019 CA, TDMonday 20 May 201910:18 DAQ Continues ok
      Alpha run continues - Currently on
file R8_2
 16x 
  806   Sun May 19 02:28:07 2019 OH, TD, CASunday 19 May10:28 DAQ Continues ok
      Alpha run continues - Currently on
file R7_5
 11x 
  805   Sun May 19 02:21:43 2019 CATests of low energy calibration on Alpha Data10.23 Low energy calibration program now produces
relative gain coefficients in a format that
can be used with AIDASort
 25x 
  804   Sat May 18 04:47:22 2019 TDSaturday 18 May12.47 DAQ continues OK to file May19/R7_3

      alpha background
 17x 
  803   Fri May 17 08:10:05 2019 TDAIDA+DTAS @ BigRIPS F11   10x 
  802   Fri May 17 02:15:56 2019 CA, TD, OHFriday 17 May10.18 DAQ continues OK to file May19/R5_1

      alpha background
 15x 
  801   Thu May 16 02:13:10 2019 CA, OH, TDThursday 16th May10:13 all system wide checks OK *except* nnaida7
fails ADC calibration
 16x 
  800   Wed May 15 02:17:23 2019 CA, OH, TDWednesday 15 May10.18 DAQ continues OK to file May19/R2

      alpha background
 20x 
  799   Tue May 14 02:19:20 2019 CA, OH, TDTuesday 14th May 201910.20 System wide checks ok (except naida07
ADC calibration failure)
 11x 
  798   Mon May 13 10:13:26 2019 TDAIDA with 25MHz external clock does not work ... !
OH setup AIDA external clock using  Tektronix
AFG3102 - settings as follows
 2.png 
  797   Mon May 13 10:00:01 2019 TDReport - low - SETUP/Perform Timestamp Resync produces error message
AIDA@RIKEN
 1.png 
  796   Mon May 13 03:43:08 2019 CA, TD, OHSunday 12 May
19.12 all system wide checks OK *except*
nnaida7 fails ADC calibration
 14x 
  795   Mon May 13 03:23:58 2019 CA, TD, OHMonday 13 May
09.55 all system wide checks OK *except*
nnaida7 fails ADC calibration
 18x 
  794   Sat May 11 02:50:14 2019 CA, OH, TDSaturday 11th May 201910:52 system wide checks ok, except naida07
fails ADC calibration
      good event statistics, rates in naida19,20,23,24
 190511_1053_stats.png190511_1053_temp.png190511_1054_bias.png 
  793   Fri May 10 05:58:01 2019 CA, OH, TDFriday 10 May 201911.00 - chiller refilled and switched on
        set to 20 degrees celsius
 12x 
  792   Tue Mar 26 14:02:59 2019 OHInventory to be shipped backInventory is currently packaged up under the
AIDA desk in B3F
  
  791   Sun Nov 18 02:02:48 2018 TDLatest detector bias & leakage current spreadsheet (URL and csv & xlsx files)https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=1347508769  AIDA_leakage_current(17).xlsxAIDA_leakage_current_-_Sep2018.csv 
  790   Fri Nov 16 06:01:47 2018 CAHigh Energy Channel Ex vs Ey for different degrader thicknesses15.04 Plots of X Energy vs Y Energy for each
detector, and for 4 different Al degrader
thicknesses, as indicated
 2_3HECexey.png2_8HECexey.png3_0HECexey.png3_3HECexey.png 
  789   Fri Nov 16 04:47:39 2018 CA, TD, OHCorrelation analysis at different degrader Al thickness13.53 Correlation analysis plot of all detectors
with 3.3mm Al degrader thickness (attachment
1)
 3mmcorr.png181116_1350_det12.png181116_1351_det34.png181116_1352_det56.png 
  788   Thu Nov 15 22:55:38 2018 CA, TD, OH, LSFriday 16th November 08.00 - 16.0007.56 DAQ continues - AIDA file RIBF148/R5_822
      165Pm BigRIPS setting + 2.8mm Al degrader
 42x 
  787   Thu Nov 15 15:05:33 2018 LSFriday 16 November 00.00 to 08.00
00.25 System wide checks ok * except nnaida
7 fails adc*
 9x 
  786   Thu Nov 15 06:52:09 2018 OHThursday 15th November 16:00 - 24:0015:51 DAQ continues - AIDA file RIBF148/R5_664
      165Pm BigRIPS setting + 2.8mm Al degrader
 11x 
  785   Wed Nov 14 22:54:11 2018 LSThursday 15th November 08:00 - 16:00
08.10 BRIKEN stop
      AIDA file RIBF148/R5_587
 10x 
  784   Wed Nov 14 14:46:47 2018 CAThursday 15th November 00:00 - 08:0023.58 DAQ continues ok (RIBF148/R5_505)

00.09 system wide checks ok, except nnaida7
 25x 
  783   Wed Nov 14 07:43:35 2018 TDWednesday 14 November 16:00 - 00:0016.44 DAQ continues OK - AIDA file RIBF148/R5_432
      165Pm BigRIPS setting + 2.8mm Al degrader
 21x 
  782   Tue Nov 13 22:58:49 2018 OH Wednesday 14 November 08:00 - 16:0008:01 BigRips and BRIKEN stop
      AIDA on file R5_346
 30x 
  781   Tue Nov 13 14:27:38 2018 LSWednesday 14 November 00:00 to 08:00
00:00 BRIKEN stop AIDA file RIBF148/R5_269
 9x 
  780   Tue Nov 13 07:35:37 2018 CA, TD, OHTuesday 13 November 16:00 - 00:0016.36 DAQ continues ok
      AIDA file RIBF148/R5_198
      BRIKEN file 37
 20x 
  779   Tue Nov 13 01:41:12 2018 TDOffline analysis RIBF148/R5_130 to _139
10.41 FEE64 ADC data synchronised - attachment
 20.png21.png22.png 
  778   Mon Nov 12 23:03:53 2018 TDTuesday 13 November 08:00 - 16:00
08.03 DAQ continues - AIDA file RIBF148/R5_117
      165Pm BigRIPS setting + 3mm Al degrader
 23x 
  777   Mon Nov 12 14:51:44 2018 OHTuesday 13 November 00:00 - 08:0000:00 AIDA currently on file R5_38
      BRIKEN on file 181112_2321_165Pm_019.dlt
(AIDA file at start R5_33)
 12x 
  776   Mon Nov 12 08:59:43 2018 LS, CA, TDMonday 12 November 6pm onwards

17:59 DAQ continues OK
 28x 
  775   Sun Nov 11 21:35:42 2018 CB, OH, CA, LSMonday 12 November06:35 DAQ Continues ok
      Stats ok - attachment 1
      FEE Temps ok - attachment 2
 20x 
  774   Sat Nov 10 21:53:29 2018 CA, CB, TD, OHSunday 11 November06.53 DAQ continues OK - data transfer disabled

06.55 all system wide checks OK *except*
 21x 
  773   Sat Nov 10 04:06:20 2018 TDLess commonly recorded AIDA control tabs
Some less commonly recorded AIDA control
tabs whilst DAQ going (data transfer disabled)
 20x 
  772   Sat Nov 10 03:50:00 2018 CA, CB, TD, OHSaturday 10 November
12.35 DAQ continues OK - data transfer disabled
 9x 
  771   Fri Nov 9 02:26:58 2018 TDOffline analysis R18, R27, R29 - alpha backgroundOffline analysis of Oct18/R18_0 to 2, R27_0,
4 & 9, R29_0, 7 & 30
 8x 
  770   Thu Nov 8 23:35:50 2018 OH, TD, CA, CBFriday 9 November08:36 DAQ still running
      Not writing data to disk
 23x 
  769   Thu Nov 8 00:55:18 2018 CA, CB, TD, OHThursday 8th November09.57 DAQ still running (R29_29)
      System wide checks ok, except nnaida7
ADC calibration failure
 14x 
  768   Wed Nov 7 01:00:58 2018 CA, CB, TD, OH, PJWWednesday 7 November10.02 DAQ still running, on file Oct18/R27_9
      Merger and TapeServer ok, no error
warnings in terminals
 13x 
  767   Tue Nov 6 00:13:00 2018 CB. PJW, TD, OH, CATuesday 6 November09:13 DAQ still running R18_1
      Merger and TapeServer OK
      System wide checks ok, except for nnaida7
 14x 
  766   Mon Nov 5 10:02:52 2018 TDOffline analysis R16 - beam backgroundOffline analysis of Oct18/R16_0 to 11

 200.png201.png202.png203.png 
  765   Mon Nov 5 01:40:10 2018 CA, CB, TD, OH, PJWMonday 5 November10.40 Lowered slow comparator threshold from
100 to 10
      Good event statistics ok (attachment
 16x 
  764   Sun Nov 4 04:31:49 2018 TDOffline analysis R4Offline analysis of Oct18/R4_0 to _2

alpha background and pulser
 28x 
  762   Sun Nov 4 01:11:41 2018 CA, CB, TD, OH, PJWSunday 4 November10.03 DAQ continues OK - current file Oct18/R16_9
      FEE64 LEC/MEC slow comparator threshold
0x64
 20x 
  761   Sat Nov 3 00:49:22 2018 TDOffline analysis R15 - beam backgroundOffline analysis of Oct18/R15_0 to 7

 50.png51.png52.png54.png55.png 
  760   Sat Nov 3 00:37:29 2018 CA, CB, TD, OHSaturday 3 November09.37 DAQ continues OK - data transfer disabled
      FEE64 LEC/MEC slow comparator threshold
0xa
 9x 
  759   Fri Nov 2 01:56:00 2018 TD[How To] Recover from unable to connect to nnaida ...
If you obtain the 'unable to connect' from
one, or more, of the FEE64s try the
  
  758   Fri Nov 2 01:19:49 2018 TDOffline analysis R9 - alpha background 
Offline analysis of Oct18/R9_0 to 17
 7x 
  757   Fri Nov 2 00:57:24 2018 CA, CB, TD, OHFriday 2 November09.58 DAQ continues OK - current file Oct18/R15_6
      alpha background run
 14x 
  756   Thu Nov 1 00:24:23 2018 TD, OH, CAThursday 1 November09.24 DAQ continues OK - current file Oct18/R12_116
      alpha background run
 19x 
  755   Wed Oct 31 00:18:12 2018 TD, OH, CAWednesday 31 October09.18 DAQ continues OK - current file Oct18/R10_7
      alpha background run
 20x 
  754   Mon Oct 29 23:40:41 2018 TD, OH, CATuesday 30 October08.40 DAQ continues OK - current file Oct18/R9_15

08.42 all system wide checks OK *except*
 16x 
  753   Sun Oct 28 23:34:28 2018 TD, OH, CAMonday 29 October 08.34 DAQ continues OK - current file Oct18/R9_6

08.37 all system wide checks OK *except*
 15x 
  752   Sun Oct 28 01:33:34 2018 CA, OHSunday 28 October
09:33 DAQ still running, file R4_11. 
      Bias/leakage ok (attachment 1)
 181028_0933_bias.png181028_0937_temp.png181028_1023_1.8.W.png181028_1024_layout8.png181028_1734_bias.png 
  751   Sat Oct 27 01:22:43 2018 CA, OHSaturday 27 October09:22 DAQ found crashed. Appears to have crashed
at 20:23 last night whilst writing R3_0 to
file.
 181027_0927_bias.png181027_1004_temp.png181027_1410_temp.png181027_1409_bias.png 
  750   Fri Oct 26 03:28:10 2018 OH, CAFriday 26 OctoberOctober 25th:
In anticipation of losing access in the evening
on arrival at RIKEN the following was done:
 181026_1150_bias.png181026_1151_FEETemp.png181026_1334_Bias.png181026_1335_FEETemp.png181026_1400_Stats.png 
  749   Wed Oct 3 10:47:06 2018 OHAnalysis of R2_0 -> R2_37 Alpha RunData was analysed using offsets calculated
based on pulser walkthroughs carried out
in June 2018
 ExEy.pnghitPattern.pngxy.png 
  748   Wed Oct 3 07:09:03 2018 OH, TDCurrent FEE Configuration Map October 3rd 2018
             FEE Number
DSSD      A    B    C    D
  
  747   Wed Oct 3 01:48:21 2018 OH, TDWednesday 3 October09.42 DAQ continues OK - current file Sep18/R2_36

09.42 all system wide checks OK *except*
 30x 
  746   Tue Oct 2 01:55:11 2018 OH, TDTuesday 2 October09.54 DAQ continues OK - current file Sep18/R2_26

09.55 all system wide checks OK *except*
 10x 
  745   Mon Oct 1 01:10:57 2018 OH, TDMonday 1 October09.10 DAQ continues OK - current file Sep18/R2_16

09.15 all system wide checks OK *except*
 10x 
  744   Sun Sep 30 01:48:27 2018 OH, TDCurrent link to Google sheets leakage current loghttps://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit?pli=1#gid=282765719   
  743   Sun Sep 30 01:13:47 2018 OH, TDSunday 30 September09.10 DAQ continues OK - current file Sep18/R2_6

09.15 all system wide checks OK *except*
 8x 
  742   Sat Sep 29 06:25:23 2018 OH, TDSaturday 29 September14:25 Moved from 8x DSSD setup to 6x DSSD
      Top two detectors removed.
      Detector alignments in snout unchanged
 18x 
  741   Fri Sep 28 02:08:07 2018 OH, TDFriday 28 September10:08 Normal system restart ok
      System currently in 8DSSD configuration
as was left in June 2018
 6x 
  740   Wed Aug 22 13:50:30 2018 OH, TD, Reply by PCSAIDA GSI Setup Noise Tests> Currently seems to be a problem with the
memory check in the system wide checks that
produces the message shown
  
  739   Wed Aug 22 11:38:11 2018 OH, TDAIDA GSI Setup Noise TestsCurrently seems to be a problem with the memory
check in the system wide checks that produces
the message shown
 13x 
  738   Wed Aug 22 09:10:28 2018 OH, TDAIDA@DESPEC dhcpd.conf, dhcpd startup and log messages
> Attachment 1 - DHCP configuration file
/etc/dhcpd.conf
  
  737   Tue Aug 21 12:29:44 2018 OH, TDAIDA@DESPEC dhcpd.conf, dhcpd startup and log messages
Attachment 1 - DHCP configuration file /etc/dhcpd.conf
 dhcpd.confdhcdConfStartup.txtmessagesLog.txt 
  736   Tue Jul 3 02:24:45 2018 OHTuesday 3 July10:23 Bias and leakage currents ok - attachment
1
      Fee temperatures ok - attachment 2
 180703_1023_bias.png180703_1025_FEETemp.png180703_1406_bias.png180703_1406_stats.png 
  735   Mon Jul 2 02:36:41 2018 OHMonday 2 July10:35 Bias and leakage currents ok - attachment
1
      FEE Temps ok - attachment 2
 180702_1036_bias.png 
  734   Sun Jul 1 08:25:24 2018 OHInventoryAttached is an updated inventory of the cables
and adapter boards we have in RIKEN.
 180701_Cable_Inventory.xlsx 
  733   Sun Jul 1 02:26:50 2018 OHSunday 1st July10:25 Bias and leakage currents ok - attachment
1
      FEE Temperatures ok
 180701_1025_bias.png 
  732   Sat Jun 30 03:05:36 2018 OHSaturday 30 June11:05 Bias and leakage currents ok - attachment
1
      FEE temperatures ok
 180630_1104_bias.png180630_1327_BIAS.png180630_1335_Stats.png180630_8dssd_map.png180630_xandydssd8.png 
  731   Fri Jun 29 02:26:34 2018 OHFriday 29 June10:27 Bias and leakage currents ok - attachment
1
      Fee temperatures ok - attachment 2
 180629_1026_bias.png180629_1028_feetemp.png180629_1445_bias.png180629_1954_bias.png 
  730   Thu Jun 28 05:22:31 2018 OHAnalysis of R7 -> R9R7_0 -> R7_1 High Energy pulser run
R8_0 -> R8_1 Low energy puler run
R9_52 -> R9_62 Alpha run
 lowPulserADC.pnghighPulserADC.pngalphaADC.pngalphaOld.pngExEyPulser.PNG 
  729   Thu Jun 28 02:19:30 2018 OHThursday 28th June10:18 Bias and leakage currents ok - attachment
1
      FEE Temperatures ok
 180628_1018_bias.png180628_1249_bias.png180628_1922_FEE29ASIC2.png 
  727   Wed Jun 27 02:23:03 2018 OHWednesday 26 June10:20 Bias and leakage currents ok - attachment
1
      FEE temperatures ok
 180628_1023_Bias.png180628_1023_Bias.png180626_1527_feetemps.png 
  726   Tue Jun 26 05:44:44 2018 OHTuesday 26 June04:12 TD found the nnaida14 appeared to have
become noisy at some point. Biases/;eakages/temps
ok
 180526_1345_Bias.png180626_2152_bias.png 
  724   Mon Jun 25 01:56:08 2018 OH, TDMonday 25th June09:55 Alpha run stopped

10:45 Investigating the large noise in FEE28
 21x 
  723   Sun Jun 24 09:08:03 2018 3OH, TDJune 2018 New Stack ConfigurationStack has been changed in configuration from
a 6 DSSD stack to 8 DSSD stack.
What was detectors 1-6 are now 3-8 with 2
 IMG_20180623_104349.jpgIMG_20180623_113315.jpg 
  722   Sun Jun 24 01:40:08 2018 OH, TDSunday 24 June 2018
09.38 DAQ continues OK
 15x 
  721   Sat Jun 23 02:44:36 2018 OH, TDSaturday 23 June 2018
      DSSSD stack dismounted yesterday to
change configuration from 6x to 8x DSSSDs.
 16x 
  720   Sat Jun 23 02:28:13 2018 TD, OHNew fuses fitted to USB-controlled ac mains relay
The input fuses of the USB-controlled ac
mains relay have been changed from 2x 5x20mm
 2290195.pdf 
  719   Fri Jun 22 02:50:37 2018 OH, TDFriday 22 June 201810:50 Yesterday 4 FEE modules installed for
FEE64s 25-32
      dhcpd.conf updated to reflect MAC addresses
 60.png70.png71.pngstartup.tcldhcpd.conf 
  718   Thu Jun 21 06:48:22 2018 TD, OHDSSSD HV cablingThe DSSSD HV cabling has been changed in preparation
for configuration change
from 6x DSSSDs to 8x DSSSDs as follows:
 50.png51.png 
  717   Thu Jun 21 05:23:16 2018 TD, OHOffline analysis R1 - alpha background
Analysis of overnight alpha background run
(June18/R1_0 ... _2) indicates that all FEE64s
 8x 
  716   Thu Jun 21 02:31:49 2018 TD, OHThursday 21 June10.20 DAQ continues OK

10.29 DAQ stop June18/R1
 30.png31.png32.png33.png34.png 
  715   Wed Jun 20 03:33:06 2018 TDWednesday 20 June 11.09 Julabo FL11006 recirculating chiller
- ON - water level OK (75%)
      Tektronix AFG3102 - CH2 ON - amplitude
 14x 
  713   Tue Jun 19 06:08:03 2018 TDTuesday 19 June 201813.00

Julabo FL11006 chiller
  
  712   Thu Nov 23 01:12:33 2017 TD, CBAIDA to safe shutdown state10.11 Detector bias OFF
      FEE64 power OFF
      BNC PB-4 OFF
  
  710   Thu Nov 23 01:10:43 2017 TD, CBDetector bias & leakage currents - October & November 2017https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=282765719  AIDA_leakage_current(16).xlsx 
  708   Thu Nov 23 00:41:43 2017 TD, CBThursday 23 November 09.33 Detector biases & leakage currents OK
- see attachments 1 & 2
      FEE64 Temperatures OK - see attachment
 10x 
  707   Tue Nov 21 00:30:31 2017 TD, CBTuesday 21 November09.27 Detector biases & leakage currents OK
- see attachments 1 & 2
      FEE64 Temperatures OK - see attachment
 20x 
  706   Mon Nov 20 00:53:27 2017 TD, CBMonday 20 November09.50 Detector biases & leakage currents OK
- see attachments 1 & 2
      FEE64 Temperatures OK - see attachment
 9x 
  704   Sun Nov 19 01:46:10 2017 CB, TDSunday 19 November10.45 Detector biases & leakage currents OK
- see attachments 1
      FEE64 Temperatures OK - see attachment
 14x 
  703   Sat Nov 18 04:25:16 2017 CB, TDSaturday 18 November
13.27 Detector biases & leakage currents
OK - see attachments 1 & 2
 19x 
  702   Sat Nov 18 03:53:43 2017 TDOffline analysis Nov17/R2_8-R2_16 data MIDASsort offline analysis Nov17/R2_8-R2_16
data
 22x 
  701   Sat Nov 18 03:37:46 2017 TDOffline analysis RIBF128/R5_124-R5_148, Oct17/R17_31-R17_34 and Nov17/R2_8-R2_16 dataOffline analysis of

AIDA RIBF128/R5_124 to R5_148 data "130Ag
 100.png101.png102.png103.png 
  700   Fri Nov 17 10:03:25 2017 CB, TDFriday 17 November19.03 DAQ started OK - data transfer not enabled

      BNC PB-4
 32x 
  699   Fri Nov 17 03:32:31 2017 CBJulabo FL11006 recirculating chiller refilled12:32 Chiller found almost empty &
still working at 20C. Refilled to overflow.
  
  698   Sat Nov 4 23:49:14 2017 OHSunday 5 November08.09 DAQ running OK - data transfer not enabled

      BNC PB-4
 6x 
  697   Fri Nov 3 23:09:36 2017 TD, OHSaturday 4 November08.09 DAQ running OK - data transfer not enabled

      BNC PB-4
 20x 
  696   Thu Nov 2 22:57:53 2017 OHFriday 3 November10.56 DAQ running OK - data transfer not enabled

      BNC PB-4
 031117_0758_bias.png031117_0759_bias.png031117_0759_stats.png 
  695   Thu Nov 2 01:56:18 2017 TD, OHThursday 2 November 10.56 DAQ running OK - data transfer not enabled

      BNC PB-4
 16x 
  694   Wed Nov 1 02:24:20 2017 OHWednesday 1 November11:24 DAQ running OK - data transfer not enabled

      BNC PB-4
 011117_1120_bias.png011117_1122_feetemps.png011117_1123_stats.png 
  693   Tue Oct 31 05:57:33 2017 TDOffline analysis RIBF128/R5_124-R5_148 and Oct17/R31_17-R17_34
Offline analysis of the AIDA Oct17/R17_31
to R17_34 data "84Ge setting"
 10x 
  692   Tue Oct 31 00:34:10 2017 TD, OHTuesday 31 October09.34 DAQ running OK - data transfer not enabled

      BNC PB-4
 8x 
  691   Mon Oct 30 01:10:28 2017 TD, OHMonday 30 October10.10 DAQ running OK - data transfer not enabled

      BNC PB-4
 8x 
  690   Sun Oct 29 05:16:35 2017 TD, OHSunday 29 October14.16 DAQ running OK - data transfer not enabled

      BNC PB-4
 14x 
  689   Sat Oct 28 06:25:07 2017 TDWaveforms
For comparison with waveforms shown in https://elog.ph.ed.ac.uk/AIDA/665
and https://elog.ph.ed.ac.uk/AIDA/668
 10x 
  688   Sat Oct 28 06:09:44 2017 TDOffline analysis Oct17/R17_31-R17_34   20x 
  687   Sat Oct 28 03:33:10 2017 TD, OHSaturday 28 October11.33 DAQ running OK - date transfer not enabled

      BNC PB-4
 13x 
  686   Fri Oct 27 08:35:33 2017 TDOffline analysis Oct17/R17_31-R17_34
Offline analysis of High Energy Channel (HEC)
20GeV FSR data from AIDA data file Oct17/R17_31-R17_34
 8x 
  685   Fri Oct 27 01:58:44 2017 TD, OHFriday 27 October09.56 DAQ stopped OK yesterday

      BNC PB-4
 12x 
  684   Wed Oct 25 18:36:46 2017 TD, OHThursday 26 October02.37 DAQ stalled - USB-controlled ac mains
relay fuse blown
      Not writing to disk
 28x 
  683   Wed Oct 25 03:26:55 2017 TD, OHWednesday 25 October11.27 DAQ continues
      Not writing to disk
 7x 
  682   Tue Oct 24 03:16:07 2017 TD, OHTuesday 24 October11.16 DAQ continues
      AIDA file Oct17/R8_107
 20x 
  681   Mon Oct 23 11:50:09 2017 TD, OHMon 23 Oct - further information please.> 10:18 Leakage and bias ok - Attachment 1
>       FEE temperatures ok - Attachment
2
  
  680   Mon Oct 23 02:24:14 2017 TD, OHMonday 23 October10:18 Leakage and bias ok - Attachment 1
      FEE temperatures ok - Attachment 2
      Statistics - Attachment 3
 19x 
  679   Sun Oct 22 02:10:03 2017 OHSunday 22 October10:10 DAQ found crashed
      Stopped writing to file at 05:31
      System wide checks ok
 25x 
  678   Sat Oct 21 02:48:17 2017 OH, TDSaturday 21st October10:48 Adapter boards replaced for DSSD 1 &2
(FEEs 1,2,22 and 21)
      Previous boards were Rev D new boards
 31x 
  677   Fri Oct 20 01:43:40 2017 OHFriday 20th October09:43 DAQ continues ok
      System wide checks all ok
      Detector bias and leakage ok - Attachment
 6x 
  676   Thu Oct 19 11:32:29 2017 TD, OHThursday 19 October
> 09.40 DAQ continues OK
>       File /TapeData/Oct17/R1_280
  
  675   Thu Oct 19 01:40:35 2017 TD, OHThursday 19 October
09.40 DAQ continues OK
      File /TapeData/Oct17/R1_280
 35x 
  674   Wed Oct 18 03:57:37 2017 TD, OHWednesday 18 October 11.57 Startup of AIDA following June 2017
shutdown
 24x 
  673   Mon Jun 19 08:58:00 2017 TD, PatrickReport - high - 'zero all histograms' doesn't
> The DAQ Run Control 'zero all histograms'
function appears to have stopped working
  
  672   Mon Jun 19 08:52:40 2017 TDReport - high - 'zero all histograms' doesn't
> The DAQ Run Control 'zero all histograms'
function appears to have stopped working
  
  671   Sun Jun 18 08:01:42 2017 TDSeagate Backup Plus Hub 8Tb USB disk #2 aidas1> df -h
Filesystem            Size  Used Avail Use%
Mounted on
  
  670   Sun Jun 18 07:57:26 2017 TDSeagate Backup Plus Hub 8Tb USB disk #3
N.B. data directory RIBF148 incomplete
  
  669   Sun Jun 18 06:35:22 2017 TDDSSSD bias & leakage current spreadsheet
https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=808110721
 AIDA_leakage_current(15).xlsx 
  668   Sun Jun 18 02:56:43 2017 TDSunday 18 June10.56 Detector biases & leakage currents OK
- see attachments 1 & 2
 11x 
  666   Sat Jun 17 11:00:55 2017 TDReport - high - 'zero all histograms' doesn't
The DAQ Run Control 'zero all histograms'
function appears to have stopped working
  
  665   Sat Jun 17 05:47:58 2017 TDSaturday 17 June13.47 DAQ continues
      AIDA file RIBF148/R10_39
 40x 
  664   Fri Jun 16 02:38:36 2017 TDFriday 16 June10.35 DAQ continues
      AIDA file RIBF148/R10_14
 28x 
  663   Thu Jun 15 07:44:41 2017 OHRIKEN Cable InventoryList of the type and quantity of cables we
have at RIKEN that are not currently in use.
 170615_Cable_Inventory.xlsx 
  662   Thu Jun 15 02:56:32 2017 TD, OHThursday 15 June10.52 DAQ continues
      AIDA file RIBF148/R8_39
 18x 
  661   Wed Jun 14 07:01:34 2017 TDWednesday 14 June15.01 DAQ continues
      AIDA file RIBF148/R8_22
 21x 
  660   Tue Jun 13 00:11:56 2017 TD,ZLIUTuesday 13 June 08:00-16:00
08.11 DAQ continues
 17x 
  659   Mon Jun 12 15:51:15 2017 OHTuesday 13 June 00:00-08:0000:02 System wide checks ok
      Good events - attachment 1
      FEE temperatures - attachment 2
 14x 
  658   Mon Jun 12 08:02:01 2017 TDMonday 12 June 16.00-24.0016.01 DAQ continues

16.01 Detector biases & leakage currents
 26x 
  657   Mon Jun 12 00:31:29 2017 ZLiu, TD, OHMonday 12 June 08:00-16:00 09:00   Stop DAQ  to tune the Sm beam, may
need 3 hours
        AIDA file RIBF128/R9_319
 11x 
  656   Sun Jun 11 16:04:12 2017 DKMonday 12 June 0:00 ~ 8:000:04    Biases and leak currents shown as
attachment #1, 12JunBias1.png
        System-wide checks: nnaida13 fails
 10x 
  655   Sun Jun 11 08:23:23 2017 PVSunday 11 June 16:00-00:00 16:40 beam lost - stripper foil problem
      AIDA file RIBF128/R9_55
 21x 
  654   Sun Jun 11 00:07:24 2017 OHSunday 11 June 08:00-16:0008:10 BRIKEN and BigRIPS stops DAQs
      AIDA on file R7_1287
 25x 
  653   Sat Jun 10 15:56:31 2017 ZLiu0:00-8:00 11 June 2017
00:35   Stop DAQ
        AIDA file
RIBF128/R7_1172

00:36   Start DAQ
  
     AIDA file RIBF128/R7_1172
        BRIKEN
 46x 
  652   Sat Jun 10 09:24:45 2017 AE, TDSaturday 19 June 16.00-24.0017.25 Detector biases & leakage currents OK
- see attachments 1 & 2
      FEE64 Temperatures OK - see attachment
 24x 
  651   Sat Jun 10 02:40:18 2017 DKSat 10 June 8:00 ~ 16:0010:40    Put lead wall in front of AIDA during
beam tuning.
 R7_1002.txt 
  650   Fri Jun 9 16:22:54 2017 PVSaturday 10 June 00:00-08:0000:21  BigRIPS and BRIKEN stop their DAQ
       AIDA run file R7_826
 28x 
  649   Fri Jun 9 09:12:03 2017 ZLiu, AE17:00-24:0017:06 BRIKEN and BigRIPS stop their DAQs
      AIDA on file R7_723
 leakage_jun9_6pm.pngstat_21.14.pngtemp2116.pngnnaida12_EL.pngnnaida9_EL.png 
  648   Fri Jun 9 04:53:24 2017 TDWaveforms
x-scale 1000ch = 2ms
y-scale expanded
 28x 
  647   Thu Jun 8 23:57:26 2017 ZLiu, TD9June2017 8:00-16:00
08:06 System wide checks all ok
 
       implantation profile - attachment

         count rate - attachment 2
 32x 
  646   Thu Jun 8 16:06:21 2017 OHFriday 9 June 00:00-08:0000:06 System wide checks all ok
      Bias and leakage currents ok - attachment
1
 9x 
  645   Thu Jun 8 08:11:39 2017 NN, PVThursday 8 June 16:00 - 24:00 (evening shift)16:13  DAQ still running

16:34  BigRIPS and BRIKEN stop their DAQ
 22x 
  644   Thu Jun 8 00:54:26 2017 OH, PWThursday 8 June 00:00-16-0008:54 DAQ still running

09:01 BRIKEN and BigRIPS stop daqs
 6x 
  643   Wed Jun 7 16:04:42 2017 ZL, DKThurs 8 June 0:00~8:0000:05  Shift change.
       Primary beam current ~4800 enA, 238U^86+
so 50 to 60 pnA.
 13x 
  642   Wed Jun 7 08:02:42 2017 OH, PVWednesday 7 June 16:00 - 24:0016:02 System wide checks ok
      Good Events statistics (No beam at
time!)- attachment 1
 15x 
  641   Wed Jun 7 00:10:24 2017 NN, TDWednesday 7 June 08:00 - 16:0008:12    Analysis of file RIBF128/R6_438 -
zero timewarps, four MBS timewarps - see
attachment 1
 30x 
  640   Tue Jun 6 15:59:19 2017 DKWed 7 June night shift7 June 2017   

00:05  All system-wide checks are passed
 14x 
  639   Tue Jun 6 15:26:44 2017 TD, ZLTuesday 06 June 16.00-24.0015.53    Bias and leakage currents ok - attachments
1 & 2 
         FEE temperatures ok - attachment
 29x 
  637   Tue Jun 6 07:44:19 2017 TDPreamplifier waveformsPreamplifier waveforms sampled by 50MSPS,
14 bit ADC
 25x 
  636   Tue Jun 6 00:57:49 2017 PJW, TDTuesday 6 June 08.00-16.0008.57 Stop DAQ
      AIDA file RIBF128/R6_24
 16x 
  634   Mon Jun 5 16:02:50 2017 OH, PV, AETuesday 06 June 00.00-08.0000:03 BigRIPS starts run 3007
      BRIKEN starts run 007
      AIDA on file R5_146
 40x 
  633   Mon Jun 5 08:43:24 2017 CB, TD, PW, DKMonday 5 June 16:00 to 24:0016:43  Leakage currents OK - see attachment
1
       FEE64 temperatures OK - see attachment
 38x 
  632   Sun Jun 4 23:50:24 2017 CB, PW, DK, TDMonday 5 June 08:00 to 16:0007:50  Leakage currents OK - attachment 1
       FEE64 temperatures OK - attachment
2
 24x 
  631   Sun Jun 4 16:00:49 2017 NN, OHMonday 5 June 00:00 to 08:0023:59   BigRIPS and Briken stop their DAQ
        AIDA run file R2_245
 19x 
  630   Sun Jun 4 08:13:10 2017 LHB, PV, NN4th June 16.00-00.0016.25  *All* system wide checks OK *except*
ADC calibration of nnaida1, 21 and nnaida1
clock status (status=6)
 28x 
  629   Sun Jun 4 00:06:18 2017 OH, TD, PJWSunday 4 June 08.00-16.0008:00 DAQ found stopped at around 04:49 -
Attachment 1
      Time obtained from last file written
 32x 
  628   Sat Jun 3 08:07:48 2017 OH, CB, AESaturday 3 June 16:00-24:0016:26 DAQ continues OK
      all system wide checks ok, *except*
nnaida1 clock status (6), nnaida1, 21 ADC
 1.png2.png3.png4.png5.png 
  627   Sat Jun 3 05:32:09 2017 TDReport - high - MBS correlation scaler anomalies
The analysis of files RIBF127R1/R1_1478 to
R1_1486 is appended. This sequence of files
 testmbs 
  626   Sat Jun 3 00:00:11 2017 LJB, PW, TD, OHSaturday 3 June 08.00-16.0008.29 BRIKEN 100; BigRIPS 1111 stopping run.
      AIDA on run R1_1429
 19x 
  625   Fri Jun 2 16:02:37 2017 CBSaturday 3 June 00:00-08:0000:02  Noise in nnaida 1 and 2 appears to
be reduced.
       However, some channels in nnaida1,
 28x 
  624   Fri Jun 2 08:25:34 2017 LHB2nd June Evening Shift16.34  Beam is off
       Aida R_1216, BRIKEN (83)/BigRIPS (1094)
continue to run for background data
 20x 
  623   Fri Jun 2 00:01:48 2017 OH, PW, CBFriday 2 June 08:00-16:0008:05 Briken and BigRIPS stopping daqs
      AIDA on file R1_1099
 9x 
  622   Thu Jun 1 16:06:03 2017 NNFriday 2 June 00:00-08:00 00:35   Beam is on
        current AIDA file R1_996
 14x 
  621   Thu Jun 1 08:49:39 2017 LHB, PVThursday 1 June Evening Shift16.44 DAQ stop BigRIPS, BRIKEN
      AIDA file RIBF127R1/R1_886
 27x 
  620   Thu Jun 1 00:00:25 2017 TD, PV, CBThusrday 1 June 08.00-16.0007.57 run continues
      BRIKEN start run 55
      BigRIPS start run 1066
 17x 
  619   Wed May 31 16:48:54 2017 TDThursday 1 June 00.00-08.0000.48 BigRIPS DAQ now running

      BRIKEN start run 48
 42x 
  618   Wed May 31 16:43:52 2017 TDMerger & TapeServer server startup scripts modified
aidas1> cd /MIDAS/Merger/AIDA
aidas1> ls
 StartupAidaTapeServer 
  617   Wed May 31 08:00:26 2017 NN, CBWednesday 31 May 16:00 - 24:0016:30  Check online data ok (R1_533) see attachment
1
 15x 
  616   Wed May 31 00:02:41 2017 VP, CBWednesday 31 May 08:00 - 16:0008:02 BRIKEN starts run 1032
      BigRIPS starts run 31
      AIDA on file R1_423
 10x 
  615   Tue May 30 16:05:12 2017 OHWednesday 31 May 00:00 - 08:0000:05 BigRIPS and BRIKEN stop their daqs
      AIDA currently on file R1_312
 9x 
  614   Tue May 30 07:56:05 2017 CB, NN, OH, AETuesday 30 May - evening shift16.00   Still no beam  
        Current run /RIBF127R1/R1_197
        Found dropped channels on nnaida1,
 7x 
  613   Tue May 30 00:58:10 2017 TD, CBTuesday 30 May - day shift08.58 DAQ continues OK 
      File RIBF127R1/R1_99
      BigRIPS run 1009
 27x 
  611   Mon May 29 16:02:21 2017 OH, TDTuesday 30th May00:02 Bias and leakage currents ok - attachment
one
      System wide check all ok
 16x 
  610   Mon May 29 07:05:06 2017 TDMerger error messages and SEGV
Overnight and earlier today Obtained the
following Merger error messages
 R33_51R33_5211.png12.png 
  609   Mon May 29 05:26:39 2017 TDSeagate Backup Plus Hub 8Tb USB disk #1
aidas1> df -h
Filesystem            Size  Used Avail Use%
  
  608   Mon May 29 00:59:27 2017 TD, PV, CB, NN, OHMonday 29 May09.00 DAQ continues OK 
      Current file May2017/R32_239
 10x 
  607   Sun May 28 10:25:11 2017 TDAnalysis of RIBF123R1/R23   R23.txt 
  606   Sun May 28 09:55:11 2017 PVADC offset value from pulser walkthrough run May2017/R28 R29ADC offset calculation using data from pulser
walkthrough runs, see:
https://elog.ph.ed.ac.uk/AIDA/603
 ADC_offset_R2829_BRIKENMay2017.xlsADC_offset_R2829_BRIKENMay2017.txtcal_histo.pngcal_histo.root 
  605   Sun May 28 09:20:29 2017 TDAnalysis of RIBF123R1/R21   R21.txt 
  604   Sun May 28 02:16:04 2017 TD, CBSunday 28 May10.15 DAQ continues OK 
      Current file May2017/R31_239
 16x 
  603   Sat May 27 05:38:39 2017 CB, TD, OHSaturday 27 May13.38 DAQ continues OK 
      Current file May2017/R27_49
 9x 
  602   Fri May 26 05:19:40 2017 TDOffline analysis RIBF123R1/R23_44 to R23_70
Observe same noise structures to https://elog.ph.ed.ac.uk/AIDA/600
  
  601   Fri May 26 02:20:42 2017 CB, OH, NNFriday 26 May10.20 DAQ continues OK 
      Current file May2017/R27_22
 15x 
  600   Thu May 25 03:03:38 2017 TDOffline analysis of R23_91 to R23_115Offline analysis of RIBF123R1_91 to R23_115

See https://elog.ph.ed.ac.uk/AIDA/583 & https://elog.ph.ed.ac.uk/AIDA/594
 13x 
  599   Thu May 25 02:11:04 2017 CB, TDThursday 25 May10.10 DAQ continues OK 
      Current file May2017/R26_17
 10x 
  598   Wed May 24 15:58:53 2017 Patrick Coleman-SmithExamination of Console Logs -- and a couple of reminders 




  
  597   Wed May 24 14:51:06 2017 Patrick Coleman-SmithExamination of Console Logs -- and a couple of reminders 

  
  595   Wed May 24 13:39:12 2017 Patrick Coleman-SmithExamination of Console Logs -- and a couple of remindersI have tarred and zipped all 24 logs and
shipped them back to the UK. Now I can browse
through them.
  
  594   Wed May 24 06:33:19 2017 TDAnalysis of RIBF123R1/R23_44, R23_91 & R25_142
Álvaro Tolosa Delgado reports observation
of c. 1s 'oscillations' in implant-decay
 R23_44R23_91R25_142R25_12 
  593   Wed May 24 06:12:48 2017 TDLead bricks removed from BRIKEN aperture for source tests - AIDA NOT SHIELDED FROM BEAM
To install the 252Cf fission source to test
the 3He neutron counters, Pb bricks which
  
  592   Wed May 24 03:20:35 2017 CB, TDWednesday 24 May11.00 Merger found stopped at 03:27 - current
file R24_7
      Restarted Merge. Stopped Run control.
 8x 
  590   Tue May 23 03:01:52 2017 CB, TD, NN, OHTuesday 23 May11.02 DAQ continues OK 
      Current file May2017/R22_192
 19x 
  589   Mon May 22 10:29:11 2017 TDFEE64 system console to Raspberry pi /dev/ttyUSB mappingttyUSB0 =>  last host=nnaida24, => last addr=10.1.2.24,
; #panics => 0 ; Not Finished 
ttyUSB1 =>  last host=nnaida23, => last addr=10.1.2.23,
  
  588   Mon May 22 10:21:29 2017 PatrickConsole mapping to FEE64 pleasePlease attach the list of ttyUSB to FEE64
console connection .

 
  
  586   Mon May 22 09:12:56 2017 PatrickConsoles reporting Options not available.... defaults operational ?I have noticed from the console logs reports
concerning an inability to open the Options
CONTENTS files for the FEE64s and hence failure
  
  585   Mon May 22 08:53:42 2017 CB, TD, PatrickMonday 22 May> Concerning nnaida7 and the failure of calibration.....
have you tried to calibrate it using the
FADC Align  & Control ?
  
  584   Mon May 22 08:43:10 2017 CB, TD, PatrickMonday 22 May> 10.35 DAQ continues OK 
>       Current file May2017/R19_253
  
  583   Mon May 22 08:29:26 2017 TDOffline analysis R25_12 to R25_22Offline analysis of AIDA data files R25_12
to R25_22 using MIDASsort
 21x 
  582   Mon May 22 02:34:51 2017 CB, TDMonday 22 May10.35 DAQ continues OK 
      Current file May2017/R19_253
 16x 
  581   Sun May 21 10:58:01 2017 TDJulabo FL11006 recirculating chiller refilled18.55 Julabo FL11006 recirculating chiller
refilled to "H" marker of the filling level
indicator.
 15.png 
  580   Sun May 21 02:54:22 2017 CB, TD, OHSunday 21 May10.54 DAQ continues OK 
      Current file May2017/R18_208
 10x 
  579   Sat May 20 02:39:06 2017 CB, OHSaturday 20 May10.35 DAQ continues OK 
      Current file May2017/R16
 9x 
  578   Fri May 19 10:16:27 2017 CB, TD, OHDAQ sever rebooted18:16 Finished rebooting DAQ server and acquisition.
All OK, except ADC calibration on #7.
      Started run May2017/R16
  
  577   Fri May 19 09:55:54 2017 CB, TD, OHLogs from Raspberry Pi System Console17:50 Rebooted Server and FEE64. Connected
remotely to Ras Pi System Console. Repeated
USB connection procedure. All 24 modules
 ttyUSB1 
  576   Fri May 19 02:44:14 2017 TD, CB, OHFriday 19th May10:44 System wide checks all ok
      Leakages and biases all ok (see attachment
1)
 190517_bias1045.png190517_feetemp1045.png190517_goodevents1056.png 
  575   Thu May 18 15:20:44 2017 Patrick Coleman-Smith[HowTo] Connecting a USB console interface to the FEE64The three attachments show the orientation
of the console cable pcb relative to the
FEE64 connectors.
 IMG_0107_resize.jpgIMG_0108_resize.jpgIMG_0109_resize.jpg 
  574   Thu May 18 09:46:36 2017 TD, OH, CBRasPi system console diagnostics
> Can you let me know when you power-cycled
the FEEs please ? Or maybe just do a stop/go.
  
  573   Thu May 18 09:29:50 2017 TD, OH, CBRasPi system console diagnostics> Connecting monitor to RasPi system console
diagnostics
  
  572   Thu May 18 03:07:47 2017 TD, OH, CBRasPi system console diagnosticsConnecting monitor to RasPi system console
diagnostics
 105.png105.png106.png 
  571   Thu May 18 02:16:05 2017 CB, TD, OHThursday 18 May10.10 DAQ continues OK 
      Current file May2017/R10_346
 10x 
  570   Wed May 17 05:28:19 2017 TD, OHWednesday 17 May11.11 DAQ found stopped
      Most recent file May2017/R11_245 (last
accessed 06:09)
 6x 
  568   Tue May 16 03:18:46 2017 TD, OHTuesday 16 May11.19 DAQ continues OK 
      Current file May2017/R10_346
 9x 
  567   Mon May 15 02:01:02 2017 TD, OHMonday 15 May10.01 DAQ continues OK 
      Current file May2017/R8_334
 7x 
  566   Sun May 14 01:52:49 2017 TD, OHSunday 14 May09.54 DAQ continues OK 
      Current file May2017/R7_292
 16x 
  565   Sat May 13 03:16:16 2017 TDAnalysis of May2017/R1_0 to May2017/ R1_79
See https://elog.ph.ed.ac.uk/AIDA/555
 11x 
  564   Sat May 13 02:35:53 2017 TD, OHSaturday 13 May10.35 DAQ continues OK 
      Current file May2017/R6_246
 17x 
  563   Fri May 12 02:55:10 2017 TD, OHFriday 12 May10.55 DAQ continues OK 
      Current file May2017/R6_181
 6x 
  562   Thu May 11 05:43:30 2017 TD, OHThursday 11 May13.43 DAQ continues OK 
      Current file May2017/R6_123
 16x 
  561   Wed May 10 02:55:13 2017 TD, OHWednesday 10 May10.55 DAQ continues OK 
      Current file May2017/R6_44
 8x 
  560   Tue May 9 02:25:04 2017 TD, OHTuesday 9 May10.25 DAQ continues OK 
      Current file May2017/R1_79
 18x 
  559   Mon May 8 10:00:02 2017 Patrick Coleman-Smith[HowTo] Operating document for the Pi_Monitor FEE64 console logging equipmentThe operating proceedure for the Raspberry
Pi FEE64 console monitor is attached.

Please let me know if more detail
 Operating_the_Aida_Pi_Monitor.pdf 
  558   Mon May 8 02:11:37 2017 OH, TDMonday 8 May10.11 DAQ continues OK 
      Current file May2017/R1_58
 11x 
  557   Sun May 7 01:29:50 2017 OH, TDSunday 7 May
09.28 DAQ continues OK 
      Current file May2017/R1_36
 13x 
  556   Sat May 6 03:32:38 2017 OH, TDSaturday 6 May
11.30 Detector biases & leakage currents
OK - see attachments 1 & 2
 8x 
  555   Fri May 5 08:03:36 2017 OH, TDFriday May 5thRelatively painless start-up. Had an issue
with firefox where all bookmarks had been
forgotten.
 10x 
  554   Thu Apr 13 15:08:31 2017 CBCard testI tested the FWHM of a BNC PB-5 pulser
signal as a function of shaping time using
the first produced ISOL FEE64 card in Daresbury
 8us.png4us.png0.5us.pngPlot.pngPlot_teflon.png 
  553   Wed Apr 5 06:11:08 2017 OHBigRIPS particle IDI've been going through collecting the BigRIPS
root files with Phong and making sure they
are on AIDAs1.
  
  Draft   Wed Apr 5 06:10:55 2017 OHBigRIPS particle ID    
  551   Sun Apr 2 04:40:00 2017 DKBigRIPS Summary InfoIt is all saved locally file:///homes/npg/Documents/2017Ca/

Although, a little more hacking is required
  
  550   Sun Apr 2 03:32:30 2017 DK, OHPulser walkthrough11:32 Pulser walkthrough, 90k down to 10k,
10k steps, 1 min per step
      R26
 bias_2_a.png 
  549   Sat Apr 1 16:16:05 2017 OH, CGSunday 2 April00:12 BigRips started run 0223 (Started at
00:12)
      AIDA file R20_344
 bias_020417_0146.pngbias_020417_0742.pngBigRIPSlogbias_020417_0922.png 
  548   Fri Mar 31 17:21:56 2017 CG, OH, DKSaturday 1 April - Run status00.46 34Ne stopped for 36Ne setting (R19_37).
      DAQ kept running as I was upstairs
getting some food.
 9x 
  547   Thu Mar 30 16:12:21 2017 DK, OH, CGFriday, March 31 run status00:11 BigRIPS has started a new run at 00:10:42
run 0165.
      AIDA subrun R16_357 was about halfway
 14x 
  546   Wed Mar 29 18:02:12 2017 OH, TD, DK, CGThursday 30th March02:02 Recovered DAQ from crash. Merger became
clogged and the system required a full restart.
Raspberry pi also
 31x 
  545   Wed Mar 29 17:49:36 2017 DKcshrc hacking w/ MIDASThe ~/.cshrc was modified to change the MIDAS
path for a convenient analysis method, but
it should be done in a shell script instead,
  
  544   Wed Mar 29 13:38:38 2017 OH, DK, CGFirst beam runsFor BigRIPS run numbers, they are available
online: http://bripscnt01.rarfadv.riken.jp/runsum/index.php
 biases_firstbeam.png 
  543   Wed Mar 29 13:02:17 2017 TDReport - high - interaction between DHCP and FEE64 authenticated mount requests
What has happened here?
  
  542   Wed Mar 29 08:13:34 2017 DK, PV, JL, CGDegrader, Pb wall opening16:21

Chris noticed that when the degraders that
  
  541   Wed Mar 29 05:08:04 2017 TDReport - medium - delayed or missing authenticated mount requests following FEE64 power cycleThis is not, I think, a new observation.

Following FEE64 power cycles we sometimes
 messages.log 
  540   Wed Mar 29 00:23:12 2017 TDAnalysis of Mar2017/R3Analysis of Mar2017/R3_0 ... R3_9 by MIDASsort

*** ENTRY finish
 8x 
  539   Wed Mar 29 00:02:49 2017 TDWednesday 29 March08.02 DAQ halted overnight

      System checks OK *except* for nnaida1
 21x 
  538   Tue Mar 28 01:28:12 2017 TD, CG, OH, DKTuesday 28 March
09.13 DAQ run R3 ends OK (final file R3_9)
      
 15x 
  537   Mon Mar 27 03:29:05 2017 OH, TD, DK, CGMonday 27 March11:28 Biases and leakages okm (see attachment
1)
 15x 
  536   Mon Mar 27 03:28:53 2017 DK, TD, JAClock settings at the waveform generator stageClock settings for this experiment are slightly
different than in the previous case.
  
  535   Sun Mar 26 03:53:43 2017 CG, OHSunday 26th March10.30 Left DAQ running overnight to look for
alphas in DSSDs.
      DSSD bias still ok @ 23.3oC (see att.
 bias_260317.pngnniada15_w_260317.png 
  534   Thu Mar 23 10:56:29 2017 CG, OHThursday 23rd March - DSSD replacement + move
10.00 Investigating DSSD2 (MSL BB18-1000
3058-9) missing channels, found broken bond
 7x 
  533   Tue Mar 21 08:04:43 2017 CG, OHTuesday 21 March - AIDA checks10.00 Powered system on and biased.
      Bias voltages and leakage currents
ok (see att. 1). Ambient temp @23.1oC.
 bias1.pnglayout4.pngnnaida19.pnglayout3.pngnnaida13.png 
  532   Thu Feb 2 13:44:02 2017 OHT9 Test BenchT9 test setup at Daresbury was powered up
and noise levels were checked using a pulser
peak.
 nnaida114_10.pngnnaida11.pngnnaida114_7.png 
  531   Wed Feb 1 16:54:40 2017 CGNP1306 run summary   Run_Summary_NP1306.xlsx 
  530   Wed Jan 18 14:16:47 2017 Patrick Coleman-SmithRepaired Modules returning to RIKENFive modules are being returned to RIKEN
after repair.

The MAC addresses are :-
  
  529   Tue Dec 6 06:38:46 2016 TD, Updated PatrickCAEN N1419 HV output common mode noise
There appears to be significant common mode
noise on the output of the
 9x 
  528   Tue Dec 6 02:30:35 2016 TDReport - low - significant variation in FEE64 boot times
Not something we were not aware of already
but /var/log/messages illustrate the issue.
  
  527   Tue Dec 6 02:20:29 2016 TDTuesday 6 December11.20 DSSSD bias & leakage currents OK - see
attachments 1 & 2
      FEE64 temperatures OK - see attachment
 100.png101.png102.pngAIDA_leakage_current(13).xlsx 
  525   Mon Dec 5 11:53:26 2016 TDMACB test
MACB configuration can be found at https://elog.ph.ed.ac.uk/AIDA/357
 42x 
  524   Mon Dec 5 10:51:08 2016 TDMonday 5 December19.50 DSSSD bias & leakage currents OK - see
attachments 1 & 2
      FEE64 temperatures HIGH - see attachment
 1.png2.png3.png4.pngAIDA_leakage_current(12).xlsx 
  523   Sun Dec 4 05:46:42 2016 TDSyncCheck RIBF03R1 & RIBF123R1 commissioning tests archived
The SyncCheck etc software used for the RIBF123R1
and RIBF03R1 commissioning
  
  522   Sun Dec 4 04:05:24 2016 TDReport - low - DAQ SETUP sometimes produces Javascript error
DAQ SETUP sometimes produces Javascript error
instead of a pop-up displaying
 10.png 
  521   Sun Dec 4 03:44:12 2016 TDSunday 4 December12.45 DSSSD bias & leakage currents OK - see
attachments 1 & 2
      FEE64 temperatures OK - see attachment
 16x 
  520   Sat Dec 3 10:49:36 2016 TDSaturday 3 December19.48 DSSSD bias & leakage currents OK - see
attachments 1 & 2
      FEE64 temperatures OK - see attachment
 1.png2.png3.png 
  519   Fri Dec 2 09:58:54 2016 DKSimple PID with LISE++I wrote this LISE++ file based on the Takechi
.lpp modified by AE for 77Ni, 78Ni, 76Ni.
 lise-41Al.pngSettingFallonDK.lppPIDintensity.png 
  518   Fri Dec 2 09:47:58 2016 DKF8 targetsF8 target measurements, for posterity.

Plastic: ~39 to 40 mm
  
  517   Fri Dec 2 09:47:45 2016 DKF8 targetsF8 targets, for posterity.

Plastic: 39~40 mm
  
  516   Fri Dec 2 08:23:28 2016 TDOffline analysis of R48_9Analysis of background, pulser off

S O R T    C O M P L E T E ..... Fri Dec
 100.png101.png102.png103.png 
  515   Fri Dec 2 06:41:25 2016 DKBenchmarks for compressionR45_17 as the test file, which was closed
at 9.02 AM Friday, December 2nd at the end
of the official parasitic
  
  514   Thu Dec 1 16:01:10 2016 CG, PVFriday 2 December00.07 BigRIPS data file 1135

01.07 BigRIPS data file 1136.
 14x 
  513   Thu Dec 1 10:58:54 2016 PV, TD, LiuImplantation profile in AIDA , after switch back to the previous ZDS setting (AIDA 43_63 to 43_71, bigrips run 1129)   51.png45.png31.png 
  512   Thu Dec 1 09:46:06 2016 TDOffline analysis of R43_59     Variable degrader setting is now #2 +
#3: 0.3 mm W + 1.0 mm W [+2 mm Al]
     Centre ZDS @ 40Mg
 9x 
  511   Thu Dec 1 08:13:06 2016 PV,Liu, TDImplantation profile in AIDA , after changing the ZDS setting to center at 41Al, AIDA 43_ 33 to 43Bigrips run 1127

AIDA run 43_ 33 to 43
 36.png24.png50.png 
  510   Thu Dec 1 02:25:41 2016 DKOffline analysis of R42_32Offline analysis of AIDA R42_32.

Degrader condition of F11 is with the same
 6x 
  509   Thu Dec 1 00:21:08 2016 DKOffline analysis of R42_7Checking that the implantation is still
reasonable after LN2 fill recovery. 

Degrader condition is 8. + 0.2
 r42_2110.pngr42_307.pngr42_2120.pngr42-301.pngr42-2000.png 
  508   Wed Nov 30 21:26:52 2016 CG, DK, TDThursday 1 December00.51 BigRIPS data file 1112.

01.50 BigRIPS data file 1113.
 10x 
  507   Wed Nov 30 11:36:32 2016 TDOffline analysis of R41_2Degrader (8mm Al) fixed + ( 0.3mm W/1mm Al
+ 0.5mm/1mm Al + 1mm W/1m Al) variable
 8x 
  506   Wed Nov 30 11:10:10 2016 TDCorrelation_Check.ccd /TapeData/RIBF03R1
~/td/a.out R31 10000 > /tmp/R31.out
~/td/a.out R31 24 > /tmp/R31-2.out
 R31.outR31-2.outR42.out 
  505   Wed Nov 30 08:41:37 2016 PV, TD, RCF, LiuImplantation profile in AIDA R39 37 to 46, after changing degrader at 16:23
Degrader setting:
Variable degrader:
0.5
mm W + 1 mm Al : in
0.3 mm W + 1 mm Al :
in
1 mm W + 1 mm Al : in
Fix degrader:
20mm
 01.png52.png44.png 
  504   Wed Nov 30 06:42:01 2016 TDOffline analysis of R39_26Following degrader change to  (8mm Al) fixed
+ ( 0.3mm W/1mm Al + 0.5mm/1mm Al + 1mm W/1m
Al) variable
 8x 
  503   Wed Nov 30 06:33:52 2016 TDOffline analysis R36_30
Following target change from (CH2)n to C
 8x 
  502   Wed Nov 30 06:31:04 2016 PV, TD, RCF, LiuImplantation profile in AIDA R39 2 to 9, after changing degrader at 13:30Degrader setting was:
Variable degrader:
0.5 mm W + 1 mm Al : in
 29.png22.png12.png 
  501   Wed Nov 30 05:30:20 2016 TDOffline analysis R39_6
Degrader 8mm Al fixed + ( 0.5mm W/1mm Al
+ 1mm W/1mm Al) variable
 8x 
  500   Wed Nov 30 04:56:40 2016 TDOffline analysis R38_33
Degrader 8mm Al fixed + ( 0.3mm W/1mm Al
+ 1mm W/1mm Al) variable
 9x 
  499   Tue Nov 29 19:07:35 2016 AE, CG, ATS, ATF11 conditions after change to C target in F8 [light particles?]The main experiment changed to a carbon
reaction target at F8 (similar thickness
of CH2 previously used), and retuned the
 visual_scal_4am_Cin_F7.pngpid_r1093.pngimp_ch2.pngpid_ch2.pnghits_ch2.png 
  498   Tue Nov 29 15:12:33 2016 CG, AE, TD, DKWednesday 30 November00.11 Beam stopped for target @F8 change.
      R35 stopped at R35_62.
      BRIKEN file 161129_1951 155->159
 13x 
  497   Tue Nov 29 12:21:35 2016 TDOffline analysis R35_1

S O R T    C O M P L E T E ..... Tue Nov
 8x 
  496   Tue Nov 29 05:18:50 2016 TDOffline analysis of R31Offline analysis of AIDA data files from R31_0
to c. R31_5 (elapsed time 1120.45s)
 10x 
  494   Mon Nov 28 18:07:14 2016 CG, TD, AE, DKTuesday 29 November01:39 : Attachment 26 (R30_70to72) shows a
gradual change in the hit pattern for DSSD2
(at the lower left
 42x 
  493   Mon Nov 28 15:53:39 2016 AE, AT, RG, CGDAQ synchronization We noticed a peculiar feature in the time-stamp
synchronization monitor. The spectra of timestamp
difference between pairs of DAQ systems show,
 7x 
  492   Mon Nov 28 13:12:31 2016 PV, AE, LiuImplantation profile in AIDA with 8mm Al replacing 3 mm PbData for ~3 hrs: Nov 28th, 20:06 to 23:16

Bigrips run 1060 to 1062

AIDA run R30_ 2 to R30_40
 10.pngimp_dssd_106x.pngimp_pid_106x.pngimp_xy_106x.pngpid_r106x.png 
  491   Mon Nov 28 11:55:20 2016 TDOffline analysis R30_2Degrader (8mm Al) fixed + ( 0.3mm W/1mm Al
+ 1mm W/1mm Al)
 20.png21.png22.png 
  490   Mon Nov 28 06:49:04 2016 DKOffline analysis R27_1Conditions: One Pb wall with empty windows.
3mm Pb degrader closer to AIDA, on the front
of PE wall
 r27_1-307.pngr27_1-2110.pngr27_1-2120.png 
  489   Mon Nov 28 05:38:39 2016 DKOffline analysis R28_14Conditions: Two Pb walls with empty windows.
3mm Pb degrader between MUSIC 1 and MUSIC
2.
 r28_14-2120.pngr28_14-2110.pngr28_14-307.png 
  488   Sun Nov 27 22:35:37 2016 Liu, PV, AEIon hit pattern in AIDA after degrader changingAfter changing degrader to optimize 40Mg,
hit pattern in AIDA is shown in figure below.

The implantation position changed
 aida_ion_hitpattern_run26_51to63.png 
  487   Sun Nov 27 19:33:00 2016 Liu, PV, AEF11 degrader setting (night Nov27-Nov28)Analysis of files for two more settings of
F11 degrader to optimize implantation of
40Mg.
 run1038_imp_profile.pngrun1038_imp_pid.pngrun104x_imp_profile.pngrun104x_imp_pid.png 
  486   Sun Nov 27 16:29:51 2016 CG, AE, DKMonday 28 November01.28 Beam stopped temporarily.
      ~750MB into R26_38.
      Bias and leakage currents ok, as are
 12x 
  485   Sun Nov 27 12:53:04 2016 TDOffline analysis R24_3

S O R T    C O M P L E T E ..... Sun Nov
 20.png21.png22.png24.png 
  484   Sun Nov 27 12:30:41 2016 AE, PVEnergy loss in Degraders and Implantation for runs 1028 and 1033Implantation profile in AIDA

    BigRIPS file 1028
(Attachment run1028.png):  Degrader
 6x 
  483   Sun Nov 27 06:35:47 2016 TD, DK, AESunday 27 November - part 214.15 BigRIPS run number is now 1029

15.22 BigRIPS run number is now 1030
 14x 
  482   Sun Nov 27 05:30:51 2016 TDOffline analysis of R12Offline analysis of R12 LEC -> MEC setting

S O R T    C O M P L E T E ..... Sun Nov
 103.png104.png120.png121.png 
  480   Sun Nov 27 03:25:20 2016 TD[How to] AIDA discriminator thresholdsThe function and setting of the AIDA discriminators
is as follows:
  
  479   Sun Nov 27 02:46:54 2016 DKOffline analysis of R18_2Run R18_2: 3 mm Pb, 0.5 mm W (+1 mm Al)
and 0.3 mm W (+1 mm Al)

 
 307-312.png2120-2125.png2110-2115.png 
  478   Sat Nov 26 20:26:06 2016 Liu, AEAnalysis of implantation profile in AIDAHere we show the PID plot and implantation
depth in AIDA from BigRIPS file 40Mg1012
(1 hr of data from 20:30 in Nov 26th), merged
 imp.jpgpid_corr.png 
  477   Sat Nov 26 17:14:47 2016 TDVisual scaler inputsVisual scaler inputs

1 F11
  
  476   Sat Nov 26 15:32:38 2016 TD, AE, CG, DKSunday 27 November 00.33 DSSSD bias & leakage currents OK - see
attachments 1 & 2
      FEE64 temperatures OK - see attachment
 19x 
  475   Sat Nov 26 12:18:25 2016 AESaturday 26 November, Part III19:30 Power cycled of AIDA reuired after Ge
filling
 6x 
  474   Sat Nov 26 09:17:42 2016 AE, TD, DKOffline analysis of R9_24
R9_24 3mm Pb + 0.3mm W (+1mm Al) +
1.0mm W (+1mm Al)

 

 *** data items:  261088000
 rates_r9_24.pngee_r9_24.pngxy_r9_24.png 
  473   Sat Nov 26 07:45:48 2016 TD, DK, AEOffline analysis of R7_45R7_45 3mm Pb + 0.5mm W (+1mm Al) only (at
start of run) changing to 1.5mm W (+2mm Al)
 103.png110.png111.png 
  472   Sat Nov 26 07:26:51 2016 TD[How to] Desktop application launchers for Httpd for Data Acquisition & Merge/TapeServer, Merger & TapeServer
   Type: Application in Terminal
   Name: Httpd for Data Acquisition
  
  471   Sat Nov 26 07:11:34 2016 TD, DK, AESaturday 26 November, Part II16.11 The cyclotron and BigRIPS condition
are now restored and we have good beam

     Count
  
  470   Sat Nov 26 06:57:36 2016 DK, TDOffline analysis of R7_37
R7_37 3mm Pb + from 0 to 1.8mm W (+ up to
3mm Al, 1mm per W layer - 0.3mm W, 0.5mm
 100.png101.png102.pngK3MVQY.tmp 
  469   Fri Nov 25 22:28:13 2016 TD[How to] Start MIDASsort
aidas1> setenv MIDASBASE /MIDAS@aidas.240215
aidas1> setenv PATH $MIDASBASE/bin_Linux64:$PATH
  
  468   Fri Nov 25 15:56:36 2016 CG, DKSaturday 26 November00.55 Bias and leakage currents ok (attachments
1+2).
      Temps ok (attachment 3).
 11x 
  467   Fri Nov 25 07:33:44 2016 TDFriday 25 November16.35 DSSSD bias & leakage currents OK - see
attachments 1 & 2
      note - the significant increase observed
 9x 
  466   Thu Nov 24 01:07:14 2016 TD, CGThursday 24 November10.05 DSSSD bias & leakage currents OK - see
attachments 1 & 2
      note - the significant increase observed
 29x 
  465   Wed Nov 23 14:50:59 2016 Patrick Coleman-Smith[ Info ] What does the System Wide Clock check mean when it fails.The System Wide check called "Check
Clock Status"  reads the status
register from the FEE64 units in the system
  
  464   Wed Nov 23 01:47:28 2016 TD, CGWednesday 23 November10.45 DSSSD bias & leakage currents - see
attachments 1 & 2
       note - significant increase in leakage
 6x 
  463   Tue Nov 22 12:24:48 2016 TDAnalysis of R25_11 to R25_23Offline analysis of AIDA data files R25_11
to R25_23 using MIDASsort
 20x 
  462   Mon Nov 21 21:22:04 2016 TDTuesday 22 November 05.59 M7.3 Fukushima-ken Oki (locally 4) http://www.jma.go.jp/en/quake/20161122060517493-220559.html

06.20 DSSSD bias & leakage currents OK -
 6x 
  461   Mon Nov 21 02:12:45 2016 CG & TDMonday 21 November
11.10 DSSSD bias & leakage currents OK -
see attachments 1 & 2
 12x 
  460   Sun Nov 20 02:24:53 2016 CGSunday 20 November11.20 FEE temps and bias leakages ok (attachments
1-3).
      However, stats screen shows no SYNCs
 8x 
  459   Sat Nov 19 02:46:09 2016 TD, CGSaturday 19 November
11.45 DSSSD bias & leakage currents OK -
see attachments 1 & 2
 7x 
  458   Sat Nov 19 02:43:39 2016 TDThursday 17 November
10.15 DSSSD bias & leakage currents OK -
see attachments 1 & 2
 1.png2.png3.png4.png 
  457   Wed Nov 16 06:47:02 2016 TDAnalysis of data files R25_11 to _13Offline analysis of R25_11 to _13 see http://ribf-exp.riken.jp/elog/RIBF123/141

"F5 C target F7 no F11 C 6mm
 1001.png1002.png1000.png1003.png1004.png 
  456   Wed Nov 16 03:13:25 2016 CGWednesday 16 November11.30 Leakage currents and FEE temps ok (attachments
1-3)
 bias1.pngbias2.pngtemps.png 
  455   Tue Nov 15 02:22:25 2016 TDTuesday 15 November11.20 DSSSD bias & leakage currents OK - see
attachments 1 & 2
      FEE64 temperatures OK - see attachment
 7x 
  454   Mon Nov 14 05:51:36 2016 TDMonday 14 November
14.51 DSSSD bias & leakage currents OK -
see attachments 1 & 2
 1.png2.png3.png 
  453   Sat Nov 12 01:45:00 2016 TDSaturday 12 November10.45 DSSSD bias & leakage currents OK - see
attachments 1 & 2
      FEE64 temperatures OK - see attachment
 6x 
  452   Fri Nov 11 00:50:00 2016 TDFriday 11 November10.00 DAQ continues (R33) in no storage mode

      DSSSD bias & leakage currents OK -
 11x 
  451   Thu Nov 10 12:02:24 2016 TD, OH, CGThursday 10 November
21.17 DAQ starts (R30)
 30.png31.png32.png34.png 
  450   Thu Nov 10 11:57:35 2016 TDData directory NP1412 renamed as RIBF123R1
Data directory NP1412 renamed as RIBF123R1
  
  449   Thu Nov 10 09:56:20 2016 TD, OH, MLNP1412 R26 R27start 18.55 10.11.16
stop 
AIDA filename R26_0
 8x 
  448   Wed Nov 9 22:16:11 2016 CG, DK, TD, MLNP1412 R24 R2507.15 R24 started. BRIKEN run 33.
      76~78Ni beam setting.
      F5 C target out. F7 CH2 in. F11 C out.
 34x 
  447   Wed Nov 9 11:07:14 2016 TD, CG, DKNP1412 R22 R23DAQ start (R22) failed - merger remained in
'want first sync' state, no output to TapeServer
-> soft reset OK
 6x 
  446   Wed Nov 9 09:50:50 2016 TDNP1412 R20, R21
DAQ start (R20) failed - nnaida5 dropped
data transfer #1 link
 1.png2.png3.png4.png 
  445   Wed Nov 9 08:47:03 2016 OH, TDNP1412 R16, R17 and R18start 17:44
stop 17:49
AIDA filename R16
 r16bias1.pngr16bias2.png 
  444   Wed Nov 9 07:16:59 2016 OH, TDNP1412 R15Run 15

start 16:14
 6x 
  443   Wed Nov 9 02:14:08 2016 OH, TDNP1412 R1411.13 Still waiting to get beam back got access
so took temp measurement.
      T=25.6 DP=0.0 H=18.1
 bias1.pngbias2.pngR14bias1.pngR14bias2.png 
  442   Wed Nov 9 00:49:03 2016 TD, OHNP1412 R1309.50 Run 13 Start
      Thick C target (6mm) removed from F11.
All variable Al degraders put in place
 r13bias1.pngr13bias2.png 
  441   Tue Nov 8 23:36:56 2016 DK, TDNP1412 R12Takechi team changes the condition: F5
carbon; F7 empty; F11 carbon

  F11 Plastic is 1.1kHz
 10x 
  440   Tue Nov 8 23:16:15 2016 DK, TDNP1412 R11Recovered AIDA after power cycle (unknown
cause of crash from the end of R10)

Corresponding run in BRIKEN: 161109_0814_747576Ni_012
 R11_USB1.pngR11_USB2.png 
  439   Tue Nov 8 22:04:21 2016 DKNP1412 R10Put the variable Al degraders all back
in for safety (was 4.4 mm, now 5.4 mm)

Takechi team switches the condition:
 R10_USB1.pngR10_USB2.png 
  438   Tue Nov 8 21:01:40 2016 CG, DKNP1412 R906.02 R9 started with Takechi group C target
out and all variable degraders in.
      F5 C in. F7 empty. F11 empty.
  
  437   Tue Nov 8 18:52:32 2016 CG, DKNP1412 R7 R803.50 74-76Ni beam delivered to F11.
      F11 plastic rate ~1kHz.
      F5 C target in. F7 empty. F11 C target
 bias1.pngbias2.pngbias1.pngbias2.png 
  436   Tue Nov 8 15:10:16 2016 CG, TD, DK, OHNP1412 R5 R600.15 Setting changed to 71,72,73Ni. All variable
degraders in.
      Will remove while watching rates to
 bias1.pngbias2.png 
  435   Tue Nov 8 14:29:34 2016 TD, OH, DKNP1412 Run 423:28 Run 4 Start
      Thick 6mm C target in beam
      
  
  434   Tue Nov 8 14:22:16 2016 TD, OH, DKNP1412 R311:21 Run 3 Started
      Degrader moved upstream. AIDA moved
to centre of BRIKEN. Fixed degrader moved
  
  433   Tue Nov 8 13:37:06 2016 TD, OH, DKNP1412 R210:36 Run 2 Start
      Degraders (5.4mm Al) in at start and
all removed once started.
 6x 
  432   Tue Nov 8 13:06:18 2016 DK, TD, CG, OHNP1412 Run 1AIDA run with Takechi experiment. 71~73
Ni beam setting

F5 carbon target is:   
 14_JST_2016.png 
  431   Tue Nov 8 00:52:59 2016 OH, TDFEE Settings and Options filesUsed a program to sort through the settings
files located in /MIDAS/DB/EXPERIMENTS/AIDA/Settings_FIle_Name/nnaider1,2,3...
and /MIDAS/DB/EXPERIMENTS/AIDA/Options.
 FEE_Settings.xlsx 
  430   Tue Nov 8 00:12:56 2016 TDReport - medium - TapeServer changes volume name following request for existing filename
When you request a filename that already
exists and select OK to the prompt
 9.png 
  429   Mon Nov 7 23:15:14 2016 TD, CG, OHTuesday 8 November08.15 DAQ found stalled

      Soft reset OK
 12x 
  428   Mon Nov 7 02:13:05 2016 CG, OH, TD, DKMonday 7 November11.10 DAQ found stopped. No storage mode so
can't tell when, but presumably at 06.30
during LN2 fill cycle.
 10x 
  427   Sun Nov 6 05:16:22 2016 OHUpdateLeakage current spreadsheet has now been uploaded
to google docs for ease of access.
  
  425   Sun Nov 6 01:34:15 2016 TD, OH, CGSun 6th November10:34 Detector Bias a leakage currents all
ok. (Attachments 1 and 2)
      Temperatures all ok (Attachment 3)
 18x 
  424   Sat Nov 5 09:40:02 2016 OHUpdated Leakage Current SpreadsheetAttached is the updated leakage current spreadsheet
(Attachment 1)  as pf 5/11/2016 it is
up to date with the elog.
 AIDA_leakage_current.odsLeakage_Plot_Ex.PNGAIDA_leakage_current.csv 
  423   Sat Nov 5 01:55:15 2016 CG, TD, OHSaturday 5th November10.55 DAQ found to have stopped at 06:47 during
LN fill cycle.
 20x 
  422   Fri Nov 4 08:10:46 2016 CGPb bricks upstreamStack of Pb bricks upstream of AIDA+BRIKEN
to protect from incoming beam.
  
  421   Fri Nov 4 04:35:03 2016 TD, CG, DKFriday 4 November part 213.35 Swapped HDMI cables from master MACB
to MACB #3 & #7
      for HDMI cables from MACB #7 ports
 36x 
  419   Thu Nov 3 17:42:37 2016 TD, CG, DKFriday 4 November
00.40-02.30 Discussion with PJCS
 
 32x 
  418   Thu Nov 3 02:29:45 2016 TD[How To] Startup AIDA (October 2016)Assumes 3-phase ac power (to Julabo FL11006
recirculating chiller) and single-phase ac
power
 29x 
  417   Thu Nov 3 01:25:30 2016 TD, CGThursday 3 November10.20 DAQ found stalled

      DSSSD bias & leakage current OK - see
 11x 
  416   Tue Nov 1 23:55:33 2016 TD, CGWednesday 2 November08.56 DAQ continues OK

      DSSSD bias & leakage current OK - see
 12x 
  415   Tue Nov 1 02:24:05 2016 TDTuesday 1 November11.24 DAQ found stalled
      Most recent file R95_168 last accessed
06.31
 8x 
  414   Mon Oct 31 04:50:59 2016 TD[How to] Monitor AIDA (October 2016)
All AIDA operations are controlled from the
Dell T410 Workstation aidas1 using web browsers.
  
  413   Mon Oct 31 04:02:11 2016 TD[How To] Stop Runs (October 2016)
All AIDA operations are controlled from the
Dell T410 Workstation aidas1 using web browsers.
 200.png201.png202.png203.png204.png 
  412   Mon Oct 31 02:26:32 2016 TD[How To] Start Runs (October 2016)All AIDA operations are controlled from the
Dell T410 Workstation aidas1 using web browsers.
 12x 
  411   Mon Oct 31 02:00:01 2016 TDMonday 31 October11.00 DAQ continues OK
      DAQ STOP OK
      Most recent files R91_568 last accessed
 11x 
  410   Sun Oct 30 04:37:31 2016 TDSpectrum layouts createdThe following spectrum layouts have been created

1  All Rate spectra
 8x 
  409   Sun Oct 30 03:26:55 2016 TDReport - medium - cannot restore layout if currently displaying >16 galleries
Cannot restore layout if currently displaying
>16 galleries
  
  408   Sun Oct 30 01:53:13 2016 TDSunday 30 October10.53 DAQ found stalled 
      Most recent files R89_102 last accessed
07.17
 9x 
  407   Sat Oct 29 07:26:59 2016 TDAIDA ADC & disc data synchronisation check
Following analysis of AIDA ADC & disc readout
( see https://elog.ph.ed.ac.uk/AIDA/404 )
 14x 
  406   Sat Oct 29 03:31:03 2016 TDSaturday 29 October
11.30 DAQ continues (R87)
      System-wide checks OK *except* SYNC
 11x 
  405   Fri Oct 28 06:12:50 2016 TDFriday 28 October14.12 DAQ stalled as expected
      Most recent file R86_245 last accessed
06.26
 12x 
  404   Thu Oct 27 10:57:49 2016 TDAIDA data readout
Developing real-time AIDA data synchronisation
test using MIDASsort
 100.png101.png102.png 
  403   Thu Oct 27 10:54:14 2016 TDThursday 27 October 14.20 DSSSD bias & leakage currents OK - see
attachments 1 & 2
      FEE64 temperatures OK - see attachment
 1.png2.png3.png 
  402   Tue Oct 25 02:06:34 2016 TDTuesday 25 October10.10 DAQ found stopped
      Most recent file R81_169, last accessed
06.26
 13x 
  401   Mon Oct 24 02:46:57 2016 TDMonday 24 October10.47 DAQ found stopped, no merger error messages
      Most recent file R78_281, last accessed
06.46
 19x 
  400   Sun Oct 23 10:22:36 2016 TDReport - high - merger SEGV
Merger crashed during operation - see https://elog.ph.ed.ac.uk/AIDA/399
  
  399   Sun Oct 23 02:34:12 2016 TDSunday 23 October 10.34 DAQ found stopped, no merger error messages
      Most recent file R74_296, last accessed
06.31
 1.png2.png3.png4.png5.png 
  398   Sat Oct 22 02:32:37 2016 TDSaturday 22 October10.32 DAQ found stopped, no merger error messages
      Most recent file R70_315, last accessed
06.46
 15x 
  397   Fri Oct 21 01:41:54 2016 TDFriday 21 October
09.38 DAQ (R66) continues OK
 14x 
  396   Thu Oct 20 20:00:14 2016 CGReturned module tests @ DLOriginal system configuration before my arrival:
nnaida11 - 2b:22:6e
                                        
 7x 
  395   Thu Oct 20 01:30:10 2016 TDThursday 20 October09.30 DAQ found stopped, no merger error messages
      Most recent file R63_291, last accessed
06.46
 12x 
  394   Wed Oct 19 01:14:10 2016 TDWednesday 19 October09.13 DAQ found stopped, no merger error messages
      Most recent file R55_10, last accessed
19.17
 8x 
  393   Tue Oct 18 06:56:52 2016 TDDAQ status
From the installation of the RG58 cable for
the 50MHz TTL clock from BRIKEN DAQ
  
  391   Tue Oct 18 01:43:04 2016 TDTuesday 18 October09/42 DAQ found stopped, no merger error messages
      Most recent file R52_211, last accessed
06.30
 33x 
  390   Mon Oct 17 04:10:30 2016 TDMonday 17 October12.05 DAQ found stopped
      Most recent file R49_226, last accessed
06.26
 7x 
  388   Sun Oct 16 03:14:41 2016 TDSunday 16 October11.12 DAQ start (R47)

      Detector bias and leakage currents
 16x 
  387   Sat Oct 15 03:27:31 2016 TDSaturday 15 October11.27 DAQ found stopped
      Most recent file R42_164, last accessed
07.18
 10x 
  385   Thu Oct 13 16:12:06 2016 TD & CGFriday 14 October
DAQ continues (R33)
 14x 
  384   Thu Oct 13 06:07:43 2016 TD & CGThursday 13 October
11.40 Power cycle AIDA FEE64s
      Set TS_SYNC_PHASE 0
 1.png2.png3.png4.png5.png 
  383   Wed Oct 12 02:58:19 2016 TD & CGWednesday 12 October10.50 Merger & TapeServer found stopped
      connect errors - see attachment 1
 1.png2.png3.png4.png5.png 
  382   Tue Oct 11 03:34:02 2016 CG & TDTuesday 11 October10.40 DAQ found stopped

      All FEE64 AIDA SYNC rates zero, AIDA
 16x 
  381   Mon Oct 10 03:15:59 2016 CG & TDMonday 10 October
10.30 DAQ found stopped
 25x 
  380   Sun Oct 9 11:47:34 2016 CG, TDSunday 9th October
12.30 Following scheduled power outages of
October 8
 9x 
  379   Fri Oct 7 02:43:47 2016 TD & CGAnalysis of Sept2016/R13_47Analysis of R13_47 - the data file that was
being written when DAQ stalled
yesterday evening - see https://elog.ph.ed.ac.uk/AIDA/371
 Unsaved_Document_1 
  378   Fri Oct 7 02:29:19 2016 TD & CGFriday 7 October10.29 DAQ left running overnight
      Histograms only - no data transfer
to Merger & TapeServer
 22x 
  377   Thu Oct 6 13:22:24 2016 TDImages of setup at F11 - 4   IMG_6702.JPG 
  375   Thu Oct 6 13:20:34 2016 TDImages of setup at F11 - 3   IMG_6695.JPGIMG_6696.JPGIMG_6701.JPG 
  373   Thu Oct 6 13:09:50 2016 TDImages of setup at F11 - 2   IMG_6692.JPGIMG_6693.JPGIMG_6694.JPG 
  372   Thu Oct 6 12:39:14 2016 TDImages of setup at F11   IMG_6687.JPGIMG_6689.JPGIMG_6690.JPG 
  371   Thu Oct 6 11:16:40 2016 CG & TDThursday 6 October
DSSSD bias voltages and leakage currents
OK - see attachments 1 & 2
 9x 
  370   Wed Oct 5 07:29:29 2016 CG & TDWednesday 5 October (inc AIDA+BRIKEN photos)14.30 Adjusted and checked insertion of AIDA
snout into BRIKEN (CH2)n moderator.
      up-down    AIDA snout appears centred
 11x 
  369   Sun Oct 2 15:03:11 2016 CG, TDProblems compiling AIDAsort program on aidas1
I have been trying to compile the sort program
I have been working on in Edinburgh so I
 make.logmake.logEditransfer.h 
  368   Sun Oct 2 06:12:54 2016 TDSunday 2 October
14.15 DSSSD bias/leakage current OK - see
attachments 1-2
 16x 
  367   Sat Oct 1 09:34:23 2016 TDInstalling latest (16 April 2015) MACB firmwareInstalled Xilinx 14.7 LabTools + (free) WebPack
license
 Untitled.png 
  366   Sat Oct 1 07:48:48 2016 CG & TDSaturday 1 October11.00 Moved detector stack forward several
cm. 1st DSSD now ~6cm from end of snout.
Middle of stack now ~47cm from
 14x 
  365   Sat Oct 1 01:57:56 2016 TD & PJCSLatest MACB firmware - 16 April 2015   macb_top_revB.jed 
  364   Fri Sep 30 07:52:56 2016 TDReport - low - AIDA correlation L/M/H statistics count 3x
The AIDA correlation L, M & H statistics
count 3x for each correlation trigger,
  
  363   Fri Sep 30 03:35:12 2016 TDFriday 30 September11.37 Attempt to use external 50MHz clock
for Master MACB (w/ 50MHz front panel label)
 20.png21.png22.png23.png24.png 
  362   Thu Sep 29 03:20:38 2016 TD & CGThursday 29 September 11.20 R1 stops

      DSSSD bias/leakage current OK - see
 15x 
  361   Wed Sep 28 07:51:45 2016 TD & CGNew spectrum display software installed
Spectrum display software updated
    maximum number of galleries increased
  
  360   Wed Sep 28 06:40:40 2016 TD & CGWednesday 28 September14.40 AIDA power up

      Julabo FL11006 set point +20 deg C
 1.png2.png3.png4.png 
  359   Wed Sep 7 16:11:25 2016 Patrick Coleman-SmithUpdated layout.txt file in aidas1Used the layout reported in ELOG357 and
updated the layout.txt file used in the "Layout
and Status" browser window.
  
  358   Mon Sep 5 06:54:02 2016 TDMonday 5 September14.20 R17 continues

      DSSSD bias/leakage current OK - see
 16x 
  357   Sun Sep 4 04:35:42 2016 TDFEE64 & MACB configuration

 IMG_6502.JPGIMG_6503.JPGIMG_6504.JPG 
  356   Sun Sep 4 04:26:23 2016 TDSunday 4 September14.20 R13 continues

      DSSSD bias/leakage current OK - see
 20x 
  355   Sat Sep 3 05:54:14 2016 TDSaturday 3 September14.20 R13 continues

      DSSSD bias/leakage current OK - see
 16x 
  354   Fri Sep 2 06:22:26 2016 TDFriday 2 September14.20 R11 continues

      DSSSD bias/leakage current OK - see
 17x 
  353   Thu Sep 1 03:45:34 2016 TDThursday 1 September13.33 R11 starts

      ASIC settings 2016Aug20-15.34.53
 28x 
  352   Tue Aug 30 08:26:33 2016 TDTuesday 30 August16.18 R10 stops

      ASIC settings 2016Aug20-15.34.53
 28x 
  351   Mon Aug 29 08:53:55 2016 TDnnaida19 restored
nnaida19 restored to configuration - /MIDAS/Aida/tclhttpd/aidas1/startup.tcl
- see attachment 1
 startup.tcl 
  350   Mon Aug 29 06:57:32 2016 TDMonday 29 August
Per the instructions provided by https://elog.ph.ed.ac.uk/AIDA/331
added Servisol Heat Sink Compound
 7x 
  349   Fri Aug 26 02:10:31 2016 TDFriday 26 August10.11 R9 continues

      ASIC settings 2016Aug20-15.34.53
 28x 
  348   Thu Aug 25 02:10:10 2016 TDThursday 25 August11.40 R9 continues

      ASIC settings 2016Aug20-15.34.53
 21x 
  347   Wed Aug 24 03:43:44 2016 TDWednesday 24 August11.40 R8 continues

      B2F/FF temp +25 deg C, d.p. +14 deg
 32x 
  346   Tue Aug 23 01:49:01 2016 TDTuesday 23 August
09.50 DAQ found stopped
      No error messages merge/tapeserver
 18x 
  344   Mon Aug 22 13:37:30 2016 TDMonday 20 August> 11.00 Restore power to AIDA following Saturday's
shutdoen in preparation for the planned maintenance
>       outage on Sunday.
  
  343   Mon Aug 22 11:45:07 2016 Patrick Coleman-SmithSoftware updated in AidaLogged into aidas1, installed AidaExecV8
with a test of the time difference between
SYNC data items. Failure to be 0x40000 clocks
  
  342   Mon Aug 22 10:35:31 2016 TDMonday 20 August11.00 Restore power to AIDA following Saturday's
shutdoen in preparation for the planned maintenance
      outage on Sunday.
 17x 
  341   Mon Aug 22 10:35:06 2016 TDSaturday 20 August    
  340   Fri Aug 19 12:41:43 2016 TD, VP, reply PJCSFriday 19 August> > > 
> > > 14.00 Both AIDA NIM bins U/S 
> > >       Upper NIM bin - BNC PB-4, Ortec
  
  339   Fri Aug 19 11:07:44 2016 TD, VP, reply PJCSFriday 19 August> > 
> > 14.00 Both AIDA NIM bins U/S 
> >       Upper NIM bin - BNC PB-4, Ortec
 7.png 
  338   Fri Aug 19 09:43:27 2016 TD, VP, reply PJCSFriday 19 August
> 14.00 Both AIDA NIM bins U/S 
>       Upper NIM bin - BNC PB-4, Ortec 433,
  
  337   Fri Aug 19 07:42:22 2016 TD, PVFriday 19 August
14.00 Both AIDA NIM bins U/S 
      Upper NIM bin - BNC PB-4, Ortec 433,
 6x 
  336   Wed Aug 17 14:44:52 2016 Patrick Coleman-Smith[HowTo] start acquisition using the new "Start ASIC Readout" buttonDue to sometimes operating with very noisy
systems, both at Daresbury and RIKEN, I have
installed a change to the startup of the
 RunControl_portion.png 
  335   Wed Aug 17 14:10:05 2016 Patrick Coleman-SmithLinux Memory problem solutions for FEE64The problem indicated by "page allocation
failure" and the kernal subsequently
"killing" the AidaExecV8 process
  
  334   Mon Aug 15 09:55:08 2016 Patrick Coleman-SmithFound a candidate for DAQ failure.The problem :-
The DAQ stops working and can only
be fixed by a reboot of the FEE64s.
  
  333   Mon Aug 1 11:30:07 2016 Patrick Coleman-SmithFirst time remotely power up HV in RIKEN from DaresburyLogged into aidas1 and opened the nnrpi1
relay control window ... powered up the FEE64s.
seperatly connected to ribfdaq and
  
  332   Sun Jul 31 09:38:07 2016 TDAnalysis of AIDA75_1Attachment 2 - analysis from *end* of file
AIDA75_1
 AIDA75_1.txtUntitled.png200.png400.png 
  331   Thu Jul 28 11:35:58 2016 Patrick Coleman-Smith[HowTo] Apply Thermal paste to FPGA   Process_for_applying_thermal_paste_to_the_FPGA_in_FEE64.pdf 
  330   Mon Jul 25 08:38:56 2016 TDAnalysis of R4   R4.out 
  329   Wed Jul 20 18:41:55 2016 DKAIDA topped up on water I actually topped off the chiller
with water tonight as I am returning to Scotland
(and then off to CERN) within hours.
  
  328   Mon Jul 18 12:00:16 2016 Patrick Coleman-SmithReport of remote operation of Aida at RIKEN 11/7 to 14/7






Normal
0
  
  327   Thu Jul 14 16:55:32 2016 Patrick Coleman-SmithChanges to AIDA softwareAn updated copy of the merger has been
downloaded ( merger64.AD ) with a copy of
/MIDAS/Merger/AIDA/Startup.
  
  326   Fri Jul 8 18:54:47 2016 TDAnalysis July2016/R1 data
See https://elog.ph.ed.ac.uk/AIDA/324
 R1_0.outR1_114.outanalyser2.fUntitled.png 
  325   Thu Jul 7 17:16:11 2016 Patrick Coleman-SmithInstall & Run new firmware with diagnostics for the SYNCConnected to aidas from daresbury.
Started Firefox with windows for Rpi, Merge,
Runcontrol.
  
  324   Tue Jul 5 13:43:02 2016 DK, PVPulser Test Run after AIDA is movedNeeded to run startx and start the TcLHttpd
server on rpi
Following along here: https://elog.ph.ed.ac.uk/AIDA/242
 10x 
  323   Tue Jul 5 10:26:11 2016 DKAIDA relocation picturesHere are some pictures after AIDA's relocation.
In principle, it can stay here, but
probably after the tests we will push it
 6x 
  322   Tue Jul 5 09:39:27 2016 DKRly16 is not onlineAIDA was relocated, and now I want to power
it on to do some tests.  However, I
cannot get the Rly16 service running.
 usb_serial.JPG 
  321   Sat Jun 18 14:35:31 2016 TDAIDA photographs - June 2016 - 4   IMG_5854.JPGIMG_5855.JPGIMG_5856.JPGIMG_5857.JPGIMG_5863.JPG 
  320   Thu Jun 16 08:18:50 2016 TDAIDA photographs - May 2016    IMG_5751.JPGIMG_5721.JPG 
  319   Thu Jun 16 08:12:51 2016 TDAIDA photographs - June 2016 - 3   IMG_5849.JPGIMG_5850.JPGIMG_5851.JPG 
  318   Thu Jun 16 08:07:37 2016 TDAIDA photographs - June 2016 - 2   IMG_5842.JPGIMG_5843.JPGIMG_5846.JPGIMG_5847.JPG 
  317   Thu Jun 16 08:00:10 2016 TDAIDA photographs - June 2016 - 1   IMG_5838.JPGIMG_5839.JPGIMG_5840.JPGIMG_5841.JPG 
  316   Thu Jun 16 03:40:43 2016 TDThursday 16 June 201610.40 DAQ stalled AIDA75_30 c. 01.36

      SYNC errors since baseline (start of
 70.png71.png72.png74.png75.png 
  315   Wed Jun 15 01:43:47 2016 TDWednesday 15 June 201609.19 DAQ stalled AIDA72_87 c. 01.25

      SYNC errors since baseline (start of
 6x 
  314   Tue Jun 14 01:42:56 2016 TDTuesday 14 June 201609.35 AIDA67 stalled AIDA67_43 (c. 01.27)
      DAQ stopped and file closed 09.32
 7x 
  313   Mon Jun 13 03:45:15 2016 TDMonday 13 June 201610.20 AIDA62 found stalled - no SYNCs, no
data transfer
      All FEE64s pass all system-wide tests
 20x 
  312   Sun Jun 12 19:19:22 2016 DKMachine Time End3:13 operators call to tell us the machine
time is over.  No more EURICA!
         
  
  311   Sun Jun 12 03:05:37 2016 TD, AE, CG, MASunday 12 June 2016 part 2
BigRIPS switched from 60Ti to 64V
 11x 
  310   Sat Jun 11 17:24:11 2016 DK, TDSunday 12 June 2016Runs 41 and 42 are quite short.  Run
41 was interrupted by the beam dropping (operators
called), and run 42 we are just trying to
 14x 
  309   Sat Jun 11 16:06:16 2016 TD[How To] Monitor per FEE64 Activity
Launch terminal and enter commands
  
  308   Sat Jun 11 15:48:49 2016 TD[How To] Monitor Pause-Resume TimesThe basic GREAT data format analyser will
report per FEE cumulative
pause-resume times which should be << timestamp
  
  307   Sat Jun 11 13:57:09 2016 lauraHow to monitor and check synchronisation of FEESAlfredo has written a program to check
the synchronisation of the FEES, which need
to be checked regularly
 eg1.pngeg2.pngeg3.pngeg4.png 
  306   Sat Jun 11 10:29:16 2016 AE, TD, LHBsynchronization between different FEEsfile AIDA10_20: stopped on June 10, 14:59
file AIDA10_40: stopped on June 10, 16:16
 AIDA10_20_pulser_allign.pngAIDA10_40_pulser_allign.pngAIDA34_puls_alignm.png 
  305   Fri Jun 10 21:07:52 2016 AE, DK, TD, ML, MASaturday 11 June 201604.51 Start run AIDA18.  Beam is back
from the operators.
      Scalers are shown as attachment 1
 8x 
  304   Fri Jun 10 14:14:56 2016 TDnnaida19
See attachments 1 and 2 and spot the difference
...
 4.png5.png6.png 
  303   Fri Jun 10 14:02:17 2016 TD (courtesy VFEP)[How to] Avoid Power-Cycling/Rebooting FEE64s
If you obtain the 'unable to connect' from
one, or more, of the FEE64s try the
  
  302   Fri Jun 10 12:51:19 2016 TDADC offsets - pass 1 -18.15 3 June 2016
Column order:
 offsets.dat 
  301   Fri Jun 10 08:04:11 2016 YSLeakage Currents Spread SheetLeakage Currents Spread Sheet and Chart  AIDA_leakage_current.ods44.png 
  300   Fri Jun 10 02:52:02 2016 TD, ML & YSFriday 10 June 201610.50 SyncCheck ... EURICA server refusing
connection
 16x 
  299   Fri Jun 10 02:25:45 2016 TD, ML & YSDAQ State of Play - Friday 10 June 2016
10.25 Screenshots showing DAQ state of play
during NP1512
 6x 
  298   Wed Jun 8 20:56:28 2016 CGThurs 9th June04.45 Lowered slow comp threshold on all FEEs
bar nnaida24 to 8 (nnaida24 @ 12).
      Fast comp thresh @ 6 on all nnaida.
 6x 
  297   Wed Jun 8 09:29:55 2016 TDDAQ state of play
17.25 State of play
 9x 
  296   Wed Jun 8 05:00:53 2016 TDAnalysis of R1229
Files R1229_0 ... R1229_3 (written by TapeServer
without data compression)
 10.png11.png12.png13.png 
  295   Wed Jun 8 04:24:04 2016 TDaidas1 disk statistics (without data compression)aidas1> iostat -xn
Linux 2.6.32-504.8.1.el6.x86_64 (aidas1)
06/08/2016  _x86_64_ (16 CPU)
  
  294   Wed Jun 8 03:57:59 2016 TDAnalysis of R1222Timestamp data per FEE per 10s (i.e. 1 ch
= 10s)
 1.png2.png3.png4.png 
  293   Wed Jun 8 03:46:51 2016 TD & MLTapeServer compression disabled
CHnaged TapeServer configuration file to
disable data compression
  
  292   Wed Jun 8 02:31:20 2016 TDaidas1 disk statistics
DAQ running to disk at relatively low rate
(merger ~600k item/s, tapeserver ~4700kb/s)
  
  291   Tue Jun 7 19:19:34 2016 CG, TD, DK, AEWednesday 8th June(4 mm Al mask was put upstream of AIDA
near 20:20 on 7 June)
 
 27x 
  290   Tue Jun 7 10:59:20 2016 TDmerge statsLet me which merge stats for all data links
would be most useful and I will upload screenshots.
 100.png101.png 
  289   Tue Jun 7 10:36:14 2016 TDnnaida19aidas1> cat var/log/dmesg
Using Xilinx Virtex440 machine description
Linux version 2.6.31 (nf@nnlxb.dl.ac.uk)
  
  288   Tue Jun 7 05:48:13 2016 TD, AE, ML & PJWHEC spectra & implant profile
DSSSD#1 and DSSSD#6 ADC hit patterns (profile)
and 1*H (ASIC#1 20GeV FSR) energy spectra
 30.png36.png40.png 
  287   Mon Jun 6 19:26:38 2016 CG, DK, BM, AETues 7th June02.08 Tried updating AIDA SYNC on stats
page and got this message.
         
 28x 
  286   Mon Jun 6 15:57:51 2016 TD, ML & YSR1121 (AIDA)
R1120 stalled shortly after DAQ GO
      'unable to connect' etc
 43.png44.png 
  285   Mon Jun 6 15:06:22 2016 1TD, ML & YSR1119R1118 ended OK

R1119 DAQ GO, check AIDA SYNCs OK, toggle
 41.png42.png 
  284   Mon Jun 6 14:24:07 2016 TD, ML & YSR1118 (AIDA)22.14 R1118 starts

      aidas1 has been rebooted
 10x 
  283   Mon Jun 6 13:52:10 2016 TD, ML & YSFEE64 power-cycle, FEE64 & aidas1 reboot
21.40 toggled merge input pause state  -
merge pause stopped at link 18 (nnaida19
  
  282   Mon Jun 6 13:46:45 2016 TD, ML & YS/var/log/messagesaidas1 log  messages 
  281   Mon Jun 6 11:17:30 2016 TD, ML & YSRe-configure merger to ignore nnaida19
19.00 Power-cycled and rebooted AIDA FEE64s
 11.png12.png 
  280   Mon Jun 6 08:57:34 2016 GL,PW, YS, TD, MLAIDA run 1112 - Sync problemAfter starting run 1112, we noticed that
the merge program was waiting for a first
sync. It then turned out that all syncs had
  
  279   Mon Jun 6 08:51:50 2016 TDChange of set point for Julabo FL11006 recirculating chiller
The Julabo FL11006 recirculating chiller
set point has been changed from +20.0 deg
 10.png100.png 
  278   Sun Jun 5 17:09:49 2016 CG, DK, AEMonday 6th June00.45 Run R1100 started on n-rich setting
(EURICA run_1100, BigRIPS run 1165)
           
 20x 
  277   Sun Jun 5 02:14:10 2016 TD, AE, CG & DKSunday 5 June 201610.10 Detector biases & leakage currents -
OK - see attachments 1-2 
 8x 
  276   Sun Jun 5 01:32:44 2016 TD, DK, GL, AE, PJWFirst RIB implantation: Run 67We restarted the merger (Stop, Setup &
Configure, Go, Pause) and then we could restart
the DAQ as normal.  Rate is ~500 Hz. 
  
  275   Sun Jun 5 01:20:39 2016 DK, AE, GL, PJWMerger wants first SYNCTrying to start the AIDA DAQ now that the
RI beam is (nearly) ready.  However,
we cannot get merging to work.  But
  
  274   Sat Jun 4 08:46:20 2016 TDAIDA noise - state of play 2
Attachments  1-23 AIDA FEE64s nnaida1-nnaida23
ASIC #1 waveforms
 27x 
  273   Sat Jun 4 04:53:25 2016 TD, AE, CG, DK, GL YL & PJW (Team AIDA)Saturday 4 June 201612.27 DAQ run R61 started 01.30 
      Appears to have stopped abruptly at
~06.55
 8x 
  272   Fri Jun 3 03:10:55 2016 TD, AE, CG & DKFriday 3 June 201611.00 Detector biases and leakage currents
- see attachments 1-2
  
 12x 
  271   Thu Jun 2 09:04:57 2016 TD[How to] Monitor AIDA Every 4h

1) Record DSSSD #1 = #6 detector bias voltages
  
  270   Thu Jun 2 01:33:13 2016 TD, AE, CG & DKThursday 2 June 2016
09.30 DAQ left running overnight
      AIDA SYNCs on all FEE64s this morning
 1.png2.png3.png4.png5.png 
  269   Wed Jun 1 13:58:48 2016 TD - Reply PJCSWednesday 1 June 2016
> Check the Local Controls for the setting
of the LMK3200 control rgister.
 500.png501.png503.png505.png 
  268   Wed Jun 1 12:14:08 2016 Patrick Coleman-Smith[HowTo] React to "Check Clock Status => FEE64 Failure"If there are more than one failures then check
how they map to the MACB HDMI connections.
 Are they all connected to the just one MACB
  
  267   Wed Jun 1 09:00:13 2016 TD - Reply PJCSWednesday 1 June 2016> 09.30 Detector biases and leakage currents
- ambient temp +24.9 deg C - attachments
1-2
  
  266   Wed Jun 1 07:49:45 2016 TDDetector noise - state of playScreenshots of ASIC#1 waveforms for each side
of each of the DSSSD #1 - #6 are attached.
 10x 
  265   Wed Jun 1 01:33:58 2016 TDWednesday 1 June 201609.30 Detector biases and leakage currents
- ambient temp +24.9 deg C - attachments
1-2
 9x 
  264   Wed Jun 1 01:32:04 2016 TDCo/Bi source run (R19)
09.18 R19 (AIDA) stopped 
      AIDA SYNC lost for most (but not all)
 110.png111.png 
  263   Tue May 31 16:03:24 2016 AE. VPCo/Bi source run (R17)Set discriminator mask for DSSD2 through DSSD6
(see attachments). Fast comparator threshold
set to 9 for all DSSDs.
 8x 
  262   Tue May 31 08:06:43 2016 TD, AE & CGTuesday 31 May 2016
Attachment 3 - AIDA discriminator with pulser
~5Hz
 7x 
  261   Mon May 30 22:57:58 2016 AECo/Bi source run (R7)> Some comments regarding source run for beta-gamma
calibration, to complement EURICA16 elog
entry:
  
  260   Mon May 30 18:29:54 2016 AECo/Bi source run (R7)Some comments regarding source run for beta-gamma
calibration, to complement EURICA16 elog
entry:
 R7_1.pngR7_2.pngR7_3.pngR7_5.pngR7_6.png 
  259   Mon May 30 09:03:07 2016 TD, AE & CGtimstamping - state of play
Current error messages and status - see attachments
 11x 
  258   Mon May 30 08:43:10 2016 CG, TD - PJCS replyMACB settings

    

       
            
  
  257   Mon May 30 08:18:48 2016 CG, TD - PJCS replyMACB settings

    

       
            
  
  256   Mon May 30 06:03:51 2016 CG, TDMACB settings14.00 MACB settings (from left -> right)

    
  
  
  255   Mon May 30 03:58:10 2016 TDpeakfind not working on aidas1
Peakfind appears not to be working on aidas1
- example spectrum attached
 1.5.L.msf 
  254   Mon May 30 02:50:19 2016 CGMonday 30th May10.30 Pulser walkthrough carried out 90,000
- 10,000 @ 10,000 step
 startup.tcl95.png 
  253   Mon May 30 00:07:56 2016 TD, AE & CG - reply PJCSSunday 29 May 2016> > > > 
> > > > > > 22.05 nnaida17 ASIC parameters
not loading
  
  252   Mon May 30 00:01:23 2016 TD, AE & CG - reply PJCSSunday 29 May 2016> > > 
> > > > > 22.05 nnaida17 ASIC parameters
not loading
 90.png91.png92.png93.png94.png 
  251   Sun May 29 23:55:15 2016 TD, AE & CG - reply PJCSSunday 29 May 2016> > 
> > > > 22.05 nnaida17 ASIC parameters not
loading
 80.png81.png82.png83.png84.png 
  250   Sun May 29 23:28:56 2016 TD, AE & CG - reply PJCSSunday 29 May 2016
> > > 22.05 nnaida17 ASIC parameters not
loading
  
  249   Sun May 29 22:35:25 2016 TD, AE & CG - reply PJCSSunday 29 May 2016
> > 22.05 nnaida17 ASIC parameters not loading
> >       power cycle & reboot
 70.png71.png72.png 
  248   Sun May 29 20:06:15 2016 TD, AE & CG - reply PJCSSunday 29 May 2016> Throughout day:
>       DSSD2 (3058-25) would not bias, either
short circuit or suspiciously low leakage
  
  247   Sun May 29 14:06:31 2016 TD, AE & CGSunday 29 May 2016Throughout day:
      DSSD2 (3058-25) would not bias, either
short circuit or suspiciously low leakage
 62.png63.png64.pngcaen_addr0_290616_2244.pngcaen_addr1_290616_2244.png 
  246   Sun May 29 10:31:59 2016 TDnnaida19 'H' histogramming enabled indicator dispappears following DAQ start18.30 Options for nnaida19 and a.n.other (working)
FEE (nnaida18)
 60.png61.png 
  245   Sun May 29 10:11:07 2016 TD, CG & reply by PJCSSaturday 8 May 2016 - reply about 'H' and "X"> 15.20 DAQ histogramming & data transfer
#1 enabled
>       Merger configured, started, input
  
  244   Sat May 28 07:31:07 2016 Saturday 8 May 2016TD, CG15.20 DAQ histogramming & data transfer #1
enabled
      Merger configured, started, input paused
 9x 
  243   Fri May 27 11:16:40 2016 TD[How To] Start and Stop RunsAll AIDA operations are controlled from the
Dell T410 Workstation aidas1 using web browsers.
 7x 
  242   Fri May 27 11:10:37 2016 TD[How To] Startup AIDA1) Start Julabo FL11006 Recirculating Chiller

   See manual (page 19)  http://www2.ph.ed.ac.uk/~td/AIDA/Information/Julabo%20FL11006.pdf
 34x 
  241   Fri May 27 06:38:27 2016 TD, AE & CGFriday 27 May 201614.30 DSSSD stack moved upstream to position
DSSSD#3 at centre of EURICA.
 13x 
  240   Thu May 26 14:19:13 2016 Patrick Coleman-Smith[HowTo] Access AIDA documentationThe latest version of the FEE64 software Interface
document ( May 2016 ) is available as a .pdf
from
  
  239   Thu May 26 10:03:11 2016 Patrick Coleman-Smith[HowTo] Specification Document for MACB including suggested setup.Attached is the specification for the MACB
with the settings currently available.
 Specification_for_the_MACB_25May16.pdf 
  238   Thu May 26 03:46:41 2016 TD, AE & CGThursday 26 May 201611.45 AIDA discriminator rates - see attachment
1
      Today's rates similar to yesterday's
 72.pngstartup.tcl 
  237   Thu May 26 01:44:45 2016 Patrick Coleman-Smith[HowTo] Use the Multiplicity Trigger Firmware, V8.18, and update the files
Done. Awaiting test. See attachments 1-2.
 70.png71.png 
  236   Wed May 25 18:51:54 2016 Patrick Coleman-Smith[HowTo] Use the Multiplicity Trigger Firmware, V8.18, and update the filesThe attached firmware file, FEE_GF_Feb16_18.bin,
should be saved to /MIDAS/Aida and the FlashPgm.csh
file edited
 FEE_GF_Feb16_18.binDISC_25May16.zipLOCAL_tml_25May16.zip 
  235   Wed May 25 02:10:51 2016 TD, CGWednesday 25 May 201610.05 Recirculating chiller on
      FEE power on
      Detector bias on - ambient temp +23
 50.png51.png60.png 
  234   Tue May 24 08:28:28 2016 Patrick Coleman-Smith[HowTo] Save power if not using the Waveforms and restart the WaveformsThe USB controlled power Relays are near their
AC fuse operating limit which has caused
some Fuse failures.
  
  233   Tue May 24 07:12:30 2016 TD3x WDC WD30EFRX ATA 3Tb disks added to aidas1 LVM configuration
The 3x WDC WD30EFRX ATA 3Tb disks installed
in aidas1 in April 2015 (formerly /data20,
 9x 
  232   Tue May 24 06:39:17 2016 TD, CGper FEE64 waveforms
Attachments 1-30 per FEE64 ASIC #1 waveforms
 30x 
  231   Tue May 24 00:06:26 2016 TD24 May 2016Overnight. DAQ stopped. Detector bias off.
FEE power and recirculating chiller on.
 1.png2.png3.png4.png5.png 
  230   Mon May 23 17:21:29 2016 Patrick Coleman-Smith[HowTo] A solution to the problem of no SYNCsWhen starting Aida some FEE64 fail to provide
SYNC data , or any data for that matter,
on the ASIC data stream.
  
  229   Mon May 23 09:17:55 2016 Patrick Coleman-SmithMultiplicity Trigger SpecificationPlease read and comment on the attached
specification.
 Specification_for_the_multiplicity_Trigger_for_AIDA.pdf 
  228   Mon May 23 07:28:38 2016 TD23 May 201612.45 Rly16 'Sequence ALL On' operational

15.20 Startup remote control of CAEN N1419
 25x 
  227   Sat May 14 11:27:09 2016 AE, VP[How To] DAQ correlation monitor (June16 campaign)The program for online monitoring the correlation
of the DAQ systems (AIDA-EURICA-BigRIPS)
through a common scaler is SyncCheck (J.
 sync2.pngsync3.pngsync5.pngsync6.png 
  226   Fri May 13 13:27:50 2016 patrick Coleman-SmithPower supply changes and blowing fuses ! Reading about the power supply changes
and the requirement to replace fuses leads
me to be concerned.
  
  225   Fri May 13 13:24:42 2016 Patrick Coleman-SmithAn idea that might help when everything grinds to a haltWhen using the T9 system and running with
too much rate in one FEE64 so the system
is unbalanced.
  
  224   Fri May 13 06:18:53 2016 AE, VP, BMFriday May 13th11 am: Changed configuration of power source
for AIDA PSU (see paper logbook). Now both
cables with power for
 9x 
  223   Thu May 12 16:55:37 2016 AE, VP, BMThursday May 12Continued work on beta-trigger for EURICA.
However the system seems to have different
noise condition than before, which 
 7x 
  222   Thu May 12 15:50:48 2016 PatrickSystem Checks and firmware updateAdded two checks to the System wide checks.
Modified
the Firmware so the checks work properly.

One
check reads the status of the FEE64 clocks
 FEE_GF_Feb16_17.binCheck_12May16.zip 
  221   Wed May 11 11:24:09 2016 PatrickCorrelation ControlsPlease note that the Force Trigger and Reset
buttons  in the Correlation Browser only
have meaning if the FEE64 
  
  220   Wed May 11 06:37:32 2016 AE, VP, BMWednesday 11 May*2:30 pm*: changed power source of USB-controlled
power supply for FEEs. Now one of the power
cables is connected
 Eurica_timestamp.pngAIDA_timestamp.pngTimestamp_correlation_AIDA_EURICA.png 
  219   Wed May 11 06:01:16 2016 AE, VP, BMBeta triggerPlease find attached the best diagram of the
beta trigger logic circuit for EURICA campaign
2016
 Trigger_scheme-new.jpg 
  218   Wed May 11 06:00:56 2016 AE, VP, BM (Byul Moon)FEE64 <-> MACB trigger mappingHere is the mapping of the trigger output
of MAC-B modules to FEE64 modules
 dssd_layout.jpg 
  217   Wed May 11 05:49:51 2016 AEVHDL update to FEE_GF_Feb16_16The firmware of all FEEs was updated to the
version in FEE_GF_Feb16_16.bin (https://elog.ph.ed.ac.uk/AIDA/215).
This provides a 25 MHz clock output from
 FEEprogram1.pngFEEprogram2.pngFEEprogram3.png 
  216   Tue May 10 16:03:50 2016 TD & VFEPLatest version of Rly16
Do not forget to backup the current versions
of the attached files before
 Rly16.jsRly16.tclRly16.tml 
  215   Mon May 9 16:46:30 2016 PatrickUpdate for FEE64 VHDL and Correlation browser windowsThe attached VHDL file should be saved to
/MIDAS/Aida and the FlashPgm.csh file edited
to load "FEE_GF_Feb16_16.bin"

Use the
 FEE_GF_Feb16_16.binAida_js_tml_May16.zip 
  214   Thu May 5 14:44:48 2016 PatrickTrigger selection explanationsPlease request more information if the
attached is not clear.
 Explanations_for_the_Trigger_selections_in_AIDA.pdf 
  213   Thu May 5 11:10:36 2016 CG,PV,TDThursday 5 May 2016 Detector configuration - see https://elog.ph.ed.ac.uk/AIDA/193

Ribbon cable to nnaida19 FEE adaptor PCB
 8x 
  212   Thu May 5 09:52:20 2016 TDMERGE test OK
Slow comparator 0x10 -> 0x20
Fast comparator LEC/MEC 0x10 -> 0xff
 7x 
  211   Thu May 5 08:47:49 2016 TD[How To] Mask Fast DiscriminatorsFrom the 'AIDA Control' tab select 'Discriminator
control'
 305.png 
  210   Thu May 5 08:30:00 2016 TD[How To] Set MACB Trigger Output Mode
From the 'AIDA Control' tab select 'Local
Controls'
 304.png 
  209   Thu May 5 08:12:14 2016 TDCurrent AIDA settings and options
Current AIDA settings DB Key: 2016May03-20.44.33
 303.png 
  208   Thu May 5 07:55:32 2016 TD[How To] Mount SAS and USB disks
*******************************************************************************************************
UPDATE 24 May 2016
 301.png302.png 
  207   Wed May 4 14:45:09 2016 TDmerge/tapeserver issues
TapeServer issue fixed - disk incorrectly
mounted following reboot
  
  206   Wed May 4 14:33:34 2016 TDmerge/tapeserver issues
Reboot aidas1
Power cycle FEE64s
 230.png231.png232.pngGS_configuration 
  205   Wed May 4 07:04:12 2016 TDWAVE statistics
AIDA wave statistics
 13x 
  204   Wed May 4 06:35:08 2016 TD[How To] Save AIDA Settings & Options
From 'Control' tab select 'Save/Restore Settings'
  
  203   Wed May 4 03:01:15 2016 TDWednesday 4 May 2016
10.30 Power up.
Normal DAQ startup.
 11x 
  202   Tue May 3 16:11:57 2016 TDMIDAS updates - problemsWith help from Patrick Coleman-Smith & Vic
Pucknell most of the issues identified
appear to be related to one (or more) of
 100.png101.png102.png103.png 
  201   Tue May 3 15:45:17 2016 TDAIDA Temperatures Log
AIDA temperatures (ASIC, Virtex, PSU) are
recorded in the file:
 Temperatures.txt 
  200   Tue May 3 08:46:25 2016 TDMIDAS updates - problems1) Unable to enable data transfer

   From RunControl unable to 'Enable #1 All'
 8x 
  199   Tue May 3 08:37:50 2016 TDMIDAS updatesMIDAS updated per instructions of VFEP (I
append the new and old versions of startup.tcl
and aidacommon)
 startup.tclstartup.tcl.BAK-030516aidacommonaidacommon.BAK-030516 
  198   Tue May 3 07:51:04 2016 TDTuesday 3 May 201632x FEE64 re-programmed from version 7 to
version 8 per instructions 
 40.png41.png42.png 
  197   Mon May 2 12:13:25 2016 CG,PV,TDMonday 2 May 2016   22x 
  196   Mon May 2 09:10:53 2016 TDMIDAS_MIDASsort_160316 installedThe latest (and greatest!) version of MIDASsort
has been installed.
  
  195   Mon May 2 07:37:03 2016 TDAIDA FEE layout
                                        
          UP
  
  194   Mon May 2 07:27:26 2016 TDaidas1 /etc/dhcp/dhcpd.conf updatedaidas1 /etc/dhcp/dhcpd.conf update

to install two scratch FEE modules assembled
  
  193   Sun May 1 07:59:08 2016 CG,PV,TDAIDA Detector Configuration
UPSTREAM
  
  192   Sat Apr 30 16:27:50 2016 TDSaturday 30 April 2016 photographs
Attachments 1-4 MSL type 2977-2- adaptor
PCB configurations (looking downstream) L,
 6x 
  191   Sat Apr 30 07:46:47 2016 CG,PV,TDSaturday 30 April 2016MSL type BB18 serial # 2977-20 bias +100V
I_L +12.45uA T=23 deg C
(biased by nnaida # 3 & 5 )
 11x 
  190   Fri Apr 29 11:11:20 2016 CG,PV,TDFriday 29 April
MSL type BB18 serial # 2977-20 bias +100V
I_L +12.0uA T=23 deg C
 6x 
  189   Thu Apr 28 07:42:11 2016 TD[How To] Change the AIDA Acquisition Server Configuration
Edit the file /MIDAS/config/TclHttpd/aidas1/startup.tcl
and change the definition of variables
 startup.tcl 
  188   Tue Apr 26 10:06:59 2016 CG, PV & TDTuesday 26 April
2 (of 3) WD 3Tb ATA disk drives are not currently
mounted on aidas1.
  
  187   Tue Apr 26 07:10:56 2016 TDSeagate Backup Plus 8Tb USB disk installedI have installed a Seagate Backup Plus 8Tb
(nominal) USB disk for data backup and
transfer to the UK
  
  186   Tue Apr 26 06:13:00 2016 TDaidas1: updated /etc/fstab file
The aidas1 /etc/fstab file contained commented
out entries for 2 (of 3) WD 3Tb disks
  
  185   Mon Apr 25 10:11:40 2016 CG, KM, PV & TDMonday 25 April
AIDA stand, Julabo FL11006 recirculating
chiller (with 110VAC/50Hz - 240VAC/50Hz 3ph
  
  184   Mon Apr 25 08:58:25 2016 TDReport - high? - aidas1 - Binding NIS service FAILED During a reboot of aidas1 the message 

Binding NIS service FAILED
 messages 
  183   Thu Apr 14 13:56:17 2016 PJCSUpdating the FEE64 firmware.To update the FEE64 firmware:-

    Power-up the FEE64 modules
that you wish to update.
    Identify
 FEE_GF_Feb16_15.bin 
  182   Tue Mar 22 10:59:52 2016 TD : PJCSTuesday 22 MarchMSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.515uA, ambient temperature
+19.8 deg C
 7x 
  181   Mon Mar 21 14:37:41 2016 PJCSVernier Timing document for commentHere is a document about the FEE64 waveform
Vernier Timing.
Please comment/criticise/offer advice.
 Considering_the_Vernier_Timing_unit_in_the_FEE64.pdf 
  180   Thu Mar 17 10:46:30 2016 TDAnalysis of R45See https://elog.ph.ed.ac.uk/AIDA/179

207Bi source, no pulser
 8x 
  179   Tue Mar 15 11:15:42 2016 TDTuesday 15 MarchMSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.845uA, ambient temperature
+19.8 deg C
 10.png11.png12.png13.png14.png 
  178   Mon Mar 14 11:27:47 2016 PJCSASIC_clock synchronisation across the systemDuring 'SETUP' the ASIC readout clock (
500KHz ) is synchronised to the SYNC pulse
in V8.10 and later versions of the VHDL.
 R44_0.zip.zip 
  177   Fri Mar 11 15:31:53 2016 TDAnalysis of R34_0lancre> ./analyser R34_0
 *** GREAT format 3.2.0 analyser - TD - May
2014
 1.png2632.txt2.png3.png4.png 
  176   Thu Mar 10 16:35:39 2016 TD : PJCSReport - high - AIDA timestamps> Version 8 firmware

> Analysing R37_* data files (see https://elog.ph.ed.ac.uk/AIDA/160)
 Time_Difference_FEE13to14.png 
  175   Wed Mar 9 17:31:58 2016 TDReport - high - LEC/MEC fast comparator issues
> Fast comparator rate spectra and statistics
do not appear to working as expected. See
 Discriminator_Thresh_50 
  174   Wed Mar 9 16:18:01 2016 TDnndhcp021 AIDA server Httpd/TapeServer/Merger startupStarting Httpd for the TapeServer/Merger,
TapeServer and Merger for AIDA produces
three terminal windows which will display
  
  173   Wed Mar 9 12:16:01 2016 TDWednesday 9 MarchMSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.505uA, ambient temperature
+19.8 deg C
  
  172   Tue Mar 8 16:29:07 2016 TDReport - high - AIDA timestampsVersion 8 firmware

Analysing R37_* data files (see https://elog.ph.ed.ac.uk/AIDA/160)
 8.png 
  171   Tue Mar 8 15:40:57 2016 TDTuesday 8 MarchMSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.705uA, ambient temperature
+19.8 deg C
  
  170   Tue Mar 8 15:32:53 2016 TDReport - low - run control frame issue with multiple streamsThe run control frame does not appear to update
the data transfer 'X' tag 
for all FEE modules after selecting 'Enable
 7.png 
  169   Tue Mar 8 15:09:49 2016 TDReport - high - LEC/MEC fast comparator issues
Fast comparator rate spectra and statistics
do not appear to working as expected. See
 6x 
  168   Tue Mar 8 12:11:56 2016 CG, AERIKEN maintenance progress


   
        
            
  
  167   Tue Mar 8 06:00:45 2016 CG, AERIKEN maintenance progress 07/03/16
The new snout doesn't fit due to
the screw holes being misaligned. I am going
 2016-03-07_15.54.46.jpg 
  166   Wed Mar 2 11:59:48 2016 PJCSFirst data with two streams merged from one FEE64The Fail bit is used to indicate The Timing
Vernier  word.
I'll post a seperate Elog entry to explain
  
  165   Thu Feb 25 12:47:43 2016 PJCSFirst data with two streams merged from one FEE64
My GREAT data analyser program reports that
the 'fail' bit is set ?
 analyser.f 
  164   Wed Feb 24 16:13:24 2016 PJCSFirst data with two streams merged from one FEE64


   
        
            
  
  163   Wed Feb 24 15:46:11 2016 PJCSOR64 - OR of all the ASIC discriminator channels after application of a maskFirmware version8 number 8 has an OR64
added which can be routed, using the Local
control, to the Trigger output and hence
 IMG_0290.JPG 
  162   Wed Feb 24 14:53:41 2016 PJCSFirst data with two streams merged from one FEE64nnaida2 running Version 8 Firmware and
data acquisition software outputting both
and ASIC data stream and a Waveform data
 R1_0.gz 
  161   Wed Feb 24 13:54:53 2016 TDReport - low - FEE temperature plot displays incorrect dates
See Attachment 1
 77.png 
  160   Wed Feb 24 10:25:35 2016 TDWednesday 24 February 2016MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.770uA, ambient temperature
+19.8 deg C
 78.png79.png80.png81.png 
  159   Tue Feb 23 12:16:08 2016 TDTuesday 23 February 2016MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.570uA, ambient temperature
+19.8 deg C
 60.png 
  158   Mon Feb 22 16:47:28 2016 PJCSVersion 8 in nnaida2 outputting and merging two streamsnnaida2 , the bare test FEE64 in T9, is
successfully running with two streams connected
to nndhcp177 ( a Linux64 computer )
  
  157   Mon Feb 22 15:19:52 2016 PJCST9 System changed to version 8I have changed the T9 system to be using
Version 8.
Tests using the detector and pulser
 LED_window.png 
  156   Fri Feb 19 10:23:31 2016 TD19 February 2016MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.070uA, ambient temperature
+20.2 deg C
  
  155   Thu Feb 18 13:23:03 2016 TDReport: high: MERGE error messagesDuring R30 ( see https://elog.ph.ed.ac.uk/AIDA/154
) obtain the following merger error messages
(rate ~ 10 per minute) with merger rate ~100-200k
  
  154   Thu Feb 18 10:23:48 2016 TDThursday 18 FebruaryMSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.200uA, ambient temperature
+20.1 deg C
 19x 
  153   Wed Feb 17 11:54:50 2016 CG, TD17 February 2016File R17 -> pulser walkthrough.
     - Started ~10.00
     - Pulser peak amplitude taken from 9.0V
 6x 
  152   Tue Feb 16 17:32:21 2016 CG, TD16 February 2016MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.150uA, ambient temperature
+20.1 deg C
  
  151   Wed Feb 10 10:56:02 2016 CG, TD9-10 February 2016MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.540uA, ambient temperature
+19.9 deg C
 7x 
  150   Tue Feb 9 17:27:12 2016 CG, TDRibbon cable + coupler tests at DL 8-9th Feb08/02/16
Spoke to PJC-S -> Ethernet cables
from FEEs to switch are all 4m Cat6.
 allnnaida_inSafe_cablesIsolated_0.5us.pngallnnaida_inSafe_cablesIsolated_1us.pngallnnaida_inSafe_cablesIsolated_2us.pngallnnaida_inSafe_cablesIsolated_4us.pngallnnaida_inSafe_cablesIsolated_8us.png 
  149   Wed Feb 3 15:34:30 2016 CG, TDRibbon cable + coupler tests at DL 1st-2nd Feb01/02/16
Started up system. Biased det to
+200V 
  
  148   Tue Feb 2 17:32:46 2016 CG, TDTuesday 2 February 2016Bias +200V, I_L +6.955uA, ambient temp +20.2
deg C
 9x 
  147   Tue Feb 2 14:08:44 2016 CG, TDReport: Low - No SYNCs from FEEsCurrently running with a source, and everything
seems to be running fine in terms of histograms
doing what we expect, no error messages etc.
 noSYNCs.png 
  146   Thu Jan 28 13:53:29 2016 CG, TDRibbon cable + coupler tests at DL - 25-26th Jan 25/01/16
On start up, received error when
trying to access spectrum browser (attachment
 15x 
  145   Wed Jan 27 14:54:48 2016 TD, CGWednesday 27 January 2016MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +8.110uA, ambient temperature
+20.2 deg C
 11.png14.png 
  144   Wed Jan 20 17:02:47 2016 CG, TDRibbon cable + coupler tests at DL 18/01/16
Set up as last week but with 8us
shaping time.
 17x 
  143   Wed Jan 20 16:44:02 2016 TDReport - LOW - spectrum browser x/y expand
Spectrum Browser
  
  142   Wed Jan 20 12:00:19 2016 CG, TDWednesday 20 January 201611.58 Repeat yesterday's test - no significant
change observed
 6x 
  141   Tue Jan 19 18:09:53 2016 CG, TDTuesday 19 january 2016
18.00 Swapped input cables to nnaida11 and
nnaida14
 1.png2.png3.png4.png 
  140   Fri Jan 15 16:50:09 2016 CG, TDRibbon cable + couple tests at DL 12/01/16      (Attachments
1-8)
FEEs set up as per ELOG entry 136
 20x 
  139   Thu Jan 7 16:04:44 2016 CG, PJCSPCS Reply to RIKEN progress - 15/12/15 (late)


   
        
            
  
  138   Thu Jan 7 13:55:24 2016 CGRIKEN progress - 15/12/15 (late) Tues 15/12/15
Swapped previously tripped detector
(3131-11) on to kaptons already in place
 AIDA_measurements_-_Dec2015.pdfAIDA_measurements_-_Dec2015.pptx 
  137   Wed Jan 6 16:06:32 2016 CG, TD, PJCSReport: Low - RPi power cable can't be fully inserted due to case conflict - solved


   
        
            
  
  136   Tue Dec 15 11:17:05 2015 TDSTFC DL tests - 14-15.12.15BNC PB-5 Pulser

Fall time 1.0ms
 13x 
  135   Mon Dec 14 19:25:35 2015 AE, CG ,PhongMerger/TapeServer trouble reportSat. 12/12/15

Working with a 8-FEE setup (as in https://elog.ph.ed.ac.uk/AIDA/133).
 master_no_data_transfer.pngmaster_no_data_transfer.pngerror_when_stop_daq_merger_running.pngerror_show_1_3_8_kaput.pngout_term.txt 
  134   Mon Dec 14 07:56:27 2015 CGRIKEN progress13/12/15
Current jumper setup:
     - detector
 10x 
  133   Sat Dec 12 03:30:50 2015 Alfred, Chris, Phongchange configuration of NNAIDA modules in setupWe want to reduce the configuration of
the setup to 4 FEE cards (8 NNAIDA modules),
so we only have to isolate 4 of them from
  
  132   Sat Dec 12 02:12:17 2015 CG, AE, VHRIKEN progressStripped down contents of AIDA NIM bins
to only what is required by AIDA.
Now have BNC PB-5 pulser, sum and
 9x 
  131   Thu Dec 10 04:56:08 2015 CG, AERIKEN progress - first day and a half08/12/15 - Day 0.5
Test fitted new snout to snout base
     - the holes
 2015-12-08_16.19.16.jpg2015-12-08_16.16.30.jpg 
  130   Thu Dec 3 16:28:46 2015 CG, TDNew Kapton cable tests at DLSpent whole day trying to isolate mezzanines
from cooling crate.
Finally managed to increase resistance
 18x 
  129   Thu Dec 3 10:12:08 2015 CG, TDReport: Low - RPi power cable can't be fully inserted due to case conflictThe RPi power cable cannot sit fully in
the connector, and the lock pins can't engage,
because the case gets in the way of the plastic
  
  128   Wed Dec 2 18:39:44 2015 CGNew Kapton cable tests at DLPowered on system ok.
Electrical connection between crate
and mezzanines still persists, but only to
 nnaida14_wav_noHVnoDetNoShielding.pngnnaida14_wav_noHVnoDetWithShielding.pngall1.8.L_noDetShaping2us.png 
  127   Thu Nov 26 16:32:52 2015 CG, TDNew Kapton cable tests at DLPowered on system without issue. biased
detector to -200V. Leakage current not stable,
bouncing around between ~3.66 - 3.74uA. Room
 9x 
  126   Wed Nov 25 19:24:39 2015 CG, TD, PJCSNew Kapton cable tests at DLPowered system on and biased to +200V at
room temp of 22.4oC. Leakage current of 3.37uA.
Waveforms very noisy and spectra
 6x 
  125   Fri Nov 20 16:29:49 2015 CGNew Kapton cable tests at DLPowered system up from state it was left
in last night. Biased to +200V with leakage
current 3.9uA @ room temp 23.3oC.
 nnaida14_goodGNDbetweenAll.png 
  124   Thu Nov 19 17:31:24 2015 CG, TDNew Kapton cable tests at DLPowered system on from the state it was
in last night. Biased to +200V with leakage
current 3.9uA at room temp 22.8oC.
 nnaida11_wav.pngIMG_20151119_162831.jpg 
  123   Thu Nov 19 12:23:03 2015 CG, TDReport: Low - Error message when selecting Act on all FEE64s for FADC calibrateWhen trying to calibrate FADCs in FADC
Align and Control page, ticked 'Act on ALL
FEE64 modules'.
 FADC_actOnAll.png 
  122   Thu Nov 19 12:19:15 2015 CG, TDReport: Low - nnaida12 ASIC4 not functioningCurrent nnaida12 (MAC address 2b:09:e8)
has several noisy channels in ASICs 1-3,
whilst ASIC4 does not work at all.
 nnaida12_stats.pngnnaida12_ASIC4_checkError.png 
  121   Wed Nov 18 18:18:26 2015 CG, TDNew Kapton cable tests at DLNote: kapton #7 may have broken pins next
to (deliberately) broken ground pin. Unclear,
but should not be used for bias until certain.
 nnaida11_noJumpers.pngnnaida14_detectorGNDjumper.pngnnaida14_shortDrainWires.pngnnaida14_shortDrainWiresSinglePoint_8us.pngIMG_20151118_164436.jpg 
  120   Sat Nov 14 20:19:43 2015 CG, TD, PJCS13 Nov 2015 - new Kapton cable tests at DL

    

       
            
  
  119   Fri Nov 13 16:17:14 2015 CG, TD13 Nov 2015 - new Kapton cable tests at DLPowered system up with 4 bare 45cm kaptons
connected and nothing seems to have changed
from where we left last night
 6x 
  118   Thu Nov 12 18:28:41 2015 CG, TD12 Nov 2015 - new Kapton cable tests at DLThis morning PC-S changed firmware and
DAQ software to that of the RIKEN setup
Firmware
 23x 
  117   Wed Nov 11 17:36:19 2015 CG, TD11 Nov 2015 - new Kapton cable tests at DLUpon starting system with nothing connected
beyond adapter PCBs, observed pulser peak
FWHM of ~12-15ch in nnaida13+14 and ~15-18ch
 18x 
  116   Thu Nov 5 16:28:05 2015 CG, TD5 Nov 2015 - New kapton cable tests @ DLNew Kapton PCB design (2x 0.45m + inter-connecting
PCB, no ground plane layers)  under
test with small system in T9.
 11x 
  115   Fri Jul 17 17:28:35 2015 AE[Data Analysis] Correlation Scaler 100Kr data (go4_30**.root) Plots of corr-scaler vs event number in Root
files for 100Kr(?) setting: go4_40XX.root.
 scaler_r4001_4010.pngscaler_r4011_4020.pngscaler_r4021_4030.pngscaler_r4031_4040.pngscaler_r4041_4049.png 
  114   Fri Jul 17 16:00:38 2015 CGRun summary for Apr-May 2015 
A table summarising the run information
within the lab book and ELog for Apr-May.
 RIKEN_may2015_runSummary.xlsx 
  113   Thu Jul 16 15:10:34 2015 Patrick Coleman-Smith[DAQ and VHDL] Changes to the Discriminator Information data item I have attached a document describing
the new format of the Discriminator Information
data item used in Version 8
 Changes_to_the_Discriminator_Info_word_for_Version_8_of_the_AIDA_and_LYCCA_DAQ_and_firmware.pdf 
  112   Tue Jul 14 18:06:54 2015 AE, CG[Data Analysis] Correlation Scaler timestamp in PID data (go4_30**.root)The attached plots show the time-stamp data
in the EURICA files with PID information
(EventInfo.timestamp). The
 10x 
  111   Wed Jul 1 16:42:39 2015 Patrick Coleman-SmithTesting Version 8I have installed Version 8 of the AidaExec
program and FEE_GF_Feb15_6.bin for the VHDL
on the system in T9.
  
  110   Fri May 22 11:58:02 2015 TD22 May 2015
MSL type BB18 serial 2998-22
 6x 
  109   Fri May 22 11:26:43 2015 TDInternal Server Error - attempting to save settings to /MIDAS/DB/EXPERIMENTS/AIDA/2015May22-11.19.38Got the error Server Internal Error
while trying to obtain /AIDA/SaveRestore/SaveRestore.tml.
  
  108   Fri May 22 11:14:21 2015 TDAIDA T9 test bed - nnaida11 DAQ stallAIDA T9 test bed

nnaida11 DAQ stall (0 AIDA SYNCs) at DAQ
 1.png 
  107   Sat May 9 23:40:49 2015 TDNetwork cabling & Raspberry Pi configuration Hi Tom,
Please could you photo the power
supply cabling and the MACBs.
  
  106   Sat May 9 11:47:40 2015 TDNetwork cabling & Raspberry Pi configuration   IMG_2907.JPGIMG_2908.JPGIMG_2909.JPGIMG_2910.JPG 
  105   Sat May 9 11:28:32 2015 TDAIDA DSSSD dis-assemblyAIDA DSSSD #1-3 stack disassembled without
problem. DSSSDs returned to boxes
in the
BF3 AIDA storage area.

Attachments 1 &
 IMG_2922.JPGIMG_2929.JPG 
  104   Sat May 9 03:50:56 2015 TD & CGSaturday 9 May 2015
Gzip'd tar file of /MIDAS/DB - attachment
1
 MIDAS_DB_090515.tar.gzaida_may2015-0001.compressed.rotated.pdf 
  103   Fri May 8 01:05:18 2015 JA, TD, AE & CGFriday 8 May 201508.50 FEE64 temperatures (attachment 1)

09.03 R70 ends OK
 150.png 
  102   Thu May 7 01:32:39 2015 JA, TD, AE, CG & JLTThursday 7 May 201509.25 R69 continues
      100Kr setting, degrader 4mm + 0.4mm
(variable) Al
  
  101   Tue May 5 16:40:23 2015 JA, TD, AE, CG & JLTWednesday 6 May 201500.00 Degrader changed to 4mm + some of variable
(need to confirm)
      Extra 1mm removed.
 140.png 
  100   Mon May 4 18:09:42 2015 JA, TD, AE, CG & JLTTuesday 5 May 201502.09 R61 starts
      nnaida1, 2, 6, 10, 13 & 14 fast discs
disabled
  
  99   Mon May 4 12:10:35 2015 AEonline monitor and data transferOnline monitor program for AIDA is in 
/homes/npg/AIDAonline
 R53_implant_E.pngR53_implant_XY.pngR53_decat_E.png 
  98   Mon May 4 02:32:29 2015 VFEP & TDHow to fix DAQ stalls at GOIt has been observed that when starting the
AIDA data acquisition (select 'GO' from the
'Data Acquisition Run
  
  97   Mon May 4 02:03:24 2015 TDUnable to obtain Data Acqusition Statistics frame

    

       
            
  
  96   Mon May 4 01:27:56 2015 JA, TD, AE, CG & JLTMonday 4 May 2015
09.18 SN changed degrader to 5.7mm Al (4mm
+ all variable degraders + additional 1mm)
 16x 
  95   Mon May 4 01:23:48 2015 TDUnable to obtain Data Acqusition Statistics frameGot the error Server Internal Error
while trying to obtain /DataAcquisitionControl/DataAcquisitionStats.tml.
  
  94   Sun May 3 01:32:18 2015 JA, TD, AE, CG, VP & JLTSunday 3 May 2015
09.19 Beam off on arrival, now back
      R51 running
  
  93   Sat May 2 19:20:59 2015 AErun R51 online spectraOnline spectra to monitor condition during
run R51.
 ADClow_vs_Ch_R51online.pngADChigh_vs_Ch_R51online.pngX_implant_R51online.pngE_implant_R51online.pngTraking_implant_R51online.png 
  92   Sat May 2 19:17:25 2015 AEtime-stamp for event reconstructionSome first analysis of building events to
look for implants and decays
 time_stamp_dist_disc.pngevt_time_stamp_disc_R51.pngXY_implant_disc_R51.pngevt_time_stamp_slowcomp_R51.pngXY_implant_slowcomp_R51.png 
  91   Sat May 2 14:41:20 2015 JA, TD, AE, CG, VP & JLTMUSIC detector signalsAdjusted setting of MUSIC detector signals
during break
 
 MUSIC_lowE.pngMUSIC_highE_log.png 
  90   Sat May 2 02:04:50 2015 JA, TD, AE, CG, VP & JLTSaturday 2 May 20150055: Degrader changed. 1mm removed.
         
  1.4mm total
 50x 
  89   Thu Apr 30 20:21:20 2015 Patrick Coleman-SmithHigh Energy Spectra from LYCCA with pulser> I have an eight FEE64 system now in place
on the LYCCA chamber with a PB-5 pulser going
into the adapter cards 
  
  88   Thu Apr 30 17:43:36 2015 Patrick Coleman-SmithHigh Energy Spectra from LYCCA with pulserI have an eight FEE64 system now in place
on the LYCCA chamber with a PB-5 pulser going
into the adapter cards 
  
  87   Thu Apr 30 16:20:54 2015 JA, LHB, TD, AE, CG & VPFriday 1 May 2015      diode link threshold 0xca -> 0xb6
                           0x11 -> 0x2c 
  
  86   Thu Apr 30 15:28:25 2015 Patrick Coleman-SmithHigh Energy Spectra from LYCCA with pulserI have an eight FEE64 system now in place
on the LYCCA chamber with a PB-5 pulser going
into the adapter cards test input. The test
 LYCCA_High_Energy.png 
  85   Thu Apr 30 03:00:48 2015 TDDegrader changes
From 20.00 29.4.15
  
  84   Thu Apr 30 02:11:19 2015 TDExample waveforms with heavy-ion beam
1 - nnaida1 DSSSD#3 p+n (pulser?)
2 - nnaida1 DSSSD#3 p+n heavy ion
 7x 
  83   Thu Apr 30 01:06:44 2015 JA, LHB, TD, AE, CG & VPThursday 30 April 2015Overnight
      Degrader OUT
      DAQ ran OK - data file R22
 16x 
  82   Wed Apr 29 18:12:02 2015 AEonline analysis codeA first online analysis code is running now
in Desktop 4 aidas1
 8x 
  81   Wed Apr 29 11:34:09 2015 Patrick Coleman-SmithFast Trigger timings against Pulser Input and LEC/MEC Fast Comparator threshold settingI have tried the latest version ( 26 )
of the FEE64 code and carried out some measurements
of the Fast Trigger delay from the Pulser
  
  80   Wed Apr 29 11:00:29 2015 TDWednesday 29 April 2015 - R20 screenshots1230: Attachments 

19.00 Screenshots taken during R20
 10x 
  79   Wed Apr 29 10:01:27 2015 Patrick Coleman-SmithFast Trigger output fault in FEE64 FPGA logic The Fast Trigger output of the FEE64
is formed from the OR of the four OR16 signals
( one from each of the ASICs.
  
  78   Wed Apr 29 01:03:41 2015 JA, LHB, TD, AE, CG & VPWednesday 29 April 2015Overnight
      Beam tuning, PID tests - beam stopped
in scintilator detector + 1" thick Pb bricks
 16x 
  77   Tue Apr 28 11:22:25 2015 VPRPIreplace RPI with model B+.  4 USB
ports + 4 port switch
 
  
  76   Tue Apr 28 06:25:13 2015 JA, LHB, TD, AE & CGTuesday 28th April progress28/04/15
1420: Carried out ASIC optimisation
tests to find best shaping time. Chose system
 6x 
  75   Tue Apr 28 05:59:48 2015 AE"beta" trigger from MACB Trigger outputsWe've constructed a beta trigger with the
signals from the p-side of the three DSSDs
(OR of all fast
 6x 
  74   Mon Apr 27 04:54:02 2015 VFEP & TD[How To] Remote control of CAEN N1419 Programmable HV Power Supply
@ CAEN N1419
 N1419_rev4.pdf30.png 
  73   Mon Apr 27 01:48:59 2015 JA, LHB, TD, VP, AE & CGMonday 27 April 2015DSSSD #1 +100V, +3.8uA
DSSSD #2 +100V, +5.5uA
 8x 
  72   Sun Apr 26 02:28:59 2015 JA, LHB, TD, AE & CGSunday 26 April 2015
Upstream, 207Bi source
 33x 
  71   Sat Apr 25 03:56:44 2015 JA, LHB, TD, AE & CGSaturday 25 April 2015
1130: Rotated forward water inlet connection
to point towards rear of AIDA stand to remedy
 IMG_2852.JPGIMG_2853.JPGIMG_2858.JPGIMG_2860.JPG 
  70   Fri Apr 24 08:11:04 2015 CG, AE & TDThursday 23 April 2015 contd
Image of interior of closed EURICA array
with AIDA inserted.
 IMG_2850.JPG 
  69   Thu Apr 23 10:27:59 2015 CG, AE, TDThursday 23rd April progress23/04/15
1800: Spent majority of the day moving
AIDA forward and into EURICA.
 IMG_2846.JPGIMG_2847.JPGIMG_2848.JPGIMG_2849.JPG 
  68   Thu Apr 23 09:02:57 2015 TD, PatrickFEE64 Fast Discriminator OR o/p via MACB> Illustration of the trigger timing of the
AIDA FEE64 fast discriminator OR output via
the
  
  67   Thu Apr 23 03:21:48 2015 TDMSL type BB18(DS)-1000MSL type BB18

Serial Thickness Depletion Date Note Location
  
  66   Wed Apr 22 08:50:59 2015 CG, AE, TDWednesday 22nd April progress22/04/15
1230: Solved problem (empty spectra
despite changing modules) with nnaida5 noted
 20150422_nnaida1_FWHM.png20150422_nnaida3_FWHM.png20150422_nnaida5_FWHM.png20150422_nnaida8_FWHM.png 
  65   Wed Apr 22 07:28:25 2015 AE (PM)Mechanical setup instructions: AIDA+EURICA at F11Attached are Paul Morrall's instructions on
how to move new AIDA support table into place,
for a setup with 
 AIDA_procedure_document.docx 
  64   Wed Apr 22 03:33:01 2015 TDFEE64 Fast Discriminator OR o/p via MACBIllustration of the trigger timing of the
AIDA FEE64 fast discriminator OR output via
the
 tek00000.tiftek00001.tif 
  63   Tue Apr 21 09:39:00 2015 AELISE estimates for implantation setup [updated][UPDATED 22/4: initial LISE file had incorrect
thickness for MACi plastic]
 LISE_estimates_84Zn.docxLISE_estimates_94Se.docx 
  62   Tue Apr 21 06:01:50 2015 CG, TDTuesday 21 April 201521/04/15
1325: Recabled the MACB distribution
tree as per PC-S instruction yesterday.
 8x 
  61   Mon Apr 20 09:45:38 2015 CG, TD, Patrick Coleman-SmithProgress 20th April + RPi procedure + reply ++

    

       
            
  
  60   Mon Apr 20 09:38:15 2015 CG, TD, Patrick Coleman-SmithProgress 20th April + RPi procedure + reply
  
  59   Mon Apr 20 09:07:59 2015 CG, TD, Patrick Coleman-SmithProgress 20th April + RPi procedure + reply

    

       
            
  
  58   Mon Apr 20 07:39:49 2015 CG, TDRasberry Pi : USB ac mains switch + USB serial link to FEE64 console
It would appear that you cannot reliably
startup the Raspberry Pi (nnrpi1)
  
  57   Mon Apr 20 06:53:24 2015 CG, TDProgress 20th April + RPi procedure20/04/15
1200: Complete all points on first
part of check list, except checking the PSU
 7x 
  56   Sat Apr 18 09:30:11 2015 CGTo do list 19/04/15 - 21/04/15To do (roughly in order):

     Move shipped boxes
down from Gabor's office to the experimental
  
  55   Mon Mar 9 16:51:26 2015 TDAIDA adaptor PCB configuration - RIKEN - Feb 2015   6x 
  54   Mon Mar 9 16:45:35 2015 TDJulabo FL11006 Recirculating Chiller: connection to 3ph ac mains
3ph 100VAC/50Hz to Julabo FL11006 3ph 230VAC/50Hz
via local transformer
 7x 
  53   Mon Mar 9 13:59:32 2015 TDNew AIDA support frame for F11/F12 @ RIKEN   IMG_2798.JPG 
  52   Mon Mar 9 09:02:03 2015 Patrick Coleman-SmithAdding Filters to the AIDA PSU.  This guide is to help with the filter
pcb assembly and installation into the AIDA
power supply.
 Assembly_of_the_AIDA_PSU_filter_and_installation_guide.pdf 
  51   Thu Mar 5 12:11:44 2015 TDTo Do list - March 2015A draft 'to do' list in preparation for further
AIDA tests at RIKEN from mid-April.
  
  50   Wed Mar 4 17:38:06 2015 CGLog book for Feb 2015 tests04/03/15
Please find attached a scan of the
log book for the Feb 2015 AIDA tests at RIKEN. 
 AIDA_Feb2015_labBook_comp.pdf 
  49   Wed Feb 25 09:59:28 2015 CG, AEWeds 25th Feb progress25/02/15
1200: Swapped out old green power
switch for new one from UoE (having previously
 2015-02-25_14.25.40.jpg2015-02-25_14.38.43.jpg25Feb_Rly16error.png 
  48   Tue Feb 24 03:04:59 2015 CG, TDTues 24th Feb progress24/02/15
1200: Update the FEE firmware on
nnaida1-16 without problem.
 9x 
  47   Mon Feb 23 11:10:44 2015 TDOutline test plan - RIKEN - Feb 2015
With the exception of one AIDA FEE64 PSU
configuration test (5) and the upgrades
 RIKEN_test_-_Feb_2015.txt 
  46   Mon Feb 23 07:23:08 2015 J. Agramunt, H. Baba, A. EstradeDAQ correlation testThe attached figure shows the configuration
used to test the synchronization of the DAQ
systems using a
 DAQcorrelation_diagram.pdfDAQsoftware.pdfcorrelation_25Hz.pngcorrelation_random.png 
  45   Mon Feb 23 07:03:10 2015 TD, AE & CGMonday 23 February 201514.30 Saved nnaida1-16 ASIC + Waveform
configurations to directory (Data Base Key)
          
  
  44   Sun Feb 22 06:47:23 2015 CG, AE, TDSunday 22 February 201522/02/15
am    Testing various
grounding configurations for the connection
 Screenshot.png 
  43   Sat Feb 21 06:37:52 2015 CG, AE, TDSat 21st Feb progress21/02/15
1230: Developing the software to
check synchronisation between DAQs. Below
 6x 
  42   Fri Feb 20 10:48:09 2015 TDHow To Connect the FEE64 System Console Using PuTTY
Set permissions for the USB-serial device
using the command
  
  41   Fri Feb 20 10:04:29 2015 CG, AE, TDFri 20th progress20/02/15
1400: Measured leakage current as
function of bias V for the Caen 1419B high
 bias_voltage_vs_leakage_current_for_caen_n1419b_and_detector_bb18_2977-20(2).png2015-02-20_20.27.57.jpg 
  40   Thu Feb 19 08:21:33 2015 CG, AE, TDThrus 19th Feb progress19/02/15
1000: Check system gives same resolution
as yesterday, removing only the Cu braiding
 39x 
  39   Wed Feb 18 11:25:54 2015 Patrick Coleman-SmithInvestigations into removing HV noise With the system in T9 and a Keithley
Source Meter supplying HV to the detector.
The source meter supplies 200V and
  
  38   Wed Feb 18 05:49:29 2015 CG, AE, TD, PJC-SWed 18th Feb progress18/02/15
1300: Error seen when trying to check
ASIC settings. See Attachment #1. Power cycle
 15x 
  37   Tue Feb 17 08:03:32 2015 Patrick Coleman-Smith[How To] Set up the Raspberry Pi for PuTTY

    

       
            
  
  36   Tue Feb 17 06:32:24 2015 CG, AE, TDTues 17th Feb progress17/02/15
1515: Installed detector BB18 2977-7
with 3 modified kapton cables, one unmodified
 22x 
  35   Mon Feb 16 12:17:21 2015 Patrick Coleman-SmithMACB update for 50Mhz external clock This version of the MACB has an additional
selection at 5 for a ROOT module.
This will operate the Correlation
 macb_top_revB_16Feb15.jed 
  34   Mon Feb 16 09:41:45 2015 Patrick Coleman-Smith[How To] Set up the Raspberry Pi for PuTTYWhen logged in and before opening PuTTY
open a cmdtool window.
cd /dev
  
  33   Mon Feb 16 06:17:31 2015 TD, AEV & CGMonday 16th Feb progress16/02/2015
1500: AIDA moved into operational
position.
 10x 
  32   Sun Feb 15 22:30:48 2015 TDJulabo FL11006 Operating Manual   Julabo_FL11006.pdf 
  31   Sun Feb 15 06:12:00 2015 TD, AEV & CGHow to mount USB disk with NTFS
Mount external USB expansion disk with NTFS
filesystems 
  
  30   Tue Feb 10 16:01:50 2015 Chris Griffin, Alfredo EstradeHigh data rate - Pause/Resume06/02/15
 A look at the data rate at
which Pause/Resumes start to cause missing
 6x 
  29   Mon Feb 9 11:52:52 2015 Patrick Coleman-Smith[ How To ] Integrating AIDA with other systems This document details how to integrate
AIDA with other systems.
 Integrating_AIDA_with_other_Acquisition_Systems.pdf 
  28   Fri Jan 30 15:27:35 2015 Alfredo Estrade[Analysis] 207Bi source (R61): check of monitor spectra
A first look at the data from the 207Bi source
(run described in previous elog entry, ID
 7x 
  27   Fri Jan 30 13:02:35 2015 Alfredo Estrade[Data] R61 (207Bi source) and R62-R65 (pulser walk-through)Jan 22, 2015

R61: 207Bi source spectra accumulated during
  
  26   Thu Jan 29 15:57:01 2015 Patrick Coleman-Smith[How To] AIDA power supply alteration document I've added the power supply change
document.
Please have a look and let me know
 Power_Supply_setup_and_options_for_RIKEN_February_2015.pdf 
  25   Wed Jan 28 16:19:05 2015 Patrick Coleman-Smith[How To] Loading new firmware into a FEE64Log into the FEE64 module using telnet.
use root
enter =>  /usr/sbin/flash_unlock
  
  24   Wed Jan 28 16:12:52 2015 Tom DavinsonAIDA Tests at STFC DL - 27-28.1.15 - TD & PCSMSL type BB18-1000 2998-22 bias +200V I_L
+3.52uA
 IMG_0881.JPGIMG_0882.JPGIMG_0883.JPG 
  23   Thu Jan 22 14:26:10 2015 Alfredo and Tom[DATA] R49: alpha background radioactivityJan20-21, 2015

 ASIC_settings_Jan20_2015.pngR49few_a_bckgrnd_multiplicity.pngR49few_a_bckgrnd_xy.pngR49few_a_bckgrnd_dt_event.pngR49few_a_bckgrnd_EfEb.png 
  22   Thu Jan 22 13:50:33 2015 Alfredo and TomFurther measurements with filtered PSUJan 20, 2015

Test settings: DSSD biased at 100V, with
  
  21   Wed Jan 14 15:29:01 2015 PatrickFiltered switch mode PSU performanceTrying the AIDA format power supply with
the simple filters installed.
The detector is attached and HV of
  
  20   Wed Dec 3 12:13:03 2014 Alfredo EstradeIV curve with CAEN N1419Measured IV curve for BB18 DSSD with new CAEN
HV supply. Settings as in previous elog entry:
 IV_dec14.PNG 
  19   Thu Nov 20 14:05:21 2014 Tom DavinsonAIDA Tests at STFC DL - PCS, TD
Configuration per Elog entries:
 20x 
  18   Fri Oct 24 16:02:26 2014 Alfredo Estradebench tests with pulserPerformed pulser measurements with test
setup at Daresbury lab, with main purpose
of remembering how to operate the system!
 nnaida13_1.2.L_pulser_noDSSD.pngpulser_nnaida13_sample.pngnoise_nnaida11_DSSD_sample2.pngnoise_nnaida12_DSSD_sample.png 
  17   Fri Oct 24 15:05:28 2014 Patrick and Alfredonew VHDL: FEE_Riken_Apr14_21.bin New VHDL loaded in NNAIDA#11,#12,#13,#14:
/MIDAS/Aida/FEE_Riken_Apr14_21.bin
 
The code introduces
 turn_off_nnaida12_asic3.png 
  16   Sun Oct 5 22:42:56 2014 Chris GriffinDL tests on 02/10/14 A late entry for the work I carried
out on Thursday.
With the Emco box providing the HV,
 17x 
  15   Thu Oct 2 15:23:38 2014 Patrick Coleman-Smith and Chris GriffinTrial with Filtered AIDA PSUAssembled three more of the filter boards
and installed them in the AIDA PSU with the
first, wired to use the switchmode power
  
  14   Wed Oct 1 18:37:42 2014 Chris Griffin01/10/2014 Tests @ DLKept largely the same settings at the entry https://elog.ph.ed.ac.uk/AIDA/4
Same ASIC
settings
 11x 
  13   Wed Oct 1 15:41:07 2014 Patrick Coleman-SmithPower supply filters #3 Measuring the signal at the FEE64
end.
+5v , -6v , +7v, +7v 
 RTOScreenshot_2014-10-01_17_152532.pngRTOScreenshot_2014-10-01_18_152907.pngRTOScreenshot_2014-10-01_19_152935.pngRTOScreenshot_2014-10-01_20_153021.pngRTOScreenshot_2014-10-01_21_153113.png 
  12   Wed Oct 1 15:15:32 2014 Patrick Coleman-SmithPower supply filters2.0.L FWHM:14.26
2.15.L ( 270pF )  FWHM : 119.04
(ooops found the 'scope channel was
 14x 
  11   Wed Oct 1 13:28:03 2014 Patrick Coleman-SmithPower supply filtersThe new pcb for the power supply filter
arrived.
I assembled the components ( after
 RTOScreenshot_2014-10-01_1_121051.pngRTOScreenshot_2014-10-01_0_121012.png 
  10   Thu Sep 25 11:53:34 2014 Patrick Coleman-SmithBackup a step to check ASICsDisconnected the adaptors with the detector.
Added the adaptors with the kapton
cables only attached.
  
  9   Thu Sep 25 11:35:18 2014 Patrick Coleman-SmithRemoving the MACB from the systemI have been wondering if the 0v path from
the FEE64s to the MACB where they are joined
is a possible problem.
  
  8   Mon Sep 22 09:34:37 2014 Patrick Coleman-SmithClue to difference between ASICs 1&2 and 3&4While investigating a VHDL conundrum I
have noticed that the Mux ADC serial readout
clock has a 'FAST' slew rate on ASICs 1&2
  
  7   Thu Sep 18 11:18:46 2014 Patrick Coleman-SmithTrying the Liverpool HV supplyThe SY1527 supply was delivered with three
modules.
A cable has been made with LEMO00
  
  6   Mon Sep 15 13:51:28 2014 PatrickOdd spectra from running nnaida2 for 3 hours I'm running nnaida2 with the PB-5
and an old adaptor.(1pF)
I've seen spectra like this before
 nnaida2_3hours 
  5   Thu Sep 11 17:29:59 2014 Tom DavinsonAIDA Tests at STFC DL - To Do list
In no particular order of priority:
  
  4   Thu Sep 11 16:12:06 2014 Tom Davinson and photos by PatrickAIDA Tests at STFC DL - PCS, SLT, TD
Changes from configuration described by Elog
entry https://elog.ph.ed.ac.uk/AIDA/3
 19x 
  3   Thu Sep 11 10:16:57 2014 Tom DavinsonAIDA Tests at STFC DL - PCS, SLT, TDMSL type BB18-1000 2998-22 bias +200V I_L
+3.27uA
 19x 
  2   Wed Sep 10 09:27:43 2014 PatrickElog appreciation This is very interesting. Look forward
to many happy interactions.
  
  1   Wed Sep 10 08:42:03 2014 Tom DavinsonWelcome to the AIDA ElogThe AIDA Elog is now operational and can be
found at
  
ELOG V3.1.4-unknown