Entry  Wed Apr 10 16:45:59 2024, TD, AIDA interlock cynergy3-fsvplc-v3.pdf

Honeywell HSS DPS sensor information https://elog.ph.ed.ac.uk/AIDA/932
Entry  Thu Mar 28 15:43:47 2024, TD, Unable to start MIDAS DAQ with 1x FEE64 ( aida04 ) Screenshot_from_2024-03-28_15-43-28.pngScreenshot_from_2024-03-28_15-43-08.pngScreenshot_from_2024-03-28_15-47-49.png

At AIDA test station T9, STFC DL unable to start MIDAS DAQ with 1x FEE64 ( aida04 ) - see attachments
    Reply  Fri Mar 29 08:39:18 2024, TD, PJCS, Unable to start MIDAS DAQ with 1x FEE64 ( aida04 ) 

> At AIDA test station T9, STFC DL unable to start MIDAS DAQ with 1x FEE64 ( aida04 ) - see attachments
Entry  Thu Mar 28 11:10:09 2024, TD, Test of 4x FEE64s at AIDA test station, T9, STFC DL 22x
Test of 4x FEE64s at AIDA test station, T9, STFC DL

startup.tcl changed from 'aida01 aida03' to 'aida01 aida02 aida03 aida04'
Entry  Wed Mar 13 14:50:04 2024, NH, [HowTo] Backup and Restore Raspberry Pi SD Cards 
Micro SD cards used by the raspberry pis are cheap but prone to failing

If the system won't boot and the SD card is read only it may have failed. Best way is to buy a new micro SD card (16 or 32GB) and restore a backup
Entry  Tue Jan 30 14:18:16 2024, NH, [HowTo] Update MACB Firmware  MACB_GSI_Simple.jed
https://elog.ph.ed.ac.uk/CARME/482
Entry  Thu Dec 14 10:53:27 2023, NH, MP, CC, GA, Snout Removed 
Snout removed from S4

All detectors removed
Entry  Mon Dec 11 23:56:36 2023, TD, Tuesday 12 December 18x
00.55 Observe high frequency noise in aida02 & aida04 ( n+n FEE64s ) - attachments 1-5
      and aida05 ( p+n FEE64 )
      frequency c. 5MHz
Entry  Mon Dec 11 11:05:27 2023, TD, WR timestamp fail aida05 & aida07 11x

MACB config 
1x level 0
Entry  Mon Dec 11 09:57:54 2023, TD, Monday 11 December 27x
Water flow and temperature ( gauges outside S4 entrance ) OK

BNC PB-5 pulser connected to p+n FEE64s by diasy chain of test + inputs
Entry  Sun Dec 10 13:06:27 2023, TD, Sunday 10 December 14x
14.05 S4 closed

Water flow and temperature ( gauges outside S4 entrance ) OK
Entry  Fri Dec 8 12:55:38 2023, TD, NH, FEE64 configuration 

FEE64 configuration for 1x MSL type BB18(DS)-1000 24cm x 8cm DSSSD
Entry  Fri Dec 8 11:32:44 2023, NH, CC, VP, TD, Friday 8 December 18x

Change n+n FEE64 aida04 d8:80:39:41:f6:b7
 asic #1 faulty
Entry  Thu Dec 7 17:30:36 2023, NH, CC, VP, TD, Thursday 7 December 8x

Stack re-assembled - upstream to downstream
Entry  Wed Dec 6 16:32:03 2023, NH, Replacement of faulty Honeywell HSS-DPS sensor Honeywell_HSS-DPS_63-2711.pdf1000008603.jpg1000008604.jpg1000008605.jpg

Honeywell HSS-DPS sensor is faulty - attachments 1 & 2
Entry  Mon Dec 4 10:34:48 2023, NH, AIDA Todo for 11.12.23 
This is a short list of things todo or check before the test beam time on 11.12.23 
Updated after 15:00 CET meeting
Entry  Fri Nov 24 10:36:06 2023, NH, Friday 24 November Screenshot_from_2023-11-24_11-47-29.pngScreenshot_from_2023-11-24_11-47-39.pngScreenshot_from_2023-11-24_11-48-14.pngScreenshot_from_2023-11-24_12-00-33.png
Pulser LEMOs removed from p+n fees
Pulser connected to n+n fees: aida02 and aida04 
BNC PB-5 Polarity --> NEGATIVE
Entry  Wed Nov 22 13:44:36 2023, NH, Report - Cannot change per-ASIC Settings 
On ASIC settings page trynig to change the settings for one ASIC (e.g. ASIC1 of aida09) seems to cause all 4 ASIC settings to change

1. Ensure act on all FEEs and act on all ASICs unticked
    Reply  Thu Nov 23 10:00:16 2023, NH, Report - Cannot change per-ASIC Settings Screenshot_from_2023-11-23_10-58-30.pngScreenshot_from_2023-11-23_10-58-57.pngScreenshot_from_2023-11-23_10-59-12.pngScreenshot_from_2023-11-23_10-59-24.png
> On ASIC settings page trynig to change the settings for one ASIC (e.g. ASIC1 of aida09) seems to cause all 4 ASIC settings to change

> 1. Ensure act on all FEEs and act on all ASICs unticked
Entry  Wed Nov 22 15:12:40 2023, TD, /tmp/log8015_error log8015_error
 
Entry  Wed Nov 22 14:52:43 2023, NH, AIDA Pulser Calibration Screenshot_from_2023-11-22_15-18-08.pngScreenshot_from_2023-11-22_15-31-43.pngScreenshot_from_2023-11-22_15-21-34.pngScreenshot_from_2023-11-22_16-05-33.png
Connect pulser to all p+n FEEs

Turn on pulser, 100 Hz (attachment 3 for settings), rates OK (attachment 1)
Entry  Tue Nov 21 13:56:59 2023, NH, CC, HA, MP, AM, VP, Tuesday 21 November 8x
Connect the BB7 on top of the snout to the former aida05 (FEE above aida01)
Also remove copper busbar that is unused
Entry  Sat Nov 18 02:28:26 2023, TD, NH, JB, Saturday 18 November 10x
03.20 c. 3k per spill 13N beam to S4
      Observe scatter of events at all energies for LEC
Entry  Fri Nov 17 15:53:03 2023, TD, JB, JG, Friday 17 November contd. 25x

AIDA ASIC settuings 2023Nov16-18.55.20
     low comparator p+n FEE64s 0xa, n+n 0xf
Entry  Fri Nov 17 09:19:41 2023, TD, CC, VP, AIDA test 17/11/2023 46x
We restarted AIDA (a10277ttachment 6) this morning and checked rates (attachments 3/4) and waveforms (attachments 1/2). Temperatures are shown in attachment
5.
It seems consistent with what was observed yesterday.
Entry  Thu Nov 16 17:43:25 2023, TD, JB, CC, VP, AIDA test 16/11/2023 cont. Screenshot_from_2023-11-16_16-37-22.pngScreenshot_from_2023-11-16_16-36-25.pngScreenshot_from_2023-11-16_16-35-51.pngScreenshot_from_2023-11-16_16-35-30.png
Screenshot uploads as I hit the 50 image upload limit.
Entry  Thu Nov 16 09:09:58 2023, TD, JB, CC, VP, AIDA tests 16/11/2023 48x
Viewing AIDA status on Thursday morning 16/11/2023. 

Rates and histograms are observed with bPlast HV connected but not powered. The LIMO cables to the booster cards of bPlast are connected and the TAMEX
Entry  Wed Nov 15 10:37:00 2023, TD, Wednesday 15 November 27x

11.36 Water flow, pressure & temperature ( 19 deg C ) OK
Entry  Tue Nov 14 17:19:11 2023, TD, TapeServer, Merger, NetVar etc status Screenshot_from_2023-11-14_18-18-51.pngScreenshot_from_2023-11-14_18-18-45.pngScreenshot_from_2023-11-14_18-18-34.pngScreenshot_from_2023-11-14_18-18-29.png
 
Entry  Tue Nov 14 17:08:49 2023, TD, Report - high - unable to change ASIC settings directory in Options  Screenshot_from_2023-11-14_18-07-27.pngScreenshot_from_2023-11-14_18-07-56.png

Attempting to change the text string specifying the ASIC settings directory ( 2023Nov14-15.25.24 ) in Options produces an error - see attachments 1 & 2
Entry  Tue Nov 14 16:52:54 2023, TD, Tuesday 14 November  Screenshot_from_2023-11-14_15-37-10.pngScreenshot_from_2023-11-14_15-37-41.png

15.06 Quick test of AIDA 24cm x 8cm 'triple' DSSSD before dismounting to install 1x bPlast detector downstream of the DSSSD
Entry  Mon Nov 6 17:30:44 2023, NH, Aida Alpha Analysis alpha_hit.pngalpha_energy.pngalpha_energy_xy.pngalpha_strip_v_energy.png
Analysis of tape folder /TapeData/BG18OCT23

Using Go4 https://github.com/cej25/DESPEC_NOV23
Entry  Wed Oct 25 12:42:18 2023, CC, AIDA test Screenshot_from_2023-10-25_13-42-54.pngScreenshot_from_2023-10-25_13-43-10.pngScreenshot_from_2023-10-25_13-44-00.pngScreenshot_from_2023-10-25_13-43-46.png
Started AIDA at 1:41 pm, writing to disk: file BG18OCT2/R6, stopped at  17:26
pict1: HV supply
pict2: temperature
Entry  Tue Oct 24 10:54:14 2023, at 19:14NH, CC, AIDA test Screenshot_from_2023-10-24_11-54-48.pngScreenshot_from_2023-10-24_11-55-08.pngScreenshot_from_2023-10-24_11-55-46.pngScreenshot_from_2023-10-24_11-55-33.png
Started AIDA at 11:54am, writing to disk: file BG18OCT2/R5, stopped at 19:14

pict1: HV supply
Entry  Mon Oct 23 14:08:06 2023, NH, CC, AIDA test Screenshot_from_2023-10-23_15-08-59.pngScreenshot_from_2023-10-23_15-09-16.pngScreenshot_from_2023-10-23_15-10-01.pngScreenshot_from_2023-10-23_15-09-36.pngScreenshot_from_2023-10-23_18-20-13.png
Started AIDA at 3:05pm, writing to disk: file BG18OCT2/R4, stopped 18.30

pict1: HV supply
Entry  Mon Oct 23 10:52:06 2023, NH, CC, AIDA test Screenshot_from_2023-10-23_11-53-28.pngScreenshot_from_2023-10-23_11-53-59.pngScreenshot_from_2023-10-23_11-54-43.pngScreenshot_from_2023-10-23_11-54-54.png
Started AIDA at 11:50, writing to disk: file BG18OCT2/R3, stopped around 3 pm

pict1: HV supply
Entry  Thu Oct 19 10:39:20 2023, NH, Thursday 19 October 10x
Water Temp: 20 C - Flow felt on pipe
AIDA interlock OVERRIDE 
Entry  Wed Oct 18 17:18:57 2023, TD, Wednesday 18 October 8x
 
Entry  Thu Oct 12 16:40:21 2023, TD, background alpha 13x

start 14.55
Entry  Thu Oct 12 13:02:50 2023, TD, Thursday 12 October contd. 50x

      ASIC settings 2021Apr29-13-16-00
      slow comparator 0xa ( all p+n junction FEE64s ) and 0xf ( all n+n Ohmic FEE64s )
Entry  Thu Oct 12 09:12:34 2023, TD, Thursday 12 October 47x
10.10 Water flow & temp OK
      Power ON
Entry  Wed Oct 11 16:53:20 2023, TD, Wednesday 11 October contd. 14x
      CAEN N1419ET ch 2 - all outputs non-floating ( internal LK fitted )
      Standard coaxial HV cable chained to aida12, aida03, aida11, aida09, aida01 & aida10
      aida04 LK1 ( local gnd ) fitted
Entry  Wed Oct 11 09:37:30 2023, TD, Wednesday 11 October 48x

10.00 Water flow & temp OK
      Power ON
Entry  Tue Oct 10 08:38:37 2023, TD, Tuesday 10 October 40x

09.38 Water flow & temp OK
      Power ON
Entry  Mon Oct 9 14:29:12 2023, TD, Monday 9 October contd. Screenshot_from_2023-10-09_15-40-36.png

15.20 aida10 LK4 ( front f/p -> gnd ) fitted - investigate impact aida10 asic #4 edge channels
      DSSSSD HV bias +100V >+50uA
Entry  Mon Oct 9 09:03:10 2023, TD, Monday 9 October 50x
09.55 Water pressure and temp OK
      Power on
Entry  Sun Oct 8 14:51:59 2023, TD, Sunday 8 October contd. 28x

Slow comparator 0xf
Entry  Sun Oct 8 11:44:35 2023, TD, Sunday 8 October 50x
12.22 USB-controlled ac mains relay - interlock overidden
      Water flow OK. Water temp 19 deg C OK.
      Power on.
Entry  Tue Oct 3 10:16:06 2023, TD, nnrpi2 scripts 
pi@raspberrypi:~ $ cat ./caen_screen.sh
if ! screen -list | grep -q "caenhv"; then
screen -f -S caenhv /dev/ttyACM0 9600
Entry  Tue Oct 3 09:14:59 2023, TD, Tuesday 3 October Screenshot_from_2023-10-03_11-49-17.pngScreenshot_from_2023-10-03_12-22-30.png

09.45 Power up
Entry  Mon Oct 2 14:03:42 2023, TD, Monday 2 October Screenshot_from_2023-10-02_15-03-02.pngScreenshot_from_2023-10-02_15-02-55.pngScreenshot_from_2023-10-02_15-02-46.png

15.00 DSSSD bias +60V +6.44uA - breakdown above c. 60V, bias +100V leakage current +20-30uA
Entry  Sun Oct 1 12:38:56 2023, TD, Sunday 1 October 13x
12.50 Power up

      All system wide checks OK
Entry  Sat Sep 30 16:37:06 2023, TD, Honeywell HSS-DPS fault 

The Honeywell HSS-DPS dew point sensor indicator ( red LED ) is flashing c. 0.5Hz indicating humiidity > 90+/-3 %
Entry  Sat Sep 30 12:14:52 2023, TD, Satuurday 30 September 10x
12.54 Power up

      All system wide checks OK
Entry  Thu Sep 28 16:03:40 2023, TD, Thursday 28 September 10x

17.00 USB-controlled ac mains relay - no water interlock ( yellow ) LED
      Water temperature ( station outside S4 entrance ) c. 19 deg C and pressure OK
Entry  Thu Aug 31 15:01:11 2023, TD, Test of CAEN N1419B - T9, STFC DL 7x

Noise test of CAEN N1419B in T9, STFC DL.
Entry  Wed Aug 30 15:30:50 2023, TD, Test of AIDA ASIC mezzanines with FEE64s - summary 13x
Test of ( previously bench-tested OK ) AIDA ASIC mezzanines using FEE64 nnlycca5 ( MAC d8:80:39:41:d7:c3 )

AIDA test station STFC DL, T9 - see attachments 12-13
Entry  Mon Aug 21 13:17:54 2023, TD, Silena 7710 HV test - JCMB 21.8.23  11x
Silena 7710 - see attachment 1

Bias -60V
Entry  Sun Aug 20 16:21:45 2023, TD, Silena 7710 HV test - JCMB 20.8.23 6x
Silena 7710 - see attachment 1

Bias -60V
Entry  Sat Aug 19 14:52:42 2023, TD, BNC PB-4 & BNC PB-5 pulser test - JCMB 18.8.23 21x
BNC PB-4 - see attachment 1

Amplitude 35,000
Entry  Wed Aug 9 14:40:28 2023, Carole, Nic, Jeroen, AIDA HV SUPPLY & PULSER TEST AIDA_PulserTest_0908_FullPulse.pngAIDA_PulserTest_09.08_5mV_10us_HVOFF.pngAIDA_PulserTest_0908_10mV_10us_50HV.pngHV_0V_090823_1500_wPulser.pngHV_-50V_090823_1500_wPulser.png
Tests with the HV supply (CAEN N1419ET) and Pulse Generator ( BNC PB-5 ) in the detector lab on the crate behind the DEGAS detectors, carried out the
9th August 2023

Both modules were plugged
Entry  Fri Aug 4 10:04:58 2023, TD, Friday 4 August contd. 17x

10.45 Power cycle and reboot
Entry  Fri Aug 4 09:07:08 2023, TD, Friday 4 August 23x

07.00 DAQ stopped
      Overnight run for background alphas
Entry  Thu Aug 3 14:16:12 2023, TD, Thursday 3 August contd. 21x

15.16 DSSSD bias +100V leakage current +8.415uA
Entry  Thu Aug 3 09:21:26 2023, TD, Thursday 3 August 47x

10.20 DSSSD bias +100V leakage current +6.565uA - attachment 1
Entry  Wed Aug 2 15:39:52 2023, TD, Wednesday 2 August contd. 11x
16.22 Add LK1 to aida01
      DSSSD bias -100V leakage current -7.950uA
Entry  Wed Aug 2 08:44:00 2023, TD, Wednesday 2 August 48x

09.40 Al snout electrically connected ( < 1 Ohm ) to Al gasket and Al base plate
      Al snout electrically isolated ( > 20 MOhm ) from aida02 FEE64 adaptor PCB and AIDA support frame
Entry  Tue Aug 1 08:50:36 2023, TD, Tuesday 1 August 30x

09.50 DSSSD bias +100V leakage current +9.255uA - attachment 2
Entry  Mon Jul 31 09:43:37 2023, TD, Monday 31 July 44x

10.43 DSSSD bias +100V leakage current +7.550uA
Entry  Mon Jul 24 08:54:48 2023, TD, Monday 24 July 17x

09.54 DSSSD#1 bias +100V leakage current +9.065uA
Entry  Mon Jul 24 08:39:39 2023, TD, aida10 sys console output & aida10 options sys_console_aida10.txtScreenshot_from_2023-07-24_09-48-03.png
Options and system cosnole disagree about which version of the DataAcq program is in use?
Entry  Sun Jul 23 08:50:48 2023, TD, Sunday 23 July 19x
09.50 Cooknell HV2
      2x + polarity, grounded HV channels
Entry  Sat Jul 22 08:17:48 2023, TD, Saturday 22 July 26x
09.20 CAEN N1419ET 
      Floating outputs
      Channel #3 + polarity, Channels #0-2 - polarity
Entry  Sun Jul 16 14:20:31 2023, TD, Sunday 16 July contd. 27x
15.20 All ERNI pins of aida01 adaptor PCB OK => FEE64 #1 ASIC #2 channel #5 issue faulty test C? faulty ASIC channel?

      Fitted drain wire from aida06 & aida08 adaptor PCBs to FEE64 cooling plates
Entry  Sun Jul 16 09:36:40 2023, TD, 15-16 July 2023 40x

Saturday 15 July
Entry  Fri Jul 7 11:59:06 2023, TD, Test of AIDA FEE64 - summary 11x
Test of AIDA FEE64s 

ISOL test station STFC DL, T9
Entry  Fri Jul 7 10:52:34 2023, TD, PJCS, Test of AIDA FEE64 d8:80:39:42:0d:0b ( aida03 ) - ASIC mezzanine replaced 16x

Test of AIDA FEE64 d8:80:39:42:0d:0b ( aida03 ) - ASIC mezzanine replaced
Entry  Fri Jul 7 10:15:09 2023, TD, Test of AIDA FEE64 d8:80:39:41:f6:ee ( aida01 ) - HDMI connector replaced 17x

Test of AIDA FEE64 d8:80:39:41:f6:ee ( aida01 ) - HDMI connector replaced. Cooling plate fitted - no base plate.
ISOL test station STFC DL, T9
Entry  Thu Jul 6 10:20:25 2023, TD, Unable to start Rly16 server Screenshot_from_2023-07-06_10-18-59.png

Unable to start Rly16 server - see attachment 1
Entry  Wed Apr 12 12:32:13 2023, PJCS, ASIC power short problem Mezzanine_Under_test_Wider_view_resized.jpgMezzanine_Under_test_resized.jpg
I have taken videos with an Infrared camera of the power being supplied to one isolated ASIC on a mezzanine.

The power supply is a bench supply with current limit set to 3A.

The centre of the ASIC glowed white hot for a short time and then the whole ASIC shows as hot. Ths the short is on the ASIC and not the bond
Entry  Wed Mar 1 16:42:06 2023, Further results from Mezzanine bench tests, PJCS mezz_cap_gone_resized.jpgmezz_resistors_resized.jpg
Carried out some further work on failed mezzanine modules.

Inspected them externally and removed the copper block, internally with a bench microscope.

Found two obvious faults ..... broken components with scrambled pcb tracks.
Entry  Thu Feb 23 16:15:31 2023, TD PJCS, Bench test of AIDA FEE64 mezzanines 7x

Attachments 2 & 7 AIDA FEE64 mezzanine with
                  1) adaptor PCB connected to ERNI input connector
Entry  Mon Apr 19 15:10:55 2021, OH TD, Less HEC events than expected in DSSD3 Capture.PNG
we are noticing we appear to see less implant events in detector 3 than we expect. This was first noticed in the xy spectra of the DSSD in the Go4 online.
As part of testing we have lowered the threshold in aida09 which from the xy appeared to have less events.
Entry  Tue Feb 9 11:44:21 2021, OH, TD, CA, LS, 9th Feb GSI Dry run 16x
Database file - 2019Dec19-16.19.51
Current threshold at 0x64
Entry  Thu Nov 14 07:57:46 2019, TD, AIDA moved from in-beam position at F11 

To make room for the installation of an MR-TOF device at F11, AIDA and DTAS have been removed 
from their in-beam position at F11.
Entry  Fri Jun 21 09:57:15 2019, CG, B2F network cables 
AIDA network cables in B2F disconnected, looped and cable tied to hand rail, out of the way.

Labelled AIDA1/AIDA2 according to which network switch they belong to.
Entry  Fri Jun 21 01:08:35 2019, CA, CB, Friday 21 June 21junSync.png20june_2319_temps.png21jun_bias.png
09.08 all system wide checks okay *except* naida7 fails adc calibration
      mismatch between sync pulses received from master and FEE64 - attachment 1
Entry  Thu Jun 20 07:42:54 2019, CA, TD, AIDA shutdown checklist 
stop the daq

pause merger
Entry  Thu Jun 20 07:35:46 2019, CA, TD, Bias & leakage current spreadsheet AIDA_leakage_current(1).xlsx

https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=1560332343
Entry  Thu Jun 20 02:37:55 2019, CA, CB, TD, CG, DK, Thursday 20 June 23x
10.37 Post - beam, AIDA & DTAS run only
      DTAS stop run 164
      AIDA file R2_1012
Entry  Wed Jun 19 08:30:36 2019, CG, Wed Jun 19 16.00 - end of run AIDAimplants.png
16.10 DAQ continues as before.
      Merger rate ~700k items/s and ~5.3Kb/s
      Individual FEE rates remain roughly constant
Entry  Tue Jun 18 23:58:46 2019, CB, Wed Jun 19 8:00-16:00  19x
08:00 Shift change
      No change in settings
Entry  Tue Jun 18 16:14:03 2019, CA, Wednesday 19 June 00.00 - 08.00 shift 32x
00.00 Shift Change

      DAQ continues ok 
Entry  Tue Jun 18 08:03:20 2019, DK, Tuesday 18 June 16:00 - 24:00 15x
Shift change

16:00 
Entry  Mon Jun 17 16:01:27 2019, CB, CG, OH, TD, Tuesday 18 June 00:00 - 16:00 34x
00:00 New day. The DAQ continues OK

      Beam setting 2 for enhanced yield of Sn100
Entry  Mon Jun 17 08:03:37 2019, CA, CB, TD, OH, Mon Jun 17 16:00-24:00 19x
16:04  DAQ continues running OK
       All system-wide checks OK except nnaida7 ADC calibration fails
       FEE64 temperatures OK - attach 1
Entry  Mon Jun 17 03:01:04 2019, CA, TD, OH, PID plot and selected isotope implantation rates 2hrPID.pdf
PID plot produced from 2 hours of merged data - attachment 1

Z on y-axis, A/Q on x-axis
Entry  Mon Jun 17 02:31:53 2019, CA, TD, OH, Monday 17 June 08.00-16.00 21x
10.41 DAQ continues OK file RIBF147/R2_352

      100Sn setting, no degrader
Entry  Sun Jun 16 16:00:58 2019, ML, CG, OH, Monday 17 June 2019 17x
It's a new day, it's a new log entry !!

01:25 DTAS run 46 started
Entry  Sun Jun 16 10:06:21 2019, TD, CG, FEE64 nnaida14 noise issues 16x

Attachments 1, 3, 5 & 7 *.L spectra log scale
Entry  Sun Jun 16 04:50:03 2019, CA, Tests of calibration on beta data 25x
Analysis of RIBF148/R5_170_190, with 500 < E < 1000 keV energy cut

Note also a 600 keV energy difference cut was applied when sorting the data.
Entry  Sun Jun 16 04:09:40 2019, CA, CB, ML, TD, CG, Sunday 16 June noon-midnight 16x
12.10 DAQ continues OK file RIBF147/R2_145

      100Sn setting, no degrader
Entry  Sat Jun 15 16:53:22 2019, CB, OH, DK, ML, Sunday 16 June 37x

00.30 AIDA file R2_26
      DTAS run 007
Entry  Sat Jun 15 01:05:41 2019, CA, CB, TD, CG, OH, DK, ML, Saturday 15 June 47x
09.05 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 75% M-H markers
      Temperature +24.1 deg C dew point +8.3 deg C RH 36.2%
Entry  Fri Jun 14 10:33:44 2019, OH, CA, TD, CG, CB, DK, Friday 14th June 22x
Friday 14th June 

Authors: TD, DK, CB
Entry  Thu Jun 13 05:49:37 2019, CA, Further tests of calibration on Alpha data 27x
Alpha data used: /May19/{R1,R2,R7,R8,R9,R11} (c. 380 hr.)

Absolute calibration calculated with relative calibrated data
Entry  Thu Jun 13 00:30:17 2019, CA, CB, TD, CG, OH, DK, Thursday 13 June 18x
08.32 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 70% M-H markers + 0.5 jugful -> c. 80% M-H markers
      Temperature +24.0 deg C dew point +9.6 deg C RH 39.0%
Entry  Wed Jun 12 01:54:04 2019, OH, TD, CG, CB, CA, Wednesday 12 June 11x
09:54 DAQ Continues ok with merger running at ~ 560k data items per second

      ASIC settings 2019May19-17.54.03
Entry  Tue Jun 11 01:45:55 2019, CA, CB, TD, CG, OH, DK, Tuesday 11 June 17x
09:46 DAQ continues ok

      all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Mon Jun 10 07:39:35 2019, CA, CB, TD, CG, OH, DK, Varying per DSSSD slow comparator thresholds 32x

DSSSDs #1-6 slow comparator 0xa = 100keV - attachments 1-4
Entry  Mon Jun 10 01:43:16 2019, CA, CB, TD, CG, OH, DK, Monday 10 June 19x
09:45 DAQ continues ok 

      all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Sun Jun 9 03:43:00 2019, CB, TD, CG, OH, Sunday 9 June 28x
11.43 DAQ continues OK

      ASIC settings 2019May19-17.54.03
Entry  Sat Jun 8 06:08:52 2019, CB, TD, Saturday 8 June 13x
14.14 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 70% M-H markers
      Temperature +25.3 deg C dew point +8.5 deg C RH 34.7%
Entry  Fri Jun 7 05:58:11 2019, TD, per FEE64 rate/20.48us versus slow comparator threshold 10x

per FEE64 rate/20.48us & 'good event' DAQ statistics 
Entry  Fri Jun 7 05:30:23 2019, TD, Friday 7 June 17x
14.05 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 70% M-H markers
      Temperature +25.6 deg C dew point +10.3 deg C RH 37.7%
Entry  Thu Jun 6 08:55:15 2019, TD, Thursday 6 June 13x
16.40 DAQ continues OK

      ASIC settings 2019May19-17.54.03
Entry  Wed Jun 5 06:57:38 2019, TD, Wednesday 5 June 13x
14.50 DAQ continues OK

      ASIC settings 2019May19-17.54.03
Entry  Tue Jun 4 07:10:27 2019, TD, Tuesday 4 June 13x
15.01 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 70% M-H markers - topup to 100% with 1x jugful water
      Temperature +25.8 deg C dew point +8.0 deg C RH 32.4%
Entry  Mon Jun 3 05:40:19 2019, TD, Monday 3 June 25x
13.40 DAQ continues OK

      ASIC settings 2019May19-17.54.03
Entry  Sun Jun 2 04:00:50 2019, TD, Sunday 2 June 21x
12.00 DAQ continues file May19/R15_169

      ASIC settings 2019May19-17.54.03
Entry  Sat Jun 1 09:14:19 2019, TD, Screenshots miscellaneous AIDA Control & Merge tabs  22x
 
Entry  Sat Jun 1 08:11:15 2019, TD, Saturday 1 June 14x
16.08 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 60% M-H markers - topup to 100% with 1x jugful water
      Temperature +25.7 deg C dew point +7.7 deg C RH 31.4%
Entry  Fri May 31 03:31:54 2019, TD, Friday 31 May 14x
11.31 DAQ continues OK

      ASIC settings 2019May19-17.54.03
Entry  Thu May 30 03:13:04 2019, TD, Thursday 30 May 16x

11.13 DAQ continues OK
Entry  Wed May 29 06:53:56 2019, TD, Report - medium - unable to monitor FEE64 logs using pi_monitor 10.png11.png12.png

Unable to monitor FEE64 logs using pi_monitor using instructions https://elog.ph.ed.ac.uk/AIDA/559
Entry  Wed May 29 06:11:34 2019, TD, Wednesday 29 May 12x
14.10 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 75% M-H markers
      Temperature +25.7 deg C dew point +8.2 deg C RH 32.4%
Entry  Tue May 28 01:37:14 2019, TD, Monday 28 May 8x
09.30 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 75% M-H markers
      Temperature +25.1 deg C dew point +9.7 deg C RH 37.9%
Entry  Mon May 27 10:31:35 2019, TD, Updated /etc/hosts & /etc/dhcp/dhcpd.conf hostsdhcpd.conf

/etc/dhcp/dhcpd.conf updated to reflect actual MAC and IP 
addresses for nnrpi1 and to add nnrpi2 to /etc/hosts
Entry  Mon May 27 08:51:04 2019, TD, Offline analysis of alpha background data files May19/R1, R2, R7, R8, R9, R11 9x
Offline analysis of alpha background data files May19/R1, R2, R7, R8, R9, R11 ( c. 380h )

1  per DSSSD m_p versus m_n
Entry  Mon May 27 08:29:02 2019, TD, AIDA position within DTAS 

AA informs me that the *centre* of the DTAS detector system is 26.7cm downstream
of the upstream edge of the upstream DTAS NaI(Tl) detectors.
Entry  Mon May 27 02:50:20 2019, TD, Monday 27 May 30x
10.50 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 60% M-H markers - topped up 1x jugful to 100% M-H markers
      Temperature +25.6 deg C dew point +9.6 deg C RH 36.2%
Entry  Sun May 26 04:14:27 2019, TD, Sunday 26 May 11x
12.14 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 60% M-H markers
      Temperature +25.8 deg C dew point +6.7 deg C RH 29.6%
Entry  Sat May 25 06:27:12 2019, TD, Saturday 25 May 12x
14.32 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 60% M-H markers
      Temperature +25.6 deg C dew point +3.1 deg C RH 23.1%
Entry  Fri May 24 07:21:31 2019, TD, Offline analysis May19/R1, R2, R7, R8 & R9 11x

Offline analysis of alpha background data files May19/R1, R2, R7, R8, R9 ( c. 310h )
Entry  Fri May 24 03:04:26 2019, TD, Friday 24 May 15x
11.04 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 75% M-H markers
      Temperature +26.1 deg C dew point +4.2 deg C RH 24.4%
Entry  Wed May 22 07:36:08 2019, TD, Screenshots miscellaneous AIDA Control tabs 13x
 
Entry  Wed May 22 06:08:29 2019, TD, Wednesday 22 May 15x
14.08 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 75% M-H markers
      Temperature +26.5 deg C dew point +6.2 deg C RH 27.6%
Entry  Mon May 20 02:16:58 2019, CA, TD, Monday 20 May 2019 16x
10:18 DAQ Continues ok
      Alpha run continues - Currently on file R8_2
Entry  Sun May 19 02:28:07 2019, OH, TD, CA, Sunday 19 May 11x
10:28 DAQ Continues ok
      Alpha run continues - Currently on file R7_5
Entry  Sun May 19 02:21:43 2019, CA, Tests of low energy calibration on Alpha Data 25x
10.23 Low energy calibration program now produces relative gain coefficients in a format that can be used with AIDASort

      using sorted alpha data Oct18/R29*
Entry  Sat May 18 04:47:22 2019, TD, Saturday 18 May 17x
12.47 DAQ continues OK to file May19/R7_3

      alpha background
Entry  Fri May 17 08:10:05 2019, TD, AIDA+DTAS @ BigRIPS F11 10x
 
Entry  Fri May 17 02:15:56 2019, CA, TD, OH, Friday 17 May 15x
10.18 DAQ continues OK to file May19/R5_1

      alpha background
Entry  Thu May 16 02:13:10 2019, CA, OH, TD, Thursday 16th May 16x
10:13 all system wide checks OK *except* nnaida7 fails ADC calibration

      FEE64 temperatures OK - see attachment 1
Entry  Wed May 15 02:17:23 2019, CA, OH, TD, Wednesday 15 May 20x
10.18 DAQ continues OK to file May19/R2

      alpha background
Entry  Tue May 14 02:19:20 2019, CA, OH, TD, Tuesday 14th May 2019 11x
10.20 System wide checks ok (except naida07 ADC calibration failure)

      FEE temperatures ok (attachment 1)
Entry  Mon May 13 10:13:26 2019, TD, AIDA with 25MHz external clock does not work ... ! 2.png

OH setup AIDA external clock using  Tektronix AFG3102 - settings as follows
Entry  Mon May 13 10:00:01 2019, TD, Report - low - SETUP/Perform Timestamp Resync produces error message 1.png

AIDA@RIKEN
Entry  Mon May 13 03:43:08 2019, CA, TD, OH, Sunday 12 May 14x

19.12 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Mon May 13 03:23:58 2019, CA, TD, OH, Monday 13 May 18x

09.55 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Sat May 11 02:50:14 2019, CA, OH, TD, Saturday 11th May 2019 190511_1053_stats.png190511_1053_temp.png190511_1054_bias.png
10:52 system wide checks ok, except naida07 fails ADC calibration
      good event statistics, rates in naida19,20,23,24 high (attachment 1)
      FEE temperatures ok (attachment 2)
Entry  Fri May 10 05:58:01 2019, CA, OH, TD, Friday 10 May 2019 12x
11.00 - chiller refilled and switched on
        set to 20 degrees celsius
Entry  Tue Mar 26 14:02:59 2019, OH, Inventory to be shipped back 
Inventory is currently packaged up under the AIDA desk in B3F

Entry  Sun Nov 18 02:02:48 2018, TD, Latest detector bias & leakage current spreadsheet (URL and csv & xlsx files) AIDA_leakage_current(17).xlsxAIDA_leakage_current_-_Sep2018.csv
https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=1347508769
Entry  Fri Nov 16 06:01:47 2018, CA, High Energy Channel Ex vs Ey for different degrader thicknesses 2_3HECexey.png2_8HECexey.png3_0HECexey.png3_3HECexey.png
15.04 Plots of X Energy vs Y Energy for each detector, and for 4 different Al degrader thicknesses, as indicated
on each graph. (Attachments 1-4)
Entry  Fri Nov 16 04:47:39 2018, CA, TD, OH, Correlation analysis at different degrader Al thickness 3mmcorr.png181116_1350_det12.png181116_1351_det34.png181116_1352_det56.png
13.53 Correlation analysis plot of all detectors with 3.3mm Al degrader thickness (attachment 1)
 
13.54 Correlation analysis plot of detectors 1 and 2 with 3mm, 2.3mm and 2.8mm degrader thickness (attachment 2)
Entry  Thu Nov 15 22:55:38 2018, CA, TD, OH, LS, Friday 16th November 08.00 - 16.00 42x
07.56 DAQ continues - AIDA file RIBF148/R5_822
      165Pm BigRIPS setting + 2.8mm Al degrader
Entry  Thu Nov 15 15:05:33 2018, LS, Friday 16 November 00.00 to 08.00 9x

00.25 System wide checks ok * except nnaida 7 fails adc*
      FEE Temps ok - attachment 1
Entry  Thu Nov 15 06:52:09 2018, OH, Thursday 15th November 16:00 - 24:00 11x
15:51 DAQ continues - AIDA file RIBF148/R5_664
      165Pm BigRIPS setting + 2.8mm Al degrader
Entry  Wed Nov 14 22:54:11 2018, LS, Thursday 15th November 08:00 - 16:00 10x

08.10 BRIKEN stop
      AIDA file RIBF148/R5_587
Entry  Wed Nov 14 14:46:47 2018, CA, Thursday 15th November 00:00 - 08:00 25x
23.58 DAQ continues ok (RIBF148/R5_505)

00.09 system wide checks ok, except nnaida7 ADC calibration failure
Entry  Wed Nov 14 07:43:35 2018, TD, Wednesday 14 November 16:00 - 00:00 21x
16.44 DAQ continues OK - AIDA file RIBF148/R5_432
      165Pm BigRIPS setting + 2.8mm Al degrader
Entry  Tue Nov 13 22:58:49 2018, OH , Wednesday 14 November 08:00 - 16:00 30x
08:01 BigRips and BRIKEN stop
      AIDA on file R5_346
Entry  Tue Nov 13 14:27:38 2018, LS, Wednesday 14 November 00:00 to 08:00 9x

00:00 BRIKEN stop AIDA file RIBF148/R5_269 
Entry  Tue Nov 13 07:35:37 2018, CA, TD, OH, Tuesday 13 November 16:00 - 00:00 20x
16.36 DAQ continues ok
      AIDA file RIBF148/R5_198
      BRIKEN file 37
Entry  Tue Nov 13 01:41:12 2018, TD, Offline analysis RIBF148/R5_130 to _139 20.png21.png22.png

10.41 FEE64 ADC data synchronised - attachment 1 
Entry  Mon Nov 12 23:03:53 2018, TD, Tuesday 13 November 08:00 - 16:00 23x

08.03 DAQ continues - AIDA file RIBF148/R5_117
      165Pm BigRIPS setting + 3mm Al degrader
Entry  Mon Nov 12 14:51:44 2018, OH, Tuesday 13 November 00:00 - 08:00 12x
00:00 AIDA currently on file R5_38
      BRIKEN on file 181112_2321_165Pm_019.dlt (AIDA file at start R5_33)
      BigRIPS run 1004
Entry  Mon Nov 12 08:59:43 2018, LS, CA, TD, Monday 12 November 6pm onwards 28x


17:59 DAQ continues OK
Entry  Sun Nov 11 21:35:42 2018, CB, OH, CA, LS, Monday 12 November 20x
06:35 DAQ Continues ok
      Stats ok - attachment 1
      FEE Temps ok - attachment 2
Entry  Sat Nov 10 21:53:29 2018, CA, CB, TD, OH, Sunday 11 November 21x
06.53 DAQ continues OK - data transfer disabled

06.55 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Sat Nov 10 04:06:20 2018, TD, Less commonly recorded AIDA control tabs 20x

Some less commonly recorded AIDA control tabs whilst DAQ going (data transfer disabled)
Entry  Sat Nov 10 03:50:00 2018, CA, CB, TD, OH, Saturday 10 November 9x

12.35 DAQ continues OK - data transfer disabled
Entry  Fri Nov 9 02:26:58 2018, TD, Offline analysis R18, R27, R29 - alpha background 8x
Offline analysis of Oct18/R18_0 to 2, R27_0, 4 & 9, R29_0, 7 & 30

alpha background, BNC PB-4 pulser OFF, LEC/MEC slow comparator 0x64 (~1MeV)
Entry  Thu Nov 8 23:35:50 2018, OH, TD, CA, CB, Friday 9 November 23x
08:36 DAQ still running
      Not writing data to disk
Entry  Thu Nov 8 00:55:18 2018, CA, CB, TD, OH, Thursday 8th November 14x
09.57 DAQ still running (R29_29)
      System wide checks ok, except nnaida7 ADC calibration failure
      
Entry  Wed Nov 7 01:00:58 2018, CA, CB, TD, OH, PJW, Wednesday 7 November 13x
10.02 DAQ still running, on file Oct18/R27_9
      Merger and TapeServer ok, no error warnings in terminals
Entry  Tue Nov 6 00:13:00 2018, CB. PJW, TD, OH, CA, Tuesday 6 November 14x
09:13 DAQ still running R18_1
      Merger and TapeServer OK
      System wide checks ok, except for nnaida7 ADC calibration failure
Entry  Mon Nov 5 10:02:52 2018, TD, Offline analysis R16 - beam background 200.png201.png202.png203.png
Offline analysis of Oct18/R16_0 to 11

Entry  Mon Nov 5 01:40:10 2018, CA, CB, TD, OH, PJW, Monday 5 November 16x
10.40 Lowered slow comparator threshold from 100 to 10
      Good event statistics ok (attachment 1)
      System wide checks ok, except for nnaida7 ADC calibration failure
Entry  Sun Nov 4 04:31:49 2018, TD, Offline analysis R4 28x
Offline analysis of Oct18/R4_0 to _2

alpha background and pulser
Entry  Sun Nov 4 01:11:41 2018, CA, CB, TD, OH, PJW, Sunday 4 November 20x
10.03 DAQ continues OK - current file Oct18/R16_9
      FEE64 LEC/MEC slow comparator threshold 0x64
      beam background
Entry  Sat Nov 3 00:49:22 2018, TD, Offline analysis R15 - beam background 50.png51.png52.png54.png55.png
Offline analysis of Oct18/R15_0 to 7

Entry  Sat Nov 3 00:37:29 2018, CA, CB, TD, OH, Saturday 3 November 9x
09.37 DAQ continues OK - data transfer disabled
      FEE64 LEC/MEC slow comparator threshold 0xa
Entry  Fri Nov 2 01:56:00 2018, TD, [How To] Recover from unable to connect to nnaida ...  

If you obtain the 'unable to connect' from one, or more, of the FEE64s try the
following procedures *before* power-cycling/rebooting all of the FEE64s:
Entry  Fri Nov 2 01:19:49 2018, TD, Offline analysis R9 - alpha background 7x
 
Offline analysis of Oct18/R9_0 to 17
Entry  Fri Nov 2 00:57:24 2018, CA, CB, TD, OH, Friday 2 November 14x
09.58 DAQ continues OK - current file Oct18/R15_6
      alpha background run
Entry  Thu Nov 1 00:24:23 2018, TD, OH, CA, Thursday 1 November 19x
09.24 DAQ continues OK - current file Oct18/R12_116
      alpha background run
Entry  Wed Oct 31 00:18:12 2018, TD, OH, CA, Wednesday 31 October 20x
09.18 DAQ continues OK - current file Oct18/R10_7
      alpha background run
Entry  Mon Oct 29 23:40:41 2018, TD, OH, CA, Tuesday 30 October 16x
08.40 DAQ continues OK - current file Oct18/R9_15

08.42 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Sun Oct 28 23:34:28 2018, TD, OH, CA, Monday 29 October  15x
08.34 DAQ continues OK - current file Oct18/R9_6

08.37 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Sun Oct 28 01:33:34 2018, CA, OH, Sunday 28 October 181028_0933_bias.png181028_0937_temp.png181028_1023_1.8.W.png181028_1024_layout8.png181028_1734_bias.png

09:33 DAQ still running, file R4_11. 
      Bias/leakage ok (attachment 1)
Entry  Sat Oct 27 01:22:43 2018, CA, OH, Saturday 27 October 181027_0927_bias.png181027_1004_temp.png181027_1410_temp.png181027_1409_bias.png
09:22 DAQ found crashed. Appears to have crashed at 20:23 last night whilst writing R3_0 to file.
      Run Control is non responsive
      Leakage currents okay - attachment 1
Entry  Fri Oct 26 03:28:10 2018, OH, CA, Friday 26 October 181026_1150_bias.png181026_1151_FEETemp.png181026_1334_Bias.png181026_1335_FEETemp.png181026_1400_Stats.png
October 25th:
In anticipation of losing access in the evening on arrival at RIKEN the following was done:
- Chiller was refilled
Entry  Wed Oct 3 10:47:06 2018, OH, Analysis of R2_0 -> R2_37 Alpha Run ExEy.pnghitPattern.pngxy.png
Data was analysed using offsets calculated based on pulser walkthroughs carried out in June 2018
Offsets appear to still be good. Ex V Ey plots - attachment 1
Entry  Wed Oct 3 07:09:03 2018, OH, TD, Current FEE Configuration Map October 3rd 2018 

             FEE Number
DSSD      A    B    C    D
Entry  Wed Oct 3 01:48:21 2018, OH, TD, Wednesday 3 October 30x
09.42 DAQ continues OK - current file Sep18/R2_36

09.42 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Tue Oct 2 01:55:11 2018, OH, TD, Tuesday 2 October 10x
09.54 DAQ continues OK - current file Sep18/R2_26

09.55 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Mon Oct 1 01:10:57 2018, OH, TD, Monday 1 October 10x
09.10 DAQ continues OK - current file Sep18/R2_16

09.15 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Sun Sep 30 01:48:27 2018, OH, TD, Current link to Google sheets leakage current log 
https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit?pli=1#gid=282765719
Entry  Sun Sep 30 01:13:47 2018, OH, TD, Sunday 30 September 8x
09.10 DAQ continues OK - current file Sep18/R2_6

09.15 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Sat Sep 29 06:25:23 2018, OH, TD, Saturday 29 September 18x
14:25 Moved from 8x DSSD setup to 6x DSSD
      Top two detectors removed.
      Detector alignments in snout unchanged so can use the 6xDSSD mark from June 2018
Entry  Fri Sep 28 02:08:07 2018, OH, TD, Friday 28 September 6x
10:08 Normal system restart ok
      System currently in 8DSSD configuration as was left in June 2018
Entry  Wed Aug 22 11:38:11 2018, OH, TD, AIDA GSI Setup Noise Tests 13x
Currently seems to be a problem with the memory check in the system wide checks that produces the message shown
- attachment 1
    Reply  Wed Aug 22 13:50:30 2018, OH, TD, Reply by PCS, AIDA GSI Setup Noise Tests 
> Currently seems to be a problem with the memory check in the system wide checks that produces the message shown
> - attachment 1
Entry  Tue Aug 21 12:29:44 2018, OH, TD, AIDA@DESPEC dhcpd.conf, dhcpd startup and log messages dhcpd.confdhcdConfStartup.txtmessagesLog.txt

Attachment 1 - DHCP configuration file /etc/dhcpd.conf
    Reply  Wed Aug 22 09:10:28 2018, OH, TD, AIDA@DESPEC dhcpd.conf, dhcpd startup and log messages 

> Attachment 1 - DHCP configuration file /etc/dhcpd.conf
Entry  Tue Jul 3 02:24:45 2018, OH, Tuesday 3 July 180703_1023_bias.png180703_1025_FEETemp.png180703_1406_bias.png180703_1406_stats.png
10:23 Bias and leakage currents ok - attachment 1
      Fee temperatures ok - attachment 2
      System wide checks ok
Entry  Mon Jul 2 02:36:41 2018, OH, Monday 2 July 180702_1036_bias.png
10:35 Bias and leakage currents ok - attachment 1
      FEE Temps ok - attachment 2
      System wide checks all ok
Entry  Sun Jul 1 08:25:24 2018, OH, Inventory 180701_Cable_Inventory.xlsx
Attached is an updated inventory of the cables and adapter boards we have in RIKEN.
Entry  Sun Jul 1 02:26:50 2018, OH, Sunday 1st July 180701_1025_bias.png
10:25 Bias and leakage currents ok - attachment 1
      FEE Temperatures ok
      System wide checks ok
Entry  Sat Jun 30 03:05:36 2018, OH, Saturday 30 June 180630_1104_bias.png180630_1327_BIAS.png180630_1335_Stats.png180630_8dssd_map.png180630_xandydssd8.png
11:05 Bias and leakage currents ok - attachment 1
      FEE temperatures ok
      System wide checks ok
Entry  Fri Jun 29 02:26:34 2018, OH, Friday 29 June 180629_1026_bias.png180629_1028_feetemp.png180629_1445_bias.png180629_1954_bias.png
10:27 Bias and leakage currents ok - attachment 1
      Fee temperatures ok - attachment 2
      Temperature 24.7C, Humdidity 44.5%, D.P +11.8C
Entry  Thu Jun 28 05:22:31 2018, OH, Analysis of R7 -> R9 lowPulserADC.pnghighPulserADC.pngalphaADC.pngalphaOld.pngExEyPulser.PNG
R7_0 -> R7_1 High Energy pulser run
R8_0 -> R8_1 Low energy puler run
R9_52 -> R9_62 Alpha run
Entry  Thu Jun 28 02:19:30 2018, OH, Thursday 28th June 180628_1018_bias.png180628_1249_bias.png180628_1922_FEE29ASIC2.png
10:18 Bias and leakage currents ok - attachment 1
      FEE Temperatures ok
      System wide checks all ok
Entry  Wed Jun 27 02:23:03 2018, OH, Wednesday 26 June 180628_1023_Bias.png180628_1023_Bias.png180626_1527_feetemps.png
10:20 Bias and leakage currents ok - attachment 1
      FEE temperatures ok
      System wide checks all ok
Entry  Tue Jun 26 05:44:44 2018, OH, Tuesday 26 June 180526_1345_Bias.png180626_2152_bias.png
04:12 TD found the nnaida14 appeared to have become noisy at some point. Biases/;eakages/temps ok
      ASIC check load appears to have fixed problem
      Noise appears to affect R9_0 to R9_51
Entry  Mon Jun 25 01:56:08 2018, OH, TD, Monday 25th June 21x
09:55 Alpha run stopped

10:45 Investigating the large noise in FEE28
Entry  Sun Jun 24 09:08:03 2018, 3OH, TD, June 2018 New Stack Configuration IMG_20180623_104349.jpgIMG_20180623_113315.jpg
Stack has been changed in configuration from a 6 DSSD stack to 8 DSSD stack.
What was detectors 1-6 are now 3-8 with 2 new detectors added to the front.
Entry  Sun Jun 24 01:40:08 2018, OH, TD, Sunday 24 June 2018 15x

09.38 DAQ continues OK
Entry  Sat Jun 23 02:44:36 2018, OH, TD, Saturday 23 June 2018 16x

      DSSSD stack dismounted yesterday to change configuration from 6x to 8x DSSSDs.
Entry  Sat Jun 23 02:28:13 2018, TD, OH, New fuses fitted to USB-controlled ac mains relay 2290195.pdf

The input fuses of the USB-controlled ac mains relay have been changed from 2x 5x20mm 250V/16A to 2x 5x20mm
250V/20A cartridge, time-lag Littelfuse 0215020.MXP
Entry  Fri Jun 22 02:50:37 2018, OH, TD, Friday 22 June 2018 60.png70.png71.pngstartup.tcldhcpd.conf
10:50 Yesterday 4 FEE modules installed for FEE64s 25-32
      dhcpd.conf updated to reflect MAC addresses of new FEE64s
Entry  Thu Jun 21 06:48:22 2018, TD, OH, DSSSD HV cabling 50.png51.png
The DSSSD HV cabling has been changed in preparation for configuration change
from 6x DSSSDs to 8x DSSSDs as follows:
Entry  Thu Jun 21 05:23:16 2018, TD, OH, Offline analysis R1 - alpha background 8x

Analysis of overnight alpha background run (June18/R1_0 ... _2) indicates that all FEE64s and DSSSDs are
operating OK.
Entry  Thu Jun 21 02:31:49 2018, TD, OH, Thursday 21 June 30.png31.png32.png33.png34.png
10.20 DAQ continues OK

10.29 DAQ stop June18/R1
Entry  Wed Jun 20 03:33:06 2018, TD, Wednesday 20 June  14x
11.09 Julabo FL11006 recirculating chiller - ON - water level OK (75%)
      Tektronix AFG3102 - CH2 ON - amplitude +5V, phase 180n deg, offset 0V, frequency 50.000000MHz
Entry  Tue Jun 19 06:08:03 2018, TD, Tuesday 19 June 2018 
13.00

Julabo FL11006 chiller
Entry  Thu Nov 23 01:12:33 2017, TD, CB, AIDA to safe shutdown state 
10.11 Detector bias OFF
      FEE64 power OFF
      BNC PB-4 OFF
Entry  Thu Nov 23 01:10:43 2017, TD, CB, Detector bias & leakage currents - October & November 2017 AIDA_leakage_current(16).xlsx
https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=282765719
Entry  Thu Nov 23 00:41:43 2017, TD, CB, Thursday 23 November  10x
09.33 Detector biases & leakage currents OK - see attachments 1 & 2
      FEE64 Temperatures OK - see attachment 3
      DAQ statistics OK - see attachment 4
Entry  Tue Nov 21 00:30:31 2017, TD, CB, Tuesday 21 November 20x
09.27 Detector biases & leakage currents OK - see attachments 1 & 2
      FEE64 Temperatures OK - see attachment 3
      DAQ statistics OK - see attachment 4
Entry  Mon Nov 20 00:53:27 2017, TD, CB, Monday 20 November 9x
09.50 Detector biases & leakage currents OK - see attachments 1 & 2
      FEE64 Temperatures OK - see attachment 3
      DAQ statistics OK - see attachment 4
Entry  Sun Nov 19 01:46:10 2017, CB, TD, Sunday 19 November 14x
10.45 Detector biases & leakage currents OK - see attachments 1
      FEE64 Temperatures OK - see attachment 2
      DAQ statistics OK - note *all* slow comparators 0xa - see attachment 3
Entry  Sat Nov 18 04:25:16 2017, CB, TD, Saturday 18 November 19x

13.27 Detector biases & leakage currents OK - see attachments 1 & 2
      FEE64 Temperatures OK - see attachment 3
Entry  Sat Nov 18 03:53:43 2017, TD, Offline analysis Nov17/R2_8-R2_16 data  22x
MIDASsort offline analysis Nov17/R2_8-R2_16 data

N.B. 
Entry  Sat Nov 18 03:37:46 2017, TD, Offline analysis RIBF128/R5_124-R5_148, Oct17/R17_31-R17_34 and Nov17/R2_8-R2_16 data 100.png101.png102.png103.png
Offline analysis of

AIDA RIBF128/R5_124 to R5_148 data "130Ag setting", June 2017 RIBF128 experiment         *yellow*
Entry  Fri Nov 17 10:03:25 2017, CB, TD, Friday 17 November 32x
19.03 DAQ started OK - data transfer not enabled

      BNC PB-4
Entry  Fri Nov 17 03:32:31 2017, CB, Julabo FL11006 recirculating chiller refilled 
12:32 Chiller found almost empty & still working at 20C. Refilled to overflow.
Entry  Sat Nov 4 23:49:14 2017, OH, Sunday 5 November 6x
08.09 DAQ running OK - data transfer not enabled

      BNC PB-4
Entry  Fri Nov 3 23:09:36 2017, TD, OH, Saturday 4 November 20x
08.09 DAQ running OK - data transfer not enabled

      BNC PB-4
Entry  Thu Nov 2 22:57:53 2017, OH, Friday 3 November 031117_0758_bias.png031117_0759_bias.png031117_0759_stats.png
10.56 DAQ running OK - data transfer not enabled

      BNC PB-4
Entry  Thu Nov 2 01:56:18 2017, TD, OH, Thursday 2 November  16x
10.56 DAQ running OK - data transfer not enabled

      BNC PB-4
Entry  Wed Nov 1 02:24:20 2017, OH, Wednesday 1 November 011117_1120_bias.png011117_1122_feetemps.png011117_1123_stats.png
11:24 DAQ running OK - data transfer not enabled

      BNC PB-4
Entry  Tue Oct 31 05:57:33 2017, TD, Offline analysis RIBF128/R5_124-R5_148 and Oct17/R31_17-R17_34 10x

Offline analysis of the AIDA Oct17/R17_31 to R17_34 data "84Ge setting"
compared to an equivalent analysis of the AIDA RIBF128/R5_124 to R5_148
Entry  Tue Oct 31 00:34:10 2017, TD, OH, Tuesday 31 October 8x
09.34 DAQ running OK - data transfer not enabled

      BNC PB-4
Entry  Mon Oct 30 01:10:28 2017, TD, OH, Monday 30 October 8x
10.10 DAQ running OK - data transfer not enabled

      BNC PB-4
Entry  Sun Oct 29 05:16:35 2017, TD, OH, Sunday 29 October 14x
14.16 DAQ running OK - data transfer not enabled

      BNC PB-4
Entry  Sat Oct 28 06:25:07 2017, TD, Waveforms 10x

For comparison with waveforms shown in https://elog.ph.ed.ac.uk/AIDA/665 and https://elog.ph.ed.ac.uk/AIDA/668
Entry  Sat Oct 28 06:09:44 2017, TD, Offline analysis Oct17/R17_31-R17_34 20x
 
Entry  Sat Oct 28 03:33:10 2017, TD, OH, Saturday 28 October 13x
11.33 DAQ running OK - date transfer not enabled

      BNC PB-4
Entry  Fri Oct 27 08:35:33 2017, TD, Offline analysis Oct17/R17_31-R17_34 8x

Offline analysis of High Energy Channel (HEC) 20GeV FSR data from AIDA data file Oct17/R17_31-R17_34
Entry  Fri Oct 27 01:58:44 2017, TD, OH, Friday 27 October 12x
09.56 DAQ stopped OK yesterday

      BNC PB-4
Entry  Wed Oct 25 18:36:46 2017, TD, OH, Thursday 26 October 28x
02.37 DAQ stalled - USB-controlled ac mains relay fuse blown
      Not writing to disk
Entry  Wed Oct 25 03:26:55 2017, TD, OH, Wednesday 25 October 7x
11.27 DAQ continues
      Not writing to disk
Entry  Tue Oct 24 03:16:07 2017, TD, OH, Tuesday 24 October 20x
11.16 DAQ continues
      AIDA file Oct17/R8_107
Entry  Mon Oct 23 02:24:14 2017, TD, OH, Monday 23 October 19x
10:18 Leakage and bias ok - Attachment 1
      FEE temperatures ok - Attachment 2
      Statistics - Attachment 3
    Reply  Mon Oct 23 11:50:09 2017, TD, OH, Mon 23 Oct - further information please. 
> 10:18 Leakage and bias ok - Attachment 1
>       FEE temperatures ok - Attachment 2
>       Statistics - Attachment 3
Entry  Sun Oct 22 02:10:03 2017, OH, Sunday 22 October 25x
10:10 DAQ found crashed
      Stopped writing to file at 05:31
      System wide checks ok
Entry  Sat Oct 21 02:48:17 2017, OH, TD, Saturday 21st October 31x
10:48 Adapter boards replaced for DSSD 1 &2 (FEEs 1,2,22 and 21)
      Previous boards were Rev D new boards are Rev E
Entry  Fri Oct 20 01:43:40 2017, OH, Friday 20th October 6x
09:43 DAQ continues ok
      System wide checks all ok
      Detector bias and leakage ok - Attachment 1
Entry  Thu Oct 19 01:40:35 2017, TD, OH, Thursday 19 October 35x

09.40 DAQ continues OK
      File /TapeData/Oct17/R1_280
    Reply  Thu Oct 19 11:32:29 2017, TD, OH, Thursday 19 October 

> 09.40 DAQ continues OK
>       File /TapeData/Oct17/R1_280
Entry  Wed Oct 18 03:57:37 2017, TD, OH, Wednesday 18 October  24x
11.57 Startup of AIDA following June 2017 shutdown

      Julabo FL11006 ON, set point +20 deg C
Entry  Sat Jun 17 11:00:55 2017, TD, Report - high - 'zero all histograms' doesn't 

The DAQ Run Control 'zero all histograms' function appears to have stopped working
- an issue related to the new RunControl/sys.tcl ... ?
    Reply  Mon Jun 19 08:52:40 2017, TD, Report - high - 'zero all histograms' doesn't 

> The DAQ Run Control 'zero all histograms' function appears to have stopped working
> - an issue related to the new RunControl/sys.tcl ... ?
    Reply  Mon Jun 19 08:58:00 2017, TD, Patrick, Report - high - 'zero all histograms' doesn't 

> The DAQ Run Control 'zero all histograms' function appears to have stopped working
> - an issue related to the new RunControl/sys.tcl ... ?
Entry  Sun Jun 18 08:01:42 2017, TD, Seagate Backup Plus Hub 8Tb USB disk #2  
aidas1> df -h
Filesystem            Size  Used Avail Use% Mounted on
/dev/mapper/vg_aidas1-lv_root
Entry  Sun Jun 18 07:57:26 2017, TD, Seagate Backup Plus Hub 8Tb USB disk #3 

N.B. data directory RIBF148 incomplete
Entry  Sun Jun 18 06:35:22 2017, TD, DSSSD bias & leakage current spreadsheet AIDA_leakage_current(15).xlsx

https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=808110721
Entry  Sun Jun 18 02:56:43 2017, TD, Sunday 18 June 11x
10.56 Detector biases & leakage currents OK - see attachments 1 & 2

      USB-controlled ac mains relay input #1 fuse blown - replaced
Entry  Sat Jun 17 05:47:58 2017, TD, Saturday 17 June 40x
13.47 DAQ continues
      AIDA file RIBF148/R10_39
Entry  Fri Jun 16 02:38:36 2017, TD, Friday 16 June 28x
10.35 DAQ continues
      AIDA file RIBF148/R10_14
Entry  Thu Jun 15 07:44:41 2017, OH, RIKEN Cable Inventory 170615_Cable_Inventory.xlsx
List of the type and quantity of cables we have at RIKEN that are not currently in use.
Entry  Thu Jun 15 02:56:32 2017, TD, OH, Thursday 15 June 18x
10.52 DAQ continues
      AIDA file RIBF148/R8_39
Entry  Wed Jun 14 07:01:34 2017, TD, Wednesday 14 June 21x
15.01 DAQ continues
      AIDA file RIBF148/R8_22
Entry  Tue Jun 13 00:11:56 2017, TD,ZLIU, Tuesday 13 June 08:00-16:00 17x

08.11 DAQ continues
Entry  Mon Jun 12 15:51:15 2017, OH, Tuesday 13 June 00:00-08:00 14x
00:02 System wide checks ok
      Good events - attachment 1
      FEE temperatures - attachment 2
Entry  Mon Jun 12 08:02:01 2017, TD, Monday 12 June 16.00-24.00 26x
16.01 DAQ continues

16.01 Detector biases & leakage currents OK - see attachments 1 & 2
Entry  Mon Jun 12 00:31:29 2017, ZLiu, TD, OH, Monday 12 June 08:00-16:00  11x
09:00   Stop DAQ  to tune the Sm beam, may need 3 hours
        AIDA file RIBF128/R9_319
        
Entry  Sun Jun 11 16:04:12 2017, DK, Monday 12 June 0:00 ~ 8:00 10x
0:04    Biases and leak currents shown as attachment #1, 12JunBias1.png
        System-wide checks: nnaida13 fails ADC calib, all others okay
        Temperatures shown as attachment #2, 12JunTemp1.png
Entry  Sun Jun 11 08:23:23 2017, PV, Sunday 11 June 16:00-00:00  21x
16:40 beam lost - stripper foil problem
      AIDA file RIBF128/R9_55
Entry  Sun Jun 11 00:07:24 2017, OH, Sunday 11 June 08:00-16:00 25x
08:10 BRIKEN and BigRIPS stops DAQs
      AIDA on file R7_1287
Entry  Sat Jun 10 15:56:31 2017, ZLiu, 0:00-8:00 11 June 2017 46x

00:35   Stop DAQ
        AIDA file RIBF128/R7_1172

00:36   Start DAQ
        AIDA file RIBF128/R7_1172
        BRIKEN file 118
        BigRIPS
file 4008

 


00:50   Detector biases & leakage currents OK - see attachments 4, 5 
        FEE64 Temperatures OK - see attachments 3
        good
Entry  Sat Jun 10 09:24:45 2017, AE, TD, Saturday 19 June 16.00-24.00 24x
17.25 Detector biases & leakage currents OK - see attachments 1 & 2
      FEE64 Temperatures OK - see attachment 3
      good events statistics stable & OK - see attachment 4
Entry  Sat Jun 10 02:40:18 2017, DK, Sat 10 June 8:00 ~ 16:00 R7_1002.txt
10:40    Put lead wall in front of AIDA during beam tuning.

12.30 BNC PB-4 Pulser OFF
Entry  Fri Jun 9 16:22:54 2017, PV, Saturday 10 June 00:00-08:00 28x
00:21  BigRIPS and BRIKEN stop their DAQ
       AIDA run file R7_826
Entry  Fri Jun 9 09:12:03 2017, ZLiu, AE, 17:00-24:00 leakage_jun9_6pm.pngstat_21.14.pngtemp2116.pngnnaida12_EL.pngnnaida9_EL.png
17:06 BRIKEN and BigRIPS stop their DAQs
      AIDA on file R7_723
Entry  Fri Jun 9 04:53:24 2017, TD, Waveforms 28x

x-scale 1000ch = 2ms
y-scale expanded
Entry  Thu Jun 8 23:57:26 2017, ZLiu, TD, 9June2017 8:00-16:00 32x

08:06 System wide checks all ok
         implantation profile - attachment 1 
         count rate - attachment 2
         Bias and leakage currents
ok - attachment 3 
         DAQstatistics

08:30 BRIKEN and BigRIPS stop their DAQs
      AIDA on file R7_604

08:32 BigRIPS starts run 3090
  
   BRIKEN starts run 85
      AIDA on file R7_604

08:44   BRIKEN and BigRIPS stop their DAQs
Entry  Thu Jun 8 16:06:21 2017, OH, Friday 9 June 00:00-08:00 9x
00:06 System wide checks all ok
      Bias and leakage currents ok - attachment 1
      Good event statistics - attachment 2
Entry  Thu Jun 8 08:11:39 2017, NN, PV, Thursday 8 June 16:00 - 24:00 (evening shift) 22x
16:13  DAQ still running

16:34  BigRIPS and BRIKEN stop their DAQ
Entry  Thu Jun 8 00:54:26 2017, OH, PW, Thursday 8 June 00:00-16-00 6x
08:54 DAQ still running

09:01 BRIKEN and BigRIPS stop daqs
Entry  Wed Jun 7 16:04:42 2017, ZL, DK, Thurs 8 June 0:00~8:00 13x
00:05  Shift change.
       Primary beam current ~4800 enA, 238U^86+ so 50 to 60 pnA.
       Biases shown as attachment #1, 08JunBias1.png
Entry  Wed Jun 7 08:02:42 2017, OH, PV, Wednesday 7 June 16:00 - 24:00 15x
16:02 System wide checks ok
      Good Events statistics (No beam at time!)- attachment 1
      Fee temperatures - attachment 2
Entry  Wed Jun 7 00:10:24 2017, NN, TD, Wednesday 7 June 08:00 - 16:00 30x
08:12    Analysis of file RIBF128/R6_438 - zero timewarps, four MBS timewarps - see attachment 1

08:23    Online analysis (per DSSSD rates) of R6_443,  see attachment 2
Entry  Tue Jun 6 15:59:19 2017, DK, Wed 7 June night shift 14x
7 June 2017   

00:05  All system-wide checks are passed
Entry  Tue Jun 6 15:26:44 2017, TD, ZL, Tuesday 06 June 16.00-24.00 29x
15.53    Bias and leakage currents ok - attachments 1 & 2 
         FEE temperatures ok - attachment 3 
         statistics good events still seeing noise on 13 and 14 - attachment 4 
Entry  Tue Jun 6 07:44:19 2017, TD, Preamplifier waveforms 25x
Preamplifier waveforms sampled by 50MSPS, 14 bit ADC

Entry  Tue Jun 6 00:57:49 2017, PJW, TD, Tuesday 6 June 08.00-16.00 16x
08.57 Stop DAQ
      AIDA file RIBF128/R6_24
Entry  Mon Jun 5 16:02:50 2017, OH, PV, AE, Tuesday 06 June 00.00-08.00 40x
00:03 BigRIPS starts run 3007
      BRIKEN starts run 007
      AIDA on file R5_146
Entry  Mon Jun 5 08:43:24 2017, CB, TD, PW, DK, Monday 5 June 16:00 to 24:00 38x
16:43  Leakage currents OK - see attachment 1
       FEE64 temperatures OK - see attachment 2
       Statistics show rate increase in nnaida13, 21. Reason unclear - see attachment 3
Entry  Sun Jun 4 23:50:24 2017, CB, PW, DK, TD, Monday 5 June 08:00 to 16:00 24x
07:50  Leakage currents OK - attachment 1
       FEE64 temperatures OK - attachment 2
       Good event statistics OK - attachment 3
Entry  Sun Jun 4 16:00:49 2017, NN, OH, Monday 5 June 00:00 to 08:00 19x
23:59   BigRIPS and Briken stop their DAQ
        AIDA run file R2_245
Entry  Sun Jun 4 08:13:10 2017, LHB, PV, NN, 4th June 16.00-00.00 28x
16.25  *All* system wide checks OK *except* ADC calibration of nnaida1, 21 and nnaida1 clock status (status=6)
       FEE64 Temperatures OK - see attachment 1
       Good events statistics OK - see attachment 2 
Entry  Sun Jun 4 00:06:18 2017, OH, TD, PJW, Sunday 4 June 08.00-16.00 32x
08:00 DAQ found stopped at around 04:49 - Attachment 1
      Time obtained from last file written as part of R1
      Tape server still running - Attachment 2
Entry  Sat Jun 3 08:07:48 2017, OH, CB, AE, Saturday 3 June 16:00-24:00 1.png2.png3.png4.png5.png
16:26 DAQ continues OK
      all system wide checks ok, *except* nnaida1 clock status (6), nnaida1, 21 ADC calibration
      Leakage currents OK - attachment 1
Entry  Sat Jun 3 05:32:09 2017, TD, Report - high - MBS correlation scaler anomalies  testmbs

The analysis of files RIBF127R1/R1_1478 to R1_1486 is appended. This sequence of files should
encompass a correlation reset request (from BRIKEN to AIDA)
Entry  Sat Jun 3 00:00:11 2017, LJB, PW, TD, OH, Saturday 3 June 08.00-16.00 19x
08.29 BRIKEN 100; BigRIPS 1111 stopping run.
      AIDA on run R1_1429
Entry  Fri Jun 2 16:02:37 2017, CB, Saturday 3 June 00:00-08:00 28x
00:02  Noise in nnaida 1 and 2 appears to be reduced.
       However, some channels in nnaida1, ASIC4 and nnaida2, ASIC 1 have been dropped. See attachment 1
Entry  Fri Jun 2 08:25:34 2017, LHB, 2nd June Evening Shift 20x
16.34  Beam is off
       Aida R_1216, BRIKEN (83)/BigRIPS (1094) continue to run for background data
Entry  Fri Jun 2 00:01:48 2017, OH, PW, CB, Friday 2 June 08:00-16:00 9x
08:05 Briken and BigRIPS stopping daqs
      AIDA on file R1_1099
Entry  Thu Jun 1 16:06:03 2017, NN, Friday 2 June 00:00-08:00  14x
00:35   Beam is on
        current AIDA file R1_996
Entry  Thu Jun 1 08:49:39 2017, LHB, PV, Thursday 1 June Evening Shift 27x
16.44 DAQ stop BigRIPS, BRIKEN
      AIDA file RIBF127R1/R1_886
Entry  Thu Jun 1 00:00:25 2017, TD, PV, CB, Thusrday 1 June 08.00-16.00 17x
07.57 run continues
      BRIKEN start run 55
      BigRIPS start run 1066
Entry  Wed May 31 16:48:54 2017, TD, Thursday 1 June 00.00-08.00 42x
00.48 BigRIPS DAQ now running

      BRIKEN start run 48
Entry  Wed May 31 16:43:52 2017, TD, Merger & TapeServer server startup scripts modified StartupAidaTapeServer

aidas1> cd /MIDAS/Merger/AIDA
aidas1> ls
Entry  Wed May 31 08:00:26 2017, NN, CB, Wednesday 31 May 16:00 - 24:00 15x
16:30  Check online data ok (R1_533) see attachment 1

16:39  BigRips and BRIKEN stop their runs
Entry  Wed May 31 00:02:41 2017, VP, CB, Wednesday 31 May 08:00 - 16:00 10x
08:02 BRIKEN starts run 1032
      BigRIPS starts run 31
      AIDA on file R1_423
Entry  Tue May 30 16:05:12 2017, OH, Wednesday 31 May 00:00 - 08:00 9x
00:05 BigRIPS and BRIKEN stop their daqs
      AIDA currently on file R1_312
Entry  Tue May 30 07:56:05 2017, CB, NN, OH, AE, Tuesday 30 May - evening shift 7x
16.00   Still no beam  
        Current run /RIBF127R1/R1_197
        Found dropped channels on nnaida1, ASIC4 - see attach 1
Entry  Tue May 30 00:58:10 2017, TD, CB, Tuesday 30 May - day shift 27x
08.58 DAQ continues OK 
      File RIBF127R1/R1_99
      BigRIPS run 1009
Entry  Mon May 29 16:02:21 2017, OH, TD, Tuesday 30th May 16x
00:02 Bias and leakage currents ok - attachment one
      System wide check all ok
      FEE64 Temperatures OK - see attachment 2
Entry  Mon May 29 07:05:06 2017, TD, Merger error messages and SEGV R33_51R33_5211.png12.png

Overnight and earlier today Obtained the following Merger error messages
Entry  Mon May 29 05:26:39 2017, TD, Seagate Backup Plus Hub 8Tb USB disk #1 

aidas1> df -h
Filesystem            Size  Used Avail Use% Mounted on
Entry  Mon May 29 00:59:27 2017, TD, PV, CB, NN, OH, Monday 29 May 10x
09.00 DAQ continues OK 
      Current file May2017/R32_239
Entry  Sun May 28 10:25:11 2017, TD, Analysis of RIBF123R1/R23 R23.txt
 
Entry  Sun May 28 09:55:11 2017, PV, ADC offset value from pulser walkthrough run May2017/R28 R29 ADC_offset_R2829_BRIKENMay2017.xlsADC_offset_R2829_BRIKENMay2017.txtcal_histo.pngcal_histo.root
ADC offset calculation using data from pulser walkthrough runs, see:
https://elog.ph.ed.ac.uk/AIDA/603
Entry  Sun May 28 09:20:29 2017, TD, Analysis of RIBF123R1/R21 R21.txt
 
Entry  Sun May 28 02:16:04 2017, TD, CB, Sunday 28 May 16x
10.15 DAQ continues OK 
      Current file May2017/R31_239
Entry  Sat May 27 05:38:39 2017, CB, TD, OH, Saturday 27 May 9x
13.38 DAQ continues OK 
      Current file May2017/R27_49
Entry  Fri May 26 05:19:40 2017, TD, Offline analysis RIBF123R1/R23_44 to R23_70 

Observe same noise structures to https://elog.ph.ed.ac.uk/AIDA/600
Entry  Fri May 26 02:20:42 2017, CB, OH, NN, Friday 26 May 15x
10.20 DAQ continues OK 
      Current file May2017/R27_22
Entry  Thu May 25 03:03:38 2017, TD, Offline analysis of R23_91 to R23_115 13x
Offline analysis of RIBF123R1_91 to R23_115

See https://elog.ph.ed.ac.uk/AIDA/583 & https://elog.ph.ed.ac.uk/AIDA/594
Entry  Thu May 25 02:11:04 2017, CB, TD, Thursday 25 May 10x
10.10 DAQ continues OK 
      Current file May2017/R26_17
Entry  Wed May 24 13:39:12 2017, Patrick Coleman-Smith, Examination of Console Logs -- and a couple of reminders 
I have tarred and zipped all 24 logs and shipped them back to the UK. Now I can browse through them.

Studying the "panics" :=

       nnaida17 has one which is an NFS mount failure.
    Reply  Wed May 24 14:51:06 2017, Patrick Coleman-Smith, Examination of Console Logs -- and a couple of reminders 
 




Quote:



I have tarred and zipped all 24 logs and
       Reply  Wed May 24 15:58:53 2017, Patrick Coleman-Smith, Examination of Console Logs -- and a couple of reminders 
 




Quote:



 
Entry  Wed May 24 06:33:19 2017, TD, Analysis of RIBF123R1/R23_44, R23_91 & R25_142 R23_44R23_91R25_142R25_12

Álvaro Tolosa Delgado reports observation of c. 1s 'oscillations' in implant-decay time spectra - see below
Entry  Wed May 24 06:12:48 2017, TD, Lead bricks removed from BRIKEN aperture for source tests - AIDA NOT SHIELDED FROM BEAM 

To install the 252Cf fission source to test the 3He neutron counters, Pb bricks which
had blocked the BRIKEN aperture have now been removed.
Entry  Wed May 24 03:20:35 2017, CB, TD, Wednesday 24 May 8x
11.00 Merger found stopped at 03:27 - current file R24_7
      Restarted Merge. Stopped Run control. Run control stopped, got error message - see attachment 1
      nnaida 1-16 show error, nnaida 17-24 show stopped - see attachment 2
Entry  Tue May 23 03:01:52 2017, CB, TD, NN, OH, Tuesday 23 May 19x
11.02 DAQ continues OK 
      Current file May2017/R22_192
Entry  Mon May 22 10:29:11 2017, TD, FEE64 system console to Raspberry pi /dev/ttyUSB mapping 
ttyUSB0 =>  last host=nnaida24, => last addr=10.1.2.24, ; #panics => 0 ; Not Finished 
ttyUSB1 =>  last host=nnaida23, => last addr=10.1.2.23, ; #panics => 0 ; Not Finished 
ttyUSB10 =>  last host=nnaida18, => last addr=10.1.1.18, ; #panics => 0 ; Not Finished 
Entry  Mon May 22 10:21:29 2017, Patrick, Console mapping to FEE64 please 
Please attach the list of ttyUSB to FEE64 console connection .

 
Entry  Mon May 22 09:12:56 2017, Patrick, Consoles reporting Options not available.... defaults operational ? 
I have noticed from the console logs reports concerning an inability to open the Options CONTENTS files for the FEE64s and hence failure to load the
Options.

I have checked with similar files on nnsa here in Daresbury and they are set for permissions "-rwxrwxrwx.  1 npg npgstaff 1115
Entry  Mon May 22 02:34:51 2017, CB, TD, Monday 22 May 16x
10.35 DAQ continues OK 
      Current file May2017/R19_253
    Reply  Mon May 22 08:43:10 2017, CB, TD, Patrick, Monday 22 May 
> 10.35 DAQ continues OK 
>       Current file May2017/R19_253
       Reply  Mon May 22 08:53:42 2017, CB, TD, Patrick, Monday 22 May 
> Concerning nnaida7 and the failure of calibration..... have you tried to calibrate it using the FADC Align  & Control ?
> If it still fails then there is a question about the quality of the clock signal being received by this module.
> I will log through and look at the console log for any anomolies but please try and calibrate.
Entry  Mon May 22 08:29:26 2017, TD, Offline analysis R25_12 to R25_22 21x
Offline analysis of AIDA data files R25_12 to R25_22 using MIDASsort

Note
Entry  Sun May 21 10:58:01 2017, TD, Julabo FL11006 recirculating chiller refilled 15.png
18.55 Julabo FL11006 recirculating chiller refilled to "H" marker of the filling level indicator.

      See http://www2.ph.ed.ac.uk/~td/AIDA/Information/Julabo%20FL11006.pdf
Entry  Sun May 21 02:54:22 2017, CB, TD, OH, Sunday 21 May 10x
10.54 DAQ continues OK 
      Current file May2017/R18_208
Entry  Sat May 20 02:39:06 2017, CB, OH, Saturday 20 May 9x
10.35 DAQ continues OK 
      Current file May2017/R16
Entry  Fri May 19 10:16:27 2017, CB, TD, OH, DAQ sever rebooted 
18:16 Finished rebooting DAQ server and acquisition. All OK, except ADC calibration on #7.
      Started run May2017/R16
      ASIC settings 2017Mar27-16.12.39 *except*
Entry  Fri May 19 09:55:54 2017, CB, TD, OH, Logs from Raspberry Pi System Console ttyUSB1
17:50 Rebooted Server and FEE64. Connected remotely to Ras Pi System Console. Repeated USB connection procedure. All 24 modules can now be seen. Sample
log attached
Entry  Fri May 19 02:44:14 2017, TD, CB, OH, Friday 19th May 190517_bias1045.png190517_feetemp1045.png190517_goodevents1056.png
10:44 System wide checks all ok
      Leakages and biases all ok (see attachment 1)
      Ambient Temperature 24.4C - Humidity 38.1% - Dew Point +9.1
Entry  Thu May 18 15:20:44 2017, Patrick Coleman-Smith, [HowTo] Connecting a USB console interface to the FEE64 IMG_0107_resize.jpgIMG_0108_resize.jpgIMG_0109_resize.jpg
The three attachments show the orientation of the console cable pcb relative to the FEE64 connectors.

The first with the other cables and the other two with no cables for clarity of position.
Entry  Thu May 18 03:07:47 2017, TD, OH, CB, RasPi system console diagnostics 105.png105.png106.png
Connecting monitor to RasPi system console diagnostics

May 18 10:59:38 aidas1 dhcpd: DHCPREQUEST for 10.32.6.189 from b8:27:eb:6b:0a:a0 via p2p1: wrong network.
    Reply  Thu May 18 09:29:50 2017, TD, OH, CB, RasPi system console diagnostics 
> Connecting monitor to RasPi system console diagnostics

> May 18 10:59:38 aidas1 dhcpd: DHCPREQUEST for 10.32.6.189 from b8:27:eb:6b:0a:a0 via p2p1: wrong network.
       Reply  Thu May 18 09:46:36 2017, TD, OH, CB, RasPi system console diagnostics 

> Can you let me know when you power-cycled the FEEs please ? Or maybe just do a stop/go.
> If there is nothing to log from the consoles then the Pi won't have made a log file. 
Entry  Thu May 18 02:16:05 2017, CB, TD, OH, Thursday 18 May 10x
10.10 DAQ continues OK 
      Current file May2017/R10_346
Entry  Wed May 17 05:28:19 2017, TD, OH, Wednesday 17 May 6x
11.11 DAQ found stopped
      Most recent file May2017/R11_245 (last accessed 06:09)
Entry  Tue May 16 03:18:46 2017, TD, OH, Tuesday 16 May 9x
11.19 DAQ continues OK 
      Current file May2017/R10_346
Entry  Mon May 15 02:01:02 2017, TD, OH, Monday 15 May 7x
10.01 DAQ continues OK 
      Current file May2017/R8_334
Entry  Sun May 14 01:52:49 2017, TD, OH, Sunday 14 May 16x
09.54 DAQ continues OK 
      Current file May2017/R7_292
Entry  Sat May 13 03:16:16 2017, TD, Analysis of May2017/R1_0 to May2017/ R1_79 11x

See https://elog.ph.ed.ac.uk/AIDA/555
Entry  Sat May 13 02:35:53 2017, TD, OH, Saturday 13 May 17x
10.35 DAQ continues OK 
      Current file May2017/R6_246
Entry  Fri May 12 02:55:10 2017, TD, OH, Friday 12 May 6x
10.55 DAQ continues OK 
      Current file May2017/R6_181
Entry  Thu May 11 05:43:30 2017, TD, OH, Thursday 11 May 16x
13.43 DAQ continues OK 
      Current file May2017/R6_123
Entry  Wed May 10 02:55:13 2017, TD, OH, Wednesday 10 May 8x
10.55 DAQ continues OK 
      Current file May2017/R6_44
Entry  Tue May 9 02:25:04 2017, TD, OH, Tuesday 9 May 18x
10.25 DAQ continues OK 
      Current file May2017/R1_79
Entry  Mon May 8 10:00:02 2017, Patrick Coleman-Smith, [HowTo] Operating document for the Pi_Monitor FEE64 console logging equipment Operating_the_Aida_Pi_Monitor.pdf
The operating proceedure for the Raspberry Pi FEE64 console monitor is attached.

Please let me know if more detail is required.

 
Entry  Mon May 8 02:11:37 2017, OH, TD, Monday 8 May 11x
10.11 DAQ continues OK 
      Current file May2017/R1_58
Entry  Sun May 7 01:29:50 2017, OH, TD, Sunday 7 May 13x

09.28 DAQ continues OK 
      Current file May2017/R1_36
Entry  Sat May 6 03:32:38 2017, OH, TD, Saturday 6 May 8x

11.30 Detector biases & leakage currents OK - see attachments 1 & 2
      Ambient Temperature 24.3 Humidity 37.5% Dew Point 8.9
Entry  Fri May 5 08:03:36 2017, OH, TD, Friday May 5th 10x
Relatively painless start-up. Had an issue with firefox where all bookmarks had been forgotten.
All drop down menues in the DAQ did not work.
Kill all firefox processes to restore.
Entry  Thu Apr 13 15:08:31 2017, CB, Card test 8us.png4us.png0.5us.pngPlot.pngPlot_teflon.png
I tested the FWHM of a BNC PB-5 pulser signal as a function of shaping time using the first produced ISOL FEE64 card in Daresbury Labs.

Find attached four representative spectra per ASIC taken with 8, 5 and 0.5 us shaping time values. Run times are different.

Also find attached a plot of the FWHM as a function of the shaping time for the first channel in each ASIC. There appears to be a maximum of
Entry  Wed Apr 5 06:11:08 2017, OH, BigRIPS particle ID 
I've been going through collecting the BigRIPS root files with Phong and making sure they are on AIDAs1.

The files we have for NP1306 are not the standard format so to get particle ID you need to do this command taken
Entry  Wed Apr 5 06:10:55 2017, OH, BigRIPS particle ID 
 
Entry  Sun Apr 2 04:40:00 2017, DK, BigRIPS Summary Info 
It is all saved locally file:///homes/npg/Documents/2017Ca/

Although, a little more hacking is required to get the view.html webpage to allow you to click each run
Entry  Sun Apr 2 03:32:30 2017, DK, OH, Pulser walkthrough bias_2_a.png
11:32 Pulser walkthrough, 90k down to 10k, 10k steps, 1 min per step
      R26
    
Entry  Sat Apr 1 16:16:05 2017, OH, CG, Sunday 2 April bias_020417_0146.pngbias_020417_0742.pngBigRIPSlogbias_020417_0922.png
00:12 BigRips started run 0223 (Started at 00:12)
      AIDA file R20_344
      System wide checks all ok
Entry  Fri Mar 31 17:21:56 2017, CG, OH, DK, Saturday 1 April - Run status 9x
00.46 34Ne stopped for 36Ne setting (R19_37).
      DAQ kept running as I was upstairs getting some food.
      Stopped at R19_45.
Entry  Thu Mar 30 16:12:21 2017, DK, OH, CG, Friday, March 31 run status 14x
00:11 BigRIPS has started a new run at 00:10:42 run 0165.
      AIDA subrun R16_357 was about halfway (~1 GB) at 00:11.
      BRIKEN run 21 ( so-called 170331_0012_Mg40 )
Entry  Wed Mar 29 18:02:12 2017, OH, TD, DK, CG, Thursday 30th March 31x
02:02 Recovered DAQ from crash. Merger became clogged and the system required a full restart. Raspberry pi also
required a restart to regain control of the USB power relay.
      AIDA R16 started
Entry  Wed Mar 29 17:49:36 2017, DK, cshrc hacking w/ MIDAS 
The ~/.cshrc was modified to change the MIDAS path for a convenient analysis method, but it should be done in a shell script instead, as it pushes the MIDAS
BASE to all instances 
of MIDAS, such as the Run Control, etc.
Entry  Wed Mar 29 13:38:38 2017, OH, DK, CG, First beam runs biases_firstbeam.png
For BigRIPS run numbers, they are available online: http://bripscnt01.rarfadv.riken.jp/runsum/index.php

21:30 AIDA and BRIKEN are ready to go -- so we closed the door and asked the BigRIPS team to send the beam to
Entry  Wed Mar 29 13:02:17 2017, TD, Report - high - interaction between DHCP and FEE64 authenticated mount requests 

What has happened here?
Entry  Wed Mar 29 08:13:34 2017, DK, PV, JL, CG, Degrader, Pb wall opening 
16:21

Chris noticed that when the degraders that are at the beam right position when they are "out" may not be fully removed from the beamline.  It's difficult
Entry  Wed Mar 29 05:08:04 2017, TD, Report - medium - delayed or missing authenticated mount requests following FEE64 power cycle messages.log
This is not, I think, a new observation.

Following FEE64 power cycles we sometimes observe delayed ( ~5-15 minutes ) authenticated mount requests
Entry  Wed Mar 29 00:23:12 2017, TD, Analysis of Mar2017/R3 8x
Analysis of Mar2017/R3_0 ... R3_9 by MIDASsort

*** ENTRY finish
Entry  Wed Mar 29 00:02:49 2017, TD, Wednesday 29 March 21x
08.02 DAQ halted overnight

      System checks OK *except* for nnaida1 global clocks error 6 and some SYNC errors - see attachments 1-5
Entry  Tue Mar 28 01:28:12 2017, TD, CG, OH, DK, Tuesday 28 March 15x

09.13 DAQ run R3 ends OK (final file R3_9)
      
Entry  Mon Mar 27 03:29:05 2017, OH, TD, DK, CG, Monday 27 March 15x
11:28 Biases and leakages okm (see attachment 1)

14:00 Removed jumpers on cooling rack D. Noise was around 50 channels worse (FWHM of pulser peak) for all
Entry  Mon Mar 27 03:28:53 2017, DK, TD, JA, Clock settings at the waveform generator stage 
Clock settings for this experiment are slightly different than in the previous case.

Below are strictly the settings for the waveform generator itself.
Entry  Sun Mar 26 03:53:43 2017, CG, OH, Sunday 26th March bias_260317.pngnniada15_w_260317.png
10.30 Left DAQ running overnight to look for alphas in DSSDs.
      DSSD bias still ok @ 23.3oC (see att. 1).
      FEE temps ok.
Entry  Thu Mar 23 10:56:29 2017, CG, OH, Thursday 23rd March - DSSD replacement + move 7x

10.00 Investigating DSSD2 (MSL BB18-1000 3058-9) missing channels, found broken bond wires on rear side (~1/4).
      Replaced with 3058-3.
Entry  Tue Mar 21 08:04:43 2017, CG, OH, Tuesday 21 March - AIDA checks bias1.pnglayout4.pngnnaida19.pnglayout3.pngnnaida13.png
10.00 Powered system on and biased.
      Bias voltages and leakage currents ok (see att. 1). Ambient temp @23.1oC.
      
Entry  Thu Feb 2 13:44:02 2017, OH, T9 Test Bench nnaida114_10.pngnnaida11.pngnnaida114_7.png
T9 test setup at Daresbury was powered up and noise levels were checked using a pulser peak.

A 1V peak was used. For most channels this corresponded to a peak position at around +-11000 from the zero point at 9000.
Entry  Wed Feb 1 16:54:40 2017, CG, NP1306 run summary Run_Summary_NP1306.xlsx
 
Entry  Wed Jan 18 14:16:47 2017, Patrick Coleman-Smith, Repaired Modules returning to RIKEN 
Five modules are being returned to RIKEN after repair.

The MAC addresses are :-

00:04:a3:2a:ED:8f 
Entry  Tue Dec 6 06:38:46 2016, TD, Updated Patrick, CAEN N1419 HV output common mode noise 9x

There appears to be significant common mode noise on the output of the
CAEN N1419 4 Ch Reversible 500 V/200 µA NIM HV Power Supply Module (USB)
Entry  Tue Dec 6 02:30:35 2016, TD, Report - low - significant variation in FEE64 boot times 

Not something we were not aware of already but /var/log/messages illustrate the issue.
Entry  Tue Dec 6 02:20:29 2016, TD, Tuesday 6 December 100.png101.png102.pngAIDA_leakage_current(13).xlsx
11.20 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachment 3
      Ambient temperature +24.8 deg C, d.p. +3.6 deg C, RH 25.4%
Entry  Mon Dec 5 11:53:26 2016, TD, MACB test 42x

MACB configuration can be found at https://elog.ph.ed.ac.uk/AIDA/357
Entry  Mon Dec 5 10:51:08 2016, TD, Monday 5 December 1.png2.png3.png4.pngAIDA_leakage_current(12).xlsx
19.50 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures HIGH - see attachment 3
       FL11006 E01 low fluid level (actual halfway between minimum and middle visual markers)
Entry  Sun Dec 4 05:46:42 2016, TD, SyncCheck RIBF03R1 & RIBF123R1 commissioning tests archived 

The SyncCheck etc software used for the RIBF123R1 and RIBF03R1 commissioning
tests on d05 (user aida) has been archived as
Entry  Sun Dec 4 04:05:24 2016, TD, Report - low - DAQ SETUP sometimes produces Javascript error 10.png

DAQ SETUP sometimes produces Javascript error instead of a pop-up displaying
the status of the ReSync - see attachment 1
Entry  Sun Dec 4 03:44:12 2016, TD, Sunday 4 December 16x
12.45 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachment 3
      Ambient temperature +25.1 deg C, d.p. -3.0 deg C, RH 15.6%
Entry  Sat Dec 3 10:49:36 2016, TD, Saturday 3 December 1.png2.png3.png
19.48 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachment 3
      Ambient temperature +25.1 deg C, d.p. -3.0 deg C, RH 15.6%
Entry  Fri Dec 2 09:58:54 2016, DK, Simple PID with LISE++ lise-41Al.pngSettingFallonDK.lppPIDintensity.png
I wrote this LISE++ file based on the Takechi .lpp modified by AE for 77Ni, 78Ni, 76Ni.

Basically, I changed the primary beam to 48Ca, reduced the production target thickness to 1 mm (I think it may
Entry  Fri Dec 2 09:47:58 2016, DK, F8 targets 
F8 target measurements, for posterity.

Plastic: ~39 to 40 mm
Entry  Fri Dec 2 09:47:45 2016, DK, F8 targets 
F8 targets, for posterity.

Plastic: 39~40 mm
Entry  Fri Dec 2 08:23:28 2016, TD, Offline analysis of R48_9 100.png101.png102.png103.png
Analysis of background, pulser off

S O R T    C O M P L E T E ..... Fri Dec  2 17:11:14 2016
Entry  Fri Dec 2 06:41:25 2016, DK, Benchmarks for compression 
R45_17 as the test file, which was closed at 9.02 AM Friday, December 2nd at the end of the official parasitic
machine time on Fallon et al.
Entry  Thu Dec 1 16:01:10 2016, CG, PV, Friday 2 December 14x
00.07 BigRIPS data file 1135

01.07 BigRIPS data file 1136.
Entry  Thu Dec 1 10:58:54 2016, PV, TD, Liu, Implantation profile in AIDA , after switch back to the previous ZDS setting (AIDA 43_63 to 43_71, bigrips run 1129) 51.png45.png31.png
 
Entry  Thu Dec 1 09:46:06 2016, TD, Offline analysis of R43_59 9x
     Variable degrader setting is now #2 + #3: 0.3 mm W + 1.0 mm W [+2 mm Al]
     Centre ZDS @ 40Mg
Entry  Thu Dec 1 08:13:06 2016, PV,Liu, TD, Implantation profile in AIDA , after changing the ZDS setting to center at 41Al, AIDA 43_ 33 to 43 36.png24.png50.png
Bigrips run 1127

AIDA run 43_ 33 to 43
Entry  Thu Dec 1 02:25:41 2016, DK, Offline analysis of R42_32 6x
Offline analysis of AIDA R42_32.

Degrader condition of F11 is with the same stopping power of e.g. R42_7 (see https://elog.ph.ed.ac.uk/AIDA/509).
Entry  Thu Dec 1 00:21:08 2016, DK, Offline analysis of R42_7 r42_2110.pngr42_307.pngr42_2120.pngr42-301.pngr42-2000.png
Checking that the implantation is still reasonable after LN2 fill recovery. 

Degrader condition is 8. + 0.2 mm Al on the upstream side of the PE wall.

All three variable degraders are in (0.5 mm W; 0.3 mm W; 1.0 mm W, each on 1 mm Al backing). 
Entry  Wed Nov 30 21:26:52 2016, CG, DK, TD, Thursday 1 December 10x
00.51 BigRIPS data file 1112.

01.50 BigRIPS data file 1113.
Entry  Wed Nov 30 11:36:32 2016, TD, Offline analysis of R41_2 8x
Degrader (8mm Al) fixed + ( 0.3mm W/1mm Al + 0.5mm/1mm Al + 1mm W/1m Al) variable

Steering to F11 changed by PD
Entry  Wed Nov 30 11:10:10 2016, TD, Correlation_Check.c R31.outR31-2.outR42.out
cd /TapeData/RIBF03R1
~/td/a.out R31 10000 > /tmp/R31.out
~/td/a.out R31 24 > /tmp/R31-2.out
Entry  Wed Nov 30 08:41:37 2016, PV, TD, RCF, Liu, Implantation profile in AIDA R39 37 to 46, after changing degrader at 16:23 01.png52.png44.png

Degrader setting:
Variable degrader:
0.5 mm W + 1 mm Al : in
0.3 mm W + 1 mm Al : in
1 mm W + 1 mm Al : in
Fix degrader:
20mm Al+ 0,2 mm Al

See
https://elog.ph.ed.ac.uk/AIDA/502 for comparison
Entry  Wed Nov 30 06:42:01 2016, TD, Offline analysis of R39_26 8x
Following degrader change to  (8mm Al) fixed + ( 0.3mm W/1mm Al + 0.5mm/1mm Al + 1mm W/1m Al) variable

S O R T    C O M P L E T E ..... Wed Nov 30 17:13:45 2016
Entry  Wed Nov 30 06:33:52 2016, TD, Offline analysis R36_30 8x

Following target change from (CH2)n to C
Entry  Wed Nov 30 06:31:04 2016, PV, TD, RCF, Liu, Implantation profile in AIDA R39 2 to 9, after changing degrader at 13:30 29.png22.png12.png
Degrader setting was:
Variable degrader:
0.5 mm W + 1 mm Al : in
Entry  Wed Nov 30 05:30:20 2016, TD, Offline analysis R39_6 8x

Degrader 8mm Al fixed + ( 0.5mm W/1mm Al + 1mm W/1mm Al) variable
Entry  Wed Nov 30 04:56:40 2016, TD, Offline analysis R38_33 9x

Degrader 8mm Al fixed + ( 0.3mm W/1mm Al + 1mm W/1mm Al) variable
Entry  Tue Nov 29 19:07:35 2016, AE, CG, ATS, AT, F11 conditions after change to C target in F8 [light particles?] visual_scal_4am_Cin_F7.pngpid_r1093.pngimp_ch2.pngpid_ch2.pnghits_ch2.png
The main experiment changed to a carbon reaction target at F8 (similar thickness of CH2 previously used), and retuned the ZDS. First BigRIPS run after
retuning is 40Mg_1093 (at 2:29 am, Nov 30th)

The background at F11 has increased. The neutron backgroun incresead by a factor of ~10. The rates of visual scalers also increased; for example
Entry  Tue Nov 29 15:12:33 2016, CG, AE, TD, DK, Wednesday 30 November 13x
00.11 Beam stopped for target @F8 change.
      R35 stopped at R35_62.
      BRIKEN file 161129_1951 155->159
Entry  Tue Nov 29 12:21:35 2016, TD, Offline analysis R35_1 8x


S O R T    C O M P L E T E ..... Tue Nov 29 20:45:36 2016
Entry  Tue Nov 29 05:18:50 2016, TD, Offline analysis of R31 10x
Offline analysis of AIDA data files from R31_0 to c. R31_5 (elapsed time 1120.45s)

Note impact of increased noise ( https://elog.ph.ed.ac.uk/AIDA/494 )on LEC spectra,
Entry  Mon Nov 28 18:07:14 2016, CG, TD, AE, DK, Tuesday 29 November 42x
01:39 : Attachment 26 (R30_70to72) shows a gradual change in the hit pattern for DSSD2 (at the lower left
corner) which may indicate the noise level was increasing.
Entry  Mon Nov 28 15:53:39 2016, AE, AT, RG, CG, DAQ synchronization  7x
We noticed a peculiar feature in the time-stamp synchronization monitor. The spectra of timestamp difference between pairs of DAQ systems show, for all
possible pair combinations, a peak at Delta(ts)= 65535 = 2**15

This corresponds to a difference of 2.6 ms (for 25MHz correlation clock). See the attachments taken ~23:00 of Nov 28th.
Entry  Mon Nov 28 13:12:31 2016, PV, AE, Liu, Implantation profile in AIDA with 8mm Al replacing 3 mm Pb 10.pngimp_dssd_106x.pngimp_pid_106x.pngimp_xy_106x.pngpid_r106x.png
Data for ~3 hrs: Nov 28th, 20:06 to 23:16

Bigrips run 1060 to 1062

AIDA run R30_ 2 to R30_40
Entry  Mon Nov 28 11:55:20 2016, TD, Offline analysis R30_2 20.png21.png22.png
Degrader (8mm Al) fixed + ( 0.3mm W/1mm Al + 1mm W/1mm Al)

S O R T    C O M P L E T E ..... Mon Nov 28 20:53:02 2016
Entry  Mon Nov 28 06:49:04 2016, DK, Offline analysis R27_1 r27_1-307.pngr27_1-2110.pngr27_1-2120.png
Conditions: One Pb wall with empty windows. 3mm Pb degrader closer to AIDA, on the front of PE wall

Variable degraders: 1.0 mm W (+1 mm Al) and 0.3 mm W (+1 mm Al)
Entry  Mon Nov 28 05:38:39 2016, DK, Offline analysis R28_14 r28_14-2120.pngr28_14-2110.pngr28_14-307.png
Conditions: Two Pb walls with empty windows. 3mm Pb degrader between MUSIC 1 and MUSIC 2.

Variable degraders: 1.0 mm W (+1 mm Al) and 0.3 mm W (+1 mm Al)
Entry  Sun Nov 27 22:35:37 2016, Liu, PV, AE, Ion hit pattern in AIDA after degrader changing aida_ion_hitpattern_run26_51to63.png
After changing degrader to optimize 40Mg, hit pattern in AIDA is shown in figure below.

The implantation position changed from right side position of  first DSSD to center position of last DSSD.
Entry  Sun Nov 27 19:33:00 2016, Liu, PV, AE, F11 degrader setting (night Nov27-Nov28) run1038_imp_profile.pngrun1038_imp_pid.pngrun104x_imp_profile.pngrun104x_imp_pid.png
Analysis of files for two more settings of F11 degrader to optimize implantation of 40Mg.

+ setting 1: from Nov 27th, 22:16
Entry  Sun Nov 27 16:29:51 2016, CG, AE, DK, Monday 28 November 12x
01.28 Beam stopped temporarily.
      ~750MB into R26_38.
      Bias and leakage currents ok, as are FEE temps (attachments 1-3).
Entry  Sun Nov 27 12:53:04 2016, TD, Offline analysis R24_3 20.png21.png22.png24.png


S O R T    C O M P L E T E ..... Sun Nov 27 20:32:48 2016
Entry  Sun Nov 27 12:30:41 2016, AE, PV, Energy loss in Degraders and Implantation for runs 1028 and 1033 6x
Implantation profile in AIDA

    BigRIPS file 1028 (Attachment run1028.png):  Degrader setting: 3 mm Pb(fix) + 0.8 mm W(variable) + 2 mm Al(variable)

    BigRIPS file 1033 (Attachment run1033.png):  Degrader setting: 3 mm Pb(fix) + 0.8 mm W(variable) + 2 mm Al(variable) + 1 mm
Entry  Sun Nov 27 06:35:47 2016, TD, DK, AE, Sunday 27 November - part 2 14x
14.15 BigRIPS run number is now 1029

15.22 BigRIPS run number is now 1030
Entry  Sun Nov 27 05:30:51 2016, TD, Offline analysis of R12 103.png104.png120.png121.png
Offline analysis of R12 LEC -> MEC setting

S O R T    C O M P L E T E ..... Sun Nov 27 14:37:35 2016
Entry  Sun Nov 27 03:25:20 2016, TD, [How to] AIDA discriminator thresholds 
The function and setting of the AIDA discriminators is as follows:

                  LEC (20MeV FSR)    MEC (1GeV FSR)    HEC (20GeV FSR)    Function
Entry  Sun Nov 27 02:46:54 2016, DK, Offline analysis of R18_2 307-312.png2120-2125.png2110-2115.png
Run R18_2: 3 mm Pb, 0.5 mm W (+1 mm Al) and 0.3 mm W (+1 mm Al)

 

 *** data items:  261088000 ( 105923.42 Hz)
Entry  Sat Nov 26 20:26:06 2016, Liu, AE, Analysis of implantation profile in AIDA imp.jpgpid_corr.png
Here we show the PID plot and implantation depth in AIDA from BigRIPS file 40Mg1012 (1 hr of data from 20:30 in Nov 26th), merged with AIDA files R10_8
to R10_29

The more neutron-rich isotopes have a shorter range in AIDA, and seem to be implanted towards the first layers of the stack. For 40Mg - most
Entry  Sat Nov 26 17:14:47 2016, TD, Visual scaler inputs 
Visual scaler inputs

1 F11
Entry  Sat Nov 26 15:32:38 2016, TD, AE, CG, DK, Sunday 27 November  19x
00.33 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachment 3
Entry  Sat Nov 26 12:18:25 2016, AE, Saturday 26 November, Part III 6x
19:30 Power cycled of AIDA reuired after Ge filling

20:04 Started new run: R10_0
Entry  Sat Nov 26 09:17:42 2016, AE, TD, DK, Offline analysis of R9_24 rates_r9_24.pngee_r9_24.pngxy_r9_24.png

R9_24 3mm Pb + 0.3mm W (+1mm Al) + 1.0mm W (+1mm Al)

 

 *** data items:  261088000 (  99232.91 Hz)
 *** ADC events:   41690396 (  15845.46 Hz)
Entry  Sat Nov 26 07:45:48 2016, TD, DK, AE, Offline analysis of R7_45 103.png110.png111.png
R7_45 3mm Pb + 0.5mm W (+1mm Al) only (at start of run) changing to 1.5mm W (+2mm Al)

S O R T    C O M P L E T E ..... Sat Nov 26 16:46:31 2016
Entry  Sat Nov 26 07:26:51 2016, TD, [How to] Desktop application launchers for Httpd for Data Acquisition & Merge/TapeServer, Merger & TapeServer 

   Type: Application in Terminal
   Name: Httpd for Data Acquisition
Entry  Sat Nov 26 07:11:34 2016, TD, DK, AE, Saturday 26 November, Part II 
16.11 The cyclotron and BigRIPS condition are now restored and we have good beam

     Count rate at F11 plastic is ~8 cps

     At F8, they are focued on 41Al (D5 Brho = 7.5235 Tm)
Entry  Sat Nov 26 06:57:36 2016, DK, TD, Offline analysis of R7_37 100.png101.png102.pngK3MVQY.tmp

R7_37 3mm Pb + from 0 to 1.8mm W (+ up to 3mm Al, 1mm per W layer - 0.3mm W, 0.5mm W & 1.0 W))
Entry  Fri Nov 25 22:28:13 2016, TD, [How to] Start MIDASsort 

aidas1> setenv MIDASBASE /MIDAS@aidas.240215
aidas1> setenv PATH $MIDASBASE/bin_Linux64:$PATH
Entry  Fri Nov 25 15:56:36 2016, CG, DK, Saturday 26 November 11x
00.55 Bias and leakage currents ok (attachments 1+2).
      Temps ok (attachment 3).
Entry  Fri Nov 25 07:33:44 2016, TD, Friday 25 November 9x
16.35 DSSSD bias & leakage currents OK - see attachments 1 & 2
      note - the significant increase observed yesterday appears to be plateau'ing
      FEE64 temperatures OK - see attachment 3
Entry  Thu Nov 24 01:07:14 2016, TD, CG, Thursday 24 November 29x
10.05 DSSSD bias & leakage currents OK - see attachments 1 & 2
      note - the significant increase observed yesterday appears to be plateau'ing
      FEE64 temperatures OK - see attachment 3
Entry  Wed Nov 23 14:50:59 2016, Patrick Coleman-Smith, [ Info ] What does the System Wide Clock check mean when it fails. 
The System Wide check called "Check Clock Status"  reads the status register from the FEE64 units in the system and compares the value
of each bit against a template depending if the FEE64 is Master or not.

The bit fields have the following meaning :-
Entry  Wed Nov 23 01:47:28 2016, TD, CG, Wednesday 23 November 6x
10.45 DSSSD bias & leakage currents - see attachments 1 & 2
       note - significant increase in leakage current (~0.8uA) since previous readings
              may be temperature transient or charging effect due to delta electrons due to BigRIPS tuning to F11
Entry  Tue Nov 22 12:24:48 2016, TD, Analysis of R25_11 to R25_23 20x
Offline analysis of AIDA data files R25_11 to R25_23 using MIDASsort

Note
Entry  Mon Nov 21 21:22:04 2016, TD, Tuesday 22 November  6x
05.59 M7.3 Fukushima-ken Oki (locally 4) http://www.jma.go.jp/en/quake/20161122060517493-220559.html

06.20 DSSSD bias & leakage currents OK - see attachments 1 & 2
Entry  Mon Nov 21 02:12:45 2016, CG & TD, Monday 21 November  12x

11.10 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachment 3
Entry  Sun Nov 20 02:24:53 2016, CG, Sunday 20 November 8x
11.20 FEE temps and bias leakages ok (attachments 1-3).
      However, stats screen shows no SYNCs being issued and no "Good Events" (attachment 4).
      Stop and Go had no effect -> SYNCs output but SYNC related system checks failed (attachment 5+6).
Entry  Sat Nov 19 02:46:09 2016, TD, CG, Saturday 19 November 7x

11.45 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachment 3
Entry  Sat Nov 19 02:43:39 2016, TD, Thursday 17 November 1.png2.png3.png4.png

10.15 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachments 3 & 4
Entry  Wed Nov 16 06:47:02 2016, TD, Analysis of data files R25_11 to _13 1001.png1002.png1000.png1003.png1004.png
Offline analysis of R25_11 to _13 see http://ribf-exp.riken.jp/elog/RIBF123/141

"F5 C target F7 no F11 C 6mm
Entry  Wed Nov 16 03:13:25 2016, CG, Wednesday 16 November bias1.pngbias2.pngtemps.png
11.30 Leakage currents and FEE temps ok (attachments 1-3)
Entry  Tue Nov 15 02:22:25 2016, TD, Tuesday 15 November 7x
11.20 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachment 3
Entry  Mon Nov 14 05:51:36 2016, TD, Monday 14 November 1.png2.png3.png

14.51 DSSSD bias & leakage currents OK - see attachments 1 & 2
      Ambient temperature +24.8 deg C, d.p. +7.2 deg C, RH 32.6%
Entry  Sat Nov 12 01:45:00 2016, TD, Saturday 12 November 6x
10.45 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachment 3
Entry  Fri Nov 11 00:50:00 2016, TD, Friday 11 November 11x
10.00 DAQ continues (R33) in no storage mode

      DSSSD bias & leakage currents OK - see attachments 1 & 2
Entry  Thu Nov 10 12:02:24 2016, TD, OH, CG, Thursday 10 November 30.png31.png32.png34.png

21.17 DAQ starts (R30)
Entry  Thu Nov 10 11:57:35 2016, TD, Data directory NP1412 renamed as RIBF123R1 

Data directory NP1412 renamed as RIBF123R1
Entry  Thu Nov 10 09:56:20 2016, TD, OH, ML, NP1412 R26 R27 8x
start 18.55 10.11.16
stop 
AIDA filename R26_0
Entry  Wed Nov 9 22:16:11 2016, CG, DK, TD, ML, NP1412 R24 R25 34x
07.15 R24 started. BRIKEN run 33.
      76~78Ni beam setting.
      F5 C target out. F7 CH2 in. F11 C out.
Entry  Wed Nov 9 11:07:14 2016, TD, CG, DK, NP1412 R22 R23 6x
DAQ start (R22) failed - merger remained in 'want first sync' state, no output to TapeServer -> soft reset OK

start 20.07
Entry  Wed Nov 9 09:50:50 2016, TD, NP1412 R20, R21 1.png2.png3.png4.png

DAQ start (R20) failed - nnaida5 dropped data transfer #1 link
Entry  Wed Nov 9 08:47:03 2016, OH, TD, NP1412 R16, R17 and R18 r16bias1.pngr16bias2.png
start 17:44
stop 17:49
AIDA filename R16
Entry  Wed Nov 9 07:16:59 2016, OH, TD, NP1412 R15 6x
Run 15

start 16:14
Entry  Wed Nov 9 02:14:08 2016, OH, TD, NP1412 R14 bias1.pngbias2.pngR14bias1.pngR14bias2.png
11.13 Still waiting to get beam back got access so took temp measurement.
      T=25.6 DP=0.0 H=18.1
      Biases and leakages good. Attachments 1 and 2
Entry  Wed Nov 9 00:49:03 2016, TD, OH, NP1412 R13 r13bias1.pngr13bias2.png
09.50 Run 13 Start
      Thick C target (6mm) removed from F11. All variable Al degraders put in place
      AIDA settings file: 2016Nov07-23.03.06
Entry  Tue Nov 8 23:36:56 2016, DK, TD, NP1412 R12 10x
Takechi team changes the condition: F5 carbon; F7 empty; F11 carbon

  F11 Plastic is 1.1kHz

BRIKEN: 161109_0828_747576Ni_013.dlt
Entry  Tue Nov 8 23:16:15 2016, DK, TD, NP1412 R11 R11_USB1.pngR11_USB2.png
Recovered AIDA after power cycle (unknown cause of crash from the end of R10)

Corresponding run in BRIKEN: 161109_0814_747576Ni_012

 
Entry  Tue Nov 8 22:04:21 2016, DK, NP1412 R10 R10_USB1.pngR10_USB2.png
Put the variable Al degraders all back in for safety (was 4.4 mm, now 5.4 mm)

Takechi team switches the condition: F5 empty; F7 CH2; F11 empty

 
Entry  Tue Nov 8 21:01:40 2016, CG, DK, NP1412 R9 
06.02 R9 started with Takechi group C target out and all variable degraders in.
      F5 C in. F7 empty. F11 empty.
      F11 plastic rate 1.1kHz.
Entry  Tue Nov 8 18:52:32 2016, CG, DK, NP1412 R7 R8 bias1.pngbias2.pngbias1.pngbias2.png
03.50 74-76Ni beam delivered to F11.
      F11 plastic rate ~1kHz.
      F5 C target in. F7 empty. F11 C target in.
Entry  Tue Nov 8 15:10:16 2016, CG, TD, DK, OH, NP1412 R5 R6 bias1.pngbias2.png
00.15 Setting changed to 71,72,73Ni. All variable degraders in.
      Will remove while watching rates to settle on degrader setting.
      F5 CH2 in. F7 CH2 out. F11 C target in.
Entry  Tue Nov 8 14:29:34 2016, TD, OH, DK, NP1412 Run 4 
23:28 Run 4 Start
      Thick 6mm C target in beam
      
Entry  Tue Nov 8 14:22:16 2016, TD, OH, DK, NP1412 R3 
11:21 Run 3 Started
      Degrader moved upstream. AIDA moved to centre of BRIKEN. Fixed degrader moved upstream from centre of BRIKEN.
11:25 Run 3 Stopped
Entry  Tue Nov 8 13:37:06 2016, TD, OH, DK, NP1412 R2 6x
10:36 Run 2 Start
      Degraders (5.4mm Al) in at start and all removed once started.
      Other settings same as R1.
Entry  Tue Nov 8 13:06:18 2016, DK, TD, CG, OH, NP1412 Run 1 14_JST_2016.png
AIDA run with Takechi experiment. 71~73 Ni beam setting

F5 carbon target is:    IN

F7 CH2 target is:        OUT
Entry  Tue Nov 8 00:52:59 2016, OH, TD, FEE Settings and Options files FEE_Settings.xlsx
Used a program to sort through the settings files located in /MIDAS/DB/EXPERIMENTS/AIDA/Settings_FIle_Name/nnaider1,2,3... and /MIDAS/DB/EXPERIMENTS/AIDA/Options.
By comparing the parameter values we got from this to the value we know they should be set to we found some discrepancies in FEEs 1 and 3-8 with values
being set
Entry  Tue Nov 8 00:12:56 2016, TD, Report - medium - TapeServer changes volume name following request for existing filename 9.png

When you request a filename that already exists and select OK to the prompt
suggesting a new filename, TapeServer adds an additional character to the 
Entry  Mon Nov 7 23:15:14 2016, TD, CG, OH, Tuesday 8 November 12x
08.15 DAQ found stalled

      Soft reset OK
Entry  Mon Nov 7 02:13:05 2016, CG, OH, TD, DK, Monday 7 November 10x
11.10 DAQ found stopped. No storage mode so can't tell when, but presumably at 06.30 during LN2 fill cycle.
      Unable to regain control of (see errors after merger restart in attachment 1) system so power cycling FEEs.
Entry  Sun Nov 6 05:16:22 2016, OH, Update 
Leakage current spreadsheet has now been uploaded to google docs for ease of access.

It can be accessed and edited from the following link: https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit?usp=sharing
Entry  Sun Nov 6 01:34:15 2016, TD, OH, CG, Sun 6th November 18x
10:34 Detector Bias a leakage currents all ok. (Attachments 1 and 2)
      Temperatures all ok (Attachment 3)
      All system wide checks ok other than clock status see attachment 4
Entry  Sat Nov 5 09:40:02 2016, OH, Updated Leakage Current Spreadsheet AIDA_leakage_current.odsLeakage_Plot_Ex.PNGAIDA_leakage_current.csv
Attached is the updated leakage current spreadsheet (Attachment 1)  as pf 5/11/2016 it is up to date with the elog.

Also added is the recording of ambient temperature. This is recorded in degrees C and plotted relative to 21 degrees C to better show on the same plot
Entry  Sat Nov 5 01:55:15 2016, CG, TD, OH, Saturday 5th November 20x
10.55 DAQ found to have stopped at 06:47 during LN fill cycle.

10:57 Screen shots of system after stop
Entry  Fri Nov 4 08:10:46 2016, CG, Pb bricks upstream 
Stack of Pb bricks upstream of AIDA+BRIKEN to protect from incoming beam.
Entry  Fri Nov 4 04:35:03 2016, TD, CG, DK, Friday 4 November part 2 36x
13.35 Swapped HDMI cables from master MACB to MACB #3 & #7
      for HDMI cables from MACB #7 ports 1 & 2 to MACB modules #8 & #9
Entry  Thu Nov 3 17:42:37 2016, TD, CG, DK, Friday 4 November 32x

00.40-02.30 Discussion with PJCS
 
Entry  Thu Nov 3 02:29:45 2016, TD, [How To] Startup AIDA (October 2016) 29x
Assumes 3-phase ac power (to Julabo FL11006 recirculating chiller) and single-phase ac power
(to AIDA NIM bins, PSUs, network switches, USB-controlled ac mains relay and Raspberry Pi)
is connected and switched on.
Entry  Thu Nov 3 01:25:30 2016, TD, CG, Thursday 3 November 11x
10.20 DAQ found stalled

      DSSSD bias & leakage current OK - see attachments 1 & 2
Entry  Tue Nov 1 23:55:33 2016, TD, CG, Wednesday 2 November 12x
08.56 DAQ continues OK

      DSSSD bias & leakage current OK - see attachments 1 & 2
Entry  Tue Nov 1 02:24:05 2016, TD, Tuesday 1 November 8x
11.24 DAQ found stalled
      Most recent file R95_168 last accessed 06.31
Entry  Mon Oct 31 04:50:59 2016, TD, [How to] Monitor AIDA (October 2016) 

All AIDA operations are controlled from the Dell T410 Workstation aidas1 using web browsers.
Entry  Mon Oct 31 04:02:11 2016, TD, [How To] Stop Runs (October 2016)  200.png201.png202.png203.png204.png

All AIDA operations are controlled from the Dell T410 Workstation aidas1 using web browsers.
Entry  Mon Oct 31 02:26:32 2016, TD, [How To] Start Runs (October 2016) 12x
All AIDA operations are controlled from the Dell T410 Workstation aidas1 using web browsers.

AIDA has multiple, independent data acquisition servers connected by an Ethernet network.
Entry  Mon Oct 31 02:00:01 2016, TD, Monday 31 October 11x
11.00 DAQ continues OK
      DAQ STOP OK
      Most recent files R91_568 last accessed 10.59
Entry  Sun Oct 30 04:37:31 2016, TD, Spectrum layouts created 8x
The following spectrum layouts have been created

1  All Rate spectra
Entry  Sun Oct 30 03:26:55 2016, TD, Report - medium - cannot restore layout if currently displaying >16 galleries 

Cannot restore layout if currently displaying >16 galleries
Entry  Sun Oct 30 01:53:13 2016, TD, Sunday 30 October 9x
10.53 DAQ found stalled 
      Most recent files R89_102 last accessed 07.17
Entry  Sat Oct 29 07:26:59 2016, TD, AIDA ADC & disc data synchronisation check 14x

Following analysis of AIDA ADC & disc readout ( see https://elog.ph.ed.ac.uk/AIDA/404 )
changed timestamp resolution from 1us/channel to 20.48us/channel
Entry  Sat Oct 29 03:31:03 2016, TD, Saturday 29 October 11x

11.30 DAQ continues (R87)
      System-wide checks OK *except* SYNC errors & SYNC pulses - see attachments 1-4
Entry  Fri Oct 28 06:12:50 2016, TD, Friday 28 October 12x
14.12 DAQ stalled as expected
      Most recent file R86_245 last accessed 06.26
Entry  Thu Oct 27 10:57:49 2016, TD, AIDA data readout 100.png101.png102.png

Developing real-time AIDA data synchronisation test using MIDASsort
Entry  Thu Oct 27 10:54:14 2016, TD, Thursday 27 October  1.png2.png3.png
14.20 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachment 3
Entry  Tue Oct 25 02:06:34 2016, TD, Tuesday 25 October 13x
10.10 DAQ found stopped
      Most recent file R81_169, last accessed 06.26
Entry  Mon Oct 24 02:46:57 2016, TD, Monday 24 October 19x
10.47 DAQ found stopped, no merger error messages
      Most recent file R78_281, last accessed 06.46
Entry  Sun Oct 23 10:22:36 2016, TD, Report - high - merger SEGV 

Merger crashed during operation - see https://elog.ph.ed.ac.uk/AIDA/399
Entry  Sun Oct 23 02:34:12 2016, TD, Sunday 23 October  1.png2.png3.png4.png5.png
10.34 DAQ found stopped, no merger error messages
      Most recent file R74_296, last accessed 06.31
Entry  Sat Oct 22 02:32:37 2016, TD, Saturday 22 October 15x
10.32 DAQ found stopped, no merger error messages
      Most recent file R70_315, last accessed 06.46
Entry  Fri Oct 21 01:41:54 2016, TD, Friday 21 October 14x

09.38 DAQ (R66) continues OK
Entry  Thu Oct 20 20:00:14 2016, CG, Returned module tests @ DL 7x
Original system configuration before my arrival: nnaida11 - 2b:22:6e
                                                 nnaida12 - 2b:33:15
                                                 nnaida13 - 2b:09:ce
Entry  Thu Oct 20 01:30:10 2016, TD, Thursday 20 October 12x
09.30 DAQ found stopped, no merger error messages
      Most recent file R63_291, last accessed 06.46
Entry  Wed Oct 19 01:14:10 2016, TD, Wednesday 19 October 8x
09.13 DAQ found stopped, no merger error messages
      Most recent file R55_10, last accessed 19.17
      Restart merger OK
Entry  Tue Oct 18 06:56:52 2016, TD, DAQ status 

From the installation of the RG58 cable for the 50MHz TTL clock from BRIKEN DAQ
to AIDA Master MACB external clock input we observe DAQ stalls at c. 06.30 and
Entry  Tue Oct 18 01:43:04 2016, TD, Tuesday 18 October 33x
09/42 DAQ found stopped, no merger error messages
      Most recent file R52_211, last accessed 06.30
      Restart merger OK
Entry  Mon Oct 17 04:10:30 2016, TD, Monday 17 October 7x
12.05 DAQ found stopped
      Most recent file R49_226, last accessed 06.26
      Restart merger OK
Entry  Sun Oct 16 03:14:41 2016, TD, Sunday 16 October 16x
11.12 DAQ start (R47)

      Detector bias and leakage currents OK - see attachments 1 & 2
Entry  Sat Oct 15 03:27:31 2016, TD, Saturday 15 October 10x
11.27 DAQ found stopped
      Most recent file R42_164, last accessed 07.18
      Restart merger OK
Entry  Thu Oct 13 16:12:06 2016, TD & CG, Friday 14 October 14x

DAQ continues (R33)
Entry  Thu Oct 13 06:07:43 2016, TD & CG, Thursday 13 October 1.png2.png3.png4.png5.png

11.40 Power cycle AIDA FEE64s
      Set TS_SYNC_PHASE 0
Entry  Wed Oct 12 02:58:19 2016, TD & CG, Wednesday 12 October 1.png2.png3.png4.png5.png
10.50 Merger & TapeServer found stopped
      connect errors - see attachment 1
Entry  Tue Oct 11 03:34:02 2016, CG & TD, Tuesday 11 October 16x
10.40 DAQ found stopped

      All FEE64 AIDA SYNC rates zero, AIDA SYNC count ~ 13.8M => DAQ stopped @ 06.35
Entry  Mon Oct 10 03:15:59 2016, CG & TD, Monday 10 October 25x

10.30 DAQ found stopped
Entry  Sun Oct 9 11:47:34 2016, CG, TD, Sunday 9th October 9x

12.30 Following scheduled power outages of October 8
Entry  Fri Oct 7 02:43:47 2016, TD & CG, Analysis of Sept2016/R13_47 Unsaved_Document_1
Analysis of R13_47 - the data file that was being written when DAQ stalled
yesterday evening - see https://elog.ph.ed.ac.uk/AIDA/371
Entry  Fri Oct 7 02:29:19 2016, TD & CG, Friday 7 October 22x
10.29 DAQ left running overnight
      Histograms only - no data transfer to Merger & TapeServer
Entry  Thu Oct 6 13:22:24 2016, TD, Images of setup at F11 - 4 IMG_6702.JPG
 
Entry  Thu Oct 6 13:20:34 2016, TD, Images of setup at F11 - 3 IMG_6695.JPGIMG_6696.JPGIMG_6701.JPG
 
Entry  Thu Oct 6 13:09:50 2016, TD, Images of setup at F11 - 2 IMG_6692.JPGIMG_6693.JPGIMG_6694.JPG
 
Entry  Thu Oct 6 12:39:14 2016, TD, Images of setup at F11 IMG_6687.JPGIMG_6689.JPGIMG_6690.JPG
 
Entry  Thu Oct 6 11:16:40 2016, CG & TD, Thursday 6 October 9x

DSSSD bias voltages and leakage currents OK - see attachments 1 & 2
FEE64 temperatures OK - see attachment 3
Entry  Wed Oct 5 07:29:29 2016, CG & TD, Wednesday 5 October (inc AIDA+BRIKEN photos) 11x
14.30 Adjusted and checked insertion of AIDA snout into BRIKEN (CH2)n moderator.
      up-down    AIDA snout appears centred (@ (CH2)n centre) and tracks into (CH2)n moderator with no
significant vertical movement
Entry  Sun Oct 2 15:03:11 2016, CG, TD, Problems compiling AIDAsort program on aidas1 make.logmake.logEditransfer.h

I have been trying to compile the sort program I have been working on in Edinburgh so I can work on it locally
while at RIKEN.
Entry  Sun Oct 2 06:12:54 2016, TD, Sunday 2 October 16x

14.15 DSSSD bias/leakage current OK - see attachments 1-2
      FEE64 temperatures OK - see attachment 3
Entry  Sat Oct 1 09:34:23 2016, TD, Installing latest (16 April 2015) MACB firmware Untitled.png
Installed Xilinx 14.7 LabTools + (free) WebPack license

Start iMPACT
Entry  Sat Oct 1 07:48:48 2016, CG & TD, Saturday 1 October 14x
11.00 Moved detector stack forward several cm. 1st DSSD now ~6cm from end of snout. Middle of stack now ~47cm from
base -> approx centre of BRIKEN.
      
Entry  Sat Oct 1 01:57:56 2016, TD & PJCS, Latest MACB firmware - 16 April 2015 macb_top_revB.jed
 
Entry  Fri Sep 30 07:52:56 2016, TD, Report - low - AIDA correlation L/M/H statistics count 3x  

The AIDA correlation L, M & H statistics count 3x for each correlation trigger,
i.e. counts and rates displayed by statistics are 3x actual counts and rates 
Entry  Fri Sep 30 03:35:12 2016, TD, Friday 30 September 20.png21.png22.png23.png24.png
11.37 Attempt to use external 50MHz clock for Master MACB (w/ 50MHz front panel label)

      NIM 50MHz -> NIM-TTL translator -> Master MACB (rear panel)
Entry  Thu Sep 29 03:20:38 2016, TD & CG, Thursday 29 September  15x
11.20 R1 stops

      DSSSD bias/leakage current OK - see attachments 1-2
Entry  Wed Sep 28 07:51:45 2016, TD & CG, New spectrum display software installed 

Spectrum display software updated
    maximum number of galleries increased to 30
Entry  Wed Sep 28 06:40:40 2016, TD & CG, Wednesday 28 September 1.png2.png3.png4.png
14.40 AIDA power up

      Julabo FL11006 set point +20 deg C
Entry  Wed Sep 7 16:11:25 2016, Patrick Coleman-Smith, Updated layout.txt file in aidas1 
Used the layout reported in ELOG357 and updated the layout.txt file used in the "Layout and Status" browser window.

The file is in /MIDAS/config/TclHttpd/aidas1

The browser window "Layout and Status" is accessed from the Control browser window.
Entry  Mon Sep 5 06:54:02 2016, TD, Monday 5 September 16x
14.20 R17 continues

      DSSSD bias/leakage current OK - see attachments 1-2
Entry  Sun Sep 4 04:35:42 2016, TD, FEE64 & MACB configuration IMG_6502.JPGIMG_6503.JPGIMG_6504.JPG


Entry  Sun Sep 4 04:26:23 2016, TD, Sunday 4 September 20x
14.20 R13 continues

      DSSSD bias/leakage current OK - see attachments 1-2
Entry  Sat Sep 3 05:54:14 2016, TD, Saturday 3 September 16x
14.20 R13 continues

      DSSSD bias/leakage current OK - see attachments 1-2
Entry  Fri Sep 2 06:22:26 2016, TD, Friday 2 September 17x
14.20 R11 continues

      DSSSD bias/leakage current OK - see attachments 1-2
Entry  Thu Sep 1 03:45:34 2016, TD, Thursday 1 September 28x
13.33 R11 starts

      ASIC settings 2016Aug20-15.34.53
Entry  Tue Aug 30 08:26:33 2016, TD, Tuesday 30 August 28x
16.18 R10 stops

      ASIC settings 2016Aug20-15.34.53
Entry  Mon Aug 29 08:53:55 2016, TD, nnaida19 restored startup.tcl

nnaida19 restored to configuration - /MIDAS/Aida/tclhttpd/aidas1/startup.tcl - see attachment 1
Entry  Mon Aug 29 06:57:32 2016, TD, Monday 29 August 7x

Per the instructions provided by https://elog.ph.ed.ac.uk/AIDA/331 added Servisol Heat Sink Compound
to each of the 24x FEE64s currently installed (plus spare FEE module stored in the B3F AIDA storage
Entry  Fri Aug 26 02:10:31 2016, TD, Friday 26 August 28x
10.11 R9 continues

      ASIC settings 2016Aug20-15.34.53
Entry  Thu Aug 25 02:10:10 2016, TD, Thursday 25 August 21x
11.40 R9 continues

      ASIC settings 2016Aug20-15.34.53
Entry  Wed Aug 24 03:43:44 2016, TD, Wednesday 24 August 32x
11.40 R8 continues

      B2F/FF temp +25 deg C, d.p. +14 deg C, RH 51%
Entry  Tue Aug 23 01:49:01 2016, TD, Tuesday 23 August 18x

09.50 DAQ found stopped
      No error messages merge/tapeserver - see attachments 1-2
Entry  Mon Aug 22 10:35:31 2016, TD, Monday 20 August 17x
11.00 Restore power to AIDA following Saturday's shutdoen in preparation for the planned maintenance
      outage on Sunday.
    Reply  Mon Aug 22 13:37:30 2016, TD, Monday 20 August 
> 11.00 Restore power to AIDA following Saturday's shutdoen in preparation for the planned maintenance
>       outage on Sunday.
Entry  Mon Aug 22 11:45:07 2016, Patrick Coleman-Smith, Software updated in Aida 
Logged into aidas1, installed AidaExecV8 with a test of the time difference between SYNC data items. Failure to be 0x40000 clocks will cause a statistic
to be incremented. "SYNC Time Warp"

Installed updated versions of /MIDAS/TclHttpd/Html/AIDA/RunControl/sys.tcl and /MIDAS/TclHttpd/Html/AIDA/RunControl/implementation.tcl
Entry  Mon Aug 22 10:35:06 2016, TD, Saturday 20 August 
 
Entry  Fri Aug 19 07:42:22 2016, TD, PV, Friday 19 August 6x

14.00 Both AIDA NIM bins U/S 
      Upper NIM bin - BNC PB-4, Ortec 433, 2x CAEN N1419, 1x CAEN N1419B - ac mains fuse 100V/8A/slow? blowing
    Reply  Fri Aug 19 09:43:27 2016, TD, VP, reply PJCS, Friday 19 August 

> 14.00 Both AIDA NIM bins U/S 
>       Upper NIM bin - BNC PB-4, Ortec 433, 2x CAEN N1419, 1x CAEN N1419B - ac mains fuse 100V/8A/slow? blowing
       Reply  Fri Aug 19 11:07:44 2016, TD, VP, reply PJCS, Friday 19 August 7.png
> > 
> > 14.00 Both AIDA NIM bins U/S 
> >       Upper NIM bin - BNC PB-4, Ortec 433, 2x CAEN N1419, 1x CAEN N1419B - ac mains fuse 100V/8A/slow? blowing
          Reply  Fri Aug 19 12:41:43 2016, TD, VP, reply PJCS, Friday 19 August 
> > > 
> > > 14.00 Both AIDA NIM bins U/S 
> > >       Upper NIM bin - BNC PB-4, Ortec 433, 2x CAEN N1419, 1x CAEN N1419B - ac mains fuse 100V/8A/slow? blowing
Entry  Wed Aug 17 14:44:52 2016, Patrick Coleman-Smith, [HowTo] start acquisition using the new "Start ASIC Readout" button RunControl_portion.png
Due to sometimes operating with very noisy systems, both at Daresbury and RIKEN, I have installed a change to the startup of the system.
The Runcontrol GO button now only starts the output of SYNC pulses. A further button labelled "Start ASIC Readout" ( see attached photo
) needs to be pressed to start the ASIC ADC, Discriminator and Correlation readout.
Entry  Wed Aug 17 14:10:05 2016, Patrick Coleman-Smith, Linux Memory problem solutions for FEE64 
The problem indicated by "page allocation failure" and the kernal subsequently "killing" the AidaExecV8 process is due ( it appears
) to memory availability.
Solution 1:- Reduce the amount of memory used for histogramming. That would be by disabling the .V histograms or changing the size of the .H and/or
Entry  Mon Aug 15 09:55:08 2016, Patrick Coleman-Smith, Found a candidate for DAQ failure. 
The problem :-
The DAQ stops working and can only be fixed by a reboot of the FEE64s.
The Candidate:-
Entry  Mon Aug 1 11:30:07 2016, Patrick Coleman-Smith, First time remotely power up HV in RIKEN from Daresbury 
Logged into aidas1 and opened the nnrpi1 relay control window ... powered up the FEE64s.
seperatly connected to ribfdaq and opened a firefox to aidas1:8015.
By the time the firefox had appeared on my desktop the FEE64s had started up.
Entry  Sun Jul 31 09:38:07 2016, TD, Analysis of AIDA75_1 AIDA75_1.txtUntitled.png200.png400.png
Attachment 2 - analysis from *end* of file AIDA75_1

2D spectrum - FEE # versus timestamp (100us/channel)
Entry  Thu Jul 28 11:35:58 2016, Patrick Coleman-Smith, [HowTo] Apply Thermal paste to FPGA Process_for_applying_thermal_paste_to_the_FPGA_in_FEE64.pdf
 
Entry  Mon Jul 25 08:38:56 2016, TD, Analysis of R4 R4.out
 
Entry  Wed Jul 20 18:41:55 2016, DK, AIDA topped up on water 
 I actually topped off the chiller with water tonight as I am returning to Scotland (and then off to CERN) within hours.
I added 4 liters on around July 5th, to move the marker from a little under the halfway mark to over the halfway mark.  After 2.x weeks, it
was still sitting a bit shy of under the halfway mark.  This means that in a humid and hot Japanese month like July, AIDA doesn't evaporate more than
Entry  Mon Jul 18 12:00:16 2016, Patrick Coleman-Smith, Report of remote operation of Aida at RIKEN 11/7 to 14/7 







Normal
0




false
false
false
Entry  Thu Jul 14 16:55:32 2016, Patrick Coleman-Smith, Changes to AIDA software 
An updated copy of the merger has been downloaded ( merger64.AD ) with a copy of /MIDAS/Merger/AIDA/Startup.
These two enable the output of all of the SYNC data items to the TapeServer.
 
Entry  Fri Jul 8 18:54:47 2016, TD, Analysis July2016/R1 data R1_0.outR1_114.outanalyser2.fUntitled.png

See https://elog.ph.ed.ac.uk/AIDA/324
Entry  Thu Jul 7 17:16:11 2016, Patrick Coleman-Smith, Install & Run new firmware with diagnostics for the SYNC 
Connected to aidas from daresbury.
Started Firefox with windows for Rpi, Merge, Runcontrol.
Power on FEEs from Pi.
Entry  Tue Jul 5 13:43:02 2016, DK, PV, Pulser Test Run after AIDA is moved 10x
Needed to run startx and start the TcLHttpd server on rpi
Following along here: https://elog.ph.ed.ac.uk/AIDA/242
Can now access http://nnrpi1:8015/AIDA/Rly16/
Entry  Tue Jul 5 10:26:11 2016, DK, AIDA relocation pictures 6x
Here are some pictures after AIDA's relocation.
In principle, it can stay here, but probably after the tests we will push it further against the wall.  However, power and ethernet cabling
cannot reach that far.
Entry  Tue Jul 5 09:39:27 2016, DK, Rly16 is not online usb_serial.JPG
AIDA was relocated, and now I want to power it on to do some tests.  However, I cannot get the Rly16 service running.
Specifically, after powering up the entire AIDA system, on aidas1 PC, I cannot connect to the raspberry pi (nnrpi1) via a web browser
Entry  Sat Jun 18 14:35:31 2016, TD, AIDA photographs - June 2016 - 4 IMG_5854.JPGIMG_5855.JPGIMG_5856.JPGIMG_5857.JPGIMG_5863.JPG
 
Entry  Thu Jun 16 08:18:50 2016, TD, AIDA photographs - May 2016  IMG_5751.JPGIMG_5721.JPG
 
Entry  Thu Jun 16 08:12:51 2016, TD, AIDA photographs - June 2016 - 3 IMG_5849.JPGIMG_5850.JPGIMG_5851.JPG
 
Entry  Thu Jun 16 08:07:37 2016, TD, AIDA photographs - June 2016 - 2 IMG_5842.JPGIMG_5843.JPGIMG_5846.JPGIMG_5847.JPG
 
Entry  Thu Jun 16 08:00:10 2016, TD, AIDA photographs - June 2016 - 1 IMG_5838.JPGIMG_5839.JPGIMG_5840.JPGIMG_5841.JPG
 
Entry  Thu Jun 16 03:40:43 2016, TD, Thursday 16 June 2016 70.png71.png72.png74.png75.png
10.40 DAQ stalled AIDA75_30 c. 01.36

      SYNC errors since baseline (start of AIDA75) - attachment 1
Entry  Wed Jun 15 01:43:47 2016, TD, Wednesday 15 June 2016 6x
09.19 DAQ stalled AIDA72_87 c. 01.25

      SYNC errors since baseline (start of AIDA72) - attachment 1
Entry  Tue Jun 14 01:42:56 2016, TD, Tuesday 14 June 2016 7x
09.35 AIDA67 stalled AIDA67_43 (c. 01.27)
      DAQ stopped and file closed 09.32
Entry  Mon Jun 13 03:45:15 2016, TD, Monday 13 June 2016 20x
10.20 AIDA62 found stalled - no SYNCs, no data transfer
      All FEE64s pass all system-wide tests *except* nnaida3 & nnaida8 which fail ADC calibration
      Data files indicate DAQ stopped c. 06.56
Entry  Sun Jun 12 19:19:22 2016, DK, Machine Time End 
3:13 operators call to tell us the machine time is over.  No more EURICA!
          AIDA62_23 ought to be the last file with legitimate physics data
          We will leave the DAQ running overnight as a b/g run.
Entry  Sun Jun 12 03:05:37 2016, TD, AE, CG, MA, Sunday 12 June 2016 part 2 11x

BigRIPS switched from 60Ti to 64V
Entry  Sat Jun 11 17:24:11 2016, DK, TD, Sunday 12 June 2016 14x
Runs 41 and 42 are quite short.  Run 41 was interrupted by the beam dropping (operators called), and run 42 we are just trying to get EURICA to
synchronize with AIDA DAQ.
1:08 Started AIDA Run 43 for 60Ti beam (EURICA run 2027; BigRIPS run 2132; CAEN Run 3018)
Entry  Sat Jun 11 16:06:16 2016, TD, [How To] Monitor per FEE64 Activity 

Launch terminal and enter commands
Entry  Sat Jun 11 15:48:49 2016, TD, [How To] Monitor Pause-Resume Times 
The basic GREAT data format analyser will report per FEE cumulative
pause-resume times which should be << timestamp elapsed time (which
is time taken to write the data file analysed).
Entry  Sat Jun 11 13:57:09 2016, laura, How to monitor and check synchronisation of FEES eg1.pngeg2.pngeg3.pngeg4.png
Alfredo has written a program to check the synchronisation of the FEES, which need to be checked regularly
 
To do this:
Entry  Sat Jun 11 10:29:16 2016, AE, TD, LHB, synchronization between different FEEs AIDA10_20_pulser_allign.pngAIDA10_40_pulser_allign.pngAIDA34_puls_alignm.png
file AIDA10_20: stopped on June 10, 14:59
file AIDA10_40: stopped on June 10, 16:16
Entry  Fri Jun 10 21:07:52 2016, AE, DK, TD, ML, MA, Saturday 11 June 2016 8x
04.51 Start run AIDA18.  Beam is back from the operators.
      Scalers are shown as attachment 1
      Leak currents seem okay (all < 5 uA), shown as attachments 2 and 3.
Entry  Fri Jun 10 14:14:56 2016, TD, nnaida19 4.png5.png6.png

See attachments 1 and 2 and spot the difference ...
Entry  Fri Jun 10 14:02:17 2016, TD (courtesy VFEP), [How to] Avoid Power-Cycling/Rebooting FEE64s 

If you obtain the 'unable to connect' from one, or more, of the FEE64s try the
following procedure *before* power-cycling/rebooting all of the FEE64s. 
Entry  Fri Jun 10 12:51:19 2016, TD, ADC offsets - pass 1 -18.15 3 June 2016 offsets.dat

Column order:
Entry  Fri Jun 10 08:04:11 2016, YS, Leakage Currents Spread Sheet AIDA_leakage_current.ods44.png
Leakage Currents Spread Sheet and Chart
Entry  Fri Jun 10 02:52:02 2016, TD, ML & YS, Friday 10 June 2016 16x
10.50 SyncCheck ... EURICA server refusing connection

[aida@d05 euricatssender]$ ./euricatssender -t
Entry  Fri Jun 10 02:25:45 2016, TD, ML & YS, DAQ State of Play - Friday 10 June 2016 6x

10.25 Screenshots showing DAQ state of play during NP1512
Entry  Wed Jun 8 20:56:28 2016, CG, Thurs 9th June 6x
04.45 Lowered slow comp threshold on all FEEs bar nnaida24 to 8 (nnaida24 @ 12).
      Fast comp thresh @ 6 on all nnaida.
      See CPU load and MIDASsort in attachments 1+2.
Entry  Wed Jun 8 09:29:55 2016, TD, DAQ state of play 9x

17.25 State of play
Entry  Wed Jun 8 05:00:53 2016, TD, Analysis of R1229 10.png11.png12.png13.png

Files R1229_0 ... R1229_3 (written by TapeServer without data compression)
Entry  Wed Jun 8 04:24:04 2016, TD, aidas1 disk statistics (without data compression) 
aidas1> iostat -xn
Linux 2.6.32-504.8.1.el6.x86_64 (aidas1)  06/08/2016  _x86_64_ (16 CPU)
Entry  Wed Jun 8 03:57:59 2016, TD, Analysis of R1222 1.png2.png3.png4.png
Timestamp data per FEE per 10s (i.e. 1 ch = 10s)

s3501-s3524 ADC data
Entry  Wed Jun 8 03:46:51 2016, TD & ML, TapeServer compression disabled 

CHnaged TapeServer configuration file to disable data compression
Entry  Wed Jun 8 02:31:20 2016, TD, aidas1 disk statistics 

DAQ running to disk at relatively low rate (merger ~600k item/s, tapeserver ~4700kb/s)
Entry  Tue Jun 7 19:19:34 2016, CG, TD, DK, AE, Wednesday 8th June 27x
(4 mm Al mask was put upstream of AIDA near 20:20 on 7 June)
 
01.15 Run R1219 started on neutron rich setting.
Entry  Tue Jun 7 10:59:20 2016, TD, merge stats 100.png101.png
Let me which merge stats for all data links would be most useful and I will upload screenshots. 
Entry  Tue Jun 7 10:36:14 2016, TD, nnaida19 
aidas1> cat var/log/dmesg
Using Xilinx Virtex440 machine description
Linux version 2.6.31 (nf@nnlxb.dl.ac.uk) (gcc version 4.2.2) #34 PREEMPT Tue Nov 15 15:57:04 GMT 2011
Entry  Tue Jun 7 05:48:13 2016, TD, AE, ML & PJW, HEC spectra & implant profile 30.png36.png40.png

DSSSD#1 and DSSSD#6 ADC hit patterns (profile) and 1*H (ASIC#1 20GeV FSR) energy spectra 
Entry  Mon Jun 6 19:26:38 2016, CG, DK, BM, AE, Tues 7th June 28x
02.08 Tried updating AIDA SYNC on stats page and got this message.
            See attachment 8
 
Entry  Mon Jun 6 15:57:51 2016, TD, ML & YS, R1121 (AIDA) 43.png44.png

R1120 stalled shortly after DAQ GO
      'unable to connect' etc
Entry  Mon Jun 6 15:06:22 2016, 1TD, ML & YS, R1119 41.png42.png
R1118 ended OK

R1119 DAQ GO, check AIDA SYNCs OK, toggle merge input etc 
Entry  Mon Jun 6 14:24:07 2016, TD, ML & YS, R1118 (AIDA) 10x
22.14 R1118 starts

      aidas1 has been rebooted
Entry  Mon Jun 6 13:52:10 2016, TD, ML & YS, FEE64 power-cycle, FEE64 & aidas1 reboot 

21.40 toggled merge input pause state  - merge pause stopped at link 18 (nnaida19 - this link is supposed
      to be disabled 
Entry  Mon Jun 6 13:46:45 2016, TD, ML & YS, /var/log/messages messages
aidas1 log
Entry  Mon Jun 6 11:17:30 2016, TD, ML & YS, Re-configure merger to ignore nnaida19 11.png12.png

19.00 Power-cycled and rebooted AIDA FEE64s
Entry  Mon Jun 6 08:57:34 2016, GL,PW, YS, TD, ML, AIDA run 1112 - Sync problem 
After starting run 1112, we noticed that the merge program was waiting for a first sync. It then turned out that all syncs had disappeared. This required
an entire reboot of the AIDA DAQ. Consequently, AIDA run 1112 should not be used. 
Entry  Mon Jun 6 08:51:50 2016, TD, Change of set point for Julabo FL11006 recirculating chiller 10.png100.png

The Julabo FL11006 recirculating chiller set point has been changed from +20.0 deg C to +15.0 deg C.
Entry  Sun Jun 5 17:09:49 2016, CG, DK, AE, Monday 6th June 20x
00.45 Run R1100 started on n-rich setting (EURICA run_1100, BigRIPS run 1165)
            Degraders as noted in previous entry
           Check clock status failed for nnaida5. ADC calib failed for nnaida8. nnaida19 failed
Entry  Sun Jun 5 02:14:10 2016, TD, AE, CG & DK, Sunday 5 June 2016 8x
10.10 Detector biases & leakage currents - OK - see attachments 1-2 

10.40 Detector biases & leakage currents - OK - see attachments 3-4
Entry  Sun Jun 5 01:32:44 2016, TD, DK, GL, AE, PJW, First RIB implantation: Run 67 
We restarted the merger (Stop, Setup & Configure, Go, Pause) and then we could restart the DAQ as normal.  Rate is ~500 Hz.  
Entry  Sun Jun 5 01:20:39 2016, DK, AE, GL, PJW, Merger wants first SYNC 
Trying to start the AIDA DAQ now that the RI beam is (nearly) ready.  However, we cannot get merging to work.  But the merger status has "Merge
State = GOing     :    paused     :    xfer enabled     :   
want first SYNC"  but the last part ought to show "output paused" or after merge begins, "ready for SYNC".  We restarted
Entry  Sat Jun 4 08:46:20 2016, TD, AIDA noise - state of play 2 27x

Attachments  1-23 AIDA FEE64s nnaida1-nnaida23 ASIC #1 waveforms
Entry  Sat Jun 4 04:53:25 2016, TD, AE, CG, DK, GL YL & PJW (Team AIDA), Saturday 4 June 2016 8x
12.27 DAQ run R61 started 01.30 
      Appears to have stopped abruptly at ~06.55
      All FEE64 AIDA SYNCs zero
Entry  Fri Jun 3 03:10:55 2016, TD, AE, CG & DK, Friday 3 June 2016 12x
11.00 Detector biases and leakage currents - see attachments 1-2
  
      FEE64 temperatures - see attachment 3
Entry  Thu Jun 2 09:04:57 2016, TD, [How to] Monitor AIDA  
Every 4h

1) Record DSSSD #1 = #6 detector bias voltages and leakage currents in written logbook
Entry  Thu Jun 2 01:33:13 2016, TD, AE, CG & DK, Thursday 2 June 2016 1.png2.png3.png4.png5.png

09.30 DAQ left running overnight
      AIDA SYNCs on all FEE64s this morning 
Entry  Wed Jun 1 01:33:58 2016, TD, Wednesday 1 June 2016 9x
09.30 Detector biases and leakage currents - ambient temp +24.9 deg C - attachments 1-2

10.08 Connection lost to nnaida27 and nnaida28 
    Reply  Wed Jun 1 09:00:13 2016, TD - Reply PJCS, Wednesday 1 June 2016 
> 09.30 Detector biases and leakage currents - ambient temp +24.9 deg C - attachments 1-2

> 10.08 Connection lost to nnaida27 and nnaida28 
       Reply  Wed Jun 1 13:58:48 2016, TD - Reply PJCS, Wednesday 1 June 2016 500.png501.png503.png505.png

> Check the Local Controls for the setting of the LMK3200 control rgister.
> If you recall from the problem with nnaida5 the value should be 0xB.
Entry  Wed Jun 1 12:14:08 2016, Patrick Coleman-Smith, [HowTo] React to "Check Clock Status => FEE64 Failure" 
If there are more than one failures then check how they map to the MACB HDMI connections.
 Are they all connected to the just one MACB ? => Check the HDMI cable at the MACB Layer Port.
 Are they all connected to several MACBs which have a common "Parent" ? => Check the HDMI cable at the "Parent"
Entry  Wed Jun 1 07:49:45 2016, TD, Detector noise - state of play 10x
Screenshots of ASIC#1 waveforms for each side of each of the DSSSD #1 - #6 are attached.

Standard ASIC settings - tau = 8us
Entry  Wed Jun 1 01:32:04 2016, TD, Co/Bi source run (R19)  110.png111.png

09.18 R19 (AIDA) stopped 
      AIDA SYNC lost for most (but not all) FEE64s - see attachments 1-2
Entry  Tue May 31 16:03:24 2016, AE. VP, Co/Bi source run (R17) 8x
Set discriminator mask for DSSD2 through DSSD6 (see attachments). Fast comparator threshold set to 9 for all DSSDs.

New source run for beta-gamma correlation, now with all DSSDs included in EURICA trigger.
Entry  Tue May 31 08:06:43 2016, TD, AE & CG, Tuesday 31 May 2016 7x

Attachment 3 - AIDA discriminator with pulser ~5Hz
               standard ASIC settings (tau=8us, slow comparator 0x10, LEC/MEC comparator 0x9)
Entry  Mon May 30 18:29:54 2016, AE, Co/Bi source run (R7) R7_1.pngR7_2.pngR7_3.pngR7_5.pngR7_6.png
Some comments regarding source run for beta-gamma calibration, to complement EURICA16 elog entry:
http://ribf-exp.riken.jp/elog/EURICA+U-campaign+2016/
    Reply  Mon May 30 22:57:58 2016, AE, Co/Bi source run (R7) 
> Some comments regarding source run for beta-gamma calibration, to complement EURICA16 elog entry:
> http://ribf-exp.riken.jp/elog/EURICA+U-campaign+2016/
Entry  Mon May 30 09:03:07 2016, TD, AE & CG, timstamping - state of play 11x

Current error messages and status - see attachments
Entry  Mon May 30 06:03:51 2016, CG, TD, MACB settings 
14.00 MACB settings (from left -> right)

    
        
            MACB#
            1

           2
            3
            4
            5
            6
            7
       
    Reply  Mon May 30 08:18:48 2016, CG, TD - PJCS reply, MACB settings 


    
        
            Quote:
        
        
            

           14.00 MACB settings (from left -> right)
       Reply  Mon May 30 08:43:10 2016, CG, TD - PJCS reply, MACB settings 


    
        
            Quote:
        
        
            

           
            
                
           
Entry  Mon May 30 03:58:10 2016, TD, peakfind not working on aidas1 1.5.L.msf

Peakfind appears not to be working on aidas1 - example spectrum attached
Entry  Mon May 30 02:50:19 2016, CG, Monday 30th May startup.tcl95.png
10.30 Pulser walkthrough carried out 90,000 - 10,000 @ 10,000 step

10.40 .msf spectra saved /MIDAS/SpecData/AIDA
Entry  Sun May 29 14:06:31 2016, TD, AE & CG, Sunday 29 May 2016 62.png63.png64.pngcaen_addr0_290616_2244.pngcaen_addr1_290616_2244.png
Throughout day:
      DSSD2 (3058-25) would not bias, either short circuit or suspiciously low leakage current.
      Carried out some test in situ which were inconclusive.
    Reply  Sun May 29 20:06:15 2016, TD, AE & CG - reply PJCS, Sunday 29 May 2016 
> Throughout day:
>       DSSD2 (3058-25) would not bias, either short circuit or suspiciously low leakage current.
>       Carried out some test in situ which were inconclusive.
       Reply  Sun May 29 22:35:25 2016, TD, AE & CG - reply PJCS, Sunday 29 May 2016 70.png71.png72.png

> > 22.05 nnaida17 ASIC parameters not loading
> >       power cycle & reboot
          Reply  Sun May 29 23:28:56 2016, TD, AE & CG - reply PJCS, Sunday 29 May 2016 

> > > 22.05 nnaida17 ASIC parameters not loading
> > >       power cycle & reboot
             Reply  Sun May 29 23:55:15 2016, TD, AE & CG - reply PJCS, Sunday 29 May 2016 80.png81.png82.png83.png84.png
> > 
> > > > 22.05 nnaida17 ASIC parameters not loading
> > > >       power cycle & reboot
                Reply  Mon May 30 00:01:23 2016, TD, AE & CG - reply PJCS, Sunday 29 May 2016 90.png91.png92.png93.png94.png
> > > 
> > > > > 22.05 nnaida17 ASIC parameters not loading
> > > > >       power cycle & reboot
                   Reply  Mon May 30 00:07:56 2016, TD, AE & CG - reply PJCS, Sunday 29 May 2016 
> > > > 
> > > > > > 22.05 nnaida17 ASIC parameters not loading
> > > > > >       power cycle & reboot
Entry  Sun May 29 10:31:59 2016, TD, nnaida19 'H' histogramming enabled indicator dispappears following DAQ start 60.png61.png
18.30 Options for nnaida19 and a.n.other (working) FEE (nnaida18)
Entry  Sat May 28 07:31:07 2016, Saturday 8 May 2016, TD, CG 9x
15.20 DAQ histogramming & data transfer #1 enabled
      Merger configured, started, input paused
      Following DAQ GO nnaida9 data transfer 'X' nnaida19 histogramming 'H' disappear - see attachments 1-7
    Reply  Sun May 29 10:11:07 2016, TD, CG & reply by PJCS, Saturday 8 May 2016 - reply about 'H' and "X" 
> 15.20 DAQ histogramming & data transfer #1 enabled
>       Merger configured, started, input paused
>       Following DAQ GO nnaida9 data transfer 'X' nnaida19 histogramming 'H' disappear - see attachments 1-7
Entry  Fri May 27 11:16:40 2016, TD, [How To] Start and Stop Runs 7x
All AIDA operations are controlled from the Dell T410 Workstation aidas1 using web browsers.

AIDA has multiple, independent data acquisition servers connected by an Ethernet network.
Entry  Fri May 27 11:10:37 2016, TD, [How To] Startup AIDA 34x
1) Start Julabo FL11006 Recirculating Chiller

   See manual (page 19)  http://www2.ph.ed.ac.uk/~td/AIDA/Information/Julabo%20FL11006.pdf 
Entry  Fri May 27 06:38:27 2016, TD, AE & CG, Friday 27 May 2016 13x
14.30 DSSSD stack moved upstream to position DSSSD#3 at centre of EURICA.

      Initial tests of detector bias with DSSSD #1-6 were Ok. Unfortunately we were unable to bias
Entry  Thu May 26 14:19:13 2016, Patrick Coleman-Smith, [HowTo] Access AIDA documentation 
The latest version of the FEE64 software Interface document ( May 2016 ) is available as a .pdf from
http://npg.dl.ac.uk/documents/edoc000/#AIDA. EDOC955
Entry  Thu May 26 10:03:11 2016, Patrick Coleman-Smith, [HowTo] Specification Document for MACB including suggested setup. Specification_for_the_MACB_25May16.pdf
Attached is the specification for the MACB with the settings currently available.
Entry  Thu May 26 03:46:41 2016, TD, AE & CG, Thursday 26 May 2016 72.pngstartup.tcl
11.45 AIDA discriminator rates - see attachment 1
      Today's rates similar to yesterday's rates 
Entry  Wed May 25 18:51:54 2016, Patrick Coleman-Smith, [HowTo] Use the Multiplicity Trigger Firmware, V8.18, and update the files FEE_GF_Feb16_18.binDISC_25May16.zipLOCAL_tml_25May16.zip
The attached firmware file, FEE_GF_Feb16_18.bin, should be saved to /MIDAS/Aida and the FlashPgm.csh file edited
to load "FEE_GF_Feb16_18.bin"
    Reply  Thu May 26 01:44:45 2016, Patrick Coleman-Smith, [HowTo] Use the Multiplicity Trigger Firmware, V8.18, and update the files 70.png71.png

Done. Awaiting test. See attachments 1-2.
Entry  Wed May 25 02:10:51 2016, TD, CG, Wednesday 25 May 2016 50.png51.png60.png
10.05 Recirculating chiller on
      FEE power on
      Detector bias on - ambient temp +23 deg  C - see attachments 1-2
Entry  Tue May 24 08:28:28 2016, Patrick Coleman-Smith, [HowTo] Save power if not using the Waveforms and restart the Waveforms 
The USB controlled power Relays are near their AC fuse operating limit which has caused some Fuse failures.
To reduce the power consumption of each FEE64 it is possible to power down the Waveforms ADCs saving about 20W per FEE64. 
Entry  Tue May 24 07:12:30 2016, TD, 3x WDC WD30EFRX ATA 3Tb disks added to aidas1 LVM configuration 9x

The 3x WDC WD30EFRX ATA 3Tb disks installed in aidas1 in April 2015 (formerly /data20, /data30 and
/data40) have now been added to the aidas1 logical volume management (LVM) configuration to form a
Entry  Tue May 24 06:39:17 2016, TD, CG, per FEE64 waveforms 30x

Attachments 1-30 per FEE64 ASIC #1 waveforms
Entry  Tue May 24 00:06:26 2016, TD, 24 May 2016 1.png2.png3.png4.png5.png
Overnight. DAQ stopped. Detector bias off. FEE power and recirculating chiller on.

08.00 Detector bias on OK - see attachments 1-2
Entry  Mon May 23 17:21:29 2016, Patrick Coleman-Smith, [HowTo] A solution to the problem of no SYNCs 
When starting Aida some FEE64 fail to provide SYNC data , or any data for that matter, on the ASIC data stream.
The problem is that the ASIC Readout is not starting properly and is becoming stuck waiting for an internal
event which will never arrive.
Entry  Mon May 23 09:17:55 2016, Patrick Coleman-Smith, Multiplicity Trigger Specification Specification_for_the_multiplicity_Trigger_for_AIDA.pdf
Please read and comment on the attached specification.
Entry  Mon May 23 07:28:38 2016, TD, 23 May 2016 25x
12.45 Rly16 'Sequence ALL On' operational

15.20 Startup remote control of CAEN N1419 4-ch HV modules
Entry  Sat May 14 11:27:09 2016, AE, VP, [How To] DAQ correlation monitor (June16 campaign) sync2.pngsync3.pngsync5.pngsync6.png
The program for online monitoring the correlation of the DAQ systems (AIDA-EURICA-BigRIPS) through a common scaler is SyncCheck (J. 
Agramunt). 
Entry  Fri May 13 13:27:50 2016, patrick Coleman-Smith, Power supply changes and blowing fuses ! 
 Reading about the power supply changes and the requirement to replace fuses leads me to be concerned.
I think the power being changed is the AC input to the FEE64 power supplies. 
Which Fuses are failing ? 
Entry  Fri May 13 13:24:42 2016, Patrick Coleman-Smith, An idea that might help when everything grinds to a halt 
When using the T9 system and running with too much rate in one FEE64 so the system is unbalanced.
I found a good way to understand this and to be able to operate the controls of the FEE64s was to place the Merger in "Pause" mode.
Then the data is extracted from the busy FEE64 but it can still be controlled.
Entry  Fri May 13 06:18:53 2016, AE, VP, BM, Friday May 13th 9x
11 am: Changed configuration of power source for AIDA PSU (see paper logbook). Now both cables with power for
USB relay are connected to the 'C' unit of the F11 power supply. They use different socket pads, and share them
with power cables for raspberry pi and NIM crates. Situation intermediate to what we have on Tuesday.
Entry  Thu May 12 16:55:37 2016, AE, VP, BM, Thursday May 12 7x
Continued work on beta-trigger for EURICA. However the system seems to have different noise condition than before, which 
we think appeared after we changed power source for FEE's PSU (https://elog.ph.ed.ac.uk/AIDA/220). This is high frequency 
noise of low amplitude, with a period of 10 usec.
Entry  Thu May 12 15:50:48 2016, Patrick, System Checks and firmware update FEE_GF_Feb16_17.binCheck_12May16.zip
Added two checks to the System wide checks.
Modified the Firmware so the checks work properly.

One check reads the status of the FEE64 clocks and checks
against expected value.

The other check reads the value from all the FEE64 Sync Error Counters, pauses for one second, then reads them again and compares
with the first reading. Any change is reported as an error.

The Sync Error counter is incremented if the SYNC pulse arrives at a FEE64 when the Timestamp
Entry  Wed May 11 11:24:09 2016, Patrick, Correlation Controls 
Please note that the Force Trigger and Reset buttons  in the Correlation Browser only have meaning if the FEE64 
selected is the Master.
Entry  Wed May 11 06:37:32 2016, AE, VP, BM, Wednesday 11 May Eurica_timestamp.pngAIDA_timestamp.pngTimestamp_correlation_AIDA_EURICA.png
*2:30 pm*: changed power source of USB-controlled power supply for FEEs. Now one of the power cables is connected
to the 'B' power supply of F11, and the second to the 'C' power supply (these are in the unit on top of WASBI
crates). The reason for change is that before both were connected to 'C', and drained current was very close to
Entry  Wed May 11 06:01:16 2016, AE, VP, BM, Beta trigger Trigger_scheme-new.jpg
Please find attached the best diagram of the beta trigger logic circuit for EURICA campaign 2016
Entry  Wed May 11 06:00:56 2016, AE, VP, BM (Byul Moon), FEE64 <-> MACB trigger mapping dssd_layout.jpg
Here is the mapping of the trigger output of MAC-B modules to FEE64 modules

3.1   NNAIDA5   veto-X2
Entry  Wed May 11 05:49:51 2016, AE, VHDL update to FEE_GF_Feb16_16 FEEprogram1.pngFEEprogram2.pngFEEprogram3.png
The firmware of all FEEs was updated to the version in FEE_GF_Feb16_16.bin (https://elog.ph.ed.ac.uk/AIDA/215).
This provides a 25 MHz clock output from MACB, plus a manual reset request signal.
Entry  Tue May 10 16:03:50 2016, TD & VFEP, Latest version of Rly16 Rly16.jsRly16.tclRly16.tml

Do not forget to backup the current versions of the attached files before
installing the latest versions. The latest version features the sequential 
Entry  Mon May 9 16:46:30 2016, Patrick, Update for FEE64 VHDL and Correlation browser windows FEE_GF_Feb16_16.binAida_js_tml_May16.zip
The attached VHDL file should be saved to /MIDAS/Aida and the FlashPgm.csh file edited to load "FEE_GF_Feb16_16.bin"

Use the Run Control Expert command
to update the firmware on all the FEE64s.

Power cycle the FEE64s.

This will give a 25Mhz clock from the MACB Fast NIM output 0.

The attached .js
and .tml files will change the Control browser window to allow access to a Correlation control window.
I have already installed the Correlation directory
Entry  Thu May 5 14:44:48 2016, Patrick, Trigger selection explanations Explanations_for_the_Trigger_selections_in_AIDA.pdf
Please request more information if the attached is not clear.
Entry  Thu May 5 11:10:36 2016, CG,PV,TD, Thursday 5 May 2016  8x
Detector configuration - see https://elog.ph.ed.ac.uk/AIDA/193

Ribbon cable to nnaida19 FEE adaptor PCB disconnected due to noise issues
Entry  Thu May 5 09:52:20 2016, TD, MERGE test OK 7x

Slow comparator 0x10 -> 0x20
Fast comparator LEC/MEC 0x10 -> 0xff
Entry  Thu May 5 08:47:49 2016, TD, [How To] Mask Fast Discriminators 305.png
From the 'AIDA Control' tab select 'Discriminator control'

From the 'Discriminator controls' tab 
Entry  Thu May 5 08:30:00 2016, TD, [How To] Set MACB Trigger Output Mode 304.png

From the 'AIDA Control' tab select 'Local Controls'
Entry  Thu May 5 08:12:14 2016, TD, Current AIDA settings and options 303.png

Current AIDA settings DB Key: 2016May03-20.44.33
Entry  Thu May 5 07:55:32 2016, TD, [How To] Mount SAS and USB disks 301.png302.png

*******************************************************************************************************
UPDATE 24 May 2016
Entry  Wed May 4 14:33:34 2016, TD, merge/tapeserver issues 230.png231.png232.pngGS_configuration

Reboot aidas1
Power cycle FEE64s
    Reply  Wed May 4 14:45:09 2016, TD, merge/tapeserver issues 

TapeServer issue fixed - disk incorrectly mounted following reboot
Entry  Wed May 4 07:04:12 2016, TD, WAVE statistics 13x

AIDA wave statistics
Entry  Wed May 4 06:35:08 2016, TD, [How To] Save AIDA Settings & Options 

From 'Control' tab select 'Save/Restore Settings'
Entry  Wed May 4 03:01:15 2016, TD, Wednesday 4 May 2016 11x

10.30 Power up.
Normal DAQ startup.
Entry  Tue May 3 08:46:25 2016, TD, MIDAS updates - problems 8x
1) Unable to enable data transfer

   From RunControl unable to 'Enable #1 All' or 'Enable #2 All'
    Reply  Tue May 3 16:11:57 2016, TD, MIDAS updates - problems 100.png101.png102.png103.png
With help from Patrick Coleman-Smith & Vic Pucknell most of the issues identified
appear to be related to one (or more) of the following issues
Entry  Tue May 3 15:45:17 2016, TD, AIDA Temperatures Log Temperatures.txt

AIDA temperatures (ASIC, Virtex, PSU) are recorded in the file:
Entry  Tue May 3 08:37:50 2016, TD, MIDAS updates startup.tclstartup.tcl.BAK-030516aidacommonaidacommon.BAK-030516
MIDAS updated per instructions of VFEP (I append the new and old versions of startup.tcl and aidacommon)

I have generated the AIDA update for V8 as 2 tarballs.
Entry  Tue May 3 07:51:04 2016, TD, Tuesday 3 May 2016 40.png41.png42.png
32x FEE64 re-programmed from version 7 to version 8 per instructions 

https://elog.ph.ed.ac.uk/AIDA/183
Entry  Mon May 2 12:13:25 2016, CG,PV,TD, Monday 2 May 2016 22x
 
Entry  Mon May 2 09:10:53 2016, TD, MIDAS_MIDASsort_160316 installed 
The latest (and greatest!) version of MIDASsort has been installed.

To use MIDASsort
Entry  Mon May 2 07:37:03 2016, TD, AIDA FEE layout 

                                                   UP
                                       nnaida25
Entry  Mon May 2 07:27:26 2016, TD, aidas1 /etc/dhcp/dhcpd.conf updated 
aidas1 /etc/dhcp/dhcpd.conf update

to install two scratch FEE modules assembled by PJCS April 2016
Entry  Sun May 1 07:59:08 2016, CG,PV,TD, AIDA Detector Configuration 

UPSTREAM
Entry  Sat Apr 30 16:27:50 2016, TD, Saturday 30 April 2016 photographs 6x

Attachments 1-4 MSL type 2977-2- adaptor PCB configurations (looking downstream) L, D, R, U
Entry  Sat Apr 30 07:46:47 2016, CG,PV,TD, Saturday 30 April 2016 11x
MSL type BB18 serial # 2977-20 bias +100V I_L +12.45uA T=23 deg C
(biased by nnaida # 3 & 5 )
Entry  Fri Apr 29 11:11:20 2016, CG,PV,TD, Friday 29 April 6x

MSL type BB18 serial # 2977-20 bias +100V I_L +12.0uA T=23 deg C
(biased by nnaida # 3 & 5 )
Entry  Thu Apr 28 07:42:11 2016, TD, [How To] Change the AIDA Acquisition Server Configuration startup.tcl

Edit the file /MIDAS/config/TclHttpd/aidas1/startup.tcl and change the definition of variables
PACQSERVERS, NACQSERVERS, ACQSERVERS (respectively p+n junction strip FEE64s, n+n ohmic strip
Entry  Tue Apr 26 10:06:59 2016, CG, PV & TD, Tuesday 26 April 

2 (of 3) WD 3Tb ATA disk drives are not currently mounted on aidas1.
Attempted to mount them but found device names changed at each boot.
Entry  Tue Apr 26 07:10:56 2016, TD, Seagate Backup Plus 8Tb USB disk installed 
I have installed a Seagate Backup Plus 8Tb (nominal) USB disk for data backup and
transfer to the UK
Entry  Tue Apr 26 06:13:00 2016, TD, aidas1: updated /etc/fstab file 

The aidas1 /etc/fstab file contained commented out entries for 2 (of 3) WD 3Tb disks
(slot # 3, 4 & 5). The entries are also incorrect - /dev/sdg1 does not exist and
Entry  Mon Apr 25 10:11:40 2016, CG, KM, PV & TD, Monday 25 April 

AIDA stand, Julabo FL11006 recirculating chiller (with 110VAC/50Hz - 240VAC/50Hz 3ph transformer)
moved from F11 downstream wall to ~2m downstream of EURICA
Entry  Mon Apr 25 08:58:25 2016, TD, Report - high? - aidas1 - Binding NIS service FAILED  messages
During a reboot of aidas1 the message 

Binding NIS service FAILED
Entry  Thu Apr 14 13:56:17 2016, PJCS, Updating the FEE64 firmware. FEE_GF_Feb16_15.bin
To update the FEE64 firmware:-

    Power-up the FEE64 modules that you wish to update.
    Identify the file to be used ( FEE_GF_Feb16_15.bin  at 14/4/2016
)
    This file should be in the Server ( e.g. aidas1 ) at /MIDAS/Aida.
    Edit the file /MIDAS/Aida/FlashPgm.csh and change the file
Entry  Tue Mar 22 10:59:52 2016, TD : PJCS, Tuesday 22 March 7x
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.515uA, ambient temperature +19.8 deg C
 
Entry  Mon Mar 21 14:37:41 2016, PJCS, Vernier Timing document for comment Considering_the_Vernier_Timing_unit_in_the_FEE64.pdf
Here is a document about the FEE64 waveform Vernier Timing.
Please comment/criticise/offer advice.
 
Entry  Thu Mar 17 10:46:30 2016, TD, Analysis of R45 8x
See https://elog.ph.ed.ac.uk/AIDA/179

207Bi source, no pulser
Entry  Tue Mar 15 11:15:42 2016, TD, Tuesday 15 March 10.png11.png12.png13.png14.png
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.845uA, ambient temperature +19.8 deg C
 
Entry  Mon Mar 14 11:27:47 2016, PJCS, ASIC_clock synchronisation across the system R44_0.zip.zip
During 'SETUP' the ASIC readout clock ( 500KHz ) is synchronised to the SYNC pulse in V8.10 and later versions of the VHDL.
Attached is a short run for verification.
 
Entry  Fri Mar 11 15:31:53 2016, TD, Analysis of R34_0 1.png2632.txt2.png3.png4.png
lancre> ./analyser R34_0
 *** GREAT format 3.2.0 analyser - TD - May 2014
 *** ERROR: READ I/O error:       5002
Entry  Tue Mar 8 16:29:07 2016, TD, Report - high - AIDA timestamps 8.png
Version 8 firmware

Analysing R37_* data files (see https://elog.ph.ed.ac.uk/AIDA/160)
    Reply  Thu Mar 10 16:35:39 2016, TD : PJCS, Report - high - AIDA timestamps Time_Difference_FEE13to14.png
> Version 8 firmware

> Analysing R37_* data files (see https://elog.ph.ed.ac.uk/AIDA/160)
Entry  Tue Mar 8 15:09:49 2016, TD, Report - high - LEC/MEC fast comparator issues 6x

Fast comparator rate spectra and statistics do not appear to working as expected. See enclosed screenshots.
Have the hit/rate spectra and statistics been updated to reflect the firmware version 8 data format?
    Reply  Wed Mar 9 17:31:58 2016, TD, Report - high - LEC/MEC fast comparator issues Discriminator_Thresh_50

> Fast comparator rate spectra and statistics do not appear to working as expected. See enclosed screenshots.
> Have the hit/rate spectra and statistics been updated to reflect the firmware version 8 data format?
Entry  Wed Mar 9 16:18:01 2016, TD, nndhcp021 AIDA server Httpd/TapeServer/Merger startup 
Starting Httpd for the TapeServer/Merger, TapeServer and Merger for AIDA produces
three terminal windows which will display the following text messages
Entry  Wed Mar 9 12:16:01 2016, TD, Wednesday 9 March 
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.505uA, ambient temperature +19.8 deg C
 
Entry  Tue Mar 8 15:40:57 2016, TD, Tuesday 8 March 
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.705uA, ambient temperature +19.8 deg C
 
Entry  Tue Mar 8 15:32:53 2016, TD, Report - low - run control frame issue with multiple streams 7.png
The run control frame does not appear to update the data transfer 'X' tag 
for all FEE modules after selecting 'Enable #1 All'
Entry  Tue Mar 8 06:00:45 2016, CG, AE, RIKEN maintenance progress 2016-03-07_15.54.46.jpg
 07/03/16
The new snout doesn't fit due to the screw holes being misaligned. I am going to try modifying the old one (that was in conflict with some material
in the base) over the next couple of days. It is too long by 11mm, so if I can remove that it should then fit..
    Reply  Tue Mar 8 12:11:56 2016, CG, AE, RIKEN maintenance progress 


    
        
            Quote:
        
        
            

            07/03/16
Entry  Wed Feb 24 14:53:41 2016, PJCS, First data with two streams merged from one FEE64 R1_0.gz
nnaida2 running Version 8 Firmware and data acquisition software outputting both and ASIC data stream and a Waveform data stream to the Merge process.
Merged data is written to file ... attached.
The waveform is running at 100Hz and ASIC data is running at 10Hz.
    Reply  Wed Feb 24 16:13:24 2016, PJCS, First data with two streams merged from one FEE64 


    
        
            Quote:
        
        
            

           nnaida2 running Version 8 Firmware and data acquisition software outputting both and ASIC data stream and a Waveform data stream to the Merge
    Reply  Thu Feb 25 12:47:43 2016, PJCS, First data with two streams merged from one FEE64 analyser.f

My GREAT data analyser program reports that the 'fail' bit is set ?
       Reply  Wed Mar 2 11:59:48 2016, PJCS, First data with two streams merged from one FEE64 
The Fail bit is used to indicate The Timing Vernier  word.
I'll post a seperate Elog entry to explain the format.
Entry  Wed Feb 24 15:46:11 2016, PJCS, OR64 - OR of all the ASIC discriminator channels after application of a mask IMG_0290.JPG
Firmware version8 number 8 has an OR64 added which can be routed, using the Local control, to the Trigger output and hence seen at the front panel Fast
NIM LEMO00 connector.
The OR64 is the OR of all the ASIC Discriminators. Each rising edge of a discriminator signal will give a 10ns pulse on the Fast NIM signal. If
Entry  Wed Feb 24 13:54:53 2016, TD, Report - low - FEE temperature plot displays incorrect dates 77.png

See Attachment 1
Entry  Wed Feb 24 10:25:35 2016, TD, Wednesday 24 February 2016 78.png79.png80.png81.png
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.770uA, ambient temperature +19.8 deg C
 
Entry  Tue Feb 23 12:16:08 2016, TD, Tuesday 23 February 2016 60.png
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.570uA, ambient temperature +19.8 deg C
 
Entry  Mon Feb 22 16:47:28 2016, PJCS, Version 8 in nnaida2 outputting and merging two streams 
nnaida2 , the bare test FEE64 in T9, is successfully running with two streams connected to nndhcp177 ( a Linux64 computer )
Merge running on nndhcp177 is receiving the streams and merging them.
nnaida2 has a slow pulser , 100Hz , connected to one waveform input.
Entry  Mon Feb 22 15:19:52 2016, PJCS, T9 System changed to version 8 LED_window.png
I have changed the T9 system to be using Version 8.
Tests using the detector and pulser seem to be ok.
Transmission to the Merge and Merging operating ok
Entry  Fri Feb 19 10:23:31 2016, TD, 19 February 2016 
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.070uA, ambient temperature +20.2 deg C
 
Entry  Thu Feb 18 13:23:03 2016, TD, Report: high: MERGE error messages 
During R30 ( see https://elog.ph.ed.ac.uk/AIDA/154 ) obtain the following merger error messages
(rate ~ 10 per minute) with merger rate ~100-200k data items/s 
Entry  Thu Feb 18 10:23:48 2016, TD, Thursday 18 February 19x
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.200uA, ambient temperature +20.1 deg C
 
Entry  Wed Feb 17 11:54:50 2016, CG, TD, 17 February 2016 6x
File R17 -> pulser walkthrough.
     - Started ~10.00
     - Pulser peak amplitude taken from 9.0V to 1.0 V in 1.0V steps
Entry  Tue Feb 16 17:32:21 2016, CG, TD, 16 February 2016 
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.150uA, ambient temperature +20.1 deg C
 
Entry  Wed Feb 10 10:56:02 2016, CG, TD, 9-10 February 2016 7x
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.540uA, ambient temperature +19.9 deg C
 
Entry  Tue Feb 9 17:27:12 2016, CG, TD, Ribbon cable + coupler tests at DL 8-9th Feb allnnaida_inSafe_cablesIsolated_0.5us.pngallnnaida_inSafe_cablesIsolated_1us.pngallnnaida_inSafe_cablesIsolated_2us.pngallnnaida_inSafe_cablesIsolated_4us.pngallnnaida_inSafe_cablesIsolated_8us.png
08/02/16
Spoke to PJC-S -> Ethernet cables from FEEs to switch are all 4m Cat6.
System powered on with bias to detector of +200V and leakage current of 6.4uA at room temp 19.0oC.
Entry  Wed Feb 3 15:34:30 2016, CG, TD, Ribbon cable + coupler tests at DL 1st-2nd Feb 
01/02/16
Started up system. Biased det to +200V 
Entry  Tue Feb 2 17:32:46 2016, CG, TD, Tuesday 2 February 2016 9x
Bias +200V, I_L +6.955uA, ambient temp +20.2 deg C

MSL type BB18(DS)-1000 2998-20
Entry  Tue Feb 2 14:08:44 2016, CG, TD, Report: Low - No SYNCs from FEEs noSYNCs.png
Currently running with a source, and everything seems to be running fine in terms of histograms doing what we expect, no error messages etc.
Tried to start the merger and tape server, but the merger reports as waiting for the first SYNC.
Checked the stats page and sure enough, no SYCs are being produced.
Entry  Thu Jan 28 13:53:29 2016, CG, TD, Ribbon cable + coupler tests at DL - 25-26th Jan 15x
 25/01/16
On start up, received error when trying to access spectrum browser (attachment 1)   => required restart of 'Http for AIDA'
At 2us shaping time, and all other setting as last week, the situation remains the same
Entry  Wed Jan 27 14:54:48 2016, TD, CG, Wednesday 27 January 2016 11.png14.png
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +8.110uA, ambient temperature +20.2 deg C
Entry  Wed Jan 20 17:02:47 2016, CG, TD, Ribbon cable + coupler tests at DL 17x
 18/01/16
Set up as last week but with 8us shaping time.
With detector connected, still seeing rail-to-rail noise on waveforms in nnaida13 and double peaking in all nnaida.
Entry  Wed Jan 20 16:44:02 2016, TD, Report - LOW - spectrum browser x/y expand 

Spectrum Browser
Entry  Wed Jan 20 12:00:19 2016, CG, TD, Wednesday 20 January 2016 6x
11.58 Repeat yesterday's test - no significant change observed

nnaida11 - input -, shaping time 2us - attachment 1
Entry  Tue Jan 19 18:09:53 2016, CG, TD, Tuesday 19 january 2016 1.png2.png3.png4.png

18.00 Swapped input cables to nnaida11 and nnaida14
      both cables LH coupler + 2x 34-way Samtec ribbon cables + 3M 1245 1.4mil Copper screen w/ground wire
Entry  Fri Jan 15 16:50:09 2016, CG, TD, Ribbon cable + couple tests at DL 20x
 12/01/16      (Attachments 1-8)
FEEs set up as per ELOG entry 136 (15/12/15)
Connected cables as follows:
Entry  Thu Jan 7 13:55:24 2016, CG, RIKEN progress - 15/12/15 (late) AIDA_measurements_-_Dec2015.pdfAIDA_measurements_-_Dec2015.pptx
 Tues 15/12/15
Swapped previously tripped detector (3131-11) on to kaptons already in place for (working) 2977-15 and attempted to bias
   - i.e. made no changes (FEEs, or jumpers etc) to the known working setup of 2977-15, just replaced the detector with 3131-11
    Reply  Thu Jan 7 16:04:44 2016, CG, PJCS, PCS Reply to RIKEN progress - 15/12/15 (late) 


    
        
            Quote:
        
        
            

            Tues 15/12/15
Entry  Thu Dec 3 10:12:08 2015, CG, TD, Report: Low - RPi power cable can't be fully inserted due to case conflict 
The RPi power cable cannot sit fully in the connector, and the lock pins can't engage, because the case gets in the way of the plastic around the end.
As a result we have knocked it out a couple of times and lost power to the system.
Can this be modified or can we get a new case/cable that resolves this issue?
    Reply  Wed Jan 6 16:06:32 2016, CG, TD, PJCS, Report: Low - RPi power cable can't be fully inserted due to case conflict - solved 


    
        
            Quote:
        
        
            

           The RPi power cable cannot sit fully in the connector, and the lock pins can't engage, because the case gets in the way of the plastic around
Entry  Tue Dec 15 11:17:05 2015, TD, STFC DL tests - 14-15.12.15 13x
BNC PB-5 Pulser

Fall time 1.0ms
Entry  Mon Dec 14 19:25:35 2015, AE, CG ,Phong, Merger/TapeServer trouble report master_no_data_transfer.pngmaster_no_data_transfer.pngerror_when_stop_daq_merger_running.pngerror_show_1_3_8_kaput.pngout_term.txt
Sat. 12/12/15

Working with a 8-FEE setup (as in https://elog.ph.ed.ac.uk/AIDA/133). We could open a file with the 
Entry  Mon Dec 14 07:56:27 2015, CG, RIKEN progress 10x
13/12/15
Current jumper setup:
     - detector 2977-15 connected to nnaida1,3,5,8 with GND kapton to nnaida1
Entry  Sat Dec 12 03:30:50 2015, Alfred, Chris, Phong, change configuration of NNAIDA modules in setup 
We want to reduce the configuration of the setup to 4 FEE cards (8 NNAIDA modules), so we only have to isolate 4 of them from the cooling crate for a
noise test. Following instructions in April2015 test logbook.
Copied directory /MIDAS@aidas to /MIDAS@aidas.121215
Entry  Sat Dec 12 02:12:17 2015, CG, AE, VH, RIKEN progress 9x
Stripped down contents of AIDA NIM bins to only what is required by AIDA.
Now have BNC PB-5 pulser, sum and invert module, single and quad Caen HV supplies in the top crate and the MACBs in the bottom crate.
Removed were FIFO, leading edge discriminator and a quad coincidence module, all used in the DAQ integration.
Entry  Thu Dec 10 04:56:08 2015, CG, AE, RIKEN progress - first day and a half 2015-12-08_16.19.16.jpg2015-12-08_16.16.30.jpg
08/12/15 - Day 0.5
Test fitted new snout to snout base
     - the holes in the base of the just-shipped section all line up with those in the corresponding part just taken off.
Entry  Thu Dec 3 16:28:46 2015, CG, TD, New Kapton cable tests at DL 18x
Spent whole day trying to isolate mezzanines from cooling crate.
Finally managed to increase resistance between crate and mezzanines from ~5 Ohms to ~380 kOhms with some masking tape and parcel tape over the
slots in the FEE modules in which rest the guide pins on the bottom of cooling crate.
Entry  Wed Dec 2 18:39:44 2015, CG, New Kapton cable tests at DL nnaida14_wav_noHVnoDetNoShielding.pngnnaida14_wav_noHVnoDetWithShielding.pngall1.8.L_noDetShaping2us.png
Powered on system ok.
Electrical connection between crate and mezzanines still persists, but only to the top cool plate (no connection to the bottom or sides), eith
resistance ~5-10 ohms
Entry  Thu Nov 26 16:32:52 2015, CG, TD, New Kapton cable tests at DL 9x
Powered on system without issue. biased detector to -200V. Leakage current not stable, bouncing around between ~3.66 - 3.74uA. Room temp 22.0oC   
-> Peak widths similar to yesterday.
Changed through various permutations of jumper connections (field planes, detector grounds, bias ground reference).
Entry  Wed Nov 25 19:24:39 2015, CG, TD, PJCS, New Kapton cable tests at DL 6x
Powered system on and biased to +200V at room temp of 22.4oC. Leakage current of 3.37uA.
Waveforms very noisy and spectra dominated by low E noise. Upon taking a close look at front end found one of the kaptons to have broken a connection.
Swapped it out for a spare.
Entry  Fri Nov 20 16:29:49 2015, CG, New Kapton cable tests at DL nnaida14_goodGNDbetweenAll.png
Powered system up from state it was left in last night. Biased to +200V with leakage current 3.9uA @ room temp 23.3oC.
nnaida14 now performing as it was at the beginning of yesterday, with nnaida11 back to having noisy waveforms.
Tried various combinations of grounding to ascertain minimum possible configuration to maintain (or improve) current performance.
Entry  Thu Nov 19 17:31:24 2015, CG, TD, New Kapton cable tests at DL nnaida11_wav.pngIMG_20151119_162831.jpg
Powered system on from the state it was in last night. Biased to +200V with leakage current 3.9uA at room temp 22.8oC.
Performance of nnaida14 at shaping time of 8us slightly worse than last night - peak now non-Gaussian and double peaked. New source of noise?
Trying different permutations of grounding options initially led to no improvements.
Entry  Thu Nov 19 12:23:03 2015, CG, TD, Report: Low - Error message when selecting Act on all FEE64s for FADC calibrate FADC_actOnAll.png
When trying to calibrate FADCs in FADC Align and Control page, ticked 'Act on ALL FEE64 modules'.
Error message displayed (attachment 1) and, despite 'Act on ALL' box being ticked, was only able to act on one FEE64 at a time.
Entry  Thu Nov 19 12:19:15 2015, CG, TD, Report: Low - nnaida12 ASIC4 not functioning nnaida12_stats.pngnnaida12_ASIC4_checkError.png
Current nnaida12 (MAC address 2b:09:e8) has several noisy channels in ASICs 1-3, whilst ASIC4 does not work at all.
Frequently, but not always, ASIC4 fails to load/check.
Additionally, fast discriminators are turned off in settings but show activity in the Hit spectrum.
Entry  Wed Nov 18 18:18:26 2015, CG, TD, New Kapton cable tests at DL nnaida11_noJumpers.pngnnaida14_detectorGNDjumper.pngnnaida14_shortDrainWires.pngnnaida14_shortDrainWiresSinglePoint_8us.pngIMG_20151118_164436.jpg
Note: kapton #7 may have broken pins next to (deliberately) broken ground pin. Unclear, but should not be used for bias until certain.
Detector BB18 2998-22 connected via 4 45cm kaptons and biased to +200V via nnaida12+14, with leakage current 4.310uA @ room temp 25.4oC.
Turned off FADCs as per PCS instructions in previous entry - no change. Turned back on.
Entry  Fri Nov 13 16:17:14 2015, CG, TD, 13 Nov 2015 - new Kapton cable tests at DL 6x
Powered system up with 4 bare 45cm kaptons connected and nothing seems to have changed from where we left last night
Waveforms in nnaida11 look good and peak widths in nnaida11 1.8.L and 1.10.L are ~70ch.
Turned off flash ADCs for all FEEs by setting Q8_transfer.vhd: 0xa00, offset 0x00, to 0 to assess any affect they may play in the observed noise
    Reply  Sat Nov 14 20:19:43 2015, CG, TD, PJCS, 13 Nov 2015 - new Kapton cable tests at DL 


    
        
            Quote:
        
        
            

           Powered system up with 4 bare 45cm kaptons connected and nothing seems to have changed from where we left last night
Entry  Thu Nov 12 18:28:41 2015, CG, TD, 12 Nov 2015 - new Kapton cable tests at DL 23x
This morning PC-S changed firmware and DAQ software to that of the RIKEN setup
Firmware version /MIDAS/AIDA/FEE_Riken_Apr14_26.bin
DAQ software has been changed from AidaExecV8 to AidaExecV7
Entry  Wed Nov 11 17:36:19 2015, CG, TD, 11 Nov 2015 - new Kapton cable tests at DL 18x
Upon starting system with nothing connected beyond adapter PCBs, observed pulser peak FWHM of ~12-15ch in nnaida13+14 and ~15-18ch in nnaida11+12
All newly shielded new kapton cables passed continuity tests between drain wire and Cu tape.
Throughout all tests, grounded cable has been connected to nnaida13. All other nnaida have ground isolated cables.
Entry  Thu Nov 5 16:28:05 2015, CG, TD, 5 Nov 2015 - New kapton cable tests @ DL 11x
New Kapton PCB design (2x 0.45m + inter-connecting PCB, no ground plane layers)  under test with small system in T9.
3 cables modified to remove ground connection.
 
Entry  Fri Jul 17 17:28:35 2015, AE, [Data Analysis] Correlation Scaler 100Kr data (go4_30**.root)  scaler_r4001_4010.pngscaler_r4011_4020.pngscaler_r4021_4030.pngscaler_r4031_4040.pngscaler_r4041_4049.png
Plots of corr-scaler vs event number in Root files for 100Kr(?) setting: go4_40XX.root.

Same script, and plot description, as in the ELOG entry for go4_30XX.root files: https://elog.ph.ed.ac.uk/AIDA/112
Entry  Fri Jul 17 16:00:38 2015, CG, Run summary for Apr-May 2015 RIKEN_may2015_runSummary.xlsx
 
A table summarising the run information within the lab book and ELog for Apr-May.
Entry  Thu Jul 16 15:10:34 2015, Patrick Coleman-Smith, [DAQ and VHDL] Changes to the Discriminator Information data item Changes_to_the_Discriminator_Info_word_for_Version_8_of_the_AIDA_and_LYCCA_DAQ_and_firmware.pdf
 I have attached a document describing the new format of the Discriminator Information data item used in Version 8
Entry  Tue Jul 14 18:06:54 2015, AE, CG, [Data Analysis] Correlation Scaler timestamp in PID data (go4_30**.root) 10x
The attached plots show the time-stamp data in the EURICA files with PID information (EventInfo.timestamp). The
timestamp value should correspond to the correlation scaler included as info_code==8 in AIDA. 
Entry  Wed Jul 1 16:42:39 2015, Patrick Coleman-Smith, Testing Version 8 
I have installed Version 8 of the AidaExec program and FEE_GF_Feb15_6.bin for the VHDL on the system in T9.
On the whole the new firmware operates successfully.
I am now pursuing a few niggles.
Entry  Fri May 22 11:58:02 2015, TD, 22 May 2015 6x

MSL type BB18 serial 2998-22
Entry  Fri May 22 11:26:43 2015, TD, Internal Server Error - attempting to save settings to /MIDAS/DB/EXPERIMENTS/AIDA/2015May22-11.19.38 
Got the error Server Internal Error
while trying to obtain /AIDA/SaveRestore/SaveRestore.tml. 
can't read "env(MIDASBASE)": no such variable     while executing "file join $env(MIDASBASE) XilinxLinux ppc_4xx rfs $fee64 tmp 
Entry  Fri May 22 11:14:21 2015, TD, AIDA T9 test bed - nnaida11 DAQ stall 1.png
AIDA T9 test bed

nnaida11 DAQ stall (0 AIDA SYNCs) at DAQ GO. Merger not in use. Fixed by STOP/GO cycle.
Entry  Sat May 9 11:47:40 2015, TD, Network cabling & Raspberry Pi configuration IMG_2907.JPGIMG_2908.JPGIMG_2909.JPGIMG_2910.JPG
 
    Reply  Sat May 9 23:40:49 2015, TD, Network cabling & Raspberry Pi configuration 
 Hi Tom,
Please could you photo the power supply cabling and the MACBs.
Hope i'm not too late,
Entry  Sat May 9 11:28:32 2015, TD, AIDA DSSSD dis-assembly IMG_2922.JPGIMG_2929.JPG
AIDA DSSSD #1-3 stack disassembled without problem. DSSSDs returned to boxes
in the BF3 AIDA storage area.

Attachments 1 & 2 show DSSSD #1 (3131-11)
- spot the difference!
Entry  Sat May 9 03:50:56 2015, TD & CG, Saturday 9 May 2015 MIDAS_DB_090515.tar.gzaida_may2015-0001.compressed.rotated.pdf

Gzip'd tar file of /MIDAS/DB - attachment 1
Scan of AIDA logbook - attachment 2
Entry  Fri May 8 01:05:18 2015, JA, TD, AE & CG, Friday 8 May 2015 150.png
08.50 FEE64 temperatures (attachment 1)

09.03 R70 ends OK
Entry  Thu May 7 01:32:39 2015, JA, TD, AE, CG & JLT, Thursday 7 May 2015 
09.25 R69 continues
      100Kr setting, degrader 4mm + 0.4mm (variable) Al
      DSSSD #1 off due to detector failure ( https://elog.ph.ed.ac.uk/AIDA/101 )
Entry  Tue May 5 16:40:23 2015, JA, TD, AE, CG & JLT, Wednesday 6 May 2015 140.png
00.00 Degrader changed to 4mm + some of variable (need to confirm)
      Extra 1mm removed.
Entry  Mon May 4 18:09:42 2015, JA, TD, AE, CG & JLT, Tuesday 5 May 2015 
02.09 R61 starts
      nnaida1, 2, 6, 10, 13 & 14 fast discs disabled
Entry  Mon May 4 12:10:35 2015, AE, online monitor and data transfer R53_implant_E.pngR53_implant_XY.pngR53_decat_E.png
Online monitor program for AIDA is in  /homes/npg/AIDAonline

The program is now running in Desktop#4 of aidas1, with mode to forward data to BRIKEN PC enabled (if more than one instance forwarding data are
Entry  Mon May 4 02:32:29 2015, VFEP & TD, How to fix DAQ stalls at GO 
It has been observed that when starting the AIDA data acquisition (select 'GO' from the 'Data Acquisition Run
Control' window) that from time to time one, or possibly more, FEE64 modules fail to begin producing data.
Once running they appear to be totally reliable. 
Entry  Mon May 4 01:23:48 2015, TD, Unable to obtain Data Acqusition Statistics frame 
Got the error Server Internal Error
while trying to obtain /DataAcquisitionControl/DataAcquisitionStats.tml. 
can't read "cgiNUMdata": no such variable     while executing "InsertLog "cgidata= ([llength $cgidata]) $cgiNUMdata""
    Reply  Mon May 4 02:03:24 2015, TD, Unable to obtain Data Acqusition Statistics frame 


    
        
            Quote:
        
        
            

           Got the error Server Internal Error
Entry  Mon May 4 01:27:56 2015, JA, TD, AE, CG & JLT, Monday 4 May 2015 16x

09.18 SN changed degrader to 5.7mm Al (4mm + all variable degraders + additional 1mm)
Entry  Sun May 3 01:32:18 2015, JA, TD, AE, CG, VP & JLT, Sunday 3 May 2015 

09.19 Beam off on arrival, now back
      R51 running
Entry  Sat May 2 19:20:59 2015, AE, run R51 online spectra ADClow_vs_Ch_R51online.pngADChigh_vs_Ch_R51online.pngX_implant_R51online.pngE_implant_R51online.pngTraking_implant_R51online.png
Online spectra to monitor condition during run R51.

Position and energy spectra indicate implantation in 2nd DSSD. 
Entry  Sat May 2 19:17:25 2015, AE, time-stamp for event reconstruction time_stamp_dist_disc.pngevt_time_stamp_disc_R51.pngXY_implant_disc_R51.pngevt_time_stamp_slowcomp_R51.pngXY_implant_slowcomp_R51.png
Some first analysis of building events to look for implants and decays

Using both DISC and slow comparator values for time-stamp (whatever is available). Clearly there are some ADC
Entry  Sat May 2 14:41:20 2015, JA, TD, AE, CG, VP & JLT, MUSIC detector signals MUSIC_lowE.pngMUSIC_highE_log.png
Adjusted setting of MUSIC detector signals during break
 
MUSIC ---> (16dB att)  --> Lemo split --->  J13
Entry  Sat May 2 02:04:50 2015, JA, TD, AE, CG, VP & JLT, Saturday 2 May 2015 50x
0055: Degrader changed. 1mm removed.
            1.4mm total
0537: R38 ends  nnaida11 slow comparator 0x20 -> 0x40          LEC fast comparator -> 0xff
Entry  Thu Apr 30 15:28:25 2015, Patrick Coleman-Smith, High Energy Spectra from LYCCA with pulser LYCCA_High_Energy.png
I have an eight FEE64 system now in place on the LYCCA chamber with a PB-5 pulser going into the adapter cards test input. The test capacitor is 30pF.
I was going to explore the effect of the thresholds on the pulser peak.
I notice that the spectra look like those taken in RIKEN and not a single peak. In the 1GeV range I would interpret this as noise but since this
    Reply  Thu Apr 30 17:43:36 2015, Patrick Coleman-Smith, High Energy Spectra from LYCCA with pulser 
I have an eight FEE64 system now in place on the LYCCA chamber with a PB-5 pulser going into the adapter cards 
test input. The test capacitor is 30pF.
       Reply  Thu Apr 30 20:21:20 2015, Patrick Coleman-Smith, High Energy Spectra from LYCCA with pulser 
> I have an eight FEE64 system now in place on the LYCCA chamber with a PB-5 pulser going into the adapter cards 
> test input. The test capacitor is 30pF.
Entry  Thu Apr 30 16:20:54 2015, JA, LHB, TD, AE, CG & VP, Friday 1 May 2015 
      diode link threshold 0xca -> 0xb6
                           0x11 -> 0x2c 
Entry  Thu Apr 30 03:00:48 2015, TD, Degrader changes 

From 20.00 29.4.15
Entry  Thu Apr 30 02:11:19 2015, TD, Example waveforms with heavy-ion beam 7x

1 - nnaida1 DSSSD#3 p+n (pulser?)
2 - nnaida1 DSSSD#3 p+n heavy ion
Entry  Thu Apr 30 01:06:44 2015, JA, LHB, TD, AE, CG & VP, Thursday 30 April 2015 16x
Overnight
      Degrader OUT
      DAQ ran OK - data file R22
Entry  Wed Apr 29 18:12:02 2015, AE, online analysis code 8x
A first online analysis code is running now in Desktop 4 aidas1

The source code and executable are in 
Entry  Wed Apr 29 11:34:09 2015, Patrick Coleman-Smith, Fast Trigger timings against Pulser Input and LEC/MEC Fast Comparator threshold setting 
I have tried the latest version ( 26 ) of the FEE64 code and carried out some measurements of the Fast Trigger delay from the Pulser signal ( not the
Pulser Trigger out ) and observed the following.
The pulser gives a centroid of 28217 in the histogram.
Entry  Wed Apr 29 11:00:29 2015, TD, Wednesday 29 April 2015 - R20 screenshots 10x
1230: Attachments 

19.00 Screenshots taken during R20
Entry  Wed Apr 29 10:01:27 2015, Patrick Coleman-Smith, Fast Trigger output fault in FEE64 FPGA logic 
 The Fast Trigger output of the FEE64 is formed from the OR of the four OR16 signals ( one from each of the ASICs.
The logic levels of the OR16 signals are active low in the FPGA and so if the are OR'd together then the output is inactive if any one of the ASICs
is inactive.
Entry  Wed Apr 29 01:03:41 2015, JA, LHB, TD, AE, CG & VP, Wednesday 29 April 2015 16x
Overnight
      Beam tuning, PID tests - beam stopped in scintilator detector + 1" thick Pb bricks 
      DAQ ran OK (not to disk)
Entry  Tue Apr 28 11:22:25 2015, VP, RPI 
replace RPI with model B+.  4 USB ports + 4 port switch
 
The RPI system has been replaced by a model B+ which has 4 internal USB ports
Entry  Tue Apr 28 06:25:13 2015, JA, LHB, TD, AE & CG, Tuesday 28th April progress 6x
28/04/15
1420: Carried out ASIC optimisation tests to find best shaping time. Chose system wide shaping time of 0x6.
           Waveforms of example FEEs/channels attachments 1-6.
Entry  Tue Apr 28 05:59:48 2015, AE, "beta" trigger from MACB Trigger outputs 6x
We've constructed a beta trigger with the signals from the p-side of the three DSSDs (OR of all fast
discriminator channels of each FEE).
Entry  Mon Apr 27 04:54:02 2015, VFEP & TD, [How To] Remote control of CAEN N1419 Programmable HV Power Supply N1419_rev4.pdf30.png

@ CAEN N1419
Entry  Mon Apr 27 01:48:59 2015, JA, LHB, TD, VP, AE & CG, Monday 27 April 2015 8x
DSSSD #1 +100V, +3.8uA
DSSSD #2 +100V, +5.5uA
Entry  Sun Apr 26 02:28:59 2015, JA, LHB, TD, AE & CG, Sunday 26 April 2015 33x

Upstream, 207Bi source
Entry  Sat Apr 25 03:56:44 2015, JA, LHB, TD, AE & CG, Saturday 25 April 2015 IMG_2852.JPGIMG_2853.JPGIMG_2858.JPGIMG_2860.JPG

1130: Rotated forward water inlet connection to point towards rear of AIDA stand to remedy mechanical
      conflict with EURICA support frame - see attachments. During drain and re-fill of Julabo FL1106
Entry  Fri Apr 24 08:11:04 2015, CG, AE & TD, Thursday 23 April 2015 contd IMG_2850.JPG

Image of interior of closed EURICA array with AIDA inserted.
Entry  Thu Apr 23 10:27:59 2015, CG, AE, TD, Thursday 23rd April progress IMG_2846.JPGIMG_2847.JPGIMG_2848.JPGIMG_2849.JPG
23/04/15
1800: Spent majority of the day moving AIDA forward and into EURICA.
          So far everything seems to fit very well, we have just noticed a few points of possible
Entry  Wed Apr 22 03:33:01 2015, TD, FEE64 Fast Discriminator OR o/p via MACB tek00000.tiftek00001.tif
Illustration of the trigger timing of the AIDA FEE64 fast discriminator OR output via the
MACB front panel Trigger outputs.
    Reply  Thu Apr 23 09:02:57 2015, TD, Patrick, FEE64 Fast Discriminator OR o/p via MACB 
> Illustration of the trigger timing of the AIDA FEE64 fast discriminator OR output via the
> MACB front panel Trigger outputs.
Entry  Thu Apr 23 03:21:48 2015, TD, MSL type BB18(DS)-1000 
MSL type BB18

Serial Thickness Depletion Date Note Location
Entry  Wed Apr 22 08:50:59 2015, CG, AE, TD, Wednesday 22nd April progress 20150422_nnaida1_FWHM.png20150422_nnaida3_FWHM.png20150422_nnaida5_FWHM.png20150422_nnaida8_FWHM.png
22/04/15
1230: Solved problem (empty spectra despite changing modules) with nnaida5 noted in previous progress update.
          During Feb tests, nnaida5 was very noisy compared to other nnaida => switched it to medium
Entry  Wed Apr 22 07:28:25 2015, AE (PM), Mechanical setup instructions: AIDA+EURICA at F11 AIDA_procedure_document.docx
Attached are Paul Morrall's instructions on how to move new AIDA support table into place, for a setup with 
EURICA at F11 (March 2015).
Entry  Tue Apr 21 09:39:00 2015, AE, LISE estimates for implantation setup [updated] LISE_estimates_84Zn.docxLISE_estimates_94Se.docx
[UPDATED 22/4: initial LISE file had incorrect thickness for MACi plastic]

Calculations for Al degrader thickness required to implant ions in AIDA DSSD stack.
Entry  Tue Apr 21 06:01:50 2015, CG, TD, Tuesday 21 April 2015 8x
21/04/15
1325: Recabled the MACB distribution tree as per PC-S instruction yesterday.
          Now have nnaida5+6, 13+14 in MACB3 (nnaida5 in output 1) and nnaida3+4, 11+12 in MACB10
Entry  Mon Apr 20 06:53:24 2015, CG, TD, Progress 20th April + RPi procedure 7x
20/04/15
1200: Complete all points on first part of check list, except checking the PSU voltages.
          System now in powered and has all network/HDMI cables attached.
    Reply  Mon Apr 20 09:07:59 2015, CG, TD, Patrick Coleman-Smith, Progress 20th April + RPi procedure + reply 


    
        
            Quote:
        
        
            

           20/04/15
       Reply  Mon Apr 20 09:38:15 2015, CG, TD, Patrick Coleman-Smith, Progress 20th April + RPi procedure + reply 


    
        
            Quote:
        
        
            
            
            
          Reply  Mon Apr 20 09:45:38 2015, CG, TD, Patrick Coleman-Smith, Progress 20th April + RPi procedure + reply ++  


    
        
            Quote:
        
        
            

           
            
Entry  Mon Apr 20 07:39:49 2015, CG, TD, Rasberry Pi : USB ac mains switch + USB serial link to FEE64 console 

It would appear that you cannot reliably startup the Raspberry Pi (nnrpi1)
connected to both the USB ac mains switch *and* the USB-serial link to FEE64
Entry  Sat Apr 18 09:30:11 2015, CG, To do list 19/04/15 - 21/04/15 
To do (roughly in order):

     Move shipped boxes down from Gabor's office to the experimental area. Check contents. Should include:
    
        3x
3Tb HDD
        NIM floating HV supply
        2x Si detector boxes, containing MSL type BB18 detectors 3131-9 + 3131-11 and 3058-9
Entry  Mon Mar 9 16:51:26 2015, TD, AIDA adaptor PCB configuration - RIKEN - Feb 2015 6x
 
Entry  Mon Mar 9 16:45:35 2015, TD, Julabo FL11006 Recirculating Chiller: connection to 3ph ac mains  7x

3ph 100VAC/50Hz to Julabo FL11006 3ph 230VAC/50Hz via local transformer
Entry  Mon Mar 9 13:59:32 2015, TD, New AIDA support frame for F11/F12 @ RIKEN IMG_2798.JPG
 
Entry  Mon Mar 9 09:02:03 2015, Patrick Coleman-Smith, Adding Filters to the AIDA PSU.  Assembly_of_the_AIDA_PSU_filter_and_installation_guide.pdf
 This guide is to help with the filter pcb assembly and installation into the AIDA power supply.
Entry  Thu Mar 5 12:11:44 2015, TD, To Do list - March 2015 
A draft 'to do' list in preparation for further AIDA tests at RIKEN from mid-April.

Please feel free to add your comments, suggestions, other items etc.
Entry  Wed Mar 4 17:38:06 2015, CG, Log book for Feb 2015 tests AIDA_Feb2015_labBook_comp.pdf
04/03/15
Please find attached a scan of the log book for the Feb 2015 AIDA tests at RIKEN. 
Entry  Wed Feb 25 09:59:28 2015, CG, AE, Weds 25th Feb progress 2015-02-25_14.25.40.jpg2015-02-25_14.38.43.jpg25Feb_Rly16error.png
25/02/15
1200: Swapped out old green power switch for new one from UoE (having previously tested them both yesterday and found them to work fine).
           With first switch connected and PuTTY session opened cannot get RPi to connect to
Entry  Tue Feb 24 03:04:59 2015, CG, TD, Tues 24th Feb progress 9x
24/02/15
1200: Update the FEE firmware on nnaida1-16 without problem.
           Gone from file FEE_Oct12_27Nov13.bin ----> FEE_Riken_Apr14_24.bin
Entry  Mon Feb 23 11:10:44 2015, TD, Outline test plan - RIKEN - Feb 2015 RIKEN_test_-_Feb_2015.txt

With the exception of one AIDA FEE64 PSU configuration test (5) and the upgrades
of the AIDA FEE64 firmware (8) and MIDAS DAQ software (9) we have now completed all
Entry  Mon Feb 23 07:23:08 2015, J. Agramunt, H. Baba, A. Estrade, DAQ correlation test DAQcorrelation_diagram.pdfDAQsoftware.pdfcorrelation_25Hz.pngcorrelation_random.png
The attached figure shows the configuration used to test the synchronization of the DAQ systems using a
correlation scalar counted from a common clock signal (DAQcorrelation_diagram.pdf). 
Entry  Mon Feb 23 07:03:10 2015, TD, AE & CG, Monday 23 February 2015 
14.30 Saved nnaida1-16 ASIC + Waveform configurations to directory (Data Base Key)
           2015Feb23-12.11.40
          (directory aidas1:/MIDAS/DB/EXPERIMENTS/AIDA/2015Feb23-12.11.40)
Entry  Sun Feb 22 06:47:23 2015, CG, AE, TD, Sunday 22 February 2015 Screenshot.png
22/02/15
am    Testing various grounding configurations for the connection between the DSSSD and the FEE64 modules.
 
Entry  Sat Feb 21 06:37:52 2015, CG, AE, TD, Sat 21st Feb progress 6x
21/02/15
1230: Developing the software to check synchronisation between DAQs. Below line runs program on aidas1 - sends data from TapeServer to BELEN.
            ./DataRelayFilter -n 10.32.6.196 -p 10307 -I 2
Entry  Fri Feb 20 10:48:09 2015, TD, How To Connect the FEE64 System Console Using PuTTY 

Set permissions for the USB-serial device using the command
Entry  Fri Feb 20 10:04:29 2015, CG, AE, TD, Fri 20th progress bias_voltage_vs_leakage_current_for_caen_n1419b_and_detector_bb18_2977-20(2).png2015-02-20_20.27.57.jpg
20/02/15
1400: Measured leakage current as function of bias V for the Caen 1419B high voltage supply and detector BB18 2977-20. (see attachment #1)
1500: Modified MACB installed and connected to BELEN and RIBF DAQs (see attachment #2 for signal flow diagram).
Entry  Thu Feb 19 08:21:33 2015, CG, AE, TD, Thrus 19th Feb progress 39x
19/02/15
1000: Check system gives same resolution as yesterday, removing only the Cu braiding connecting and grounding all adapter PCBs (also moved bias
braid back to nnaida3).
Entry  Wed Feb 18 11:25:54 2015, Patrick Coleman-Smith, Investigations into removing HV noise 
 With the system in T9 and a Keithley Source Meter supplying HV to the detector.
The source meter supplies 200V and measures the current .... 
I noticed that the current value was not stable... varying by +/-0.5uA. In conversation with Marcello i learnt that normally much more stable than
Entry  Wed Feb 18 05:49:29 2015, CG, AE, TD, PJC-S, Wed 18th Feb progress 15x
18/02/15
1300: Error seen when trying to check ASIC settings. See Attachment #1. Power cycle removed error.
           nnaida3 still performing much better than other three cards connected to detector
Entry  Mon Feb 16 09:41:45 2015, Patrick Coleman-Smith, [How To] Set up the Raspberry Pi for PuTTY 
When logged in and before opening PuTTY open a cmdtool window.
cd /dev
sudo chmod 777 /dev/ttyUSB0
    Reply  Tue Feb 17 08:03:32 2015, Patrick Coleman-Smith, [How To] Set up the Raspberry Pi for PuTTY 


    
        
            Quote:
        
        
            

           When logged in and before opening PuTTY open a cmdtool window.
Entry  Tue Feb 17 06:32:24 2015, CG, AE, TD, Tues 17th Feb progress 22x
17/02/15
1515: Installed detector BB18 2977-7 with 3 modified kapton cables, one unmodified (in nnaida1) with 207Bi source.
           Bias voltage @ -100V with leakage current -11.6uA @ ambient temp of ~20oC.
Entry  Mon Feb 16 12:17:21 2015, Patrick Coleman-Smith, MACB update for 50Mhz external clock macb_top_revB_16Feb15.jed
 This version of the MACB has an additional selection at 5 for a ROOT module.
This will operate the Correlation Scalar signals used for RIBF and use the External Clock signal directly  for the FEE64 50MHz distribution.
This has been tested at Daresbury with and external clock source and operates successfully with the  merger.
Entry  Mon Feb 16 06:17:31 2015, TD, AEV & CG, Monday 16th Feb progress 10x
16/02/2015
1500: AIDA moved into operational position.
           Water cooling circuit visually checked, fittings, etc for loose fittings/snags/kinks.
Entry  Sun Feb 15 22:30:48 2015, TD, Julabo FL11006 Operating Manual Julabo_FL11006.pdf
 
Entry  Sun Feb 15 06:12:00 2015, TD, AEV & CG, How to mount USB disk with NTFS 

Mount external USB expansion disk with NTFS filesystems 
with the (superuser) command:
Entry  Tue Feb 10 16:01:50 2015, Chris Griffin, Alfredo Estrade, High data rate - Pause/Resume 6x
06/02/15
 A look at the data rate at which Pause/Resumes start to cause missing data.
Pulser settings:
Entry  Mon Feb 9 11:52:52 2015, Patrick Coleman-Smith, [ How To ] Integrating AIDA with other systems Integrating_AIDA_with_other_Acquisition_Systems.pdf
 This document details how to integrate AIDA with other systems.
Entry  Fri Jan 30 15:27:35 2015, Alfredo Estrade, [Analysis] 207Bi source (R61): check of monitor spectra 7x

A first look at the data from the 207Bi source (run described in previous elog entry, ID 27)
Entry  Fri Jan 30 13:02:35 2015, Alfredo Estrade, [Data] R61 (207Bi source) and R62-R65 (pulser walk-through) 
Jan 22, 2015

R61: 207Bi source spectra accumulated during one afternoon. Same settings as in R49 (alpha background run, 
Entry  Thu Jan 29 15:57:01 2015, Patrick Coleman-Smith, [How To] AIDA power supply alteration document Power_Supply_setup_and_options_for_RIKEN_February_2015.pdf
 I've added the power supply change document.
Please have a look and let me know if it requires further clarification.
I have ordered some plastic "pot twiddlers".
Entry  Wed Jan 28 16:19:05 2015, Patrick Coleman-Smith, [How To] Loading new firmware into a FEE64 
Log into the FEE64 module using telnet.
use root
enter =>  /usr/sbin/flash_unlock /dev/mtd2
Entry  Wed Jan 28 16:12:52 2015, Tom Davinson, AIDA Tests at STFC DL - 27-28.1.15 - TD & PCS IMG_0881.JPGIMG_0882.JPGIMG_0883.JPG
MSL type BB18-1000 2998-22 bias +200V I_L +3.52uA

Entry  Thu Jan 22 14:26:10 2015, Alfredo and Tom, [DATA] R49: alpha background radioactivity ASIC_settings_Jan20_2015.pngR49few_a_bckgrnd_multiplicity.pngR49few_a_bckgrnd_xy.pngR49few_a_bckgrnd_dt_event.pngR49few_a_bckgrnd_EfEb.png
Jan20-21, 2015

Entry  Thu Jan 22 13:50:33 2015, Alfredo and Tom, Further measurements with filtered PSU 
Jan 20, 2015

Test settings: DSSD biased at 100V, with 3.5 uA leakage current. Pulser at 0.5 V, split and inverted for both
Entry  Wed Jan 14 15:29:01 2015, Patrick, Filtered switch mode PSU performance 
Trying the AIDA format power supply with the simple filters installed.
The detector is attached and HV of 200v@3.8uA
Using one channel from each FEE64 as a guide to compare performance. Using the Integrate analysis function Peak width.
Entry  Wed Dec 3 12:13:03 2014, Alfredo Estrade, IV curve with CAEN N1419 IV_dec14.PNG
Measured IV curve for BB18 DSSD with new CAEN HV supply. Settings as in previous elog entry:

Detector bias CAEN N1419 Programmable HV Power Supply
Entry  Thu Nov 20 14:05:21 2014, Tom Davinson, AIDA Tests at STFC DL - PCS, TD 20x

Configuration per Elog entries:
Entry  Fri Oct 24 16:02:26 2014, Alfredo Estrade, bench tests with pulser nnaida13_1.2.L_pulser_noDSSD.pngpulser_nnaida13_sample.pngnoise_nnaida11_DSSD_sample2.pngnoise_nnaida12_DSSD_sample.png
Performed pulser measurements with test setup at Daresbury lab, with main purpose of remembering how to operate the system! The status is similar to
what Chris observed in Elog entry #14. Confirmed ASIC settings as in entry#4 of elog.
 
The pulser spectra shows FWHM of ~ 13.5 ch for all FEE64 cards with no DSSD connected to the system (i.e. Kapton cables unplugged).
Entry  Fri Oct 24 15:05:28 2014, Patrick and Alfredo, new VHDL: FEE_Riken_Apr14_21.bin turn_off_nnaida12_asic3.png
 New VHDL loaded in NNAIDA#11,#12,#13,#14: /MIDAS/Aida/FEE_Riken_Apr14_21.bin
 
The code introduces the feature of turning ON or OFF individual ASICs in a FEE64 card. This is achieved by turning off the
clock signal to a individual ASIC, which then will not produce any data.
 
Feature controled through "ASIC readout bugger
Entry  Sun Oct 5 22:42:56 2014, Chris Griffin, DL tests on 02/10/14 17x
 A late entry for the work I carried out on Thursday.
With the Emco box providing the HV, the pulser peak showed double (or triple) peaks. This was not seen with the SY1527 so I thought this would
be better for looking at peak widths.
Entry  Thu Oct 2 15:23:38 2014, Patrick Coleman-Smith and Chris Griffin, Trial with Filtered AIDA PSU 
Assembled three more of the filter boards and installed them in the AIDA PSU with the first, wired to use the switchmode power supply.
Powered up nnaida14 first and went fine. Just the boot sequence and measure the voltages for stability.
Powered up the remainder and all was well.
Entry  Wed Oct 1 18:37:42 2014, Chris Griffin, 01/10/2014 Tests @ DL 11x
Kept largely the same settings at the entry https://elog.ph.ed.ac.uk/AIDA/4
Same ASIC settings
Emco used to provide HV
Entry  Wed Oct 1 15:41:07 2014, Patrick Coleman-Smith, Power supply filters #3 RTOScreenshot_2014-10-01_17_152532.pngRTOScreenshot_2014-10-01_18_152907.pngRTOScreenshot_2014-10-01_19_152935.pngRTOScreenshot_2014-10-01_20_153021.pngRTOScreenshot_2014-10-01_21_153113.png
 Measuring the signal at the FEE64 end.
+5v , -6v , +7v, +7v 
The two other 'scope channels are connected by FET probes to the FEE64. I now see there is a ground connection.... so i will remove it and re-measure
Entry  Wed Oct 1 15:15:32 2014, Patrick Coleman-Smith, Power supply filters 14x
2.0.L FWHM:14.26
2.15.L ( 270pF )  FWHM : 119.04
(ooops found the 'scope channel was on 20Mhz BW filter ) 
Entry  Wed Oct 1 13:28:03 2014, Patrick Coleman-Smith, Power supply filters RTOScreenshot_2014-10-01_1_121051.pngRTOScreenshot_2014-10-01_0_121012.png
The new pcb for the power supply filter arrived.
I assembled the components ( after finding the whoops ) and connected it to the bench power supply for nnaida2.
nnaida2 functions just about the same as before but the power supply filter results seem amazing.
Entry  Thu Sep 25 11:53:34 2014, Patrick Coleman-Smith, Backup a step to check ASICs 
Disconnected the adaptors with the detector.
Added the adaptors with the kapton cables only attached.
Connected the pulser outputs ( pos and neg ).
Entry  Thu Sep 25 11:35:18 2014, Patrick Coleman-Smith, Removing the MACB from the system 
I have been wondering if the 0v path from the FEE64s to the MACB where they are joined is a possible problem.
I have been contemplating an isolated LVDS interface for the 50Mhz clock to test the idea.
Fortunately i recalled the 50Mhz internal oscillator in each FEE64.
Entry  Mon Sep 22 09:34:37 2014, Patrick Coleman-Smith, Clue to difference between ASICs 1&2 and 3&4 
While investigating a VHDL conundrum I have noticed that the Mux ADC serial readout clock has a 'FAST' slew rate on ASICs 1&2 and a normal slew rate
on ASICs 3&4.
Is it possible that the higher slew rate is actually better filtered by the ASIC de-coupling etc than the slower one.
Entry  Thu Sep 18 11:18:46 2014, Patrick Coleman-Smith, Trying the Liverpool HV supply 
The SY1527 supply was delivered with three modules.
A cable has been made with LEMO00 connectors to connect to the detector adaptor HV inputs.
The SY1527 needed an external VGA display and ps2 keyboard. The software appears to be windows 98 based and won't boot until the bios is told to
Entry  Mon Sep 15 13:51:28 2014, Patrick, Odd spectra from running nnaida2 for 3 hours nnaida2_3hours
 I'm running nnaida2 with the PB-5 and an old adaptor.(1pF)
I've seen spectra like this before but previously they have shown apparent digital relationship between the troughs. 
So maybe they show 3 peaks ? 
Entry  Thu Sep 11 17:29:59 2014, Tom Davinson, AIDA Tests at STFC DL - To Do list 

In no particular order of priority:
Entry  Thu Sep 11 16:12:06 2014, Tom Davinson and photos by Patrick, AIDA Tests at STFC DL - PCS, SLT, TD 19x

Changes from configuration described by Elog entry https://elog.ph.ed.ac.uk/AIDA/3
are as follows:
Entry  Thu Sep 11 10:16:57 2014, Tom Davinson, AIDA Tests at STFC DL - PCS, SLT, TD 19x
MSL type BB18-1000 2998-22 bias +200V I_L +3.27uA

BNC PB-5
Entry  Wed Sep 10 09:27:43 2014, Patrick, Elog appreciation 
 This is very interesting. Look forward to many happy interactions.
Entry  Wed Sep 10 08:42:03 2014, Tom Davinson, Welcome to the AIDA Elog 
The AIDA Elog is now operational and can be found at

https://elog.ph.ed.ac.uk/AIDA/
ELOG V3.1.4-unknown